Tarapur Atomic Power Station (T.A.P.S.) | |
---|---|
Country | India |
Location | Tarapur, Maharashtra |
Coordinates | 19°49′44.33″N72°39′40.34″E / 19.8289806°N 72.6612056°E |
Status | Operational |
Construction began | 1961 |
Commission date | 28 October 1969 |
Owner | Nuclear Power Corporation of India Ltd |
Operator | Nuclear Power Corporation of India |
Nuclear power station | |
Reactors | 4 |
Reactor type | Units 1 & 2: BWR-1 Units 3 & 4: IPHWR-540 |
Reactor supplier | Units 1 & 2: GE Units 3 & 4: NPCIL |
Cooling source | Arabian Sea |
Power generation | |
Units operational | 2 × 160 MW, 2 × 540 MW |
Nameplate capacity | 1400 MW |
Capacity factor | 64.31% (2020-21) [1] |
Annual net output | 7886 GW.h (2020-21) [1] |
External links | |
Commons | Related media on Commons |
Tarapur Atomic Power Station (T.A.P.S.) is located in Tarapur, Palghar, India. It was the first commercial nuclear power station built in India. [2] It is one of the largest nuclear power plant in the country. It has 4 reactors, 2 BWR-1 of 160 MWe each and 2 IPHWRs Of 540 MWe each.
Tarapur Atomic Power Station was constructed initially with two boiling water reactor (BWR) units under the 1963 123 Agreement between India, the United States, and the International Atomic Energy Agency (IAEA). It was built for the Department of Atomic Energy by GE and Bechtel. Units 1 and 2 were brought online for commercial operation on 28 October 1969 with an initial power of 210 MW of electricity. Later on this was reduced to 160 MW due to technical difficulties. [3] These were the first of their kind in Asia.
More recently, an additional two pressurised heavy water reactor (PHWR) units of 540 MW each were constructed by BHEL, L&T and Gammon India, seven months ahead of schedule and well within the original cost estimates. Unit 3 was brought online for commercial operation on 18 August 2006, and unit 4 on 12 September 2005. [3]
The facility is operated by the NPCIL (Nuclear Power Corporation of India).
The personnel operating the power plant live in a residential complex called T. A. P. S. colony, 19°48′58″N72°44′35″E / 19.816°N 72.743°E which is a fifteen-minute drive from Boisar, the nearest railway station. The residential complex was also constructed by Bechtel to house both Indian and American employees. Due to this, the residential complex has a very Indian small-town look, with neat sidewalks, spacious houses, a club with tennis courts, swimming pool, a commissary etc.
In 1974 after India conducted Smiling Buddha, its first nuclear weapons test the West chose to no longer honour its agreement to supply the plant with enriched uranium. Nuclear fuel for TAPS has subsequently been delivered from France, China and Russia under IAEA safeguards. [4]
The residential colony features 3 central schools namely - Atomic Energy Central School No. 1 (AECS-1), Atomic Energy Central School No. 2 (AECS-2) and Atomic Energy Central School No. 3 (AECS-3), all running under Atomic Energy Education Society (AEES). The local beach at Chinchani is approximately 7 kilometres (4.3 mi) from the colony.
Phase | Unit No. | Reactor | Status | Capacity in MWe | Construction start | First criticality | Grid Connection | Commercial operation | Closure | Notes | |||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Type | Model | Net | Gross | ||||||||||
I | 1 | BWR | BWR-1 | Operation suspended (under maintenance) | 150 | 160 | 1 October 1964 | 1 February 1969 | 1 April 1969 | 28 October 1969 | — | [5] | |
2 | BWR | BWR-1 | Operation suspended (under maintenance) | 150 | 160 | 1 October 1964 | 28 February 1969 | 5 May 1969 | 28 October 1969 | — | [6] | ||
II | 3 | PHWR | IPHWR-540 | Operational | 490 | 540 | 12 May 2000 | 21 May 2006 | 15 June 2006 | 18 August 2006 | — | [7] | |
4 | PHWR | IPHWR-540 | Operational | 490 | 540 | 8 March 2000 | 6 March 2005 | 4 June 2005 | 12 September 2005 | — | [8] |
In 1980s, the BWR units faced extreme technical issues and difficulties. This lead to repeated shutdoens. Finally in 1989, the gross capacity of the units was reduced to 160 MWe from the original 210 MWe to eliminate the issues.
