Burrendong Dam | |
---|---|
Location of the Burrendong Dam in New South Wales | |
Country | Australia |
Location | Wellington, New South Wales |
Coordinates | 32°40′4″S149°6′25″E / 32.66778°S 149.10694°E Coordinates: 32°40′4″S149°6′25″E / 32.66778°S 149.10694°E |
Purpose | Flood mitigation, irrigation, water supply |
Status | Operational |
Construction began | 1958 |
Opening date | 1967 |
Owner(s) | State Water Corporation |
Dam and spillways | |
Type of dam | Embankment dam |
Impounds | Macquarie River |
Height | 76 metres (249 ft) |
Length | 1,116 metres (3,661 ft) |
Dam volume | 1,188,000 megalitres (42,000×10 6 cu ft) [1] |
Spillways | One |
Spillway type | Gated concrete chute |
Spillway capacity | 13,720 cubic metres per second (485,000 cu ft/s) |
Reservoir | |
Creates | Lake Burrendong |
Total capacity | 1,188 gigalitres (4.20×1010 cu ft) |
Catchment area | 13,886 square kilometres (5,361 sq mi) |
Surface area | 8,900 hectares (22,000 acres) |
Normal elevation | 344 metres (1,129 ft) AMSL |
Power Station | |
Operator(s) | AGL Energy |
Commission date | 1996 |
Type | Conventional |
Installed capacity | 19 megawatts (25,000 hp) |
Annual generation | 50.9 gigawatt-hours (183 TJ) |
Website Burrendong Dam |
Burrendong Dam is a rock-fill embankment major gated dam with a clay core across the Macquarie River upstream of Wellington in the central west region of New South Wales, Australia. The dam's purpose includes flood mitigation, irrigation, water supply and hydro-electric power generation. The dam impounds Lake Burrendong and is filled by the waters from the Macquarie, and Cudgegong rivers as well as Meroo Creek.
The idea of building the dam arose in 1909. [2] However, it was not until 1946 until legislation was passed to construct the dam. Construction commenced in 1950. [3] The town of Mumbil expanded to accommodate the workers building the dam. [4] The dam was completed in April 1965 and water began to flow into it for the first time. [5] It was officially opened on 18 August 1967 by Robert Askin, the Premier of New South Wales. The date was chosen because it was the sesquicentenary of the town of Wellington. [6] In September 1969 the dam was nearly full for the first time. [7]
The village of Burrendong, once a gold-mining area, was flooded by the construction of the dam. [8]
The Burrendong Dam is a major dam on the Macquarie River within the Macquarie Valley, approximately 30 kilometres (19 mi) southeast of Wellington. The dam was built by the New South Wales Water Conservation & Irrigation Commission for the purposes of providing flood mitigation, irrigation, and water supply. [1] [9]
The dam wall height is 76 metres (249 ft) and is 1,116 metres (3,661 ft) long. The water depth is 57 metres (187 ft) and at 100% capacity the water level is 344 metres (1,129 ft) AHD. The surface area of the dam is 7,200 hectares (18,000 acres) and the catchment area of the dam is 13,900 square kilometres (5,400 sq mi). At 100%, Burrendong Dam has a capacity of 1,188,000 megalitres (42,000×10 6 cu ft). Additionally, the dam has a further flood mitigation capacity of 480,000 megalitres (17,000×10 6 cu ft). [1] The spillway on the dam is a gated concrete chute with a release capacity of 13,720 cubic metres per second (485,000 cu ft/s). [9]
Burrendong Dam has three times been recorded at a critically low level of 1.5% in drought. Contrastingly, however, Burrendong has mitigated potentially devastating floods downstream by using its flood capacity and releasing water in accordance with downstream tributary flows, safely reaching 160% of capacity in 1990 and 152.8% in 2010[ citation needed ]. In January 2020, the lake was again reported to be at 1.6% level. [10]
The A$32 million first phase of a major upgrade began in 2010 and is expected to be completed during 2015. This project will bring the dam up to modern safety standards including the raising of the main dam wall and saddle dam by 1.8 metres (5 ft 11 in) as well as modifications to the existing spillway, complemented by construction of an auxiliary spillway and fuse plug. [1] [11]
A hydro-electric power station generates up to 19 megawatts (25,000 hp) of electricity from the flow of the water leaving Burrendong Dam. The average output is 50.9 gigawatt-hours (183 TJ) per annum. [9] The station was completed in August 1996 and was officially opened on 9 February 1999 by the Premier of New South Wales, Bob Carr. At the time, the facility was operated by Power Facilities Pty Limited; and is now managed by AGL Energy. [12]
The Macquarie River - Wambuul is part of the Macquarie–Barwon catchment within the Murray–Darling basin, is one of the main inland rivers in New South Wales, Australia.
Lake Burrendong is a man-made reservoir created by Burrendong Dam. It impounds waters on the Macquarie and Cudgegong rivers, near Wellington, in the central west region of New South Wales, Australia.
Glenbawn Dam is a major ungated earth and rock fill with clay core embankment dam with concrete chute spillway plus fuse plugs across the Hunter River upstream of Aberdeen in the Hunter region of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-electric power, irrigation, water supply and conservation. The impounded reservoir is called Lake Glenbawn.
