Challicum Hills Wind Farm | |
---|---|
Country | Australia |
Location | Ararat, Victoria |
Coordinates | 37°23′S143°07′E / 37.38°S 143.11°E |
Status | Operational |
Construction began | October 2002 |
Commission date | November 2003 |
Construction cost | $46,000,000 |
Owner(s) | Pacific Blue |
Operator(s) | TW Power Services |
Wind farm | |
Type | Onshore |
Site usage | farming land |
Hub height | 68 m (223 ft) |
Rotor diameter | 64 m (210 ft) |
Rated wind speed | 57 km/h (15.8 m/s) |
Site elevation | 400 m (1,312 ft) |
Power generation | |
Units operational | 35 |
Make and model | NEG Micon: NM64/1500 |
Nameplate capacity | 52.5 MW |
Annual net output | 141 GWh |
External links | |
Website | www |
Commons | Related media on Commons |
Challicum Hills Wind Farm is a wind farm encompassed by 35 (1.5 MW) NEG NM 64 wind turbines, with a total generating capacity of 52.5 MW of electricity. The wind farm is near Ararat in western Victoria, Australia. The power station was commissioned in August 2003 and is in a long term Power Purchase Agreement (PPA) with Origin Energy.
The wind farm is owned and operated by Pacific Blue. Part of the profits flow into a community fund that supports local projects. [1]
The Portland wind farm is one of Australia's largest wind farms. It is owned and operated by Pacific Blue and is located on the coast of south-western Victoria near the city of Portland, it consists of four separate sites, all of which have been completed as of 2015. Completion of the entire 195 MW project was expected in 2011, at a capital cost of A$330 million.
Codrington Wind Farm is a wind farm near Yambuk on the coast of south-western Victoria, Australia. Completed in June 2001, the 18.2MW installation of 14 wind turbines generates 51 GWh annually, for a capital cost of A$30 million by Pacific Blue being the first fully private investment in a wind farm in Australia. When opened it was Australia's largest wind farm and the first in Victoria.
Crookwell Wind Farm, located at Crookwell west of Goulburn, New South Wales, consists of eight 600 kW wind turbines giving a total capacity of 4.8 MW. It was the first grid-connected wind farm in Australia when built by Pacific Power in 1998. It is now owned by Tilt Renewables.
Windy Hill Wind Farm is a wind power station near Ravenshoe on the Atherton Tableland, Queensland, Australia. It has 20 wind turbines with a generating capacity of 12 MW of electricity, providing enough power for about 3,500 homes. The cost of the project was A$20 million. It was the second wind farm to be constructed in Queensland after the 0.45Mw station on Thursday Island (1997).
Pacific Blue is a 100% renewable energy company headquartered in Melbourne, Australia. The company was founded in 1992 and was soon floated on the Australian Stock Exchange, it was later bought by a consortium of industry superannuation funds and delisted. It is now owned by China's State Power Investment Corporation.
Wonthaggi wind farm is a wind power station at Wonthaggi in Gippsland, Victoria, Australia. It has 6 wind turbines, with a total generating capacity of 12 MW of electricity.
Starfish Hill Wind Farm is a wind power station spread over two hills near Cape Jervis, South Australia. It has 22 wind turbines, eight on Starfish Hill itself and 14 on Salt Creek Hill, with a combined generating capacity of 33 MW of electricity.
Wind power is one of the main renewable energy sources in the world. In Australia, wind power contributed 10% of the total electricity supply in 2020, and 37.5% of its renewable energy supply. Wind resource testing conditions in Australia are optimum, as abundant wind resources are located close to residential areas in the southern parts of the country and on the slopes of the Great Dividing Range in the east.
AGL Energy Ltd is an Australian listed public company involved in both the generation and retailing of electricity and gas for residential and commercial use. AGL is Australia's largest electricity generator, and the nation's largest carbon emitter. In 2014, the company had an operated generation capacity of 10,984 MW. The company emitted 42,227,180 Total Scope 1 Emissions in 2019-20 and 40,209,034 t CO2-e in 2020–21. AGL is also a significant investor, owner, and operator, of renewable energy assets.
Wind power became a significant energy source within South Australia over the first two decades of the 21st century. In 2015, there was an installed capacity of 1,475 MW, which accounted for 34% of electricity production in the state. This accounted for 35% of Australia's installed wind power capacity. In 2021, there was an installed capacity of 2052.95 MW, which accounted for 42.1% of the electricity production in the state in 2020.
The Waubra wind farm is located on both sides of the Sunraysia Highway 35 km north-west of Ballarat in Victoria, Australia. Upon its completion in July 2009, it was the largest wind farm in Australia and was the largest wind farm by number of turbines and total capacity in the southern hemisphere.
The Hallett Wind Farm is the collective name for four wind farms near the town of Hallett, South Australia. They are owned and operated by AGL Energy.
The Hepburn Wind Project is a wind farm built and owned by Hepburn Wind, a community co-operative, and supported by the Victorian Government. The location of the project is Leonards Hill, 10 kilometres (6.2 mi) south of Daylesford, Victoria, north-west of Melbourne, Victoria. It comprises two individual 2.05 MW wind turbines supplied by REpower System AG which are projected to produce enough energy for 2,300 households, almost as many houses are in the twin-towns of Daylesford and Hepburn Springs.
The Macarthur Wind Farm is a wind farm located in Macarthur, Victoria, Australia, near Hamilton, 260 km west of Melbourne. It is on a 5,500 ha site which has an installed capacity of 420 megawatts (MW). Based on a capacity factor of around 35%, it is estimated that the long-term average generation will be approximately 1,250 GWh per year. Its actual capacity factor is much lower, with a historical average of 26.29% since 2013.
Stockyard Hill Wind Farm is a wind farm project in Victoria (Australia). In May 2022 the project achieved its 5th hold point test, and was approved by the Australian Energy Market Operator and Network Services Provider to generate up to 400MW into the National Electricity Market. When it is fully commissioned, it is expected to produce up to 530MW, which would be Australia's largest wind farm.
Ararat Wind Farm is a wind farm in western Victoria, Australia. It is located approximately 180km northwest of Melbourne. It was officially opened on 27 June 2017 and was the third-largest wind farm in Australia at that time, with capacity to generate 240MW from 75 turbines.
Bulgana Green Power Hub is a wind farm north of Stawell in the Australian state of Victoria. The project is owned by Neoen. Construction of the 56 wind turbines, with a total generation capacity of 194MW, was completed in August 2019, and connections to the national grid reached full capacity in 2021.