During maintenance of Tarapur-1, a blast occurred which damaged the chimney. Tarapur-2 was subsequently shut down to avoid any potential issues, completely shutting down the power generation capability of Phase-1 of TAPS in January 2020. [9]
T.A.P.S.-1 & 2 were shut down in 2020 following the explosion at T.A.P.S.-1. Later cracks were found in the primary recirculation system in both units. Restart of the two units is planned for Nov. 2024 after replacement of the damaged parts. This will increase the operational life of the older BWR units by an additional 10 years. The parts are to be delivered from Italy says plant director Mulkalwar. T.A.P.S.-3 & 4 are currently operational.
The Boiling water reactors (BWRs) at Tarapur 1 and 2 units are similar to the reactors involved in the Fukushima Daiichi nuclear disaster. The age of the reactors, coupled with their old design, have raised safety concerns and, according to one local leader in 2011, the reactors had already been in operation for 16 years longer than their design lives. [10]
In 2007, Atomic Energy Regulatory Board (AERB) evaluated seismic safety features at Tarapur 1 and 2 and reported many shortfalls, following which NPCIL installed seismic sensors. [11] In 2011, AERB formed a 10-member committee, consisting of experts from Indian Institutes of Technology (IIT) and India Meteorological Department (IMD), to assess the vulnerability of the Tarapur to earthquakes and tsunamis. [12] A. Gopalakrishnan, former director of AERB, said that since Tarapur's reactors are much older than the Fukushima units, they should be immediately decommissioned. [13]
But the reactors are planned for restart in November 2024 after replacement of parts in the primary recirculation system. The units are planned to operate for another ten years. The cost per KWh may increase slightly. AERB has assessed the units thoroughly and has said that they can operate up to 60 EFPYs while they have operated for only around 20 EFPYs.
The advanced boiling water reactor (ABWR) is a Generation III boiling water reactor. The ABWR is currently offered by GE Hitachi Nuclear Energy (GEH) and Toshiba. The ABWR generates electrical power by using steam to power a turbine connected to a generator; the steam is boiled from water using heat generated by fission reactions within nuclear fuel. Kashiwazaki-Kariwa unit 6 is considered the first Generation III reactor in the world.
The Nuclear Power Corporation of India Limited (NPCIL) is an Indian public sector undertaking based in Mumbai, Maharashtra. It is wholly owned by the Government of India and is responsible for the generation of electricity from nuclear power. NPCIL is administered by the Department of Atomic Energy (DAE).
Kaiga Generating Station is a nuclear power generating station situated at Kaiga, near the river Kali, in Uttara Kannada district of Karnataka, India. The plant has been in operation since March 2000 and is operated by the Nuclear Power Corporation of India.
Madras Atomic Power Station (MAPS) located at Kalpakkam about 80 kilometres (50 mi) south of Chennai, India, is a comprehensive nuclear power production, fuel reprocessing, and waste treatment facility that includes plutonium fuel fabrication for fast breeder reactors (FBRs). It is also India's first fully indigenously constructed nuclear power station, with two units each generating 220 MW of electricity. The first and second units of the station went critical in 1983 and 1985, respectively. The station has reactors housed in a reactor building with double shell containment improving protection also in the case of a loss-of-coolant accident. An Interim Storage Facility (ISF) is also located in Kalpakkam.
Tarapur is a census town in Palghar district in the Indian state of Maharashtra. It is an industrial town located some 45 km north of Virar, on the Western
The Prototype Fast Breeder Reactor (PFBR) is a 500 MWe sodium-cooled, fast breeder reactor that is being constructed at Kokkilamedu, near Kalpakkam, in Tamil Nadu state, India. The Indira Gandhi Centre for Atomic Research (IGCAR) is responsible for the design of this reactor, the Advanced Fuel Fabrication Facility at the Bhabha Atomic Research Centre in Tarapur is responsible for MOX fuel fabrication and BHEL is providing technology and equipment for construction of the reactor. The facility builds on the decades of experience gained from operating the lower power Fast Breeder Test Reactor (FBTR). At first, the reactor's construction was supposed to be completed in September 2010, but there were several delays. The Prototype Fast Breeder Reactor is scheduled to be put into service in December 2024, which is more than 20 years after construction began and 14 years after the original commissioning date, as of December 2023. The project's cost has doubled from ₹3,500 crore to ₹7,700 crore due to the multiple delays. The construction was completed on 4th March 2024 with commencement of core loading of the reactor hence paving the way for the eventual full utilization of India’s abundant thorium reserves.