Keepit Dam is a major gated mass concrete gravity dam with an earth fill abutment and a central gated concrete overflow crest and six radial gate spillways across the Namoi River upstream of its junction with the Peel River in the North West Slopes region of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-power, irrigation, water supply and conservation. The impounded reservoir is called Lake Keepit.
Copeton Dam is a major clay core and rock fill embankment dam with nine radial gates and a gated concrete chute spillway across the Gwydir River upstream of Bingara in the New England region of New South Wales, Australia. The dam's purpose includes environmental flows, hydro-electric power generation, irrigation, and water supply. The impounded reservoir is called Lake Copeton.
Lostock Dam is a minor rockfill and clay core embankment dam with a concrete lined, flip bucket spillway across the Paterson River upstream of the village of East Gresford in the Hunter region of New South Wales, Australia. The dam's purpose includes flood mitigation, irrigation, water supply and conservation. Mini hydro-power facilities were retrofitted in 2010. The impounded reservoir is also called Lostock Dam.
Windamere Dam is a minor ungated rock fill with clay core embankment dam with an uncontrolled unlined rock cutting spillway across the Cudgegong River at Cudgegong, upstream of Mudgee in the Central Tablelands of New South Wales, Australia. The dam's purpose includes hydro-power, irrigation, water supply, and conservation. The impounded reservoir is called Lake Windamere.
Burrinjuck Dam is a heritage-listed major gated concrete-walled gravity hydro-electric dam at Burrinjuck, Yass Valley Shire, New South Wales, Australia. It has three spillways across the Murrumbidgee River located in the South West Slopes region of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-power, irrigation, water supply and conservation. The impounded reservoir is called Lake Burrinjuck. It was designed by Lawrence Augustus Burton Wade and built from 1907 to 1927 by Lane & Peters, Sydney. It is also known as Barren Jack Dam and Barrenjack. The property was owned by Department of Planning and Infrastructure. It was added to the New South Wales State Heritage Register on 2 April 1999.
The Blowering Dam is a major ungated rock fill with clay core embankment dam with concrete chute spillway impounding a reservoir under the same name. It is located on the Tumut River upstream of Tumut in the Snowy Mountains region of New South Wales, Australia. Purposes for the dam include flood mitigation, hydro-power, irrigation, water supply and conservation. The dam is part of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
The Wivenhoe Dam is a rock and earth-fill embankment dam with a concrete spillway across the Brisbane River in South East Queensland, Australia. The dam wall is located about 80 kilometres (50 mi) by road from the centre of Brisbane. The primary purpose of the dam is the supply of potable water for the Brisbane and Ipswich regions. The dam also provides for flood mitigation control, hydroelectricity, and recreation. The impounded reservoir is called Lake Wivenhoe and the dam, the lake and a narrow strip of surrounding land forms a locality also called Lake Wivenhoe.
Cochrane Dam is a minor earthfill embankment dam with concrete spillway across Georges Creek, located in the South Coast region of New South Wales, Australia. The main purpose of the dam is to supply water for hydro-power at the downstream Brown Mountain Power Station and for irrigation purposes. The impounded reservoir is called Cochrane Lake.
The Ross River Dam is a rock and earthfill-filled embankment dam across the Ross River, located between Kelso and Mount Stuart in the City of Townsville in northern Queensland, Australia. Built initially for flood control, Lake Ross, the impoundment created by the dam, serves as one of the major potable water supplies for the region.
Split Rock Dam is a minor ungated concrete faced rock fill embankment dam with concrete chute spillway across the Manilla River upstream of Manilla in the north-western slopes region of New South Wales, Australia. The dam's purpose includes flood mitigation, irrigation, water supply and conservation. The impounded reservoir is called Split Rock Reservoir.
Pindari Dam is a minor concrete faced rockfill embankment dam with an ungated uncontrolled rock cut with concrete sill spillway across the Severn River located upstream of the town of Ashford, in the North West Slopes region of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-power, irrigation, water supply and conservation. The impounded reservoir is called Lake Pindari.
Tumut Pond Dam is a major ungated concrete arch dam across the upper reaches of the Tumut River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
Mumbil is a town in the east of central New South Wales, Australia. The town is within Dubbo Regional Council, part of the Orana Region, 327 kilometres (203 mi) north west of the state capital, Sydney.
Ben Chifley Dam, or Chifley Dam, is a rock and earth-fill embankment dam across the Campbells River in the central west region of New South Wales, Australia. The main purpose of the dam is to supply potable water to the city of Bathurst.
Oberon Dam or Fish River Dam is a major ungated concrete slab and buttress with earth embankment dam comprising a concrete ski jump chute spillway and fuse plug across the Fish River upstream of Oberon in the Central Tablelands region of New South Wales, Australia. The dam's purpose includes flood mitigation, industrial, and water supply. The impounded reservoir is called Lake Oberon.
Tumut Two Dam or Tumut Two is a major ungated concrete gravity dam across the upper reaches of the Tumut River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
Geehi Dam is a major ungated rockfill embankment dam across the Geehi River in the Snowy Mountains of New South Wales, Australia. The reservoir impounded by the dam is known as Geehi Reservoir.