Waterloo Wind Farm

Last updated

Waterloo Wind Farm
Waterloo windfarm.JPG
Turbines in 2010
Waterloo Wind Farm
CountryAustralia
Location Waterloo, South Australia
Coordinates 33°59′S138°54′E / 33.983°S 138.900°E / -33.983; 138.900 Coordinates: 33°59′S138°54′E / 33.983°S 138.900°E / -33.983; 138.900
StatusOperational
Construction began2008
Commission date November 2010 and November 2016
Owner(s) Palisade Investment Partners and Northleaf Capital
Wind farm
Type Onshore
Rotor diameter
  • 90 m (300 ft)
Rated wind speed
  • 15 m/s (49 ft/s)
Power generation
Units operational43
Make and model Vestas
Units planned37 × 3 MW
Nameplate capacity 131 MW
External links
Website http://waterloowindfarm.com.au/
Commons Related media on Commons

Waterloo wind farm is east of Manoora, South Australia. It is the largest wind farm operated by EnergyAustralia.

Contents

Site

External media
Images
Searchtool.svg Generating power at Waterloo Wind Farm
Video
Nuvola apps kaboodle.svg Waterloo Wind Farm

The wind farm is positioned along a rocky north–south ridge on privately owned property at Waterloo. [1] The 111 megawatt wind farm spreads across five acres of land and cost about $350 million, it began construction in November, 2008 and has been operational since October 2010.

For about two months in 2013, the site was monitored by the Environmental Protection Authority. The wind farm's infrasound and low-frequency noise were both examined. [2] Acoustics firm Resonate conducted noise and meteorological monitoring in the area. [3]

Turbines

Waterloo wind farm opened with 37 Vestas V90-3MW turbines, [4] each 80 metres high, with each turbine blade 44 metres long and weighing about 8 tonnes. The tower sections weigh approximately 90 tonnes in total with the tower and blades combined weighing 125 tonnes. On average the blades turn at 16.2 rpm. There are four levels in a turbine and it takes about five minutes to get to the top.

Each wind turbine produces on average 24 megawatt hours of electricity each day. On a windy day three wind turbines can power the whole of Clare and the whole wind farm can power up to 163,000 homes or 5 to 10% of South Australia.

The wind farm was expanded with six additional Vestas V117 turbines in 2016 at a cost of A$43 million. [5]

See also

Related Research Articles

<span class="mw-page-title-main">Wind farm</span> Group of wind turbines

A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore.

<span class="mw-page-title-main">Vestas</span> Danish wind turbine company

Vestas Wind Systems A/S is a Danish manufacturer, seller, installer, and servicer of wind turbines that was founded in 1945. The company operates manufacturing plants in Denmark, Germany, the Netherlands, Taiwan, India, Italy, Romania, the United Kingdom, Spain, Sweden, Norway, Australia, China, Brazil, Poland and the United States, and employs more than 25,000 people globally.

<span class="mw-page-title-main">Portland Wind Farm</span>

The Portland wind farm is one of Australia's largest wind farms. Located on the coast of south-western Victoria near the city of Portland, it consists of four separate sites, all of which have been completed as of 2015. Completion of the entire 195 MW project was expected in 2011, at a capital cost of A$330 million.

<span class="mw-page-title-main">Blayney Wind Farm</span>

The Blayney wind farm is a wind power station at Lake Carcoar, south of Blayney, New South Wales, Australia. It was acquired by Trustpower in 2014, and is now owned by Tilt Renewables. Blayney has fifteen wind turbines, with a total nameplate capacity of 9.9 MW of electricity.

<span class="mw-page-title-main">Albany Wind Farm</span> Wind power station in Western Australia

Albany wind and Grasmere farms are two wind power stations near Albany, Western Australia, owned by Bright Energy Investments. They are adjacent and are often considered a single facility. They have 18 wind turbines, with a maximum generating capacity of 35.4 MW of electricity. The original Albany Wind Farm was commissioned in October 2001, after ten years of planning. The wind farm has the capacity to produce 80 per cent of the electricity requirements of Albany.

<span class="mw-page-title-main">Canunda Wind Farm</span>

Canunda Wind Farm is a $92.5 million, 46 MW wind power project located on grazing land approximately 16 kilometres south of Millicent, and 6 kilometres west of Tantanoola in South Australia. It is jointly owned by GDF Suez Energy AustraliaEn 72%) and Mitsui (28%).

<span class="mw-page-title-main">Wild Horse Wind Farm</span>

The Wild Horse Wind Farm is a 273-megawatt wind farm that generates energy for Puget Sound Energy that consists of one hundred twenty seven 1.8-megawatt Vestas V80 turbines and twenty two 2.0-megawatt Vestas V80 turbines on a 10,800-acre (4,400 ha) site in Kittitas County, Washington, 17 miles (27 km) east of Ellensburg, Washington. The turbines are placed on the high open Shrub-steppe ridge tops of Whiskey Dick Mountain, which was chosen for its energetic wind resource, remote location, and access to nearby power transmission lines. The towers are 221 feet (67 m) tall, and each blade is 129 feet (39 m) long, with a total rotor diameter of 264 feet (80 m), larger than the wingspan of a Boeing 747. The turbines can begin producing electricity with wind speeds as low as 9 mph (14 km/h) and reach full production at 31 mph (50 km/h). They shut down at sustained wind speeds of 56 mph (90 km/h). The site is also home to one of the largest solar array (500 kW) in Washington.

