The Kiewa Hydroelectric Scheme is the largest hydro-electric scheme in the Australian state of Victoria and the second-largest in mainland Australia after the Snowy Mountains Scheme. The scheme is situated in the Australian Alps in north-eastern Victoria about 350 kilometres (220 miles) from Melbourne and is wholly owned by AGL Energy. In 2024, AGL studied the options of expanding the scheme with pumped-storage hydroelectricity. [1]

Contents

The scheme was originally constructed between 1938 and 1961 by the State Electricity Commission of Victoria although it was privatised in the 1990s. The scheme was originally developed solely for electricity generation, unlike the Snowy Mountains Scheme, which was also intended to direct water west of the Snowy Mountains for purposes of irrigation.

History

Inception

Work on the underground Power Station 4 (West Kiewa) Kiewa power station 4 shaft.jpg
Work on the underground Power Station 4 (West Kiewa)

Hydroelectric power generation in the Mount BogongFeathertopHotham area was first proposed by a private company known as the Victorian Hydro-Electric Company (VHEC), established in 1911. The Kiewa River was the most desirable location for power generation. [2]

In 1918 the Electricity Commissioners (later the State Electricity Commission of Victoria) was formed, and given a brief to investigate an alternate power-generation scheme to the burning of brown coal from the Latrobe Valley. In 1919 the Commissioners opposed the VHEC being allowed to generate power in the Upper Kiewa, but a Victorian Government found that the Kiewa scheme would produce 30 megawatts of power at a capital cost of $8 million. [3] While the hydroelectricity was cheaper than burning brown coal, and would provide more energy than Melbourne then required, it was at a capital cost twice as much. [2]

The SECV was formed on 10 January 1921, and allocated $2.86 million for power generation works at Yallourn. The SECV bought out the VHEC soon after, and in 1923 a series of technical investigations was undertaken into characteristics of rain and snowfall in the Australian Alps. It was found that local snow was more dense and soggier than that in Europe, and formed weighty blocks, but no further works were carried out by the SECV. [2]

Work begins

Workers descend into Power Station 4 Kiewa power station 4 workers descending.jpg
Workers descend into Power Station 4

It was not until 1937 that the SECV recommended the Kiewa scheme proceed. [4] The proposed works dwarfed those from 20 years earlier, with two large dams blocking saucer-shaped basins—Pretty Valley and Rocky Valley. The proposed generation capacity was 114.6 megawatts at peak load, with a 50% utilisation factor to cater for peak demand, rather than continuous load like the earlier plans. [2] The scheme was approved, and a township at Bogong was established as the base camp for construction. Building materials for the scheme had been using the railway line via Everton Gap to Bright, then by road via Tawonga Gap. [2]

World War II intervened, and drained men and materials from the scheme, and by 1940 there was little chance of the scheme operating by the planned date of winter 1942. [5] Work was 12 months behind, and work was changed to focus on Clover Power Station (Number 3), work on the rest of the scheme being stopped in February 1942. [5] It was not until 1943 that the associated Junction Dam was completed, the power station not producing power until 1944. [5]

By 1945 only a small part of the scheme was complete, and power demand had risen during war. The SECV re-examined the scheme from 1947, and in 1948 an augmented program of work was approved. [4] The size of the main reservoirs was expanded, and the catchment area was increased though the use of open aqueducts. Generation capacity was also increased, with a maximum output of 289 megawatts, double that of the 1937 scheme. The cost was to be $50.4 million [3] (or 25.27 million pounds [6] ), and the generators would be located in a series of underground power stations, the first such installations in Australia. [7] The town of Bogong was too restricted as a base camp, and the town of Mount Beauty was established at the foot of the mountains. The railhead for materials was moved to Bandiana, and the Kiewa Valley Highway was sealed and realigned for 50 miles (80 km) to Mount Beauty.

