Raichur Thermal Power Station | |
---|---|
Country | India |
Location | Raichur district, Karnataka. |
Coordinates | 16°21′18″N77°20′31″E / 16.35500°N 77.34194°E Coordinates: 16°21′18″N77°20′31″E / 16.35500°N 77.34194°E |
Status | Operational |
Commission date | Unit 1 & 2: 1986 Unit 3 & 4: 1994 Unit 5 & 6: 1999 Unit 7: 2002 Unit 8: 2013 |
Operator(s) | KPCL |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Units operational | 7 X 210 MW 1 X 250 MW |
Nameplate capacity | 1,720 MW |
External links | |
Commons | Related media on Commons |
Raichur Thermal Power Station (RTPS) is a coal-fired electric power station located at Yadlapur D(Shaktinagar) in the Raichur district of the state of Karnataka, India. It is operated by the Karnataka Power Corporation Limited (KPCL) and was the first thermal power plant to be set up in the state. [1] [2] The power station was commissioned during various periods from 1985 and it accounts for about 70% of the total electricity generated in Karnataka. [3]
The project to construct the thermal power station was finalized in 1978 after an MOU was signed between KPCL and the Karnataka State Electricity Board. [4] TCE Consulting Engineers Ltd., a Tata Group company was appointed as the consultants for the project. The project involved two stages: Stage I, in which Units 1 and 2 were expected to be installed and Stage II, Units 3 and 4. each unit was expected to have an installed capacity of 210 MW. An area of 300 hectares was allocated for the units. Unit I of the plant was completed in March 1985, with Unit II following in March 1986. [4]
The construction of Unit III was started in 1986 and completed in March 1991 and the Unit IV was started in 1989 and completed in September 1994, thereby completing the Stage II. The total cost of Stage I of the project was Rs. 4,030,000,000 and of the Stage II was Rs. 9,830,000,000. The generators were supplied by Bharat Heavy Electricals Limited and the turbines by Kraftwerk Union AG (KWU) and Mitsubishi. In 1996, a further expansion of the plant was carried out, with an investment of Rs. 15,450,000,000.
Units 5 and 6 (each of 210 MW) were installed within three years. [5] Unit 7 (210 MW) which was completed within a record time of 25 months, was installed at the end of the year 2002 [5] The total installed capacity of the power plant is 1,470 MW (7 x 210 MW). As of 2007 [update] , Unit 8, with an installed capacity of 250 MW, is being constructed and is expected to be operational by September 2009. [6]
Stage I (units 1 and 2) costing Rs. 403 crores in 1986.
Stage II (units 3 and 4) costing Rs. 983 crores in 1994.
Stage III (units 5 and 6) costing Rs. 1545 crores in 1999.
Stage IV (unit 7) costing Rs. 613 crores in 2002.
Stage IV (unit 8) costing Rs. 945 crores in 2010
RTPS uses coal for generation of electricity. Its daily requirement of coal is about 20,000 metric tons, when running at full capacity, which is delivered from Western Coalfields Ltd. and Mahanadi Coalfields Ltd. The coal supplied is sampled using a computerized system and sent to the laboratory for testing. This ensures that the proper grade of coal is used.
The plant has also started to use washed coal, due to its lower ash content. [7]
The plant's cooling water is pumped from the Krishna river nearby.
The coal is pulverized and fed into furnaces that convert water into steam. This steam runs the turbines to generate electricity. Units 1 to 7, each can produce 5.04 MU of energy per day and Unit 8 can produce 6 MU per day, hence the plant can produce 41.28 MU of energy per day when it is functioning at full capacity. [8]
RTPS generates about 1.5 million tonnes of fly ash annually which causes environmental problems. 20% of the ash produced is wet bottom ash which is let into the ash bund. [8] Though considered safer than fly-ash, bottom ash has also been found to contain heavy metals which can be dangerous to public health. The fly-ash which gets generated during the burning of coal disperses into the air and hence pollutes the atmosphere. This gets deposited on the surrounding land, thereby making the land infertile. The fly-ash may also cause breathing problems for humans. RTPS has taken steps to ensure that fly-ash gets precipitated out of the air by using electrostatic elements in the furnaces, but about 2% of fly-ash gets into the atmosphere. [8] The fly-ash is disposed of by converting it into a wet slurry and dumping it into vacant tracts of land (which become what are known as ash-ponds). [9] This is not environment friendly and hence RTPS has come up with ways to make better use of fly-ash. It has entered into a collaboration with the Indo-Norwegian Environment Programme (INEP) and has set up a technology demonstration center called CASHUTEC (Center for Ash Utilization and Environment Conservation) near its plant. [9] CASHUTEC demonstrates different uses for fly ash; mainly its use in the construction sector for making bricks, blocks and mosaic tiles. [9]
India is the third largest producer of electricity in the world. During the fiscal year (FY) 2019–20, the total electricity generation in the country was 1,598 TWh, of which 1,383.5 TWh generated by utilities. The gross electricity consumption per capita in FY2019 was 1,208 kWh.
NLC India Limited (NLC) is a central public sector undertaking under the administrative control of the Ministry of Coal, Government of India. It annually produces about 30 million tonnes of Lignite from opencast mines at Neyveli in the state of Tamil Nadu in southern India and at Barsingsar in Bikaner district of Rajasthan state. The lignite is used at pithead thermal power stations of 3640 MW installed capacity to produce electricity. Its joint venture has a 1000 MW thermal power station using coal. Lately, it has diversified into renewable energy production and installed 1404 MW solar power plant to produce electricity from photovoltaic (PV) cells and 51 MW electricity from windmills.
