Type | Government-owned corporation |
---|---|
Industry | Public Transport |
Predecessor | East African Railways and Harbours Corporation |
Founded | 1977 |
Headquarters | Nairobi, Nairobi County Kenya |
Products | Railway and Commuter rail transportation |
Kenya Railways (KR) | |
---|---|
Operation | |
Infrastructure company | Kenya Railways (KR) |
System length | |
Total | 2,066 kilometres (1,284 mi) |
Track gauge | |
Main | 1,000 mm (3 ft 3+3⁄8 in) metre gauge |
Features | |
No. stations | 180 approx |
Kenya Railways Corporation (KRC), also Kenya Railways (KR) is the national railway of Kenya. Established in 1977, KR is a state corporation.
The original Uganda Railway was transformed into the East African Railways and Harbours Corporation (EAR&H) after World War I. The EAR&H managed the railways of Uganda, Kenya, and Tanganyika until the collapse of the East African Community in 1977. [1] KR then took over the Kenyan part of the EARC.
Like the other members of the East African Community, Kenya uses the narrow gauge track gauge of 1,000 mm (3 ft 3+3⁄8 in) (metre gauge).
The mainline of the KR is based on the original Uganda Railway. Its 930 km (578 mi) main track connected the Indian Ocean port of Mombasa to the port of Kisumu at Lake Victoria. Half way is the capital of Nairobi that was founded as a rail depot of the UR. The British added several branch lines as well as a link to Tanzania and a link to Uganda. The total system eventually had 2,778 km (1,726 mi) of track.
As of 2006 much of the overall railway system has been neglected or is in disrepair. [2] Nevertheless, the mainline from Mombasa to Kisumu is operative though at reduced speed. For passengers, the "Jumbo Kenya Deluxe" connects Nairobi and Mombasa. The fourteen-hour overnight trip runs three times a week either eastbound or westbound on the single track. The "Port Florence Express" connects Nairobi with Kisumu. [3]
KR also operates the Kenyan ferry system on Lake Victoria.
In 2010, KRX announced plans to construct a new station on Mombasa Road in Nairobi; part of a planned commuter network which would include an airport link. [4]
The KR has suffered from inefficient management, has a bloated work force, and has run deficit operations in spite of its potential. [2] For several years there had been plans to privatize and revitalize the system. [6] In 2005, Rift Valley Railways Consortium (RVRC) from South Africa won the concession to run KR and Uganda Railways Corporation. [7] RVRC was to take over operations on 1 August 2006 and intended to streamline operations, reduce the work force, and make major investments to upgrade the system. [8] [9] On 28 July 2006 the East African Standard reported that the planned take-over was postponed to 1 November 2006. [10] This operational take-over took place in November and was scheduled to last for 25 years. [11]
On 9 October 2008, Toll Holdings of Australia announced that it has entered into a contract to manage the Kenya-Uganda railway, replacing the management by Rift Valley Railways Consortium. The consortium was criticized for falling freight traffic in the two years since taking control, while RVR alleges the drop is due to the poor condition of the railway infrastructure and the damage done by protesters during the 2007–2008 Kenyan crisis. Officers from Toll subsidiary Patrick Defence Logistics were to manage the railway after the transition. [12]
Towards the end of 2008, after just a few months in charge, Toll pulled out of its management obligations after disagreements with the owners and the Toll appointed MD resigned, mirroring a similar reversal of appetite that occurred when Toll took over Tranz Rail (New Zealand's privatised rail operator) in 2003.
During the riots of the 2007–2008 Kenyan crisis sections of railway were destroyed. As a result, shipments to Uganda were suspended. [13]
On 22 July 2020, Mohammed Abdalla Swazuri, the chairman of National Land Commission, and Atanas Kariuki Maina, managing director of the Kenya Railways Corporation, were among 18 officials, businesspeople and companies arrested on corruption charges involving land allocation for Kenya Railways Corporation's $3 billion flagship Nairobi-Mombasa railway. [14]
In 2012, plans were developed to expand the system with a new railway that connects to other countries, namely Uganda, Rwanda, and possibly South Sudan and Ethiopia. [15] The new railway would be 1,435 mm (4 ft 8+1⁄2 in) standard gauge. [16] Kenya had been negotiating with China to reconstruct the Nairobi-Mombasa section first. [17] Construction of the first phase of the planned 2 937 km $13.5bn line was inaugurated in Mombasa on 28 November 2013. [18] Civil works on the Mombasa-Nairobi first phase were completed in November 2016, and passenger service began on 31 May 2017. [19] [20]
Passenger and freight services currently operate between Mombasa and Naivasha via Nairobi. The extension from Naivasha to Kampala is planned. [20] The finished project will connect Mombasa via Kampala to Kigali, hence MoKaKi.