With fears of a new world war and a huge demand for electric power, by June 1951 works had reached full momentum, and the anticipated commissioning date of 1956 was considered achievable. [8] Four thousand men were employed on the project, and works on went ahead with as much haste as funds could muster. [9] Some in the SECV believed an equivalent quantity of power could be generated more cheaply from other sources, but abandonment was impossible in light of the need for additional capacity quickly. [8]

Scaled back

Exterior of Clover Power Station (Number 3) Kiewa power station 3 exterior.jpg
Exterior of Clover Power Station (Number 3)
Junction Dam and Lake Guy in 1948, Bogong in the background Junction dam - lake guy.jpg
Junction Dam and Lake Guy in 1948, Bogong in the background

In 1952 a recession hit the Australian economy, with funds to the SECV from the Commonwealth Government were cut back, as was loan funding on the private market. The Victorian State Government provided its own funds to keep the scheme alive, [9] but 1,500 men were still sacked on 27 September 1951, [8] which slowed work to a snail's pace.

As the recession continued, then Prime Minister Robert Menzies was forced to cut spending on capital works. The Snowy Mountains Scheme, commenced in 1949 by the Commonwealth Government, was a source of national prestige and political advantage, and so the cuts were made to state government projects. [9] Commonwealth loan funds were cut off to the Kiewa Scheme, and power from the Snowy Mountains Scheme would be provided to Victoria to fill the gap. Employment on Kiewa dwindled to one thousand men. [9]

The Scheme was scaled back, with the major reservoir at Pretty Valley reduced to a minor diversion weir, and Number 5 Power Station in the West Kiewa Valley was abandoned. [9]

By 1955 the West Kiewa Power Station (Number 4) commenced operation, in 1959 the Rocky Valley Dam was almost complete, and in 1960 the McKay Creek Power Station (Number 1) was commissioned, completing the scheme with 184 megawatts of generation capacity. [4]

In 1957, the SECV publicly announced that the scheme should not be completed as originally proposed, [10] and did not move to expand it for a decade afterwards, [10] but still privately maintained that the scheme has never been finished. [9]

Privatisation

With the privatisation of the State Electricity Commission of Victoria in the 1990s, the scheme passed to Southern Hydro, then acquired by AGL Energy in 2005. [11]

AGL constructed the originally planned Bogong Power Station (Number 2), which was completed in November 2009 at a cost of $240 million. [12] [13] The work consisted of 5.7 km of a five-metre-diameter headrace tunnel, two vertical shafts, a 1 km steel-lined high-pressure tunnel, a power station to house twin 70 MW generators and a tailrace outfall into neighbouring Lake Guy. [14]

The original Number 2 power station was to involve a dam below McKay Creek power station, and a surface power station of 95 MW capacity. [11] However, due to environmental concerns the design was altered so that the McKay discharge would feed into the Bogong tunnel, leaving the river between them to run naturally. [11]

The West Kiewa Power station is also being upgraded to a capacity of 74 MW.

Components

The main reservoir of the scheme is the Rocky Valley Dam, which has a capacity of 28 billion litres and is situated at 1,600 metres above sea level. The scheme also contains a number of smaller dams and pondages. A great deal of the water in the dams comes from melting snow, which covers much of the area during cooler months.

Linking the reservoirs and power station are 11 miles (18 km) of tunnels, [15] and 32 km of aqueducts. [16] The scheme consists of four power stations:

