Tarapur Atomic Power Station (T.A.P.S.) | |
---|---|
Country | India |
Location | Tarapur, Maharashtra |
Coordinates | 19°49′44.33″N72°39′40.34″E / 19.8289806°N 72.6612056°E |
Status | Operational |
Construction began | 1961 |
Commission date | 28 October 1969 |
Owner(s) | |
Operator(s) | Nuclear Power Corporation of India |
Nuclear power station | |
Reactors | 4 |
Reactor type | Units 1 & 2: BWR-1 Units 3 & 4: IPHWR-540 |
Reactor supplier | Units 1 & 2: GE Units 3 & 4: NPCIL |
Cooling source | Arabian Sea |
Power generation | |
Units operational | 2 × 540 MW |
Nameplate capacity | 1400 MW |
Capacity factor | 64.31% (2020-21) [1] |
Annual net output | 7886 GW.h (2020-21) [1] |
External links | |
Commons | Related media on Commons |
Tarapur Atomic Power Station (T.A.P.S.) is located in Tarapur, Palghar, India. It was the first commercial nuclear power station built in India. [2]
Tarapur Atomic Power Station was constructed initially with two boiling water reactor (BWR) units under the 1963 123 Agreement between India, the United States, and the International Atomic Energy Agency (IAEA). It was built for the Department of Atomic Energy by GE and Bechtel. Units 1 and 2 were brought online for commercial operation on 28 October 1969 with an initial power of 210 MW of electricity. Later on this was reduced to 160 MW due to technical difficulties. [3] These were the first of their kind in Asia.
More recently, an additional two pressurised heavy water reactor (PHWR) units of 540 MW each were constructed by BHEL, L&T and Gammon India, seven months ahead of schedule and well within the original cost estimates. Unit 3 was brought online for commercial operation on 18 August 2006, and unit 4 on 12 September 2005. [3]
The facility is operated by the NPCIL (Nuclear Power Corporation of India).
The personnel operating the power plant live in a residential complex called T. A. P. S. colony, 19°48′58″N72°44′35″E / 19.816°N 72.743°E which is a fifteen-minute drive from Boisar, the nearest railway station. The residential complex was also constructed by Bechtel to house both Indian and American employees. Due to this, the residential complex has a very Indian small-town look, with neat sidewalks, spacious houses, a club with tennis courts, swimming pool, a commissary etc.
In 1974 after India conducted Smiling Buddha, its first nuclear weapons test the West chose to no longer honour its agreement to supply the plant with enriched uranium. Nuclear fuel for TAPS has subsequently been delivered from France, China and Russia under IAEA safeguards. [4]
The residential colony features 3 central schools namely - Atomic Energy Central School No. 1 (AECS-1), Atomic Energy Central School No. 2 (AECS-2) and Atomic Energy Central School No. 3 (AECS-3), all running under Atomic Energy Education Society (AEES). The local beach at Chinchani is approximately 7 kilometres (4.3 mi) from the colony.
Phase | Unit No. | Reactor | Status | Capacity in MWe | Construction start | First criticality | Grid Connection | Commercial operation | Closure | Notes | |||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Type | Model | Net | Gross | ||||||||||
I | 1 | BWR | BWR-1 | Operation suspended (under maintenance) | 150 | 160 | 1 October 1964 | 1 February 1969 | 1 April 1969 | 28 October 1969 | [5] | ||
2 | BWR | BWR-1 | Operation suspended (under maintenance) | 150 | 160 | 1 October 1964 | 28 February 1969 | 5 May 1969 | 28 October 1969 | [6] | |||
II | 3 | PHWR | IPHWR-540 | Operational | 490 | 540 | 12 May 2000 | 21 May 2006 | 15 June 2006 | 18 August 2006 | — | [7] | |
4 | PHWR | IPHWR-540 | Operational | 490 | 540 | 8 March 2000 | 6 March 2006 | 4 June 2006 | 12 September 2005 | — | [8] |
During maintenance of Tarapur-1, a blast occurred which damaged the chimney. Tarapur-2 was subsequently shut down to avoid any potential issues, completely shutting down the power generation capability of Phase-1 of TAPS in January 2020. [9]
T.A.P.S.-1 & 2 were shut down in 2020 following the explosion at T.A.P.S.-1. Later cracks were found in the primary recirculation system in both units. Restart of the two units is planned for Nov. 2024 after replacement of the damaged parts. This will increase the operational life of the older BWR units by an additional 10 years. The parts are to be delivered from Italy says plant director Mulkalwar. T.A.P.S.-3 & 4 are currently operational.
The Boiling water reactors (BWRs) at Tarapur 1 and 2 units are similar to the reactors involved in the Fukushima Daiichi nuclear disaster. The age of the reactors, coupled with their old design, have raised safety concerns and, according to one local leader in 2011, the reactors had already been in operation for 16 years longer than their design lives. [10]
In 2007, Atomic Energy Regulatory Board (AERB) evaluated seismic safety features at Tarapur 1 and 2 and reported many shortfalls, following which NPCIL installed seismic sensors. [11] In 2011, AERB formed a 10-member committee, consisting of experts from Indian Institutes of Technology (IIT) and India Meteorological Department (IMD), to assess the vulnerability of the Tarapur to earthquakes and tsunamis. [12] A. Gopalakrishnan, former director of AERB, said that since Tarapur's reactors are much older than the Fukushima units, they should be immediately decommissioned. [13]
The Nuclear Power Corporation of India Limited (NPCIL) is an Indian public sector undertaking based in Mumbai, Maharashtra. It is wholly owned by the Government of India and is responsible for the generation of electricity from nuclear power. NPCIL is administered by the Department of Atomic Energy (DAE).
