Construction began1926
Opening date1935
Construction cost 2,062,000
Built by Ernest Macartney de Burgh
Operator(s) Sydney Catchment Authority
Dam and spillways
Type of dam Arch dam
Impounds Nepean River
Height (foundation)82 metres (269 ft)
Length216 metres (709 ft)
Elevation at crest325 metres (1,066 ft) AHD
Width (crest)6.1 metres (20 ft)
Width (base)68.6 metres (225 ft)
Reservoir
CreatesNepean Reservoir
Total capacity81,400 ML (17,900×10^6 imp gal; 2.15×1010 US gal)
Catchment area 319 square kilometres (123 sq mi)
Surface area356.5 hectares (881 acres)
Official nameNepean Dam
TypeBuilt
Criteria a., b., c., d., e., f., g.
Designated18 November 1999
Part ofUtilities - Water group
Reference no.01368

The Nepean Dam is a heritage-listed dam split across Avon in the Wingecarribee Shire and Bargo in the Wollondilly Shire, both in New South Wales, Australia. The reservoir created by the dam spreads across Avon, Bargo and also Yerrinbool in Wingecarribee Shire. The Nepean Dam is one of four dams and weirs in the catchment of the Upper Nepean Scheme, in New South Wales, Australia, and provides water to the Macarthur and Illawarra regions, the Wollondilly Shire, and metropolitan Sydney. Completed in 1935 under the supervision of Ernest Macartney de Burgh, the dam is currently managed by the Sydney Catchment Authority and is listed on the New South Wales State Heritage Register. [1]

Contents

History

The Upper Nepean Scheme was commenced in 1880 after it was realised that the Botany Swamps scheme was insufficient to meet Sydney's water supply needs. The Nepean project consisted of the construction of a weir across the Nepean River to divert of the rivers Cataract, Cordeaux, Avon and Nepean, to the Prospect Reservoir. [1]

By 1902, however, the water supply was found to be inadequate and a Royal Commission was held which recommended impounding the waters of the Cataract River by means of a major storage dam. The Cataract Dam was completed in 1907. In November 1918, a Board of Experts was appointed by the Government to draw up recommendations for the amplification of the Sydney water supply. It was upon the recommendations of this body, as approved by the Public Works Committee of the NSW Parliament, that not only Cordeaux, but also Avon and Nepean Dams were built. The Cordeaux Dam was completed in 1926 and the Avon Dam in 1927, on the Cordeaux and Avon Rivers respectively. As Cordeaux and Avon Dams were approaching completion, a fourth dam, Nepean Dam, was commenced in 1925. [1]

The site chosen was on the Nepean River, about 7 miles (11.3 km) above the point where the Cordeaux River joins the main stream at Pheasants Nest Pass and about 4 miles (6.4 km) by road southeast of Bargo railway station. The dam was designed by engineers of the Public Works Department under the direction of the Chief Engineer for Water Supply and Sewerage, EM de Burgh. [1]

Construction of the dam was undertaken by the Public Works Department until 1 September 1928, at which time the Department was re-organised and the majority of the staff associated with water supply were transferred to the Board of Water Supply and Sewerage, who continued the work on the dam. At that date, excavation for the foundations of the wall was complete and placing of concrete about to begin. Most of the plant and equipment used for the construction of Avon Dam was dismantled and re-erected at the Nepean Dam site, including the cableways and timber towers. A suspension bridge was constructed across the Nepean River which was later used at Warragamba Dam. [1]

Railway sidings were established on the Main Southern railway line at a point between Bargo and Yerrinbool. Transport to the dam site was again by light railway, on this occasion of standard gauge. This avoided transhipment from the Government vehicles bringing materials from large commercial quarries, effectively making the line an extended privately owned siding. The line was 4 km (2.5 mi) long through gentle countryside. Trains were worked by a variety of locomotives, including a former Sydney Steam Tram Motor. Additionally, there was a system of narrow (610 mm / 2 ft) gauge lines in use at the dam construction site. [2]

A township for workers was constructed of timber obtained from the clearing of the catchment for the Avon Dam. This township provided four and five-roomed cottages for the married men and had metalled roads with concrete kerbing. A typical working man's accommodation consisted of a simple timber hut with a galvanised roof. Later, a barracks was constructed for single men. A Public School and recreation halls were also provided, as were full-time medical staff and facilities. [1]

