Bodangora Wind Farm

Last updated

Bodangora Wind Farm
Bodangora Wind Farm - February 2022.jpg
Bodangora Wind Farm in February 2022
Bodangora Wind Farm
CountryAustralia
LocationBodangora, New South Wales
Coordinates 32°23′46″S149°04′01″E / 32.396°S 149.067°E / -32.396; 149.067
StatusOperational
Construction began2017
Commission date 2019
Construction costA$236 million
Owner(s) Infigen Energy
Wind farm
Type Onshore
Hub height85 metres (279 ft)
Rotor diameter130 metres (427 ft)
Power generation
Units operational33 × 3.43 MW
Make and model General Electric 3.4-130
Nameplate capacity 113.2 MW
Capacity factor 34.57% (average 2019-2021)
Annual net output 342.8 GWh (average 2019-2021)
External links
Website https://www.infigenenergy.com/our-assets/owned-renewable-energy-assets/bodangora/

Bodangora Wind Farm is a 113.2 MW [1] wind farm owned by Infigen Energy in the district of Bodangora near Wellington, New South Wales, Australia. It consists of 33 wind turbines. The towers are 85 metres tall, and the rotor diameter is 130 metres. The wind turbine blades were manufactured in Bergama, Turkey. [2] The development of the project began in 2009. It received planning approval in August 2013. The wind farm was completed on 27 February 2019. [3] Annually it is supposed to generate on average 361 GWh of energy at capacity factor of 36.4%.

Bodangora Wind Farm has a power purchase agreement to sell 60% of the electricity generated to EnergyAustralia until the end of 2030. [4]

Operations

The wind farm began grid commissioning in October 2018 and was fully commissioned in December 2018 and has operated continuously since then. The generation table uses eljmkt nemlog to obtain generation values for each month.

Bodangora Wind Farm Generation (MWh)
YearTotalJanFebMarAprMayJunJulAugSepOctNovDec
201858,782N/AN/AN/AN/AN/AN/AN/A992*6,015*8,920*18,234*24,621*
2019340,08127,41433,55927,51830,90921,68524,47930,25526,35330,01828,84629,81129,234
2020353,66330,89533,17635,92224,91129,23925,08125,08326,08331,59027,66029,15334,870
2021334,56229,70928,98032,68419,19121,53224,26029,57428,21127,55927,12936,66229,071

Note: Asterisk indicates power output was limited during the month.

Related Research Articles

<span class="mw-page-title-main">Wind farm</span> Group of wind turbines

A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore.

Walkaway is a small town in the City of Greater Geraldton local government area of Western Australia. At the 2016 census, Walkaway had a population of 270.

<span class="mw-page-title-main">Albany Wind Farm</span> Wind power station in Western Australia

Albany wind and Grasmere farms are two wind power stations near Albany, Western Australia, owned by Bright Energy Investments. They are adjacent and are often considered a single facility. They have 18 wind turbines, with a maximum generating capacity of 35.4 MW of electricity. The original Albany Wind Farm was commissioned in October 2001, after ten years of planning. The wind farm has the capacity to produce 80 per cent of the electricity requirements of Albany.

<span class="mw-page-title-main">Arklow Bank Wind Park</span>

Arklow Bank Wind Park is a 25 megawatt offshore wind farm generating electrical power for the Wicklow region in Ireland. It is the first offshore wind farm in Ireland, and the world's first erection of wind turbines rated over 3 MW. It is located on the Arklow Bank, a shallow water sandbank in the Irish Sea, around 10 kilometers (6.2 mi) off the coast of Arklow with an area of 27 by 2.5 kilometres.

<span class="mw-page-title-main">Wind power in Australia</span>

Wind power is one of the main renewable energy sources in the world. In 2020, wind power contributed 10% of Australia's total electricity supply and 37.5% of its renewable energy supply.[1] Wind resource testing conditions in Australia are optimal, as abundant wind resources are located close to residential areas in the southern parts of the country and on the slopes of the Great Dividing Range in the east.[2]

<span class="mw-page-title-main">Wind power in South Australia</span> South Australian use of wind turbines to generate electricity

Wind power became a significant energy source within South Australia over the first two decades of the 21st century. In 2015, there was an installed capacity of 1,475 MW, which accounted for 34% of electricity production in the state. This accounted for 35% of Australia's installed wind power capacity. In 2021, there was an installed capacity of 2052.95 MW, which accounted for 42.1% of the electricity production in the state in 2020.

<span class="mw-page-title-main">Lake Bonney Wind Farm</span>

Lake Bonney Wind Farm is a wind farm near Millicent, South Australia, Australia. The wind farm is south of, and contiguous with, Canunda Wind Farm. Both are built along the Woakwine Range - a line of stabilised sand dunes that once were coastal.

<span class="mw-page-title-main">Wind power in Wyoming</span> Electricity from wind in one U.S. state

Wyoming has one of the highest wind power potentials of any state in the United States. In 2019, Wyoming had wind powered electricity generating capacity of 1,589 MW, which produced 9.85% of its electric generation, with an additional 3,753 MW under construction. However, the wind generation in that year was Wyoming's third-lowest in the 2010s. By 2020, wind capacity increased to 2738 MW and 8448 gigawatt-hours of electricity were produced from wind in 2021, more than double 2019 production. Additional wind capacity and needed transmission lines are under construction or planned, despite political headwinds from Wyoming's strong coal and oil sectors.