NoPower station Max. Capacity Turbines CompletedCoordinates
1 McKay Creek Power Station 150 MW61960 36°51′31″S147°14′3″E / 36.85861°S 147.23417°E / -36.85861; 147.23417 (McKay Creek Power Station)
2 Bogong Power Station 140 MW22009 36°48′23″S147°13′40″E / 36.80639°S 147.22778°E / -36.80639; 147.22778 (Bogong Power Station)
3 Clover Power Station 29 MW21944 36°47′8″S147°13′14″E / 36.78556°S 147.22056°E / -36.78556; 147.22056 (Clover Power Station)
4 West Kiewa Power Station 62 MW41955 36°45′36″S147°11′10″E / 36.76000°S 147.18611°E / -36.76000; 147.18611 (West Kiewa Power Station)
ComponentLocationNotes
Rocky Valley Dam 36°52′27″S147°17′38″E / 36.87417°S 147.29389°E / -36.87417; 147.29389 (Rocky Valley Dam)
Rocky Valley Aqueduct [17] 36°52′6″S147°17′42″E / 36.86833°S 147.29500°E / -36.86833; 147.29500 (Rocky Valley Aqueduct) Diverts water south into Rocky Valley Dam
Langford West Aqueduct [17] 36°53′38″S147°18′59″E / 36.89389°S 147.31639°E / -36.89389; 147.31639 (Langford West Aqueduct) Diverts water north into Rocky Valley Dam from vicinity of Mt Cope
Langford East Aqueduct [17] 36°52′51″S147°20′16″E / 36.88083°S 147.33778°E / -36.88083; 147.33778 (Langford East Aqueduct) Diverts water east into Rocky Valley Dam
Pretty Valley Pondage 36°53′56″S147°14′19″E / 36.89889°S 147.23861°E / -36.89889; 147.23861 (Pretty Valley Pondage) Pondage for McKay Creek Power Station. Fed by tunnel from Rocky Valley Dam
Cope East Aqueduct [17] 36°55′57″S147°16′8″E / 36.93250°S 147.26889°E / -36.93250; 147.26889 (Cope East Aqueduct) Diverts water north through Cope Saddle into Pretty Valley Pondage
Cope West Aqueduct [17] 36°56′3″S147°15′7″E / 36.93417°S 147.25194°E / -36.93417; 147.25194 (Cope West Aqueduct) Diverts water north through Cope Saddle into Pretty Valley Pondage
McKay Creek Power Station penstock 36°51′53″S147°14′13″E / 36.86472°S 147.23694°E / -36.86472; 147.23694 (McKay Creek Power Station penstock) Carries water from Pretty Valley Pondage to McKay Creek Power Station.
Lake Guy 36°48′0″S147°13′27″E / 36.80000°S 147.22417°E / -36.80000; 147.22417 (Lake Guy) Pondage for Clover Power Station.
Clover Dam 36°46′52″S147°13′7″E / 36.78111°S 147.21861°E / -36.78111; 147.21861 (Clover Dam) Pondage for West Kiewa Power Station.
West Kiewa Power Station tailrace 36°44′40″S147°10′4″E / 36.74444°S 147.16778°E / -36.74444; 147.16778 (West Kiewa Power Station tailrace)
Mt Beauty Pondage 36°46′52″S147°13′7″E / 36.78111°S 147.21861°E / -36.78111; 147.21861 (Mt Beauty Pondage) Regulation pondage below West Kiewa Power station

Related Research Articles

<span class="mw-page-title-main">Dartmouth Dam</span> Dam in Victoria

Dartmouth Dam is a large rock-fill embankment dam with an uncontrolled chute spillway across the Mitta Mitta, Gibbo and Dart rivers, the Morass Creek and a number of small tributaries. The dam is located near Mount Bogong in the north-east of the Australian state of Victoria. The dam's purpose includes irrigation, the generation of hydro-electric power, water supply and conservation. The impounded reservoir is called Dartmouth Reservoir, sometimes called Lake Dartmouth. The Dartmouth Power Station, a hydro-electric power station that generates power to the national grid, is located near the dam wall.

<span class="mw-page-title-main">Snowy Mountains Scheme</span> Dam in Kosciuszko National Park, New South Wales

The Snowy Mountains Scheme, also known as the Snowy Hydro or the Snowy scheme, is a hydroelectricity and irrigation complex in south-east Australia. Near the border of New South Wales and Victoria, the scheme consists of sixteen major dams; nine power stations; two pumping stations; and 225 kilometres (140 mi) of tunnels, pipelines and aqueducts that were constructed between 1949 and 1974. The Scheme was completed under the supervision of Chief Engineer, Sir William Hudson. It is the largest engineering project undertaken in Australia.

<span class="mw-page-title-main">Eildon Dam</span> Dam in Victorian Alps, Victoria

The Eildon Dam is a rock and earth-fill embankment dam with a controlled spillway, located on the Goulburn River between the regional towns of Mansfield and Eildon within Lake Eildon National Park, in the Alpine region of Victoria, Australia. The dam's purpose is for the supply of potable water, irrigation, and the generation of hydroelectricity. The impounded reservoir is called Lake Eildon.The first cut of ground was done by Mr Bain and Mr MacLean from Scotland.

<span class="mw-page-title-main">Kiewa River</span> River in Victoria, Australia

Kiewa River, a perennial river that is part of the Murray catchment within the Murray-Darling basin, is located in the Alpine bioregion, in the Australian state of Victoria.

<span class="mw-page-title-main">Mount Beauty, Victoria</span> Town in Victoria, Australia

Mount Beauty is a small town in north-eastern Victoria, Australia. The town lies alongside the Kiewa River, at the junction of the Kiewa Valley Highway and Bogong High Plains Road in the Alpine Shire local government area.