Shortly after construction of the dam was transferred from the Public Works Department to the Water Board, it was decided upon the recommendation of the Chief Engineer of the Board, Gerald Haskins, that the height of the dam wall be increased by 25 ft (7.6m). This added nearly 50% to the storage capacity of the dam. [1]

Work on the dam continued until March 1930, when the depression compelled the Board first to curtail and then suspend work completely. The work recommenced on 12 June 1933 and continued without interruption until completion of the dam in 1935. Although the dam was ready to store water by September, 1935, there was little rainfall on its catchment during the ensuing three years; however, by October 1938 the dam was overflowing. At this time it was realised that scouring at the toe of the foundations of the dam required an alteration to the direction of the flow of floodwaters discharged over the spillway weir. This was done by constructing a concrete channel approximately 2,000 feet (609.7m) long, 120 feet (36.6m) wide, widening to 432 feet (131.7m) at the discharge weir. Construction of the channel commenced in July 1943, and was completed in November 1947. [1]

In the late 1960s, as part of a plan to interconnect the various water supply systems for Sydney Wollongong and Sutherland, a tunnel was constructed between the Nepean Dam and the Avon Dam (which now supplies the Wollongong area). This allows water to be transferred in either direction, as required. [1]

In the 1980s, work was undertaken on Nepean Dam to alleviate uplift pressure on, and leakage through, the foundations of the dam wall, in accordance with modern design criteria. The downstream face of the wall was supported with an embankment of quarried sandstone blocks and sandstone fill, the latter being compacted by grid and vibratory rollers. It was similar to the work undertaken at the same time for Avon Dam. [1]

Description

The Nepean Dam is a large cyclopean masonry dam. This consists of large blocks of sandstone quarried at the site, embedded in and surrounded by sandstone concrete. To ensure water-tightness, all construction joints are grouted. The upstream face consists of blue metal concrete 5 feet (1.3m) thick while the downstream face is of similar material 3 feet (0.9m) thick. Both of the facing concrete sections are merged progressively into the central sandstone masonry concrete. All the latest improvements in dam design and construction of the day were embodied in the work, building upon the experience gained from the construction of the previous three Upper Nepean Scheme dams. Inspection galleries are provided, with pressure and drainage pipes from the foundations, and rubble drains lead into them. Provision is made for any leakage of water past the copper seals in the contraction joints to be conducted into the galleries and thence drained away. To facilitate the work of maintenance staff, an electric lift was provided in the wall. The water is discharged through two 36 inch (92 cm) diameter outlet pipes controlled by Ring Falkner gate valves and FCD valves. [1]

After construction was complete and the dam had filled, the spillway weir was altered by the construction on the western side of the stream of a concrete channel approximately 2,000 feet (609.7m) long and 120 feet (36.6m) wide, widening to 432 feet (131.7m) at the discharge weir. [1]

The Nepean Reservoir has a small storage capacity in relation to its large catchment area. While its capacity is much the same as that of Cataract and Cordeaux Reservoirs, its catchment basin is two and a half times as extensive as Cataract and three and a half times as extensive as Cordeaux. The Nepean Reservoir therefore fills more rapidly and, under normal conditions, is drawn upon more freely than the other reservoirs. [1]

Specifications of Nepean Dam:

The Nepean Dam continues to supply Sydney with water. It is discharged as required into the river bed below the dam and flows to Pheasant's Nest where it is diverted by a weir to the Nepean Tunnel, 4½ miles (7.2 km) long, discharging into the Cataract Tunnel, 2 miles (3.2 km) long, emerging into the Upper Canal, by which it is conveyed to Prospect Reservoir. The Nepean Dam is now also cross-connected to the Avon Dam, which supplies the Wollongong area, to provide additional water supply to that district. If necessary, it can also receive additional water from the Shoalhaven Scheme. Water is supplied to the Picton and Bargo districts from Nepean Dam, with this water treated and filtered in the Nepean Water Filtration Plant, a treatment facility added to the dam to improve the water quality to this district, which is now supplied directly from Nepean Dam. [1]

