Torrens Island Power Station

Last updated

Torrens Island Power Station
Torrens Island Power station from the river - portrait.jpg
Torrens Island Power Station
CountryAustralia
LocationTorrens Island, South Australia
Coordinates 34°48′24″S138°31′24″E / 34.80667°S 138.52333°E / -34.80667; 138.52333
StatusOperational
Construction began
  • 1963
Commission date 1967
Owner(s) AGL Energy
Operator(s)
Thermal power station
Primary fuel Natural gas
Turbine technology Steam turbine
Chimneys
  • 2
Cooling source Port Adelaide River
Power generation
Units operational3 × C A Parsons
Nameplate capacity 600 MW
External links
Commons Related media on Commons

Torrens Island Power Station is located on Torrens Island, near Adelaide, South Australia and is operated by AGL Energy. It burns natural gas in eight steam turbines to generate up to 1,280 MW of electricity. The gas is supplied via the SEAGas pipeline from Victoria, and the Moomba Adelaide Pipeline System (MAPS) from Moomba in the Cooper Basin. [1] The station is capable of burning either natural gas or fuel oil. [2] It is the largest power station in South Australia and was formerly the largest single power station user of natural gas in Australia.

Contents

Construction

Construction began in 1963 following passing of a government act vesting the land and authorising construction. [3] The 480 MW (4 x 120MW) A Station was completed in 1967, and construction of the 800 MW (4 x 200MW) B Station was completed in 1982.

Gradual shutdown

In December 2014 AGL announced that it intended mothballing the four older units of the A Station indefinitely, having taken them out of service between July and September 2014. [4] This decision was primarily driven by increasing levels of wind and solar generation in the South Australian region of the National Electricity Market displacing fossil fuel generation, particularly higher cost gas-fired generation. AGL reviewed this decision and deferred the planned mothballing in June 2016, following the closure of Alinta's Northern and Playford B coal-fired power stations at Port Augusta [5]

However, due to the state-wide power outage in September 2016, the system operator AEMO demanded that the Torrens Island power station to be brought back online to prevent another statewide power outage.

AGL announced on 7 June 2017 that it intended to permanently mothball two of the turbines in the 50-year-old Torrens A power station, after building a new 210MW power station containing twelve gas reciprocating engines to be known as Barker Inlet Power Station adjacent to the Torrens Island site. [6] [7] The first two units (2 and 4) would be mothballed from 1 July 2019, with the remaining two units (1 and 3) planned to be mothballed after winter 2020 and winter 2021. [8] AGL announced a delay in the closure schedule in July 2019, with Units 2 and 4 rescheduled to close in September 2020, and Units 1 and 3 to close in September 2021 and September 2022. [9] On 7 July 2021, AGL announced plans to also mothball unit B1 in October 2021. It will be able to be recalled on 6 months lead time. At the same time, AGL announced construction of a 250MW grid battery on the Torrens Island site. [10] On 24 November 2022, AGL announced that it would bring forward full closure, and Torrens Island B would be retired on 30 June 2026. [11]

See also

Related Research Articles

<span class="mw-page-title-main">Loy Yang Power Station</span>

The Loy Yang Power Station is a brown coal- fired thermal power station located on the outskirts of the city of Traralgon, in south-eastern Victoria, Australia. It consists of two sections, known as Loy Yang A and Loy Yang B. Both Loy Yang A and B are supplied by the Loy Yang brown coal mine. The Loy Yang power stations are located in the brown coal rich Latrobe Valley, along with the Yallourn power station.

<span class="mw-page-title-main">Liddell Power Station</span> Coal-fired power station in Australia

Liddell Power Station is a decommissioned coal-fired thermal power station that had four 500 megawatts (670,000 hp) EE steam driven turbine alternators for a combined electrical capacity of 2,000 megawatts (2,700,000 hp).

<span class="mw-page-title-main">Callide Power Station</span> Coal-fired power station in Australia

Callide Power Station is an electricity generator at Mount Murchison, Shire of Banana, Queensland, Australia. It is coal powered with eight steam turbines with a combined generation capacity of 1,720 megawatts (MW) of electricity. Callide A was commissioned in 1965, refurbished in 1998 and decommissioned in 2015/16. As of 2018, generation capacity was 1510 MW.