<span class="mw-page-title-main">Coopers Gap Wind Farm</span> Wind farm in Queensland, Australia

Coopers Gap Wind Farm is a 453 megawatt wind farm in the Western Downs and South Burnett regions of Queensland, Australia. It is located approximately 175 km north-west of the state capital Brisbane, and 50 kilometres south-west of Kingaroy and 65 kilometers north of Dalby. When construction was announced to be completed on 30 April 2020, it became the largest wind farm in Australia. This record was held until 10 December 2020 when the Stockyard Hill Wind Farm in Victoria was completed.

The Capital Wind Farm near Bungendore is the largest wind farm in New South Wales. It is part of the 6,000-hectare (15,000-acre) Capital Renewable Energy Precinct, along with nearby Woodlawn Wind Farm and the Capital East Solar Demonstration Plant.

<span class="mw-page-title-main">Infigen Energy</span>

Infigen Energy (Infigen), operating under this name since 29 April 2009, is a developer, owner and operator of renewable energy generation assets in Australia. Infigen's wind farm portfolio has an installed capacity of 557 MW. Most of Infigen's assets generate electricity from renewable sources and are eligible to sell Large-scale Generation Certificates (LGCs) under the mandatory Renewable Energy Target scheme, which operates in Australia under the Renewable Energy (Electricity) Act 2000. Since 2020, Infigen Energy has been a subsidiary of Iberdrola.

Stockyard Hill Wind Farm is a wind farm project in Victoria (Australia). In May 2022 the project achieved its 5th hold point test, and was approved by the Australian Energy Market Operator and Network Services Provider to generate up to 400MW into the National Electricity Market. When it is fully commissioned, it is expected to produce up to 530MW, which would be Australia's largest wind farm.

<span class="mw-page-title-main">Ararat Wind Farm</span> Australian wind farm

Ararat Wind Farm is a wind farm in western Victoria, Australia. It is located approximately 180km northwest of Melbourne. It was officially opened on 27 June 2017 and was the third-largest wind farm in Australia at that time, with capacity to generate 240MW from 75 turbines.

Sapphire Wind Farm is a 270 megawatt (MW) wind farm in the Australian state of New South Wales. When it was built in 2018, it was the largest wind farm in New South Wales. It is located in the New England region of northern New South Wales, 28 kilometres east of Inverell and 18 kilometres west of Glen Innes. The farm covers approximately 8921 hectares of cleared grazing land, and has an elevation of about 750 to 1100m. It is north of the Gwydir Highway. The White Rock and Glen Innes Wind Farms are south of the highway closer to Glen Innes. It is intended to be colocated with a 200 MW solar farm. The wind farm contains 75 Vestas V126 turbines, each of which can generate 3.6 MW of electricity. They each have a 137 metre hub height and 126 metre rotor diameter. The project is approved to build up to 109 wind turbines.

Boco Rock Wind Farm is a wind farm 10km southwest of Nimmitabel in the Snowy Mountains region of New South Wales, Australia. It has 67 GE 100-1.7 wind turbines with a hub height of 80m, and generates up to 113MW of electricity. It is managed by the developers, CWP Renewables but is now owned by EGCO.

The Port Augusta Renewable Energy Park is a combined wind and solar farm under construction south of Port Augusta in South Australia, Australia. The solar farm is planned to be at the northern end of the site, west of the Augusta Highway and south of Sundrop Farms. The wind turbines will be on both sides of the Augusta Highway, extending south as far as the road to Horrocks Pass. Construction formally started in October 2020 and is estimated to take about 18 months to complete. The total site is about 5,400 hectares.

Warradarge Wind Farm is under construction 15 kilometres (9.3 mi) northeast of Warradarge, and 30 kilometres (19 mi) southeast of Eneabba in the Mid West region of Western Australia. The first of its planned 51 turbines was completed on 21 January 2020.

Cherry Tree Wind Farm is a small wind farm located approximately 15 km south-east of Seymour, Victoria. The 16 turbine, 57.6 MW farm was developed and constructed by Infigen Energy for John Laing Group. Construction started in January 2019 and was operational in June 2020. The wind farm is expected to generate 182 GWh on average annually, for a capacity factor of 36%.

References

  1. "Bodangora Wind Farm" (PDF). Archived (PDF) from the original on 31 October 2020. Retrieved 27 October 2020.
  2. Coffey, Brendan (13 September 2019). "Fresh Air: Turkish Turbine Blade Factory Invigorates Historic Town". GE Reports. Retrieved 28 September 2019.
  3. "Bodangora". Infigen Energy . Retrieved 25 September 2019.
  4. Vorrath, Sophie (28 February 2017). "EnergyAustralia signs PPA for 113MW wind farm in NSW". Renew Economy . Retrieved 25 September 2019.