The Nepean Dam includes within its area three brick residential staff cottages, two apparently dating from the 1960s and one from the 1980s, and two older weatherboard cottages, one of which, utilised by the Filtration Plant staff, is the original Resident Engineer's Cottage. Just north of the entrance to the Dam picnic area are the former Catchment workshops, a series of small corrugated iron and weatherboard utilitarian buildings which were formerly the central maintenance facility for the Upper Nepean Catchment area. They remain in use at a low scale by the Sydney Catchment Authority and include a weatherboard residential cottage similar to the second of the weatherboard residences at the Dam. The area of the former construction village for the Dam remains undeveloped and heavily overgrown, with remnant road borders and evidence of buildings visible on the ground. [1]

The public area has been maintained by the Water Board and its successors, with picnic grounds, landscaped gardens and a children's playground. Remnants of the interwar period landscape at the Nepean Dam site are mainly concentrated in two areas - around a small park, with cement faux rockwork bedding edges, to the east of the dam wall, including a long line of Roman Cypress (Cupressus sempervirens) along the spillway alignment; and in a park-like picnic area along a terrace above the dam. Features of the latter area include pleasant plantings of mixed deciduous and evergreen exotic trees and Australian trees enclosing a long raised shelf, which is the remnant railway platform from the temporary construction railway, with a series of small timber picnic shelters with a somewhat log cabin-style character. Nearby a considerable line of dry-packed sandstone walling has been used and drystone walling is used generally to control access. The main entry road includes the remains of an old Cypress avenue and an ornamental gum avenue. [1]

Heritage listing

Nepean Dam was the fourth of the four water supply dams built as part of the development of the Upper Nepean Water Supply Scheme, one of the most important engineering works and items of public infrastructure in Australia, and had the highest wall of all the NSW water supply dams at the time of its construction. It was designed by the NSW Public Works Department under the direction of one of Australia's leading water supply engineers, E.M. de Burgh. [1]

The completion of the Nepean Dam was a significant step in the continuing process of providing a reliable water supply for Sydney and surrounding areas as part of the Upper Nepean Scheme. Even by the international standards of the time, Nepean was a large dam and was a significant work of engineering in its day. It continues to play an important role as a major source of water supply for the Sydney region. Additionally, the Nepean Dam is a handsome, well proportioned structure with strong Stripped Classical style architectural character which complements the monumental nature of the structure and its attractive natural surroundings. [1]

Nepean Dam includes a range of ancillary structures which form components of the overall site, including residential cottages of various ages for operational staff and are representative of their age and type. The former Resident Engineer's cottage is an attractive example of a vernacular cottage of the early twentieth century. The public picnic grounds include a former construction railway platform now housing picnic shelters, and the site of the original construction village remains undeveloped and is now an overgrown archaeological site. The Nepean Dam picnic areas and gardens contain a cultural landscape resource - including remnants of its interwar period plantings, layout and detailing, and extensive areas of bushland - of regional value. The finely detailed dam structures of large-scaled concrete in Art Deco-style sit within a broader landscape setting of outstanding scenic quality. [1]

Nepean Dam was listed on the New South Wales State Heritage Register on 18 November 1999 having satisfied the following criteria. [1]

The place is important in demonstrating the course, or pattern, of cultural or natural history in New South Wales.

Nepean Dam is located within the Upper Nepean Catchment Area which was developed with the completion of the Cataract and Nepean Tunnels in 1888, as the fourth source of water supply for Sydney. The potential of the Upper Nepean Catchment Area to supply water was fully developed through the construction of four major dams between 1903 and 1936. Nepean Dam is the last of these dams to have been completed. The Upper Nepean Catchment Area continues to supply the regions of Sydney and Illawarra, with the Nepean Dam providing a supply to Sydney, Macarthur, Bargo and Illawarra (through the Avon/Nepean Tunnel) regions. [1]

Nepean Dam was the fifth of the major water supply/irrigation dams constructed in NSW during the first half of the twentieth century. Whilst the dam was designed by the Public Works Department of NSW, the technologies used in the dam are representative of methods developed by that authority, the planning and scale of the construction techniques are more representative of the Water Board. [1]