<span class="mw-page-title-main">Wind power in Australia</span>

Wind power is one of the main renewable energy sources in the world. In Australia, wind power contributed 10% of the total electricity supply in 2020, and 37.5% of its renewable energy supply. Wind resource testing conditions in Australia are optimum, as abundant wind resources are located close to residential areas in the southern parts of the country and on the slopes of the Great Dividing Range in the east.

<span class="mw-page-title-main">AGL Energy</span> Australian electricity generator and retailer

AGL Energy Ltd is an Australian listed public company involved in both the generation and retailing of electricity and gas for residential and commercial use. AGL is Australia's largest electricity generator, and the nation's largest carbon emitter. In 2014, the company had an operated generation capacity of 10,984 MW. The company emitted 42,227,180 Total Scope 1 Emissions in 2019-20 and 40,209,034 t CO2-e in 2020–21. AGL is also a significant investor, owner, and operator, of renewable energy assets.

<span class="mw-page-title-main">Solar power in Australia</span>

Solar power is a fast-growing industry in Australia. As of December 2022, Australia's over 3.36 million solar PV installations had a combined capacity of 29,683 MW photovoltaic (PV) solar power, of which at least 3,922 MW were installed in the preceding 12 months. In 2019, 59 solar PV projects with a combined capacity of 2,881 MW were either under construction, constructed or due to start construction having reached financial closure. Solar accounted for 12.4% of Australia's total electrical energy production in 2021.

<span class="mw-page-title-main">SEAGas pipeline</span>

The SEA Gas pipeline(South East Australia Gas pipeline) is a 687 km natural gas pipeline from the Iona Gas Plant near Port Campbell in Victoria to the Pelican Point Power Station at Port Adelaide. It connects Adelaide's gas supply to sources from Victoria's Otway Basin, thus increasing the security of natural gas supply to Adelaide. The pipeline is owned and operated by South East Australia Gas Pty Ltd who are owned in a 50-50 partnership by APA Group (Australia) and the Retail Employees Superannuation Trust.

Condamine Power Station is a 140 MW combined cycle power station near Miles on the western Darling Downs in Queensland, Australia. The station is located 8 kilometres (5.0 mi) east of Miles on the south side of the Warrego Highway. The Condamine Power Station is owned by QGC Limited, a subsidiary of Royal Dutch Shell. It has been claimed to be the world’s first combined-cycle power station entirely fired by untreated coal seam gas and Australia's first steam turbine condenser cooled by coal seam methane waste water. However, the Townsville Power Station at Yabulu, which was converted from a peak load power station to burn only coal seam gas in a combined cycle configuration, was commissioned much earlier, in February 2005.

Tamar Valley Power Station is a $230 million natural gas-fired power station located in Bell Bay in the Tamar Valley, Tasmania. It is owned by Hydro Tasmania, and is immediately adjacent to the decommissioned Bell Bay Power Station, which is also owned by Hydro Tasmania.

The Australian Energy Market Operator (AEMO) performs an array of gas and electricity market, operational, development and planning functions. It manages the National Electricity Market (NEM), the Wholesale Electricity Market (WA) (WEM) and the Victorian gas transmission network. AEMO also facilitates electricity and gas full retail contestability, overseeing these retail markets in eastern and southern Australia. It is additionally responsible for national transmission planning for electricity and the establishment of a Short Term Trading Market (STTM) for gas.

<span class="mw-page-title-main">Torrens Island</span> Island in South Australia

Torrens Island is an island in the Australian state of South Australia located in the Adelaide metropolitan area in the Port River Estuary about 15 kilometres (9.3 mi) northwest of the Adelaide city centre. Since European settlement of Adelaide in 1836, it has been used for a number of purposes.

South Australia is a leader in utility-scale renewable energy generation, and also produces gas and uranium for electricity generation. Gas production is mostly concentrated in the Cooper Basin in the state's north-east. Gas is delivered from these fields by pipeline to users interstate and to Port Adelaide where it fuels three separate gas-fired power plants. Uranium is also mined in South Australia, though nuclear power generation is prohibited nationally. The Olympic Dam mine is the world's single largest known deposit of uranium and represents 30% of the world's total uranium resource. Many utility-scale wind farms and solar farms have been commissioned during the 21st century and geology with potential for geothermal energy has also been identified but is yet to be developed.

