Wind power became a significant energy source within South Australia over the first two decades of the 21st century. In 2015, there was an installed capacity of 1,475 MW, which accounted for 34% of electricity production in the state. [1] This accounted for 35% of Australia's installed wind power capacity. [1] In 2021, there was an installed capacity of 2052.95 MW, which accounted for 42.1% of the electricity production in the state in 2020. [2] [3]
The development of wind power capacity in South Australia has been encouraged by a number of factors. These include the Australian Government's Renewable Energy Target, which require electricity retailers to source a proportion of energy from renewable sources, incentives from the South Australian Government including a supportive regulatory regime and a payroll tax rebate scheme for large scale renewable energy developments. Also the state's proximity to the Roaring forties means there are high quality wind resources for wind farms to exploit. In mid-2009, RenewablesSA was established by the South Australian Government to encourage further investment in renewable energy in the state. [4]
The load factor (or capacity factor) for South Australian wind farms is usually in the range of 32-38%. This means that a wind farm could typically produce between 32 and 38% of its nameplate capacity averaged over a year. [5]
In 2003 the only large wind turbine in South Australia was a 0.15 MW unit at Coober Pedy and by early 2004 there was 34 MW of installed wind power capacity. [5] [ unreliable source? ]
As of December 2010, South Australia had thirteen operational wind farms, with an installed capacity of 1,018 MW. By August 2014 this has increased to 1,473 MW, accounting for 27 per cent of electricity production. [6] As of late 2015 there are a large range of new wind farms in various stages of planning but only one under construction, the Hornsdale Wind Farm. Hornsdale is a place that was generating 86 MW immediately prior to the 2016 South Australian blackout in September 2016. [7]
South Australia has provided regulatory certainty for wind farms, and the government has implemented land use planning policies which represent national best practice for accommodating wind farms. [8] On 2 June 2009, Premier Mike Rann announced plans to increase South Australia's renewable energy production target to 33% by 2020, well above the national target of 20% by 2020. [8] [ needs update ]
Installed capacity (MW) | Wind farm | Owner | Stage | Installed capacity (MW) | Generating since... |
---|---|---|---|---|---|
368.7 | Snowtown wind farm | Tilt Renewables | 1 | 98.7 | September 2008 |
2 | 270 | October 2014 | |||
350.7 | Hallett Wind Farm | AGL Energy | 1 | 94.5 | March 2007 |
2 | 71.4 | September 2009 | |||
4 | 132.3 | August 2010 | |||
5 | 52.5 | July 2011 | |||
316.8 | Hornsdale Wind Farm | Neoen | 1 | 102.4 | June 2016 |
2 | 102.4 | February 2017 | |||
3 | 112 | August 2017 | |||
278.5 | Lake Bonney Wind Farm | Infigen Energy | 1 | 80.5 | March 2005 |
2 | 159 | April 2008 | |||
3 | 39 | September 2009 | |||
130.8 | Waterloo Wind Farm | Palisade Investment Partners | 1 | 111 | November 2010 |
2 | 19.8 | November 2016 | |||
126 | Lincoln Gap Wind Farm | Nexif Energy | 1 | 126 | April 2019 |
2 | 86 | ||||
119 | Willogoleche Wind Farm | Engie | - | 119 | August 2018 |
90.75 | Wattle Point Wind Farm | AGL Energy | - | 90.75 | April 2005 |
70 | Mount Millar Wind Farm | Meridian Energy | - | 70 | February 2006 |
66 | Cathedral Rocks Wind Farm | EnergyAustralia/ Acciona | - | 66 | September 2005 |
56.7 | Clements Gap Wind Farm | Pacific Hydro | - | 56.7 | February 2010 |
46 | Canunda Wind Farm | Engie/Mitsui | - | 46 | March 2005 |
33 | Starfish Hill Wind Farm | RATCH-Australia | - | 33 | September 2003 |
It is located on the Barunga Range of hills west of Snowtown in the mid-North of South Australia and around 150 km north of the state capital, Adelaide. The first stage of the Snowtown wind farm with a capacity of 98.7 MW was completed in 2008. [9] The 270 MW second stage was completed in November 2014. [10]
Hallett Wind Farm was developed in four stages: Hallett 1 (also known as Brown Hill Wind Farm), Hallett 2 (Hallett Hill), Hallett 4 (North Brown Hill) and Hallett 5 (Bluff Range). The proposed Hallett 3 (Mt Bryan) wind farm was put on hold by AGL in 2012. [11]
Hallett 1 consists of 45 Suzlon 2.1 MW S88 turbines (95 MW in total) and was completed in June 2008. Hallett 2 consists of 34 2.1 MW Suzlon turbines (71.4 MW in total) and was completed in late 2009. Hallett 4 has 63 turbines with a total installed capacity of 132 MW, and was in full operation in early 2011. Hallett 5 consists of 25 Suzlon turbines each of 2.1 MW and was completed in early 2012.