In conjunction with other Metropolitan Dams and Woronora Dam built in 1941, the impounded water of Nepean Dam provided one of the major sources of water for domestic and industrial consumption in metropolitan Sydney, the largest city in NSW. In providing water for metropolitan Sydney during this era the dam, in ensuring security of supply, contributed to the extensive residential, commercial and industrial development of Sydney during the 1930s and 1950s. Nepean Dam was constructed over a period of ten years between 1926 and 1936, a protracted construction period which is directly related to the Great Depression and a period of Government financial stringency. The completion of the dam during this period was one of the major public works projects undertaken in the State. [1]

The place has a strong or special association with a person, or group of persons, of importance of cultural or natural history of New South Wales's history.

The design and construction of Nepean Dam was initially undertaken by the Water Supply and Sewerage Branch of the NSW Public Works Department, and later developed by the Construction Branch of the Water Board. The construction of the dam drew upon the knowledge and experience of a number of engineers employed in the branches including E.M. de Burgh (Chief Engineer), and Gerald Haskins (the first engineer-in-chief of the former Water Board). [1]

The place is important in demonstrating aesthetic characteristics and/or a high degree of creative or technical achievement in New South Wales.

The wall of Nepean Dam is an engineering work imbued with a sense of high aesthetic value expressed through the short curved high wall set with the steeply sided valley of the Nepean River. [1]

The design and finishes of the crest house and lower valve house in the Inter War Stripped Classical style were prepared by the engineers of the Water Board. The architectural detailing evokes a sense of monumentalism that is ideally suited to the context of the dam. [1]

The dam is set within the valley of the Nepean River. Upstream of the dam wall this setting is characterised by the broad expanse of the pool of water bordered by the crests of the valley sides. Downstream of the dam wall the setting is characterised by the steeper inclines that graduate into the gorge created by the river's flow over time. Collectively this topography at time of high water level imparts a picturesque scene when viewed from select vantage points above and on the dam wall. [1]

The former resident officer's cottage erected at the time of the dam's construction to house the resident engineer is an excellent and intact example of the high standard of accommodation provided for resident Public Works Department Senior staff. [1]

The place has strong or special association with a particular community or cultural group in New South Wales for social, cultural or spiritual reasons.

The dam and grounds are recognised by the National Trust of Australia (NSW) as being a place which is part of the cultural environment of Australia, which has aesthetic, historical, architectural, archaeological, scientific and social significance for future generations, as well as for the present community of NSW. [1]

The dam and grounds are recognised by the Heritage Council of NSW as a place which is of significance to NSW in relation to its historical, scientific, cultural, social, archeological, natural and aesthetic values. [1]

The place has potential to yield information that will contribute to an understanding of the cultural or natural history of New South Wales.

The cyclopean masonry of the dam is an excellent late example of this type of gravity dam construction in the Inter War era incorporating inspection galleries, contraction joints, and ground surface drainage system which demonstrate the principal characteristics of this technology at this time. [1]

Terraces and platforms adjoining the dam abutments demarcate the location of plant and equipment used in the construction of the dam, in particular the location of the cableway headtowers, the railway terraces and concrete mixing plant platform. [1]

The hillside near the upper picnic area was the site of the original construction township and retains an intact road formation, kerbing and guttering and tennis courts from that era. The integrity is such that collectively these features may potentially provide further insight into the lifestyles of the employees that constructed the dam. [1]

The place possesses uncommon, rare or endangered aspects of the cultural or natural history of New South Wales.

The wall of the Nepean Dam is the highest of all the dams constructed in the Upper Nepean Catchment Area. Nepean Dam is one of three dams in NSW which incorporate extensive Inter War Stripped Classical architectural detailing. The crest and valve houses and inlet works retain original ironwork which represent a substantial repository of water supply delivery technology of the era. The use of an electronic lift in the wall (albeit now decommissioned) is a first for NSW. The completion of the dam necessitated the construction of a standard gauge (1835mm) railway line from Bargo which is unique in context of dam construction in NSW. [1]

The extent of foresight in planning the execution and design of the construction township is likely to be a first ion NSW in regard to dam construction, setting a practice which was further developed at Woronora Dam, and came to be exemplified at Warragamba Dam. [1]

The remnant platforms and terraces of the construction area are the largest in scale and most intact in regard to finishes and planning of all four of the Metropolitan Dams. The means of delivering stores and raw material through the network of railway lines and raised platforms, and the system of suspension footbridge and aerial stone ropeway to provide access and material over the gorge were particularly sophisticated for the time and foretells later developments at Warragamba Dam. The reservoir of the Nepean Dam is the second largest source of water in the whole of the network administered by SCA for the supply of metropolitan Sydney. [1]

The place is important in demonstrating the principal characteristics of a class of cultural or natural places/environments in New South Wales.