<span class="mw-page-title-main">Yallourn Power Station</span> Australian coal-fired power station

The Yallourn Power Station, now owned by EnergyAustralia a wholly owned subsidiary of the Hong-Kong-based CLP Group, is located in the Latrobe Valley of Victoria, Australia, beside the Latrobe River, with the company town of Yallourn located to the south west. Yallourn PS was a complex of six brown coal–fired thermal power stations built progressively from the 1920s to the 1960s; all except one have now been decommissioned. Today, only the 1,450 megawatts (1,940,000 hp) Yallourn W plant remains. It is the second largest power station in Victoria, supplying 22% of Victoria's electricity and 8% of the National Electricity Market. The adjacent open cut brown coal mine is the largest open cut coal mine in Australia, with reserves sufficient to meet the projected needs of the power station to 2028. On 10 March 2021, EnergyAustralia announced that it will close the Yallourn Power Station in mid-2028, four years ahead of schedule, and instead build a 350 megawatt battery in the Latrobe Valley by the end of 2026. At the time, Yallourn produced about 20% of Victoria's electricity.

<span class="mw-page-title-main">Bogong High Plains</span> Mountains in Australia

The Bogong High Plains, part of the Victorian Alps of the Great Dividing Range, are a section of plains located in the Alpine National Park in the Australian state of Victoria and are situated south of Mount Bogong.

<span class="mw-page-title-main">State Electricity Commission of Victoria</span> Government electricity supplier in Victoria, Australia

The State Electricity Commission of Victoria is a government-owned electricity company in Victoria, Australia. Originally established to generate electricity from the state's reserves of brown coal, the SEC gradually monopolised most aspects of the Victorian electricity industry, before being broken up and largely privatised in the 1990s. After several decades of dormancy, it was revived in 2023 to invest in renewable energy and storage markets.

The Shoalhaven Scheme is a dual-purpose water supply and Pumped-storage Hydroelectricity scheme located on the South Coast region of New South Wales, Australia.

<span class="mw-page-title-main">Guthega Power Station</span> Dam in Snowy Mountains, New South Wales

Guthega Power Station is located in the Snowy Mountains region of New South Wales, Australia. The power station's purpose is for the generation of electricity. It is the first to be completed and smallest of the initial seven hydroelectric power stations that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

<span class="mw-page-title-main">Murray Hydroelectric Power Station</span> Dam in Snowy Mountains, New South Wales

The Murray Region Hydroelectric Power Stations refers to two of the original seven hydroelectric power stations, both located near the town of Khancoban in the Snowy Mountains region of New South Wales, Australia. The two power stations are part of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro. Although both power stations are physically located in New South Wales, since 1 July 2008 all power generated has been allocated to the Victorian region of the National Electricity Market. The stations are not located on the Murray River.

<span class="mw-page-title-main">Tumut Hydroelectric Power Station</span> Power stations in New South Wales, Australia

The Tumut Hydroelectric Power Stations is a series of three hydroelectric power stations on the Tumut River in New South Wales, Australia, that are part of the Snowy Mountains Scheme.

McKay Creek Power Station is one of four hydroelectric power stations in the Kiewa Hydroelectric Scheme, Victoria, Australia. McKay Creek has six 25 megawatts (34,000 hp) generators driven by Pelton wheel turbines, with a total generating capacity of 150 megawatts (200,000 hp).

<span class="mw-page-title-main">Energy Brix Power Station</span>

The Energy Brix Power Station was a brown coal–fired thermal power station located at Morwell, in Victoria, Australia. The power station was used to supply electricity for the retail market, as well as the production of briquettes in the adjacent Energy Brix briquette works. It was shut down in August 2014 and is currently the earliest surviving large-scale power station designed to provide electricity to the state electricity network.

<span class="mw-page-title-main">Rubicon Hydroelectric Scheme</span> Hydroelectric scheme in Victoria, Australia

The Rubicon Hydroelectric Scheme is a small run-of-the-river hydroelectric scheme located on the Rubicon and Royston Rivers, north east of Melbourne, 40 km (25 mi) south-west of Alexandra, Victoria, Australia. The scheme commenced in 1922, and was the first state-owned hydroelectric scheme to generate electricity in mainland Australia, and among the first in the world to be remotely controlled. For the first ten years of its operation it supplied on average 16.9% of electricity generated by the State Electricity Commission of Victoria. It is now owned and operated by AGL Energy and contributes approximately 0.02% of Victoria's energy supply.