Hornsdale Wind Farm was built in three stages. Construction of Stage 1 began in September 2015 and was finished in September 2017. Stage 1 consists of 32 turbines each having a rated capacity of 3.2 MW (total 102.4 MW). Construction of Stage 2 began in July 2016 and was finished in June 2017. Stage 2 consists of 32 turbines each having a rated capacity of 3.2 MW (total 102.4 MW). Construction of Stage 3 began in April 2017 and was finished in December 2017. Stage 3 consists of 35 turbines each having a rated capacity of 3.2 MW (total 112 MW).
Lake Bonney Wind Farm was built in three stages. Stage 1 consists of 46 turbines each having a rated capacity of 1.75 MW (total 80.5 MW) and was finished in March 2005. Construction of Stage 2 began in November 2006 and was finished around April 2008. Stage 2 consists of 53 turbines of 3 MW (total 159 MW). Stage 3 consists of 13 turbines of 3 MW (total 39 MW). The combined capacity of the three stages are 278.5 MW making it the biggest wind farm in Australia at the time of completion. [12] [ unreliable source? ]
Lincoln Gap Wind Farm is built on the hills above Lincoln Gap, a gap in the range where the Eyre Highway and Whyalla railway line pass through.
The Waterloo Wind Farm was built as a 111 MW wind farm which was completed in 2010 at an estimated cost of $300 million. [13] It had thirty-seven Vestas V90 3 MW turbines along the 18 km wind farm site connected through a 33 kilovolt (kV) internal reticulation network to the wind farm substation. The wind farm is approximately 30 kilometres south-east of the township of Clare and 100 km north of Adelaide. [14] A Stage 2 expansion was approved to add up to an additional 6 turbines to the existing farm and increase its total generating capacity to over 130 MW. [15] The wind farm was expanded with six additional Vestas V117 turbines at the southern end in 2016 at a cost of A$43 million. [16]
Willogoleche Wind Farm is in the Mid North of South Australia, just west of the town of Hallett.
Wattle Point Wind Farm is near Edithburgh on the Yorke Peninsula. When it was officially opened in June 2005 it was Australia's largest wind farm at 91 MW. The installation consists of 55 wind turbines and was built at a cost of 165 million Australian dollars.
Mount Millar Wind Farm is situated on an escarpment between the towns of Cowell and Cleve located 100 kilometres southwest of Whyalla. The 35 wind turbines are positioned on the elongated Mount Millar site (about 7 kilometres in length) to maximise wind exposure and can generate up to 70 megawatts of electricity. Construction of this wind farm started in late 2004 and was completed in December 2005. Power production started in February 2006. [5]
Cathedral Rocks Wind Farm is in a remote coastal area located near the southern tip of the Eyre Peninsula in South Australia, about 30 km south west of Port Lincoln. It has 33 wind turbines capable of generating 66 MW in total. Construction started in 2004, and the first turbines were commissions in late 2005. The wind farm was fully operational by 2007. [17]
In February 2010, Pacific Hydro opened the 56.7 MW Clements Gap Wind Farm. The wind farm is located in South Australia's mid-north. The project has 27 x 2.1 MW Suzlon wind turbines, which generate enough electricity for 30,000 homes. [18]
Canunda Wind Farm is a $92.5 million, 46 MW wind power project located on grazing land approximately 16 kilometres south of Millicent. [19] The wind farm is made up of 23 Vestas 2.0 MW wind turbines. The project was opened in March 2005.