Nepean Dam is representative of a type of dam (cyclopean masonry gravity dam) constructed in NSW by the Water Supply and Sewerage Branch of the Public Works Department during the first half of the twentieth century. Key representative e attributes of the dam's design and construction include the use of cyclopean masonry bedded in sandstone concrete, use of blue metal concrete in the wall facings, use of a spillway set away from the gravity wall, valve and crest houses attractively designed and finished to a high standard, the use of an array of upstream intakes to regulate the quality of water supply, the internal inspection gallery, the foundation drainage system, the contraction joints, and the internal drainage system. [1]

The upgrading works to the spillway and dam wall in the 1980s, with the rock embankment to make the dam meet modern safety requirements are representative of modern-day safe operating practice. [1]

The construction technologies used at Nepean Dam are representative of dams constructed in NSW through the first half of the twentieth century. Key representative attributes include the use of cableways, the building of temporary camps to house labourers and tradesman, building of semi-permanent cottages to house salaried staff, the construction of terraced platforms for plant and machinery, mechanisation of concrete production, the construction of a purpose built road of access and tramway to transport men, supplies and materials from the nearest railhead to the construction site, the building of permanent infrastructure such as water supply for plant and men and horses, and the use of electricity to power plant and equipment. [1]

The rehabilitation of tracts of land scarred in the construction process employed at Nepean Dam through beautification works is representative of practices undertaken at other dams throughout NSW. Key representative attributes of this practice include utilising the former terraced construction platforms as picnic areas and lookouts, and utilising the former construction roads and tramway for vehicular access to the dam site and dam wall. [1]

The practice of ongoing maintenance of the Nepean Dam wall after completion through the surveillance of resident staff and workshop facilities is representative of procedures undertaken at other dams and weirs constructed in NSW. [1]

The provision of public amenity at the dam site is representative of the use of large water supply and irrigation dams in NSW as places for recreation by the greater community. [1]

See also

Related Research Articles

Hume Dam Dam in Riverina, New South Wales

Hume Dam, formerly the Hume Weir, is a major dam across the Murray River downstream of its junction with the Mitta River in the Riverina region of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-power, irrigation, water supply and conservation. The impounded reservoir is called Lake Hume, formerly the Hume Reservoir. It is a gated concrete gravity dam with four earth embankments and twenty-nine vertical undershot gated concrete overflow spillways.

Warragamba Dam Dam in Warragamba, New South Wales

Warragamba Dam is a heritage-listed dam in the outer South Western Sydney suburb of Warragamba, Wollondilly Shire in New South Wales, Australia. It is a concrete gravity dam, which creates Lake Burragorang, the primary reservoir for water supply for the city of Sydney. The dam wall is located approximately 65 kilometres (40 mi) W of Sydney central business district, 4½ km SW of the town of Wallacia, and 1 km NW of the village of Warragamba.

Burrinjuck Dam Dam in South West Slopes, New South Wales

Burrinjuck Dam is a heritage-listed major gated concrete-walled gravity hydro-electric dam at Burrinjuck, Yass Valley Shire, New South Wales, Australia. It has three spillways across the Murrumbidgee River located in the South West Slopes region of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-power, irrigation, water supply and conservation. The impounded reservoir is called Lake Burrinjuck. It was designed by Lawrence Augustus Burton Wade and built from 1907 to 1927 by Lane & Peters, Sydney. It is also known as Barren Jack Dam and Barrenjack. The property was owned by Department of Planning and Infrastructure. It was added to the New South Wales State Heritage Register on 2 April 1999.

