Boco Rock Wind Farm

Last updated

Boco Rock Wind Farm
Boco Rock Wind Farm
CountryAustralia
LocationNimmitabel, New South Wales
Coordinates 36°35′S149°05′E / 36.58°S 149.08°E / -36.58; 149.08
StatusOperational
Construction beganAugust 2013
Commission date 2015
Owner(s)Electricity Generating Public Company
Operator(s) CWP Renewables
Wind farm
Type Onshore
Hub height80 metres (262 ft)
Rotor diameter100 metres (328 ft)
Power generation
Units operational67 × 1.7 MW
Make and model General Electric 1.7-100
Nameplate capacity 113.9 MW
Capacity factor 34.99% (average 2015-2021)
Annual net output 349.1 GWh (average 2015-2021)
External links
Website www.bocorockwindfarm.com.au

Boco Rock Wind Farm is a wind farm 10km southwest of Nimmitabel in the Snowy Mountains region of New South Wales, Australia. It has 67 GE 100-1.7 wind turbines with a hub height of 80m, and generates up to 113MW of electricity. It is managed by the developers, CWP Renewables but is now owned by EGCO. [1]

The engineering, procurement and construction contract for the wind farm was let in June 2013 to a consortium of GE and Downer EDI. The electricity generated is contracted for sale to EnergyAustralia. [2]

Operations

The wind farm began grid output in August 2014 and was fully commissioned in November 2014 and has operated continuously since then. The generation table uses eljmkt nemlog to obtain generation values for each month.

Boco Rock Wind Farm Generation (MWh)
YearTotalJanFebMarAprMayJunJulAugSepOctNovDec
201461,991N/AN/AN/AN/AN/AN/AN/A-0.4*3,695*14,567*17,705*26,024
2015317,67630,17015,47920,78126,88031,33020,59437,33433,93824,58730,20723,65922,717
2016373,04123,87220,04218,33020,30243,05734,33135,20529,50333,87549,16233,02632,336
2017344,92330,72827,37219,84119,42223,10614,01240,76539,90050,47227,90622,03129,368
2018367,31428,33219,93023,99121,55733,57332,09643,78446,58130,17728,34732,39726,549
2019365,38626,41223,08626,67822,13340,47626,81736,39735,28731,48725,75941,27729,577
2020342,86730,89533,17635,92224,91129,23925,08125,08326,08331,59027,66025,78827,439
2021332,60821,73920,70921,99216,92724,93331,59443,95837,19841,47029,31422,72120,053

Note: Asterisk indicates power output was limited during the month.

Related Research Articles

<span class="mw-page-title-main">Wind power</span> Electrical power generation from wind

Wind power is the use of wind energy to generate useful work. Historically, wind power was used by sails, windmills and windpumps, but today it is mostly used to generate electricity. This article deals only with wind power for electricity generation. Today, wind power is generated almost completely with wind turbines, generally grouped into wind farms and connected to the electrical grid.

<span class="mw-page-title-main">Capacity factor</span> Electrical production measure

The net capacity factor is the unitless ratio of actual electrical energy output over a given period of time to the theoretical maximum electrical energy output over that period. The theoretical maximum energy output of a given installation is defined as that due to its continuous operation at full nameplate capacity over the relevant period. The capacity factor can be calculated for any electricity producing installation, such as a fuel consuming power plant or one using renewable energy, such as wind or the sun. The average capacity factor can also be defined for any class of such installations, and can be used to compare different types of electricity production.

Crookwell Wind Farm, located at Crookwell west of Goulburn, New South Wales, consists of eight 600 kW wind turbines giving a total capacity of 4.8 MW. It was the first grid-connected wind farm in Australia when built by Pacific Power in 1998. It is now owned by Tilt Renewables.

<span class="mw-page-title-main">Wind power in the United Kingdom</span>

The United Kingdom is the best location for wind power in Europe and one of the best in the world. By 2023, the UK had over 11 thousand wind turbines with a total installed capacity of 28 gigawatts (GW): 14 GW onshore and 14 GW offshore, the sixth largest capacity of any country. Wind power generated about 25% of UK electricity, having surpassed coal in 2016 and nuclear in 2018. It is the largest source of renewable electricity in the UK.

Eraring Energy was an electricity generation company in Australia that was owned by the Government of New South Wales, and had a portfolio of generating sites using thermal coal, wind, and hydroelectric power. It was sold to Origin Energy in 2013.

<span class="mw-page-title-main">AGL Energy</span> Australian electricity generator and retailer

AGL Energy Ltd is an Australian listed public company involved in both the generation and retailing of electricity and gas for residential and commercial use. AGL is Australia's largest electricity generator, and the nation's largest carbon emitter. In 2014, the company had an operated generation capacity of 10,984 MW. The company emitted 42,227,180 Total Scope 1 Emissions in 2019-20 and 40,209,034 t CO2-e in 2020–21. AGL is also a significant investor, owner, and operator, of renewable energy assets.

<span class="mw-page-title-main">Solar power in Australia</span>

Solar power is a fast-growing industry in Australia. As of March 2023, Australia's over 3.44 million solar PV installations had a combined capacity of 30,465 MW photovoltaic (PV) solar power, of which at least 3,953 MW were installed in the preceding 12 months. In 2019, 59 solar PV projects with a combined capacity of 2,881 MW were either under construction, constructed or due to start construction having reached financial closure. Solar accounted for 12.4% of Australia's total electrical energy production in 2021.