The first phase between Nairobi and Mombasa, a distance of 609 km, was built by China Road and Bridge Corporation (CRBC). [21] The project will cost Sh327 billion, but it was later increased to Sh 420 billion to allow it source for locomotives and wagons as well. The estimated cost was $2.9m per km. [22] The $3.8 billion deal was signed in May, 2012 in Nairobi by visiting Chinese premier Li Keqiang, along with the presidents of Kenya, Rwanda, South Sudan and Uganda. The Exim Bank of China provided 90% of the funds for the phase-one project, with Kenya providing the remainder. President Uhuru Kenyatta presided over the groundbreaking ceremony for the standard gauge railway in November 2013. [23] The whole project is expected to cost Ksh 1.3T (327b from Mombasa to Nairobi, a distance of 609 km). However the project had been riddled with corruption allegations, overpricing, and ignoring of procurement processes. Nandi MP Alfred Keter [24] has been at the forefront on the corruption allegations that caused the parliamentary committee of investment and transport to investigate the project. [25] However Keter has been accused of being hired as a mouthpiece by a prominent investor to fight the project. [26] By May 2015, construction was underway, and Civil works on the first phase were completed in November 2016. [27] [19] Passenger service between Mombasa and Nairobi, called the Madaraka Express, began on 31 May 2017. By November 2018 the service had transported over 2 million passengers. [20]
The second phase is operating between Nairobi and Naivasha. When complete, it will extend further westwards to Malaba on the Kenya-Uganda border. There were protests that the second phase would cut through the Nairobi National Park and that the cost of the railway was excessive. [28] In September 2016, an environmental tribunal temporarily halted the project. On 20 October 2016, President Uhuru Kenyatta inaugurated construction of Phase 2A, from Nairobi to Naivasha. Phase 2A was constructed by the China Communications Construction Company. 85% of the project cost was financed by the Export-Import Bank of China, with the balance of the funded by the Kenyan government's Railway Development Levy Fund. [29] The Nairobi–Naivasha portion opened in October 2019. [20]
Once the line from Naivasha to Malaba is completed, there are plans to extend lines to Kampala, Kigali, Bujumbura and Juba. [30]
The LAPSSET railway project is a railway that is proposed to connect Kenya, Ethiopia, and South Sudan. It will be built from Lamu in Kenya to Juba and Addis Ababa.
Transport in Kenya refers to the transportation structure in Kenya. The country has an extensive network of paved and unpaved roads.
Nairobi is the capital and largest city of Kenya. The name is derived from the Maasai phrase Enkare Nairobi, which translates to 'place of cool waters', a reference to the Nairobi River which flows through the city. The city proper had a population of 4,397,073 in the 2019 census. The city is commonly referred to as The Green City in the Sun.
Transport in Uganda refers to the transportation structure in Uganda. The country has an extensive network of paved and unpaved roads.
The Uganda Railway was a metre-gauge railway system and former British state-owned railway company. The line linked the interiors of Uganda and Kenya with the Indian Ocean port of Mombasa in Kenya. After a series of mergers and splits, the line is now in the hands of the Kenya Railways Corporation and the Uganda Railways Corporation.
Kisumu is the third-largest city in Kenya after the capital, Nairobi, and Mombasa. It is the second-largest city after Kampala in the Lake Victoria Basin. The city has a population of slightly over 600,000. The metro region, including Maseno and Ahero has a population of 1,155,574 people according to the 2019 Kenya Population and Housing census which was conducted by the Kenya national Bureau of Statistics.
The Uganda Railways Corporation (URC) is the parastatal railway of Uganda. It was formed after the breakup of the East African Railways Corporation (EARC) in 1977 when it took over the Ugandan part of the East African railways.