Upper Nepean Scheme

The Upper Nepean Scheme is a series of dams and weirs in the catchments of the Cataract, Cordeaux, Avon and Nepean rivers of New South Wales, Australia. The scheme includes four dams and two weirs, and a gravity-fed canal system that feeds into a large storage reservoir to provide water to the Macarthur and Illawarra regions, the Wollondilly Shire, and metropolitan Sydney. The four dams and associated infrastructure are individually listed on the New South Wales State Heritage Register.

Cataract Dam Dam in Cataract, New South Wales

The Cataract Dam is a heritage-listed dam in Cataract, New South Wales, Australia, provides water to the Macarthur and Illawarra regions, the Wollondilly Shire, and metropolitan Sydney. It is one of four dams and weirs in the catchment of the Upper Nepean Scheme. Completed in 1907 under the supervision of Ernest Macartney de Burgh, the dam is currently owned by Water NSW, an agency of the Government of New South Wales. The dam was listed on the NSW State Heritage Register on 18 November 1999.

Cordeaux Dam Dam in Cordeaux, New South Wales

The Cordeaux Dam is a heritage-listed dam in Cordeaux, New South Wales, Australia. It provides water to the Macarthur and Illawarra regions, the Wollondilly Shire, and metropolitan Sydney. It is one of four dams and weirs in the catchment of the Upper Nepean Scheme. Completed in 1926 under the supervision of Ernest Macartney de Burgh, the dam is owned by Water NSW, an agency of the Government of New South Wales. It was listed on the New South Wales State Heritage Register on 18 November 1999.

Avon Dam Dam in Avon Dam, New South Wales

The Avon Dam is a heritage-listed dam in Avon, Wingecarribee Shire, New South Wales, Australia. It is one of four dams and weirs in the catchment of the Upper Nepean Scheme, providing water to the Macarthur and Illawarra regions, the Wollondilly Shire, and metropolitan Sydney. The arch dam across the Avon River was completed in 1927 under the supervision of Ernest Macartney de Burgh, the dam is currently managed by the Sydney Catchment Authority and is listed on the New South Wales State Heritage Register.

Woronora Dam Dam in south of Sydney, New South Wales

The Woronora Dam is a heritage-listed concrete gravity dam with an uncontrolled serpentine spillway across the Woronora River, located south of Greater Metropolitan Sydney, in the suburb of Woronora Dam, Sutherland Shire, New South Wales, Australia. The principal purpose of the dam is for potable water supply for Sydney's southern suburbs and the northern suburbs of the Illawarra region. The impounded 71,790-megalitre reservoir is also called Woronora Dam and is sometimes incorrectly called Lake Woronora. The dam was designed by G. E. Haskins, Chief Engineer and the Metropolitan Water, Sewerage and Drainage Board of NSW (MWS&DB) and built from 1927 to 1941 by the MWS&DB. The property is owned by the Sydney Catchment Authority, an agency of the Government of New South Wales. It was added to the New South Wales State Heritage Register on 18 November 1999.

Prospect Reservoir Dam in Western Sydney, New South Wales

The Prospect Reservoir is a heritage-listed 50,200-megalitre potable water supply and storage reservoir created by the Prospect Dam, across the Prospect Creek located in the Western Sydney suburb of Prospect, in New South Wales, Australia. The eastern bounds of the reservoir are a recreational area and the western periphery are within the bounds of Western Sydney Parklands. It was added to the New South Wales State Heritage Register on 18 November 1999.

Lower Prospect Canal Reserve

The Lower Prospect Canal Reserve is a heritage-listed former farm and public water supply canal and now bushy corridor and nature reserve stretching 7.7 kilometres (4.8 mi) through the heart of suburban Sydney, New South Wales, Australia. The lineal corridor stretches from Prospect Reservoir to Sydney Water Pipehead at Albert Street, Guildford with the majority of the reserve located in Greystanes, which is a suburb within the Cumberland Council area.

Avon River (Wollongong) River in the Southern Highlands and Macarthur districts of New South Wales, Australia

The Avon River, a perennial river of the Hawkesbury-Nepean catchment, is located in the Southern Highlands and Macarthur districts of New South Wales, Australia.

