Yandin Wind Farm | |
---|---|
Country | Australia |
Location | Dandaragan |
Coordinates | 30°46′04″S115°38′34″E / 30.767889°S 115.642778°E |
Status | Operational |
Construction began | July 2019 |
Commission date | May 2021 |
Construction cost | AU$450 million [1] |
Owners | RATCH-Australia (70%) Alinta Energy (30%) |
Operator | Vestas |
Wind farm | |
Type | Onshore |
Rotor diameter | 150 metres |
Power generation | |
Nameplate capacity |
|
External links | |
Website | www.yandinwindfarm.com.au |
Yandin Wind Farm is one of Western Australia's largest [a] [3] [4] wind power stations, located in Dandaragan, Western Australia.
Construction was completed in late October 2020. It comprises 51 turbines with hub heights of 105 metres (344 ft) to maximise performance in the site's specific wind conditions. The turbines are Vestas V150 variants with a 4.2 MW capacity, resulting in a total generation capacity of 214 MW. [5] [6]
Commissioning began in July 2020 with increasing outputs being exported onto the South West Interconnected System as capacity (turbines) came online. [7] The wind farm opened in May 2021. [1]
Alinta Energy stated "the wind farm would power the equivalent of approximately 200,000 households across Western Australia each year." [3]
A wind farm or wind park, or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore.
Walkaway is a small town in the City of Greater Geraldton local government area of Western Australia. At the 2016 census, Walkaway had a population of 270.
The United Kingdom is the best location for wind power in Europe and one of the best in the world. The combination of long coastline, shallow water and strong winds make offshore wind unusually effective.
Alinta wind farm is a wind power station at Walkaway, just south of Geraldton, Western Australia. It is owned by Infigen Energy and has offtake agreements with Alinta Energy and AGL Energy.
Wind power is a type of power using wind turbines allowing for electricity to be made and stored without the use of fossil fuels, including the green power in Australia’s energy sectors. As of October 2023, the nation has an installed wind capacity of around 9,100 megawatts (MW). It accounts for approximately 5% of the country's total primary energy supply and 35% of its renewable energy supply. Australia's geographical features, including its southern regions and the eastern slopes of the Great Dividing Range, are particularly conducive to wind energy development. Most of Australia's wind farms are situated in coastal areas.
AGL Energy Ltd is an Australian listed public company involved in both the generation and retailing of electricity and gas for residential and commercial use. It is one of the "big three" retailers in the National Electricity Market. AGL is Australia's largest electricity generator, and the nation's largest carbon emitter. In 2022, 83% of its energy came from burning coal.
Solar power is a major contributor to electricity supply in Australia. As of September 2024, Australia's over 3.92 million solar PV installations had a combined capacity of 37.8 GW photovoltaic (PV) solar power. In 2019, 59 solar PV projects with a combined capacity of 2,881 MW were either under construction, constructed or due to start construction having reached financial closure. Solar accounted for 12.4% of Australia's total electrical energy production in 2021.
Wind power became a significant energy source within South Australia over the first two decades of the 21st century. In 2015, there was an installed capacity of 1,475 MW, which accounted for 34% of electricity production in the state. This accounted for 35% of Australia's installed wind power capacity. In 2021, there was an installed capacity of 2052.95 MW, which accounted for 42.1% of the electricity production in the state in 2020.
The Waubra wind farm is located on both sides of the Sunraysia Highway 35 km north-west of Ballarat in Victoria, Australia. Upon its completion in July 2009, it was the largest wind farm in Australia and was the largest wind farm by number of turbines and total capacity in the southern hemisphere.
Wind power is the fastest-growing renewable energy technology in Scotland, with 11,482 megawatts (MW) of installed wind power capacity by Q1 2023. This included 9,316 MW from onshore wind in Scotland and 2,166 MW of offshore wind generators.
As of April 2020, the energy sector in Senegal has an installed capacity of 1431 megawatts (MW). Energy is produced by private operators and sold to the Senelec energy corporation. According to a 2020 report by the International Energy Agency, Senegal had nearly 70% of the country connected to the national grid. Current government strategies for electrification include investments in off-grid solar and connection to the grid.
Coopers Gap Wind Farm is a 453 megawatt wind farm in the Western Downs and South Burnett regions of Queensland, Australia. It is located approximately 175 km north-west of the state capital Brisbane, and 50 kilometres south-west of Kingaroy and 65 kilometers north of Dalby. When construction was announced to be completed on 30 April 2020, it became the largest wind farm in Australia. This record was held until 10 December 2020 when the Stockyard Hill Wind Farm in Victoria was completed.
As of May 2024, wind power in the Netherlands has an installed capacity of 11,611 MW, 40.9% of which is based offshore. In 2022, the wind turbines provided the country with 18.37% of its electricity demand during the year. Windmills have historically played a major part in the Netherlands by providing an alternative to water driven mills.
Collgar Wind Farm is a wind farm located approximately 25 kilometres south-east of Merredin, Western Australia. It is operated by Collgar Renewables. With 111 Vestas V90-2.0MW wind turbines, and a total installed capacity of 222 MW registered with AEMO, it is Western Australia's largest wind farm. It became fully operational in October 2011 and is expected to generate 750 GWh per year on average over the 30-year life of the project.
The electricity sector in Australia has been historically dominated by coal-fired power stations, but renewables are forming a rapidly growing fraction of supply. In 2021, Australia's electricity production reached 265 TWh, with coal accounting for 52.9% and natural gas for 18.8%. Renewable sources, comprising solar, wind, hydro, and bioenergy with waste, collectively made up 26.7% of the total electricity generation mix.
Neoen is a French producer of exclusively renewable energy headquartered in Paris, France. Founded in 2008, it develops, finances, builds and operates solar power plants, onshore wind farms and energy storage solutions. As at 31 December 2023, the company's total capacity was 8 GW, made up of 50% solar, 30% wind and 20% battery storage. Neoen aims to attain 10 GW in operation or under construction by 2025.
The Murra Warra Wind Farm is one of Australia's largest wind farms. Located on the plains of north-western Victoria, approximately 25 kilometres (16 mi) north of the city of Horsham, it consists of 99 wind turbines with a maximum tip height of 220m.
Badgingarra Wind Farm is a wind farm in the locality of Hill River northwest of the town of Badgingarra in Western Australia, about 200 kilometres (120 mi) north of Perth. It is owned by APA Group and located immediately north of the older Emu Downs Wind Farm which has the same owner.