Rift Valley Railways (RVR) was a consortium established to manage the parastatal railways of Kenya and Uganda. The consortium won the bid for private management of the century-old Uganda Railway in 2005. The Kenya-Uganda railway had previously been run by the East African Railways and Harbours Corporation over the period 1948–77. In 2014, RVR moved 1,334 million net tonne kilometers of rail freight, up from 1,185 million net tonne kilometers the previous year. Both Kenya and Uganda terminated their contracts with RVR in mid-2017, with control of their national rail networks reverting to the Kenya Railways Corporation and the Uganda Railways Corporation, respectively.
Rail transport in Kenya consists of a metre-gauge network and a new standard-gauge railway (SGR). Both railways connect Kenya's main port city of Mombasa to the interior, running through the national capital of Nairobi. The metre-gauge network runs to the Ugandan border, and the Mombasa–Nairobi Standard Gauge Railway, financed by a Chinese loan, reaches Suswa.
The Northern Corridor Transit and Transport Coordination Authority (NCTTCA) is an intergovernmental body, encompassing six countries in Eastern Africa, tasked with the job of coordinating transport infrastructure improvements.
The Jubilee Insurance Company of Kenya (JICK), mostly known as Jubilee Insurance, is an insurance company in Kenya, which has the largest economy in the East African Community. It is a wholly owned subsidiary of Jubilee Holdings Limited, a multinational insurance holding company, which maintains its headquarters in Nairobi, the capital of Kenya, with subsidiaries in Kenya, Tanzania, Uganda, Burundi, and Mauritius, with plans to expand on the African continent.
Railway stations in Kenya include:
Railway stations in Uganda include:
There are several planned railway lines in Rwanda, including a line to Tanzania. Historical railways are limited to three industrial railways.
Kenya–Uganda relations are bilateral relations between Kenya and Uganda. The two African Great Lakes countries are partners in many areas, particularly in the trade, infrastructure, security (military), education, agriculture and energy sectors.
South Sudan does not have an extensive rail system. Current rail infrastructure, which was constructed between 1959–1962, and was left over from the previous Sudan government is in a serious state of disrepair. It consists of a 248 kilometers (154 mi) narrow-gauge, single-track line that connects Babonosa (Sudan) with the city of Wau in South Sudan. The line was left in poor condition after the Second Sudanese Civil War after several parts of it were mined; the line was fully rehabilitated with United Nations funds.
The Uganda National Oil Company (UNOC), also known as the National Oil Company of Uganda, is a limited liability petroleum company in Uganda owned by the Ugandan government. The 2013 Petroleum Act of Uganda provides for the establishment of the national oil company. UNOC's board of directors was inaugurated on 23 October 2015 by the president of Uganda.
The Mombasa–Nairobi Standard Gauge Railway is a standard-gauge railway (SGR) in Kenya that connects the large Indian Ocean city of Mombasa with Nairobi, the country's capital and largest city. This SGR runs parallel to the narrow-gauge Uganda Railway that was completed in 1901 under British colonial rule. The East African Railway Master Plan provides for the Mombasa–Nairobi SGR to link with other SGRs being built in the East African Community.
The Uganda Standard Gauge Railway is a planned railway system linking the country to the neighboring countries of Kenya, Rwanda, Democratic Republic of the Congo and South Sudan, as part of East African Railway Master Plan. The new Standard Gauge Railway (SGR), is intended to replace the old, inefficient metre-gauge railway system.
The Nairobi–Malaba Standard Gauge Railway (SGR) is the project of standard-gauge railway that should connect Kenya's capital city of Nairobi to Malaba, at the international border with Uganda. The Nairobi–Malaba SGR was to connect other standard gauge railways in Uganda, Rwanda, Burundi, South Sudan and eastern Democratic Republic of the Congo, under the East African Railway Master Plan.
The Kenya Standard Gauge Railway is a railway system that will connect Kenyan cities, and link the country to the neighboring country of Uganda, and through Uganda, to South Sudan, the Democratic Republic of the Congo, Rwanda, and Burundi. There are also plans to link to Addis Ababa, in neighboring Ethiopia to the north. The first segment, between Mombasa and Nairobi, opened passenger rail service in June 2017, and freight rail service in January 2018. Other segments are under construction or planned. The new Standard Gauge Railway (SGR), is intended to replace the old, inefficient metre-gauge railway system.