Kaiga Generating Station is a nuclear power generating station situated at Kaiga, near the river Kali, in Uttara Kannada district of Karnataka, India. The plant has been in operation since March 2000 and is operated by the Nuclear Power Corporation of India.
Generation III reactors, or Gen III reactors, are a class of nuclear reactors designed to succeed Generation II reactors, incorporating evolutionary improvements in design. These include improved fuel technology, higher thermal efficiency, significantly enhanced safety systems, and standardized designs intended to reduce maintenance and capital costs. They are promoted by the Generation IV International Forum (GIF).
Madras Atomic Power Station (MAPS) located at Kalpakkam about 80 kilometres (50 mi) south of Chennai, India, is a comprehensive nuclear power production, fuel reprocessing, and waste treatment facility that includes plutonium fuel fabrication for fast breeder reactors (FBRs). It is also India's first fully indigenously constructed nuclear power station, with two units each generating 220 MW of electricity. The first and second units of the station went critical in 1983 and 1985, respectively. The station has reactors housed in a reactor building with double shell containment improving protection also in the case of a loss-of-coolant accident. An Interim Storage Facility (ISF) is also located in Kalpakkam.
Tarapur is a census town in Palghar district in the Indian state of Maharashtra. It is an industrial town located some 45 km north of Virar, on the Western
The Chashma Nuclear Power Plant is a large commercial nuclear power plant located at Chashma in Mianwali, Punjab, Pakistan.
Kudankulam Nuclear Power Plant is the largest nuclear power station in India, situated in Kudankulam in the Tirunelveli district of the southern Indian state of Tamil Nadu. Construction on the plant began on 31 March 2002, but faced several delays due to opposition from local fishermen. KKNPP is scheduled to have six VVER-1000 reactors built in collaboration with Atomstroyexport, the Russian state company and Nuclear Power Corporation of India Limited (NPCIL), with an installed capacity of 6,000 MW of electricity.
Kakrapar Atomic Power Station is a nuclear power station in India, which lies in the proximity of Mandvi, Surat and Tapi river in the state of Gujarat.
The Rajasthan Atomic Power Station is a nuclear power plant located at Rawatbhata in the state of Rajasthan, India.
Nuclear power is the fifth-largest source of electricity in India after coal, gas, hydroelectricity and wind power. As of November 2020, India has 23 nuclear reactors in operation in 8 nuclear power plants, with a total installed capacity of 7,380 MW. Nuclear power produced a total of 43 TWh in 2020–21, contributing 3.11% of total power generation in India. 10 more reactors are under construction with a combined generation capacity of 8,000 MW.
India's three-stage nuclear power programme was formulated by Homi Bhabha, the well-known physicist, in the 1950s to secure the country's long term energy independence, through the use of uranium and thorium reserves found in the monazite sands of coastal regions of South India. The ultimate focus of the programme is on enabling the thorium reserves of India to be utilised in meeting the country's energy requirements. Thorium is particularly attractive for India, as India has only around 1–2% of the global uranium reserves, but one of the largest shares of global thorium reserves at about 25% of the world's known thorium reserves. However, thorium is more difficult to use than uranium as a fuel because it requires breeding, and global uranium prices remain low enough that breeding is not cost effective.
Narora Atomic Power Station (NAPS) is a nuclear power plant located in Narora, Dibai Tehsil, Bulandshahar District in Uttar Pradesh, India.
The Yangjiang Nuclear Power Station is a nuclear power plant in Guangdong province, China. The site is Dongping Town, Yangjiang City in western Guangdong Province. The station has six 1,000 megawatt (MW) CPR-1000 pressurized water reactors (PWRs). The plant began commercial operation in March 2014, and as of 2019 is the largest nuclear power station in China.
The Hanbit Nuclear Power Plant is a large nuclear power station in the Jeollanam-do province of South Korea. The facility runs at an installed capacity of 5,875 MW. The power station is currently ranked as the fifth largest nuclear power station in the world. The plant's name was changed from Yeonggwang NPP to Hanbit in 2013 at the request of local fishermen.
The Darkhovin Nuclear Power Plant is a planned nuclear power plant located in Khuzestan province, Iran about 70 kilometers south of Ahvaz at the Karun river. Construction of one reactor has started. Some other projects on this site were cancelled. It's built by Masna.
The Gorakhpur Nuclear Power Plant or the Gorakhpur Haryana Anu Vidyut Pariyojana (GHAVP) is a proposed nuclear power plant to be built on a 560 hectares area west of Gorakhpur village of Fatehabad district of Haryana.
The IPHWR-700 is an Indian pressurized heavy-water reactor designed by the NPCIL. It is a Generation III reactor developed from earlier CANDU based 220 MW and 540 MW designs. It can generate 700 MW of electricity. Currently there is two unit operational, 6 units under construction and 8 more units planned, at a cost of ₹1.05 lakh crore (US$13 billion).
The IPHWR is a class of Indian pressurized heavy-water reactors designed by the Bhabha Atomic Research Centre. The baseline 220 MWe design was developed from the CANDU based RAPS-1 and RAPS-2 reactors built at Rawatbhata, Rajasthan. Later the design was based on VVER technology which was scaled to 540 MW and 700 MW designs. Currently there are 18 units of various types operational at various locations in India.