Starfish Hill Wind Farm is near Cape Jervis on the Fleurieu Peninsula. It comprises 22 turbines of 1.5 MW each, with turbines on Starfish Hill on the nearby Salt Creek Hill, giving a combined generating capacity of 33 MW. Starfish Hill Wind Farm was commissioned in September 2003, making it the first major wind farm in South Australia. [20]
This section needs to be updated.(June 2022) |
In addition to its operating wind farms, South Australia has several proposals for new farms at various stages of development. These include:
Designed capacity (MW) | Wind farm | Location | Developer | Development Status | Expected operational date |
---|---|---|---|---|---|
180 | Barn Hill | Will fill the gap between Snowtown and Clements Gap wind farms on the Barunga Range southwest of Redhill [21] | AGL Energy | 2009 approved, 2013 revised [22] | AGL target investment decision Mid 2023 [23] |
600 | Ceres Project | Yorke Peninsula | Spark Renewables (acquired May 2022 from Senvion Australia) | Approved 2014. Revised plan approved August 2019 [24] New owner preparing fresh development application [25] | Unknown |
? - 26 turbines | Crystal Brook energy park | Crystal Brook | Neoen | August 2019 approval [26] | Construction due 12 months from approval |
144-250 | Exmoor | Naracoorte | Acciona | Application lodged 2011, [27] possibly lapsed by 2019 | 2017 [28] [29] |
412 | Goyder South Wind Farm | Southeast of Burra | Neoen | Under construction | 2024 [30] |
105 | Keyneton | Keyneton | Pacific Hydro | 2013 approved. [31] 2019 cancelled. [32] | Construction was to start mid-2019 [33] |
120 | Kongorong | Kongorong (west of Mount Gambier) | RATCH-Australia | Possibly lapsed before 2019 | [29] Not mentioned on company web site [34] |
110 | Kulpara | northwest of Port Wakefield | RATCH-Australia | Possibly lapsed before 2019 | [29] Not mentioned on company web site [34] |
375 | Palmer | Palmer, Tungkillo, Sanderston | Tilt Renewables | In Development, being assessed against other options [35] | Approved 2015, appeals dismissed 2019 [36] |
206.5 | Port Augusta Renewable Energy Park | south of Port Augusta | DP Energy and Iberdrola [37] | Under construction | 2022 [38] |
14–200 [39] | Tungketta Hill/Elliston | Between Elliston and Sheringa [40] | Ausker Energies | Approved | The developer's website (last updated in 2014) said construction would begin when transmission issues are resolved. [39] |
185 | Twin Creek Wind Farm | northeast of Kapunda | RES Australia | May 2019 development consent [41] October 2019 Development approval [42] | [43] |
350 | Woakwine | near Beachport | Infigen Energy | 2012 approved [44] | [45] [29] |
The Myponga Wind Farm was a wind farm proposal by TrustPower in the southern Mount Lofty Ranges, on the Fleurieu Peninsula 50 km south of Adelaide, between the towns of Myponga and Sellicks Beach. Development approval was granted in 2003, [46] and the project was planned to be operational by the end of 2010. [47] The approval was revoked in 2011. [48]
In 2009, TrustPower announced that it would not proceed with the project, because the South Australian government had not approved variations to height, layout and turbine type in the existing planning approval. [49] The requested change was to reduce the number of turbines to 16 but increase their power output and increase the height of the turbines from 100 metres to 110 metres. [50] The planning approval was eventually revoked. [48]
Pacific Hydro proposed to build a 105 MW wind farm near Keyneton east of the Barossa Valley. [51] It was approved by the government in 2013. [31] The proposal was cancelled in October 2019. [32]
This section needs to be updated.(June 2022) |
The increasing proportion of renewable energy in the state has caused a significant decrease in the emissions intensity of electricity generation in South Australia.
