2016 South Australian blackout

Last updated

2016 South Australian blackout
DateSeptember 28, 2016 (2016-09-28)
Duration24 Hours - 1 Week
LocationStatewide
CauseStorm damage
Inquiries Australian Energy Market Operator and Australian Energy Regulator investigations
Litigation Australian Energy Regulator legal action against four energy suppliers

The South Australian blackout of 2016 was a widespread power outage in South Australia that occurred as a result of storm damage to electricity transmission infrastructure on 28 September 2016. The cascading failure of the electricity transmission network resulted in almost the entire state losing its electricity supply, affecting 850,000 SA customers. Kangaroo Island did not lose its supply, [1] as the Kangaroo Island power station had been built to supply the island for the contingency of a failure in the power cable under the Backstairs Passage. [2]

Contents

Storms

On the day of the failure, South Australia experienced a violent storm reported as being a once-in-50-years event. [3] There was gale force and storm force wind across wide areas of the state. It included at least two tornadoes in the vicinity of Blyth, [4] which damaged multiple elements of critical infrastructure. [5] The state was hit by at least 80,000 lightning strikes; [6] the grid operator had not anticipated substantial lightning risks to the transmission system and taken no protective actions therefor. [7] The wind damaged a total of 23 pylons on electricity transmission lines, including damage on three of the four interconnectors connecting the Adelaide area to the north and west of the state.

Power grid

The South Australian power grid is operated by ElectraNet and connected to the National Electricity Market via two interconnectors to Victoria. These are the Heywood interconnector (which had recently been upgraded to 650 MW at 275 kV) [8] [9] in the southeast of the state and the Murraylink (220 MW at 150 kV) HVDC further north, connecting Berri to Red Cliffs in Victoria. [10] The Heywood interconnector had been down for upgrade earlier in the year, and was initially blamed for the widespread outage.

Blackout

The weather had resulted in localised power outages throughout the day and by around 3:50 p.m. local time, almost the entire state power grid had been cut out. Early indications were that as the transmission lines in the Mid North failed due to damaged pylons, the automatic safety features in the network isolated the generators to protect both the generation facilities and the end consumers' equipment. Over a short period, this resulted in most of the state's distribution network being powered down as the transmission network acted to protect the infrastructure.

The preliminary report from the Australian Energy Market Operator (AEMO) identified that problems started 90 seconds before the eventual failure. The first line to trip was a 66 kV line near Adelaide, and it was automatically reset. The first major fault was 47 seconds later when two phases of the 275 kV line between Brinkworth and Templers grounded. The DavenportBelalie line tripped with one phase to ground, was automatically reset, but tripped again nine seconds later, so was isolated for manual inspection, with the fault estimated to be 42 km (26 mi) from Davenport. One second later (7 seconds before the state went dark), the Hallett Wind Farm reduced output by 123 MW. Four seconds later, a third 275 kV transmission line showed a fault, the Davenport–Mount Lock is on the other side of the same towers as Davenport–Belalie, and the fault was estimated to be 1 km (0.6 mi) further on. The damaged power lines caused 5–6 voltage glitches which stressed the ride-through capability of most of the wind farm capacity, causing nine of them to shut down: [11] Finally, all within one second, the Hornsdale Wind Farm reduced output by 86 MW, Snowtown Wind Farm reduced output by 106 MW, the Heywood interconnector flow increased to over 850 MW. Both of its circuits tripped out due to imminent loss of synchronism across the network between South Australia and the eastern states. This occurred before the interconnector circuits' thermal load limits were reached. [12] Supply was then lost to the entire South Australian region of the National Electricity Market, as the Torrens Island Power Station, Ladbroke Grove Power Station, Murraylink interconnector and all remaining wind farms tripped. [13]

AEMO identified software settings in the wind farms that prevented repeated restarts once voltage or frequency events occurred too often. The group of wind turbines that could accept 9 ride-throughs in 120 seconds stayed on line through much of the event before the system went black. The rather larger group of turbines that could not accept this many repeated ride-throughs dropped out, instigating the overload and shutdown of the interconnector, and hence the electricity supply. AEMO has suggested better fault ride-through capability for the wind farms. The high wind speed caused 20 MW of wind power to disconnect to prevent overspeed. [11]

In 2019, the Australian Energy Regulator initiated proceedings in the Federal Court of Australia against the operators of four wind farms. It alleged that these companies had failed to comply with performance requirements to ride through major disruptions and disturbances. The companies AGL Energy, Neoen, Pacific Hydro and Tilt Renewables operated several of the large wind farms that tripped during the incident including Hallett, [14] Hornsdale, Clements Gap and Snowtown. [15] [16]

Restoration

As so much of the network had been shut down, the authorities needed to act carefully to bring it back online and provide a stable network. This was initiated in the first few hours following the start of the outage, initially using the Victorian interconnectors to establish a stable frequency on the network, and gradually add South Australia's power generators to the network and restore power to areas as soon as possible. The initial focus was to restore power to the Adelaide metropolitan area, and suburbs started to regain power within about three hours, and much of the city power was restored by 10 p.m. By the following morning, power had been restored to most of the areas of Adelaide and the areas south and east of it that did not have storm damage to the distribution network. The substantial damage to the transmission network north of Adelaide meant that large areas of the Mid North and Eyre Peninsula did not have power restored within 24 hours, and further damaging weather indicated that it could be at least the end of the weekend before some of those areas were restored. [17]

