Chichester Dam

Last updated

Chichester Dam
Chichester Dam - panoramio.jpg
Chichester Dam
Australia New South Wales relief location map.png
Red pog.svg
Location in New South Wales
CountryAustralia
Location Dungog, New South Wales
Coordinates 32°13′54″S151°41′04″E / 32.23167°S 151.68444°E / -32.23167; 151.68444
Purpose Water supply
StatusOperational
Construction began1917
Opening date1926
Construction cost 1,049,000
Owner(s)Hunter Water Corporation
Dam and spillways
Type of dam Gravity dam
Impounds Chichester River, Wangat River
Height43 m (141 ft)
Length254 m (833 ft)
Dam volume18.4 ML (650×10^3 cu ft)
Spillway capacity3,300 m3/s (120,000 cu ft/s)
Reservoir
CreatesLake Chichester
Total capacity21,500 ML (760×10^6 cu ft)
Catchment area 197 km2 (76 sq mi)
Surface area1.8 km2 (0.69 sq mi)
Maximum length4.22 km (2.62 mi)
Maximum width580 m (1,900 ft)
Normal elevation156.2 m (512 ft) AHD
Power Station
Operator(s) Delta Electricity
Commission dateNovember 2001 (2001-11)
Type Conventional
Turbines 1
Installed capacity 110 kW (150 hp)
Annual generation 0.4 GWh (1.4 TJ)
Website
Chichester Dam at www.hunterwater.com.au

Chichester Dam is a minor concrete gravity dam across the Chichester and Wangat rivers, upstream of Dungog, in the Hunter Region of New South Wales, Australia. The dam's main purpose is water supply for the Lower Hunter region. A mini hydro-electric power station operates at times of peak flow and is connected to the national grid. The impounded reservoir is Lake Chichester.

Contents

Location and features

The dam wall is 43 metres (141 ft) high, 254 metres (833 ft) long, and was constructed using a cyclopean system of interlocking concrete blocks and large boulders with a volume of 91 cubic metres (3,200 cu ft). The wall is anchored to the bedrock below it by 93 stressed tendons. At 100% capacity the dam wall holds back 21,500 megalitres (760×10^6 cu ft) of water at 156.2 metres (512 ft) Australian Height Datum. The spillway is capable of discharging 3,300 cubic metres per second (120,000 cu ft/s). The surface area of the reservoir is 1.8 square kilometres (0.69 sq mi) and the catchment area, largely located within the Barrington Tops National Park, is 197 square kilometres (76 sq mi). The dam is connected to reservoirs in Maitland, Cessnock and Newcastle by an 80-kilometre (50 mi) gravitation main. [1] [2]

History

Land for the water supply scheme was appropriated in the Gazette of 6 October 1916. To safeguard the purity of the water the populated part of the Wangat Valley, including the old goldmining town of Wangat, and the greater portion of the populated part of the Chichester Valley were resumed. [3] The Act appropriated £A 1,049,000 as the estimated cost of construction of the dam, with additional funds set aside for land resumption. [4]

In 1965 the spillway was lowered by 2.75 metres (9 ft 0 in) to increase flood capacity. In 1985 the dam was post tensioned with cables and the spillway was relocated to the centre of the dam and returned to its original height. In 1995 the seepage potential was reduced under the northern abutment and in 2003 an improved drainage system for the dam's foundations was installed and the left parapet wall was raised to prevent overtopping in a major flood. [1]

Power generation

Following a report by the Health Rivers Commission, in 1998 the Minister for Urban Affairs and Planning, Craig Knowles, announced that a small hydro-electric power station would be installed in the Chichester Dam in order to generate electricity, reduce greenhouse emissions and allow surplus power to be sold back to the grid. [5] Completed in 2001 and operated by Delta Electricity, the mini-power station generates up to 110 kilowatts (150 hp) of electricity at times of peak flow; with an average annual generation of 0.4 gigawatt-hours (1.4 TJ). [6]

See also

Related Research Articles

<span class="mw-page-title-main">Glenbawn Dam</span> Dam in Hunter Valley, New South Wales

Glenbawn Dam is a major ungated earth and rock fill with clay core embankment dam with concrete chute spillway plus fuse plugs across the Hunter River upstream of Aberdeen in the Hunter Valley of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-electric power, irrigation, water supply and conservation. The impounded reservoir is called Lake Glenbawn.

<span class="mw-page-title-main">Keepit Dam</span> Dam in North West Slopes, New South Wales

Keepit Dam is a major gated mass concrete gravity dam with an earth fill abutment and a central gated concrete overflow crest and six radial gate spillways across the Namoi River upstream of its junction with the Peel River in the North West Slopes region of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-power, irrigation, water supply and conservation. The impounded reservoir is called Lake Keepit.

<span class="mw-page-title-main">Copeton Dam</span> Dam in New South Wales, Australia

Copeton Dam is a major clay core and rock fill embankment dam with nine radial gates and a gated concrete chute spillway across the Gwydir River upstream of Bingara in the New England region of New South Wales, Australia. The dam's purpose includes environmental flows, hydro-electric power generation, irrigation, and water supply. The impounded reservoir is called Lake Copeton.

Lostock Dam is a minor rockfill and clay core embankment dam with a concrete lined, flip bucket spillway across the Paterson River upstream of the village of East Gresford in the Hunter region of New South Wales, Australia. The dam's purpose includes flood mitigation, irrigation, water supply and conservation. Mini hydro-power facilities were retrofitted in 2010. The impounded reservoir is also called Lostock Dam.