The Rocky Valley Dam is located on the Bogong High Plains, near Falls Creek, Victoria, Australia, a winter ski resort. The dam is man-made and has a capacity of 28,000 megalitres and is situated at 1,600 metres (5,200 ft) above sea level. The Dam wall is traversable during both Winter months and Summer months.

<span class="mw-page-title-main">Energy in Victoria</span>

Energy in Victoria, Australia is generated using a number of fuels or technologies, including coal, natural gas and renewable energy sources. Brown coal, historically, was the main primary energy source for the generation of electricity in the state, accounting for about 85% of electricity generation in 2008. The amount of coal-fired power has decreased significantly with the closure in 2017 of the Hazelwood power station which supplied around 20% of Victoria's electricity, and to a lesser extent with the exit of Anglesea power station in 2015. Brown coal is one of the largest contributors to Australia's total domestic greenhouse gas emissions and a source of controversy for the country. Australia is one of the highest polluters of greenhouse gas per capita in the world.

<span class="mw-page-title-main">Guthega Dam</span> Dam in Snowy Mountains, New South Wales

Guthega Dam is concrete gravity dam with an uncontrolled spillway across the Snowy River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the storage of water used in the generation of hydro-power. It is the first to be completed of the sixteen major dams of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

The Royston River, an inland perennial river of the Goulburn Broken catchment, part of the Murray-Darling basin, is located in the lower South Eastern Highlands bioregion and Northern Country/North Central regions of the Australian state of Victoria. The headwaters of the Royston River rise on the western slopes of the Victorian Alps and descend to flow into the Rubicon River.

References

  1. "AGL eyes quicker and cheaper pumped hydro "conversions" to back up wind and solar". RenewEconomy. 14 June 2024.
  2. 1 2 3 4 5 Johnson, Dick (1974). The Alps at the Crossroads. Victorian National Parks Association. p. 80. ISBN   0-9599428-1-5.
  3. 1 2 Edwards, Cecil (1969). Brown Power. A jubilee history of the SECV. State Electricity Commission of Victoria. p. 171.
  4. 1 2 3 Edwards, Cecil (1969). Brown Power. A jubilee history of the SECV. State Electricity Commission of Victoria. pp. 298–301.
  5. 1 2 3 Edwards, Cecil (1969). Brown Power. A jubilee history of the SECV. State Electricity Commission of Victoria. p. 154.
  6. Station 3
  7. Johnson, Dick (1974). The Alps at the Crossroads. Victorian National Parks Association. p. 81. ISBN   0-9599428-1-5.
  8. 1 2 3 Edwards, Cecil (1969). Brown Power. A jubilee history of the SECV. State Electricity Commission of Victoria. p. 183.
  9. 1 2 3 4 5 6 Johnson, Dick (1974). The Alps at the Crossroads. Victorian National Parks Association. p. 82. ISBN   0-9599428-1-5.
  10. 1 2 Edwards, Cecil (1969). Brown Power. A jubilee history of the SECV. State Electricity Commission of Victoria. p. 201.
  11. 1 2 3 International Water Power and Dam Construction: AGL links Kiewa gap – 10 January 2008 Archived 16 May 2011 at the Wayback Machine
  12. Bogong Power Station Project – Mount Beauty Secondary College – Local schools involved Archived 6 July 2011 at the Wayback Machine
  13. Bogong Hydro Power Station Comes Online in Australia Archived 27 January 2010 at the Wayback Machine
  14. Australasian Tunnelling Society – Bogong Hydro Power Project Archived 18 July 2008 at the Wayback Machine
  15. Edwards, Cecil (1969). Brown Power. A jubilee history of the SECV. State Electricity Commission of Victoria. p. Photo Insert.
  16. AGL – Kiewa Hydroelectric Scheme
  17. 1 2 3 4 5 Alpine National Park – The High Country – walks around Bogong High Plains and Mountain Creek (PDF), Park Notes, Parks Victoria, November 2010, archived from the original (PDF) on 28 March 2011, retrieved 27 March 2011

36°48′22″S147°13′38″E / 36.80611°S 147.22722°E / -36.80611; 147.22722