<span class="mw-page-title-main">Wind power in South Australia</span> South Australian use of wind turbines to generate electricity

Wind power became a significant energy source within South Australia over the first two decades of the 21st century. In 2015, there was an installed capacity of 1,475 MW, which accounted for 34% of electricity production in the state. This accounted for 35% of Australia's installed wind power capacity. In 2021, there was an installed capacity of 2052.95 MW, which accounted for 42.1% of the electricity production in the state in 2020.

<span class="mw-page-title-main">Emu Downs Wind Farm</span> Wind farm in Western Australia

The Emu Downs Wind Farm is a 79.2 MW wind farm in Western Australia. It was a 50:50 joint development between Griffin Energy and Stanwell Corporation. The site is approximately 200 kilometres north of Perth, near Cervantes. Construction of the $180 million project commenced in November 2005, and the project was commissioned in October 2006.

Musselroe Wind Farm is a wind farm at Cape Portland, Tasmania, Australia. It was the third wind farm built in the state, following the Bluff Point and Studland Bay Wind Farms.

<span class="mw-page-title-main">Coopers Gap Wind Farm</span> Wind farm in Queensland, Australia

Coopers Gap Wind Farm is a 453 megawatt wind farm in the Western Downs and South Burnett regions of Queensland, Australia. It is located approximately 175 km north-west of the state capital Brisbane, and 50 kilometres south-west of Kingaroy and 65 km north of Dalby. When construction was announced to be completed on 30 April 2020, it became the largest wind farm in Australia. This record was held until 10 December 2020 when the Stockyard Hill Wind Farm in Victoria was completed.

The Macarthur Wind Farm is a wind farm located in Macarthur, Victoria, Australia, near Hamilton, 260 km west of Melbourne. It is on a 5,500 ha site which has an installed capacity of 420 megawatts (MW). Based on a capacity factor of around 35%, it is estimated that the long-term average generation will be approximately 1,250 GWh per year. Its actual capacity factor is much lower, with a historical average of 26.29% since 2013.

<span class="mw-page-title-main">Wind power in Oklahoma</span> Electricity from wind in one U.S. state

The U.S. State of Oklahoma has high potential capacity for wind power in the western half of the state. In 2021, Oklahoma's installed wind generation capacity was almost 10,500 megawatts, supplying over 40% of the state's generated electricity and 85% of Oklahoma's total generating capacity from all renewable resources.

The Taralga Wind Farm is a wind farm located near Taralga, New South Wales. Owned by Pacific Blue, it commenced operation in 2015.

Solar River Project is a proposed photovoltaic power station planned to be built near Robertstown in South Australia. The project received development approval from the Government of South Australia in June 2018 and was expected to start construction early in 2019. However, as of November 2021, the project was still proposed to be constructed, but work on site was not expected until at least the second half of 2022.

<span class="mw-page-title-main">Murra Warra Wind Farm</span>

The Murra Warra Wind Farm is one of Australia's largest wind farms. Located on the plains of north-western Victoria, approximately 25 kilometres (16 mi) north of the city of Horsham, it consists of 99 wind turbines with a maximum tip height of 220m.

Sapphire Wind Farm is a 270 megawatt (MW) wind farm in the Australian state of New South Wales. When it was built in 2018, it was the largest wind farm in New South Wales. It is located in the New England region of northern New South Wales, 28 kilometres east of Inverell and 18 kilometres west of Glen Innes. The farm covers approximately 8921 hectares of cleared grazing land, and has an elevation of about 750 to 1100m. It is north of the Gwydir Highway. The White Rock and Glen Innes Wind Farms are south of the highway closer to Glen Innes. It is intended to be colocated with a 200 MW solar farm. The wind farm contains 75 Vestas V126 turbines, each of which can generate 3.6 MW of electricity. They each have a 137 metre hub height and 126 metre rotor diameter. The project is approved to build up to 109 wind turbines.

<span class="mw-page-title-main">Bodangora Wind Farm</span>

Bodangora Wind Farm is a 113.2 MW wind farm owned by Infigen Energy in the district of Bodangora near Wellington, New South Wales, Australia. It consists of 33 wind turbines. The towers are 85 metres tall, and the rotor diameter is 130 metres. The wind turbine blades were manufactured in Bergama, Turkey. The development of the project began in 2009. It received planning approval in August 2013. The wind farm was completed on 27 February 2019. Annually it is supposed to generate on average 361 GWh of energy at capacity factor of 36.4%.

The Port Augusta Renewable Energy Park is a combined wind and solar farm under construction south of Port Augusta in South Australia, Australia. The solar farm is planned to be at the northern end of the site, west of the Augusta Highway and south of Sundrop Farms. The wind turbines will be on both sides of the Augusta Highway, extending south as far as the road to Horrocks Pass. Construction formally started in October 2020 and is estimated to take about 18 months to complete. The total site is about 5,400 hectares.

Badgingarra Wind Farm is a wind farm in the locality of Hill River northwest of the town of Badgingarra in Western Australia, about 200 kilometres (120 mi) north of Perth. It is owned by APA Group and located immediately north of the older Emu Downs Wind Farm which has the same owner.

References

  1. "Boco Rock Wind Farm" . Retrieved 27 September 2019.
  2. "GE and Downer partner to deliver $350m Boco Rock Wind Farm". Sustainability Matters. 28 June 2013. Retrieved 27 September 2019.