Cultana Solar Farm

Last updated

cultana Solar Farm
Cultana Solar Farm
Country
  • Australia
Coordinates 32°54′S137°36′E / 32.9°S 137.6°E / -32.9; 137.6
StatusProposed
Construction cost
  • 350 million A$ (2019)
Owner(s)
Solar farm
Type
Solar tracker
Site area
  • 1,000 ha (2,500 acres)
Power generation
Nameplate capacity
  • 280 MW
External links
Website www.simecenergy.com.au/en-au/projects/cultana-solar-farm/

Cultana Solar Farm is a proposed solar farm to be constructed north of Whyalla by SIMEC Energy Australia (part of the GFG Alliance). Construction is expected to begin early in 2020 after development approval was granted in May 2019. [1]

The contract for engineering, procurement and construction (EPC) was let to Shanghai Electric in June 2019 with construction expected to take 12 to 15 months to complete. [2] The site is north of Whyalla, on both sides of the Lincoln Highway. It was to consist of a total of 925,000 solar modules (later changed to 780,000), each 1 x 2 metres and 35 mm thick, mounted in groups of 85 modules in a north–south orientation on single-axis trackers. Each tracker will be 90 metres long, with 3 metre access between them, and a maximum height of four metres. The total area across the two sites is about 1,000 hectares (2,500 acres). The southern site will generate 70MW at 33kV and be connected via overhead cables to the northern site which will generate 210MW and have a 33kV/275kV substation connected to ElectraNet's Cultana substation. [3]

The solar farm will be connected to the National Electricity Market but its primary customer will be the Whyalla Steelworks which is also owned and operated by members of the GFG Alliance. [4]

Cultana Solar Farm will be Shanghai Electric's first project in Australia, and is expected to be Australia's largest solar farm at the time of its completion, with a capacity of 280 MW. [5]

A test array of almost 200 panels was installed in late 2019 to provide more detailed information in advance of the main construction phase. [6] The saltbush onsite is rolled rather than graded, reducing dust and increasing power output, expected at 600 GWh from the 780,000 solar panels by 2022. [7] [8]

Related Research Articles

Collinsville Power Station is located in Collinsville, Whitsunday Region, Queensland, Australia. It had five coal powered steam turbines with a combined generation capacity of 190 MW of electricity. The coal-fired power station closed in 2013. A solar power farm generating 42MW has been built on adjacent land.

Arrium was an Australian mining and materials company, employing nearly 10,000 workers, that went into voluntary administration in 2016 with debts of more than $2 billion. In 2017 it was acquired by British-owned Liberty House Group.

<span class="mw-page-title-main">Solar power in Australia</span>

Solar power is a fast-growing industry in Australia. As of June 2023, Australia's over 3.52 million solar PV installations had a combined capacity of 32,095 MW photovoltaic (PV) solar power, of which at least 4,389 MW were installed in the preceding 12 months. In 2019, 59 solar PV projects with a combined capacity of 2,881 MW were either under construction, constructed or due to start construction having reached financial closure. Solar accounted for 12.4% of Australia's total electrical energy production in 2021.

<span class="mw-page-title-main">Wind power in South Australia</span> South Australian use of wind turbines to generate electricity

Wind power became a significant energy source within South Australia over the first two decades of the 21st century. In 2015, there was an installed capacity of 1,475 MW, which accounted for 34% of electricity production in the state. This accounted for 35% of Australia's installed wind power capacity. In 2021, there was an installed capacity of 2052.95 MW, which accounted for 42.1% of the electricity production in the state in 2020.

<span class="mw-page-title-main">Wind power in China</span> Overview of wind power in China

China is the world leader in wind power generation, with the largest installed capacity of any nation and continued rapid growth in new wind facilities. With its large land mass and long coastline, China has exceptional wind power resources: it is estimated China has about 2,380 gigawatts (GW) of exploitable capacity on land and 200GW on the sea. Wind power remained China's third-largest source of electricity at the end of 2021, accounting for 7.5% of total power generation.

<span class="mw-page-title-main">Fântânele-Cogealac Wind Farm</span>

The Fântânele-Cogealac Wind Farm is the largest onshore wind farm in Romania and in Europe, with installed nameplate capacity of 600 MW from 240 General Electric 2.5xl wind turbines. The wind farm has been built for the ČEZ Group.

<span class="mw-page-title-main">Whyalla Steelworks</span>

The Whyalla Steelworks is a fully integrated steelworks and the only manufacturer of rail in Australia. Iron ore is mined in the Middleback Range to feed the steelworks, resulting in the distribution of finished steel products of over 90 different grades. It occupies a 1,000 ha site on the shore of False Bay, Spencer Gulf and is the largest employer in Whyalla, South Australia.