<span class="mw-page-title-main">Pelican Point Power Station</span> Engie power station near Adelaide, South Australia

The Pelican Point Power Station is located at Pelican Point, 20 km from the centre of Adelaide, South Australia on the Lefevre Peninsula. It is operated by Engie, which owns 72 per cent of the power station. Mitsui owns the remaining 28 per cent. It burns natural gas in a combined cycle power station, comprising two 160 MW gas turbines and one 165 MW steam turbine, to generate up to 485 MW of electricity.

Macquarie Generation is an electricity generation company in New South Wales, Australia, owned by AGL Energy, and has a portfolio of generating sites using predominantly thermal coal power. The company now trades as AGL Macquarie and generates electricity for sale under contract.

Hallett Power Station is located in Canowie, in the Mid North of South Australia, located about 210 kilometres (130 mi) north of Adelaide. It was commissioned in 2001 and opened in 2002. It was built by AGL Energy, but was sold in 2007, and is currently operated by EnergyAustralia. It has capacity of approximately 200 megawatts (270,000 hp), and connects to the National Electricity Grid. It contains 12 gas turbine generators.

The South Australian blackout of 2016 was a widespread power outage in South Australia that occurred as a result of storm damage to electricity transmission infrastructure on 28 September 2016. The cascading failure of the electricity transmission network resulted in almost the entire state losing its electricity supply, affecting 850,000 SA customers. Kangaroo Island did not lose its supply, as the Kangaroo Island power station had been built to supply the island for the contingency of a failure in the power cable under the Backstairs Passage.

Barker Inlet Power Station is a power station in South Australia. It was announced on 7 June 2017 by AGL Energy to replace part of its ageing Torrens Island Power Station and was built alongside the existing station on Torrens Island in the northwestern suburbs of Adelaide. The power station was commissioned on 4 November 2019.

<span class="mw-page-title-main">Quarantine Power Station</span>

Quarantine Power Station is a gas-powered electricity generation facility near the northern end of Torrens Island in the northwestern suburbs of Adelaide, South Australia. It is at the opposite end of Torrens Island from AGL Energy's Torrens Island and Barker Inlet power stations. It gets its name from the Torrens Island Quarantine Station which was nearby.

References

  1. "TRU Torrens Island". CLP Group. Archived from the original on 21 October 2006. Retrieved 30 December 2006.
  2. "Torrens Island, SOUTH AUSTRALIA". GJC Engineers. Archived from the original on 30 August 2007. Retrieved 8 January 2008.
  3. "ELECTRICITY TRUST OF SOUTH AUSTRALIA (TORRENS ISLAND POWER STATION) ACT 1962". Australasian Legal Information Institute. Retrieved 30 December 2006.
  4. "AGL - AGL to mothball South Australian generating units". www.agl.com.au. Retrieved 27 December 2015.
  5. "AGL to defer mothballing of South Australian generating units". AGL. 6 June 2016. Retrieved 17 June 2016.
  6. Washington, David (7 June 2017). "AGL to build "rapid response" power station in Adelaide". InDaily. Retrieved 7 June 2017.
  7. "AGL announces development of $295 million power station in South Australia". ASX & Media Release (Press release). AGL. 7 June 2017. Retrieved 22 October 2017.
  8. "Generation information page". Australian Energy Market Operator. 2 November 2018. Retrieved 13 November 2018.
  9. "AGL confirms schedule to close power plants". Utility Magazine. 5 August 2019. Retrieved 3 April 2021.
  10. "AGL to mothball one unit at Torrens B in South Australia" (Press release). AGL Energy. 7 July 2021. Retrieved 7 July 2021.
  11. "Torrens Island 'B' Power Station to close in 2026" (Press release). AGL Energy. 24 November 2022. Retrieved 24 November 2022.
Torrens Island Power Station (top right) and transmission lines viewed from the NE in 2008 - Dry Creek salt pans in the foreground Port Adelaide aerial view.jpg
Torrens Island Power Station (top right) and transmission lines viewed from the NE in 2008 - Dry Creek salt pans in the foreground
Torrens Island Power Station and transmission lines viewed from North Arm Creek NorthArmPano.jpg
Torrens Island Power Station and transmission lines viewed from North Arm Creek