Tata Power Company Limited is an Indian electric utility company based in Mumbai, Maharashtra, India and is part of the Tata Group. The core business of the company is to generate, transmit and distribute electricity. With an installed electricity generation capacity of 10,577 MW, it is India's largest integrated power company. Tata Power has been ranked 3rd in 2017 Responsible Business Rankings developed by IIM Udaipur. In February 2017, Tata Power became the first Indian company to ship over 1 GW solar modules.
Shaktinagar is a town in Raichur taluk and Raichur district in the Indian state of Karnataka. There is a coal-based thermal power plant is working by vst gang limited (vgl)
The Upper Krishna Project (UKP) is an irrigation project across the Krishna River to provide irrigation to the drought-prone areas of Vijayapura district, Karnataka, Bagalkot, Kalburgi, Yadgir and Raichur districts in the state of Karnataka in south India. The project had been designed by the Government of Karnataka to irrigate 1,536,000 acres of land (6,220 km2).
Karnataka Power Corporation Limited is a company owned by the government of Karnataka, and is engaged in the Service of generating electrical power in the state of Karnataka in India. The modes for generation of electric power are hydroelectric, thermal, diesel, gas, wind and solar. The company was started on 20.07.1970 due to a vision of the Karnataka government for separate entities for generation and distribution of electric power. This was done, long before world bank dictated power sector reforms were initiated in early 21st century in India. Karnataka Power Corporation Limited began its journey with a humble beginning in 1970. With an installed capacity of 746 MW (1970), it has expanded its capacity to 8738.305 MW (2019). A revenue of Rs.77442 Million in 2019 as compared, to Rs.1.30 Million in 1971, speaks volumes about KPCL's progress.
Solar power is a fast developing industry in India. The country's solar installed capacity was 63.303 GWAC as of 31 December 2022. Solar power generation in India ranks fourth globally in 2021.
Koradi Thermal Power Station (KTPS) is located at Koradi near Nagpur, Maharashtra. The power plant is one of the four major power plants in Vidarbha – a power surplus region of India. The power station began operations in 1974 and is one of the nine active power stations operated by Maharashtra State Power Generation Company Limited (Prajot), a subsidiary of Government of Maharashtra owned Maharashtra State Electricity Board (MSEB). The plant operates 4 units and has a total power generation capacity of 2190 MW. A proposed 440 kilovolt high power transmission line from Koradi to Bhusawal would join Nagpur with Mumbai. KTPS campus also contains training institute of MahaGenco for middle and senior level engineers, technicians and other staff.
Nashik Thermal Power Plant is located at Eklahare village near Nashik in Maharashtra. The power plant is one of the coal based power plants of Maharashtra State Power Generation Company (Mahagenco)
Adani Power is an Indian power and energy company which is a part of Adani Group. Based in Khodiyar in Ahmedabad, it is a private thermal power producer, with a capacity of 12,450 MW and operates a mega solar plant of 40 MW at Naliya, Bitta, Kutch, Gujarat.
NTPC Limited, formerly known as National Thermal Power Corporation Limited, is an Indian central public sector undertaking under the ownership of the Ministry of Power, Government of India which is engaged in generation of electricity and allied activities. The headquarters of the psu is situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.
Kahalgaon Super Thermal Power Station (KhSTPP)is located in Kahalgaon in Bhagalpur district of Bihar. The power plant is one of the coal based power plants of NTPC. The coal for the power plant is sourced from Rajmahal coalfield of Eastern Coalfields Limited. Source of water for the power plant is Ganga River.
Rosa Power Plant is a 1,200 MW capacity, coal based Thermal power plant at Rosa village near Shahjahanpur in Uttar Pradesh, India. Yes Bank Limited accuries 29.97% stake in 2020 because of dues on Reliance Power. Reliance Power Limited have now 70.03% of stake in Rosa Power Supply Company Limited.
The Ennore Thermal Power Station is a coal based power plant located in Chennai Ennore, Tamil Nadu.
Kanti Thermal Power Station also known as George Fernandes Thermal Power Plant Station is located in Kanti, Muzaffarpur, Bihar. George Fernandes was former Member of Parliament from Muzaffarpur constituency of Bihar. It is wholly owned subsidiary company of NTPC. The share of the company is 100% of the NTPC. The plant was not functional between 2003 and 2013; however, renovation of both older units paved the way for commercial production of electricity by the end of 2013.
Bihar State Power Holding Company Limited (BSPHCL), formerly Bihar State Electricity Board (BSEB) is a state-owned electricity regulation board operating within the state of Bihar in India. BSEB was established in 1958 as a statutory corporation under the Electricity (Supply) Act, 1948. As of November 2012, BSEB has nearly 1,700 officers and 14,850 employees. The derated capacity comes to just 530 MW. The BSEB was unbundled on 2 August 2011. Power Finance Corporation was the main consultant for BSEB's restructuring.
Bellary Thermal Power station is located in Kudatini Village, Bellary District in the Indian state of Karnataka. Two coal-fired units of 500 MW each are in operation with generating capacity of 12 million units per day and a 700 MW coal-fired unit with operation The thermal electric power generating station is run by KPCL a government of Karnataka undertaking. This electric generating plant is located at Kudatini village on Hosapete - Ballari road.
Vallur Thermal Power Station is a power plant located in Athipattu Pudunagar, Vallur in Thiruvallur district, North Chennai, India. The power plant is operated by NTPC Tamil Nadu Energy Company Limited, a joint venture between NTPC Limited and TANGEDCO and has three units with 500 MW each.
Yermarus Thermal Power Station is a coal-based thermal power plant located in Yermarus village in Raichur district, Karnataka. The power plant is owned by the Karnataka Power Corporation. This is India's first 800MW super critical thermal power plant and Bharat Heavy Electricals is the EPC contractor for this power project.