Wind power in Ohio has a long history, and as of 2016, Ohio had 545 megawatts (MW) of utility-scale wind power installations installed, responsible for 1.1% of in-state electricity generated. Over 1000 MW more were under construction or pending approval. Some installations have become tourist attractions. There has been a sudden increase in generating capacity, as total wind power capacity in the state was just 9.7 MW in 2010. By 2019, there were 738 MW of capacity, which generated 1.71% of Ohio's electricity.

<span class="mw-page-title-main">Biglow Canyon Wind Farm</span>

Biglow Canyon Wind Farm is an electricity generating wind farm facility in Sherman County, Oregon, United States. It is owned by Portland, Oregon-based Portland General Electric and began operations in 2007. With the completion of phase 3 of the project it has a generating capacity of 450 megawatts. It is located roughly five miles (8 km) northeast of Wasco, Oregon, and about ten miles (16 km) southeast of Rufus, Oregon. Biglow Canyon Wind Farm covers 25,000 acres (10,000 ha) in the Columbia River Gorge.

<span class="mw-page-title-main">Shiloh wind power plant</span>

The Shiloh wind power plant is a wind farm located in the Montezuma Hills of Solano County, California, USA, close to Bird's Landing and Collinsville, 40 miles (64 km) northeast of San Francisco. It has a nameplate capacity of 505 megawatts (MW) of power and was built in four stages between 2005 and 2012. Several additional projects are also located in the Montezuma.

<span class="mw-page-title-main">Te Uku Wind Farm</span>

Te Uku Wind Farm is a wind farm at Te Uku near Raglan, New Zealand. It has a capacity of 64MW using 28 wind turbines. Construction was completed in March 2011, at a cost of $200 million. The farm covers an area of approximately 200 hectares (2.0 km2). The wind farm is jointly owned by WEL Networks and Meridian Energy.

<span class="mw-page-title-main">Wind turbine</span> Machine that converts wind energy into electrical energy

A wind turbine is a device that converts the kinetic energy of wind into electrical energy. Hundreds of thousands of large turbines, in installations known as wind farms, now generate over 650 gigawatts of power, with 60 GW added each year. Wind turbines are an increasingly important source of intermittent renewable energy, and are used in many countries to lower energy costs and reduce reliance on fossil fuels. One study claimed that, as of 2009, wind had the "lowest relative greenhouse gas emissions, the least water consumption demands and the most favorable social impacts" compared to photovoltaic, hydro, geothermal, coal and gas energy sources.

<span class="mw-page-title-main">Hadyard Hill Wind Farm</span>

Hadyard Hill Wind Farm is located in Carrick district of South Ayrshire. Costing £85 million, the wind farm consists of 52 three-bladed Siemens wind turbines, each capable of generating 2.3 megawatts (MW) of power, giving a total output of 120 MW. This was Britain's most powerful wind farm when it was commissioned in March 2006.

<span class="mw-page-title-main">St. Leon Wind Farm</span>

St. Leon Wind Farm is Manitoba's first wind farm, in St. Leon, Manitoba, Canada. In the first phase completed in 2006, 63 wind turbines were erected over a 93-square-kilometre (36 sq mi) area, capable of delivering 99 megawatts (MW). In 2011 a further 10 turbines were purchased, expanding the capacity of the project to 120 megawatts.

<span class="mw-page-title-main">Coopers Gap Wind Farm</span> Wind farm in Queensland, Australia

Coopers Gap Wind Farm is a 453 megawatt wind farm in the Western Downs and South Burnett regions of Queensland, Australia. It is located approximately 175 km north-west of the state capital Brisbane, and 50 kilometres south-west of Kingaroy and 65 km north of Dalby. When construction was announced to be completed on 30 April 2020, it became the largest wind farm in Australia. This record was held until 10 December 2020 when the Stockyard Hill Wind Farm in Victoria was completed.

<span class="mw-page-title-main">Delabole wind farm</span> Wind farm in Cornwall, England

The Delabole wind farm was the first commercial onshore wind farm built in the United Kingdom, in November 1991. This field of wind turbines was initially developed by Windelectric Management Ltd.

<span class="mw-page-title-main">Vestas V164</span> Three-bladed offshore wind turbine

The Vestas V164 is a three-bladed offshore wind turbine, produced by Vestas, with a nameplate capacity of up to 10 megawatts, a world record. Vestas revealed the V164's design in 2011 with the first prototype unit operated at Østerild in northern Denmark in January 2014. The first industrial units were installed in 2016 at Burbo Bank, off the west coast of the United Kingdom. By 2021, Vestas had produced 500 of the series.

The Taralga Wind Farm is a wind farm located near Taralga, New South Wales.

<span class="mw-page-title-main">South Plains Wind Farm</span> Wind farm in Texas, USA

The South Plains Wind Farm, is located between Floydada, Texas and South Plains, Texas, on the high plains of the Llano Estacado in Floyd County. Completed in 2016, the wind farm was constructed in two phases that have a total generating capacity of 500.3 megawatts (MW).

Taiba N'Diaye Wind Power Station,, is a 158.7 MW (212,800 hp) wind power plant in Senegal. The power station is the largest wind power station in West Africa, by generation capacity.

References

  1. "Waterloo Wind Farm". EnergyAustralia . Retrieved 15 July 2015.
  2. Peter Hannam (14 May 2013). "Power giant cuts stake in controversial wind farm". The Sydney Morning Herald. Fairfax Media. Retrieved 15 July 2015.
  3. "Waterloo Wind Farm Environmental Noise Study". Environmental Protection Authority (South Australia). Retrieved 15 July 2015.
  4. "Waterloo Wind Farm, a Roaring 40s success". EcoGeneration. Great Southern Press. Retrieved 15 July 2015.
  5. "About Us". Waterloo Wind Farm. Retrieved 10 August 2019.