Cordeaux River River in New South Wales, Australia

The Cordeaux River, a perennial river of the Hawkesbury-Nepean catchment, is located in the Southern Highlands and Macarthur regions of New South Wales, Australia.

Liverpool Offtake Reservoir is a small reservoir in Cecil Hills, New South Wales. Built along with the Upper Nepean Scheme it replaced the Liverpool Weir supply.

Manly Dam Dam

The Manly Dam is a heritage-listed dam near King Street, Manly Vale with a reservoir extending into Allambie Heights, both in the Northern Beaches Council local government area of New South Wales, Australia. The reservoir is located within the Manly Dam Reserve. The dam was designed by the NSW Department of Public Works and built in 1892 by the Department. The reservoir and dam is owned by Sydney Water, an agency of the Government of New South Wales. The reservoir and dam was added to the New South Wales State Heritage Register on 18 November 1999.

Upper Canal System

The Upper Canal System, also called the Southern Railway Aqueduct and the Cataract Tunnel, is a heritage-listed operational gravity-fed aqueduct that supplies some of the potable water for Sydney, in New South Wales, Australia. The aqueduct comprises 54 kilometres (34 mi) of open canals, tunnels, and closed pipelines that connect the Upper Nepean Scheme with the Prospect Reservoir. The aqueduct is managed by the Sydney Catchment Authority on behalf of WaterNSW, an agency of the Government of New South Wales. It was listed on the New South Wales State Heritage Register on 18 November 1999.

Potts Hill Reservoirs 1 and 2 Historic site in New South Wales, Australia

Potts Hill Reservoirs 1 and 2 are heritage-listed reservoirs at Cooper Road, Potts Hill, City of Canterbury-Bankstown, New South Wales, Australia. It was designed by Board of Water Supply and Sewerage & Sydney Water and built from 1880. The property is owned by Sydney Water. It was added to the New South Wales State Heritage Register on 18 November 1999.

Kiama Reservoirs Historic site in New South Wales, Australia

The Kiama Reservoirs are heritage-listed reservoirs at Irvine Street, Kiama, Municipality of Kiama, New South Wales, Australia. They are owned by Sydney Water. It was added to the New South Wales State Heritage Register on 15 November 2002.

Guildford West pipehead and water supply canal Historic site in New South Wales, Australia

The Guildford West pipehead and water supply canal is a heritage-listed sewerage infrastructure and water supply canal located at Frank Street, Guildford in the Cumberland Council local government area of New South Wales, Australia. It is also known as Headworks; Industrial Archaeological Site. The property is owned by Sydney Water, an agency of the Government of New South Wales. It was added to the New South Wales State Heritage Register on 15 November 2002.

Prospect Reservoir Valve House Historic site in New South Wales, Australia

The Prospect Reservoir Valve House is a heritage-listed waterworks located at East of Reservoir, Prospect in the City of Blacktown local government area of New South Wales, Australia. Situated on the grounds of Prospect Nature Reserve, it was designed and built by The Metropolitan Board of Water Supply and Sewerage. The property is owned by Sydney Water and Water NSW, agencies of the Government of New South Wales. It was added to the New South Wales State Heritage Register on 18 November 1999.

Warragamba Dam - Haviland Park is a heritage-listed former farm, dam, timber getting, Gundungurra traditional lands and squatter's land and now parkland located at Warragamba Dam in the south-western Sydney settlement of Warragamba in the Wollondilly Shire local government area of New South Wales, Australia. The property is owned by Water NSW, an agency of the Government of New South Wales. It was added to the New South Wales State Heritage Register on 18 November 1999.

References

  1. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 "Nepean Dam". New South Wales State Heritage Register . Office of Environment & Heritage. H01368. Retrieved 2 June 2018.
  2. Longworth, Jim (May 1994). "Construction Railways of the Upper Nepean Dams - Nepean Dam". Australian Railway Historical Society Bulletin : 137–153.

Bibliography

Attribution

CC BY icon-80x15.png This Wikipedia article contains material from Nepean Dam , entry number 01368 in the New South Wales State Heritage Register published by the State of New South Wales and Office of Environment and Heritage 2018 under CC-BY 4.0 licence , accessed on 2 June 2018.

Further reading