Kudankulam Nuclear Power Plant is the largest nuclear power station in India, situated in Kudankulam in the Tirunelveli district of the southern Indian state of Tamil Nadu. Construction on the plant began on 31 March 2002, but faced several delays due to opposition from local fishermen. KKNPP is scheduled to have six VVER-1000 reactors built in collaboration with Atomstroyexport, the Russian state company and Nuclear Power Corporation of India Limited (NPCIL), with an installed capacity of 6,000 MW of electricity.
Kakrapar Atomic Power Station is a nuclear power station in India, which lies in the proximity of Mandvi, Surat and Tapi river in the state of Gujarat. After commissioning units 3 and 4, the power plant has become the second largest nuclear power plant in the country after the Kudankulam Nuclear Power Plant in terms of installed capacity.
The Rajasthan Atomic Power Station is a nuclear power plant located at Rawatbhata in the state of Rajasthan, India. It is the fourth largest nuclear power plant in the country after the Kudankulam Nuclear Power Plant, Kakrapar Atomic Power Station, and Tarapur Atomic Power Station interms of installed capacity.
Nuclear power is the fifth-largest source of electricity in India after coal, hydro, solar and wind. As of November 2023, India has 23 nuclear reactors in operation in 8 nuclear power plants, with a total installed capacity of 8,180 MW. Nuclear power produced a total of 48 TWh in 2023, contributing around 3% of total power generation in India. 11 more reactors are under construction with a combined generation capacity of 8,700 MW.
Tianwan Nuclear Power Plant is a nuclear power plant (NPP) on the coast of the Yellow Sea, approximately 30 kilometers east of downtown Lianyungang, Jiangsu Province, China. The plant's owner is Jiangsu Nuclear Power Corporation, a joint venture with majority owner a subsidiary of China National Nuclear Corporation (CNNC).
India's three-stage nuclear power programme was formulated by Homi Bhabha, the well-known physicist, in the 1950s to secure the country's long term energy independence, through the use of uranium and thorium reserves found in the monazite sands of coastal regions of South India. The ultimate focus of the programme is on enabling the thorium reserves of India to be utilised in meeting the country's energy requirements. Thorium is particularly attractive for India, as India has only around 1–2% of the global uranium reserves, but one of the largest shares of global thorium reserves at about 25% of the world's known thorium reserves. However, thorium is more difficult to use than uranium as a fuel because it requires breeding, and global uranium prices remain low enough that breeding is not cost effective.
The Darkhovin Nuclear Power Plant is a planned nuclear power plant located in Khuzestan province, Iran about 70 kilometers south of Ahvaz at the Karun river. Construction of one reactor has started. Some other projects on this site were cancelled. It's built by Masna.
The Barakah nuclear power plant (BNPP) is the United Arab Emirates' first nuclear power station, the first nuclear power station in the Arabian Peninsula and the first commercial nuclear power station in the Arab World. It consists of four APR-1400 nuclear reactors. Total nameplate capacity is 5600 MW which is intended to supply up to 25% of UAE's electricity needs. The site is in the Gharbiya region of Abu Dhabi, on the coastline between the Persian Gulf and the E11 highway, 53 km west-southwest of Ruwais.
General Electric's BWR product line of boiling water reactors represents the designs of a relatively large (~18%) percentage of the commercial fission reactors around the world.
The Gorakhpur Nuclear Power Plant or the Gorakhpur Haryana Anu Vidyut Pariyojana (GHAVP) is a proposed nuclear power plant to be built on a 560 hectares area west of Gorakhpur village of Fatehabad district of Haryana.
The IPHWR-700 is an Indian pressurized heavy-water reactor designed by the NPCIL. It is a Generation III reactor developed from earlier CANDU based 220 MW and 540 MW designs. It can generate 700 MW of electricity. Currently there are two units operational, 6 units under construction and 8 more units planned, at a cost of ₹1.05 lakh crore (US$13 billion).
The IPHWR is a class of Indian pressurized heavy-water reactors designed by the Bhabha Atomic Research Centre. The baseline 220 MWe design was developed from the CANDU based RAPS-1 and RAPS-2 reactors built at Rawatbhata, Rajasthan. Later the design was indigenised based on VVER technology which was scaled to 540 MWe and 700 MWe designs. Currently there are 18 units of various types operational at various locations in India.