The rapid development of wind power in South Australia has led to direct economic effects from the construction and operation of wind farms. There has been a total of $2.8 billion in wind power investment up to October 2011 which is estimated to have created 3,000 direct and indirect jobs. [52] Studies into the economic effects of wind farms have reported that a 50 MW installation pays host landholders some $250,000 per year, is constructed by workers who spend up to $1.2 million locally and contributes up to $80,000 annually to community projects. [53]
Policies to streamline the approval process for wind farm developments have met with some community opposition. Specific concerns have been raised by rural residents who claim that wind farms have an unacceptable impact on property values, health and the environment. [54]
There has been some controversy with respect to the impact of the rising share of wind power and other renewables such as solar on retail electricity prices in South Australia. A 2012 report by The Energy Users Association of Australia claimed that retail electricity prices in South Australia were then the third highest in the developed world behind Germany and Denmark, with prices likely to rise to become the most expensive in the near future. [55] The then South Australian Opposition Leader, Isobel Redmond, linked the state's high retail prices for electricity to the Government's policy of promoting development of renewable energy, noting that Germany and Denmark had followed similar policies. [56] On the other hand, it has been noted that the impact of wind power on the merit order effect, where relatively low cost wind power is purchased by retailers before higher cost sources of power, has been credited for a decline in the wholesale electricity price in South Australia. [57] Data compiled by the Australian Energy Market Operator (AEMO) shows South Australian wholesale electricity prices are the third highest out of Australia's five mainland states, [58] with the 2013 South Australian Electricity Report noting that increases in prices were "largely driven by transmission and distribution network price increases". [59]
The South Australian Government has stated that the price increase due to the Australian Government's carbon price (in place from July 2012 to June 2014) was approximately half of that experienced by other states due to the high installed capacity of wind and gas-fired generation. [60]
This section needs to be updated. The reason given is: was it successful?.(June 2022) |
In October 2011 the South Australian state Government released a renewable energy plan proposing a range of measures including: [52] [61]
Crookwell Wind Farm, located at Crookwell west of Goulburn, New South Wales, consists of eight 600 kW wind turbines giving a total capacity of 4.8 MW. It was the first grid-connected wind farm in Australia when built by Pacific Power in 1998. It is now owned by Tilt Renewables.
The United Kingdom is the best location for wind power in Europe and one of the best in the world. By 2023, the UK had over 11 thousand wind turbines with a total installed capacity of 28 gigawatts (GW): 14 GW onshore and 14 GW offshore, the sixth largest capacity of any country. Wind power generated about 25% of UK electricity, having surpassed coal in 2016 and nuclear in 2018. It is the largest source of renewable electricity in the UK.
Wind power is one of the main renewable energy sources in Australia contributing 10% of Australia's total electricity supply in 2020, and making up 37.5% of it's renewable energy supply. Wind resource testing conditions in Australia are optimum, as abundant wind resources may be located close to residential areas in the southern parts of the country and on the slopes of the Great Dividing Range in the east.
AGL Energy Ltd is an Australian listed public company involved in both the generation and retailing of electricity and gas for residential and commercial use. AGL is Australia's largest electricity generator, and the nation's largest carbon emitter. In 2014, the company had an operated generation capacity of 10,984 MW. The company emitted 42,227,180 Total Scope 1 Emissions in 2019-20 and 40,209,034 t CO2-e in 2020–21. AGL is also a significant investor, owner, and operator, of renewable energy assets.
Renewable energy in Australia includes wind power, hydroelectricity, solar photovoltaics, heat pumps, geothermal, wave and solar thermal energy.
Lake Bonney Wind Farm, in South Australia, was built in three stages. Stage 1 comprises 46 turbines each having a rated capacity of 1.75 MW and was finished in March 2005. Construction of Stage 2 began in November 2006 and was finished around April 2008. Stage 2 comprises 53 turbines of 3 MW. Stage 3 comprises 13 turbines of 3 MW of total 39 MW). Stage 3 construction commenced in February 2009 and was commissioned in September 2009.
The Hallett Wind Farm is the collective name for four wind farms near the town of Hallett, South Australia. They are owned and operated by AGL Energy.