Windamere Dam is a minor ungated rock fill with clay core embankment dam with an uncontrolled unlined rock cutting spillway across the Cudgegong River at Cudgegong, upstream of Mudgee in the Central Tablelands of New South Wales, Australia. The dam's purpose includes hydro-power, irrigation, water supply, and conservation. The impounded reservoir is called Lake Windamere.

<span class="mw-page-title-main">Blowering Dam</span> Dam in Snowy Mountains, New South Wales

The Blowering Dam is a major ungated rock fill with clay core embankment dam with concrete chute spillway impounding a reservoir under the same name. It is located on the Tumut River upstream of Tumut in the Snowy Mountains region of New South Wales, Australia. Purposes for the dam include flood mitigation, hydro-power, irrigation, water supply and conservation. The dam is part of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

Cochrane Dam is a minor earthfill embankment dam with concrete spillway across Georges Creek, located in the South Coast region of New South Wales, Australia. The main purpose of the dam is to supply water for hydro-power at the downstream Brown Mountain Power Station and for irrigation purposes. The impounded reservoir is called Cochrane Lake.

<span class="mw-page-title-main">Tooma Dam</span> Dam in Snowy Mountains, New South Wales

Tooma Dam is a major ungated earthen embankment dam across the Tooma River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

<span class="mw-page-title-main">Split Rock Dam</span> Dam in North West Slopes, New South Wales

Split Rock Dam is a minor ungated concrete faced rock fill embankment dam with concrete chute spillway across the Manilla River upstream of Manilla in the north-western slopes region of New South Wales, Australia. The dam's purpose includes flood mitigation, irrigation, water supply and conservation. The impounded reservoir is called Split Rock Reservoir.

Pindari Dam is a minor concrete faced rockfill embankment dam with an ungated uncontrolled rock cut with concrete sill spillway across the Severn River located upstream of the town of Ashford, in the North West Slopes region of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-power, irrigation, water supply and conservation. The impounded reservoir is called Lake Pindari.

<span class="mw-page-title-main">Talbingo Dam</span> Dam in Snowy Mountains, New South Wales

Talbingo Dam is a major ungated rock fill with clay core embankment dam with concrete chute spillway across the Tumut River upstream of Talbingo in the Snowy Mountains region of New South Wales, Australia. The impounded reservoir is called Talbingo Reservoir.

<span class="mw-page-title-main">Tumut Pond Dam</span> Dam in Snowy Mountains, New South Wales

Tumut Pond Dam is a major gated concrete arch dam across the upper reaches of the Tumut River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

<span class="mw-page-title-main">Toonumbar Dam</span> Dam in Northern Rivers, New South Wales

Toonumbar Dam is a minor ungated rock fill with clay core embankment dam with a concrete chute spillway across the Iron Pot Creek north-west of Casino in the Northern Rivers region of New South Wales, Australia. The dam's purpose includes hydro-power, irrigation, water supply, and conservation. The impounded reservoir is called Lake Toonumbar.

<span class="mw-page-title-main">Jounama Dam</span> Dam in Snowy Mountains, New South Wales

Jounama Dam is a major ungated rockfill embankment dam across the Tumut River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

Rydal Dam is a minor ungated homogeneous earthfill embankment dam with a fuse plug uncontrolled open channel spillway across an off stream storage, located near Rydal in the Central Tablelands region of New South Wales, Australia. The dam's purpose is to provide water storage for Delta power stations at Wallerawang and Mount Piper. The impounded reservoir is also called the Rydal Dam.

Tumut Two Dam or Tumut Two is a major ungated concrete gravity dam across the upper reaches of the Tumut River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

<span class="mw-page-title-main">Guthega Dam</span> Dam in Snowy Mountains, New South Wales

Guthega Dam is concrete gravity dam with an uncontrolled spillway across the Snowy River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the storage of water used in the generation of hydro-power. It is the first to be completed of the sixteen major dams of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

<span class="mw-page-title-main">Khancoban Dam</span> Dam in Snowy Mountains, New South Wales

Khancoban Dam is a major ungated earthfill embankment dam with a controlled spillway across the Swampy Plain River in the Snowy Mountains region of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

Murray Two Dam is a major ungated concrete arch dam with a controlled spillway across Khancoban Bank, a diverted flow of the Snowy and Geehi rivers in the Snowy Mountains region of New South Wales, Australia. The impounded reservoir is called the Murray Two Pondage.

Brogo Dam is a minor ungated rockfill embankment dam with an uncontrolled unlined rock cut spillway across the Brogo River upstream of Brogo in the South Coast region of New South Wales, Australia. The dam's purpose includes environmental flows, hydro-electric power generation, irrigation, and water supply. The impounded reservoir is also called Brogo Dam.

References

  1. 1 2 "Chichester Dam". Hunter Water Corporation. Archived from the original on 27 January 2008. Retrieved 8 November 2007.
  2. "Register of Large Dams in Australia". Dams information. The Australian National Committee on Large Dams Incorporated. 2010. Archived from the original (Excel (requires download)) on 12 December 2013. Retrieved 22 April 2013.
  3. "Chichester Dam Approved". Hunter Water. 1916. Retrieved 14 April 2013.
  4. "Hunter Water Supply (Chichester Dam) Act" (PDF). NSW legislation. Government of New South Wales. 1916. Retrieved 14 April 2013.
  5. Knowles, Craig (2 June 1998). "Legislative Assembly – Chichester Dam Electricity Generation". Parliamentary Debates (Hansard) . Parliament of New South Wales. Archived from the original on 22 June 2015. Retrieved 21 June 2015. Archived 22 June 2015 at the Wayback Machine
  6. "Chichester Dam Mini-Hydro". Case studies: Hydro. Clean Energy Council. 2013. Archived from the original on 29 March 2012. Retrieved 14 April 2013.