<span class="mw-page-title-main">Teesside Wind Farm</span> British offshore wind farm

Teesside Wind Farm, or alternatively referred to as Redcar Wind Farm, is a 27 turbine 62 MW capacity offshore wind farm constructed just to the east of the mouth of the River Tees and 1.5 km north of Redcar off the North Yorkshire coast, in the North Sea, England.

SIMEC Group Ltd is a British international energy and natural resources business focused on resources, sustainable power, infrastructure, and commodities trading. In 2016 it had an annual turnover of almost USD2.5 billion and net assets of USD350 million. It is part of the Gupta Family Group ("GFG") Alliance, owned by members of the Gupta family, which had a combined turnover of more than USD13 billion and combined net assets of more than USD2.3 billion. Its activities span renewable energy generation, mining, shipping, and commodities trading.

The Lincoln Gap Wind Farm is a wind farm in the vicinity of Lincoln Gap on northeastern Eyre Peninsula in South Australia, Australia. It consists of 59 wind turbines and generates a total of 212 MW of electricity. Construction began in late 2017 and was initially expected to be commissioned in late 2018. Construction was delayed in July 2018 when unexploded ordnance was discovered on the site, left from historic military testing. The site is not far from the Cultana Training Area.

Solar River Project is a proposed photovoltaic power station planned to be built near Robertstown in South Australia. The project received development approval from the Government of South Australia in June 2018 and was expected to start construction early in 2019. However, as of November 2021, the project was still proposed to be constructed, but work on site was not expected until at least the second half of 2022.

<span class="mw-page-title-main">Murra Warra Wind Farm</span>

The Murra Warra Wind Farm is one of Australia's largest wind farms. Located on the plains of north-western Victoria, approximately 25 kilometres (16 mi) north of the city of Horsham, it consists of 99 wind turbines with a maximum tip height of 220m.

Alten Solar Power Station, also Kesses 1 Solar Power Station, is a 44 megawatts (59,000 hp) solar power plant in Kenya, the largest economy in the East African Community.

<span class="mw-page-title-main">Comanche Solar Project</span> Photovoltaic power station

The Comanche Solar Project is a 120 megawatt (MWAC) photovoltaic power station near the city of Pueblo, Colorado. It became the largest solar facility in the state when it came online in late 2016. The electricity is being sold to Public Service of Colorado, a subsidiary of Xcel Energy, under a 25-year power purchase agreement (PPA). Xcel determined through an open bid process that the PPA's terms were competitive with natural gas.

The Rush Creek Wind Project is a 600 megawatt (MW) wind facility in eastern Colorado, located south of the town of Limon. It increased the wind generating capacity in the state by 20% when it came online in late 2018. The facility is financed, owned, and operated by Xcel Energy, the largest public utility in the state. The project was developed primarily for its numerous economic benefits since Xcel previously met the minimum 30% requirement of Colorado's 2020 renewable portfolio standard.

Badgingarra Wind Farm is a wind farm in the locality of Hill River northwest of the town of Badgingarra in Western Australia, about 200 kilometres (120 mi) north of Perth. It is owned by APA Group and located immediately north of the older Emu Downs Wind Farm which has the same owner.

Djermaya Solar Power Station (DSPS) is a planned 60 MW (80,000 hp) solar power plant in Chad. The solar farm is under development and is owned by a consortium comprising (a) Aldwych International Limited, a subsidiary of Anergi Group and (b) Smart Energies. The power station will be developed in phases. Phase 1, with capacity of 32 megawatts will be developed first. Phase 2, with capacity of 28 megawatts will be developed after Phase 1.

References

  1. Mazengarb, Michael (4 June 2019). "Gupta secures China EPC contract for $350 million Cultana solar farm". Renew Economy. Retrieved 8 January 2020.
  2. Maisch, Marija (3 June 2019). "Shanghai Electric to build Gupta's 280 MW Cultana Solar Farm". pv magazine. Retrieved 8 January 2020.
  3. "Cultana Solar Farm". NS Energy. Retrieved 8 January 2020.
  4. "Cultana Solar Farm". SIMEC Energy Australia . Retrieved 8 January 2020.
  5. Shi Jing (4 June 2019). "Shanghai Electric set to build solar farm for SIMEC Energy Australia". China Daily . Shanghai. Retrieved 8 January 2020.
  6. Mayfield, Louis (20 November 2019). "Solar farm nears construction". Whyalla News . Retrieved 8 January 2020.
  7. Spence, Andrew (27 May 2020). "Solar farm construction method to reduce dust and save 'bonsai forest'". The Lead SA. Archived from the original on 27 May 2020.
  8. Spence, Andrew (27 May 2020). "Cultana Solar Farm ramps up for construction start". The Lead SA. Archived from the original on 27 May 2020.