Wind power in Texas, a portion of total energy in Texas, consists of over 150 wind farms, which together have a total nameplate capacity of over 30,000 MW. If Texas were a country, it would rank fifth in the world: The installed wind capacity in Texas exceeds installed wind capacity in all countries but China, the United States, Germany and India. Texas produces the most wind power of any U.S. state. According to the Electric Reliability Council of Texas (ERCOT), wind power accounted for at least 15.7% of the electricity generated in Texas during 2017, as wind was 17.4% of electricity generated in ERCOT, which manages 90% of Texas's power. ERCOT set a new wind output record of nearly 19.7 GW at 7:19 pm Central Standard Time on Monday, January 21, 2019.
Wind power is the fastest-growing renewable energy technology in Scotland, with 9,347 megawatts (MW) of installed wind power capacity as of June 2020. This included 8,366 MW from onshore wind in Scotland and 981 MW of offshore wind generators.
The Snowtown wind farms are located on the Barunga and Hummocks ranges west of Snowtown in the Mid North of South Australia, around 150 kilometres (93 mi) north of the state capital, Adelaide. They were developed by Trustpower and owned by Tilt Renewables, which demerged from Trustpower in 2016. The first stage of 47 turbines was completed in 2008 and Stage 2 of 90 turbines became operational in 2014. Stage 2 was sold by Tilt Renewables to Palisade Investment Partners in December 2019.
Stockyard Hill Wind Farm is a wind farm project in Victoria (Australia). In May 2022 the project achieved its 5th hold point test, and was approved by the Australian Energy Market Operator and Network Services Provider to generate up to 400MW into the National Electricity Market. When it is fully commissioned, it is expected to produce up to 530MW, which would be Australia's largest wind farm.
The Lincoln Gap Wind Farm is a wind farm in the vicinity of Lincoln Gap on northeastern Eyre Peninsula in South Australia, Australia. It consists of 59 wind turbines and generates a total of 212 MW of electricity. Construction began in late 2017 and was initially expected to be commissioned in late 2018. Construction was delayed in July 2018 when unexploded ordnance was discovered on the site, left from historic military testing. The site is not far from the Cultana Training Area.
The Willogoleche Wind Farm is a wind farm in the vicinity of Hallett in the Mid North region of South Australia. It generates up to 119 MW of electricity. There are 32 turbines in the wind farm. The closest to the town of Hallett is 3.2 km west of the town, and the furthest is 8.3 km southwest of the town. It was officially opened on 30 July 2019. The electricity generated is sold by Engie's retail brand Simply Energy.
The Murra Warra Wind Farm will be one of Australia's largest wind farms. Located on the plains of north-western Victoria, approximately 25 kilometres (16 mi) north of the city of Horsham, it will consist of 99 wind turbines with a maximum tip height of 220m.
Bodangora Wind Farm is a 113.2 MW wind farm owned by Infigen Energy in the district of Bodangora near Wellington, New South Wales, Australia. It consists of 33 wind turbines. The towers are 85 metres tall, and the rotor diameter is 130 metres. The wind turbine blades were manufactured in Bergama, Turkey. The development of the project began in 2009. It received planning approval in August 2013. The wind farm was completed on 27 February 2019. Annually it is supposed to generate on average 361 GWh of energy at capacity factor of 36.4%.
Dundonnell Wind Farm is at Dundonnell, 23 kilometres (14 mi) northeast of Mortlake in the Australian state of Victoria. Construction began in January 2019 and was completed in 2020 with 80 Vestas wind turbines with a capacity to generate 336MW of electricity. The drive trains and hubs were assembled at the former Ford Australia site in Geelong.
Bango Wind Farm is a wind farm under construction in the Australian state of New South Wales. It is being developed by CWP Renewables between the towns of Yass and Boorowa. Construction began in August 2019.22 of the turbines have been erected and 10 of those are fully operational. It is expected to be completed late in 2021.
{{cite web}}
: CS1 maint: url-status (link)We will be commencing construction after the transmission issues on the Eyre Peninsula have been resolved.