AEMO had contracts with two "System Restart Ancillary Services" (SRAS) providers to help bring the network back up. The Mintaro Emergency Diesel Generator had suffered storm damage, including a cloud-to-ground lightning strike in very close proximity, but would not have been useful anyway due to its location in the network and downed transmission lines. [12] The Quarantine Power Station was unable to start the larger Unit #5 required to provide enough power to restart any of the Torrens Island Power Station units, so Torrens Island needed power from the Victorian interconnector to be restarted. A circuit breaker in the Quarantine Power Station switchyard connecting Torrens Island Power Station and the smaller units at Quarantine Power Station with Unit #5 tripped repeatedly due to in-rush current on the generator transformer and auxiliary transformer, and subsequently ran out of stored energy before Unit #5 could be started. [12]

By the morning of Friday 30 September 2016, about 10,000 properties had not yet had power restored since the blackout on Wednesday afternoon, and 18,000 more had lost power due to distribution network faults caused by continued stormy weather. An additional transmission line fault near Tumby Bay was only detected as ElectraNet tried to power up the system, and this fault prevented the power generator in Port Lincoln from being used to power the lower Eyre Peninsula. [18]

Due to the extensive nature of the damage, temporary transmission towers were sent by Western Power; these towers can reach a height of 58 metres and take only one day to erect. It is expected that the towers will remain in use for 6 to 12 months while the permanent repairs are made. [19]

Consequences

The Flinders Medical Centre, a major hospital in Adelaide's southern suburbs, was affected when the fuel pump for the diesel-powered back-up generator failed after operating for about an hour. As a result, 17 patients were transferred from the intensive care unit to the adjacent Flinders Private Hospital, which still had an operating generator. [20] Several embryos were also lost at Flinders Fertility. [21]

The zinc smelter operated by Nyrstar at Port Pirie was expected to be shut down for several weeks, as the diesel back-up generator failed after about four hours, and the content of the smelter cooled and solidified. [17]

Immediate political responses

A number of politicians commented whilst the emergency was unfolding. The Australian Deputy Prime Minister Barnaby Joyce told ABC "[Windpower] wasn't working too well last night, because they had a blackout", [22] while the former Prime Minister Malcolm Turnbull said state governments had paid "little or no attention to energy security." [23]

Energy minister Josh Frydenberg said that "energy security was the (federal) government's "number one priority". [24] He later said "it has to be underlined that this was a major weather event." [6]

South Australian senator Nick Xenophon said he supported renewable energy but that the state's approach relied too much on wind. Former South Australian Premier Jay Weatherill said Xenophon had "jumped the shark" as the situation was yet to be analysed. [6]

Queensland One Nation senator Malcolm Roberts urged all governments to "exit all climate change policies" while South Australian Greens senator Sarah Hanson-Young said it was "pathetic" that people were politicking while emergency service officers and volunteers are flat out responding. [6]

Former Opposition Leader Bill Shorten accused the Coalition of "playing politics with what is a natural disaster" and that there was no link between the storm damage and the state's renewable energy target. [23]

The Grattan Institute's Tony Wood was reported as saying "If you've got a wind farm or a coal-fired power station at the end of a transmission line, and that system either is taken out by a storm or is forced to shut down to protect itself from a storm, it doesn't matter what the energy source is" while Clean Energy Council's Tom Butler said the weather event "created a fault in the system which has caused the generation to trip offline" and that "the Snowtown wind farm, north of Adelaide, was actually helping to prop up the state's power supply ahead of gas power stations as the network was gradually brought back online." [25]

Victorian Premier Daniel Andrews told ABC radio that Turnbull had conflated two issues, that "the poles and wires had blown over". [26]

Ensuing flood

Following the power outages, the same storm resulted in major flooding, which was dubbed "unrelenting" by South Australia Services Minister Peter Malinauskas. A flood emergency was issued for towns and suburbs north of Adelaide. [27] Flood warnings were also issued for the Adelaide hills area.

December 2016 blackouts

Further widespread blackouts occurred beginning late on Tuesday 27 December 2016, with areas losing power for upwards of twelve hours following severe storms causing damage to over 300 powerlines in the electricity distribution network. The storms also caused flooding and wind damage, including property destruction due to fallen trees. [28] A total of 155,000 properties lost power at the peak of the storms, requiring over 1200 repair jobs resulting from over 350 powerlines being damaged. [29] As of 7.30pm on Thursday 29 December, there were more than 11 500 households still without power across the state, some for up to forty-six hours, in regions including the Adelaide Hills, Mid-North, Flinders Ranges, and Murraylands. [30] By 9am on Saturday 31 December, there were still more than 1600 households without power for more than 80 hours, primarily across the Adelaide Hills. [31] [32] [ citation needed ]

February 2017 blackouts

On 8 February 2017, over 90,000 households in Adelaide lost power for 45 minutes in the middle of a major heatwave. The Australian Energy Market Operator (AEMO) ordered 100 MW of load shedding, but 300 MW was cut, [33] causing controversy with the state government. The state Energy Minister, Tom Koutsantonis said that the state had spare generation capacity but the market didn't turn that generation on, as the 165 MW [33] second unit at Pelican Point power station had gas and was ready to go. [34] [35] AEMO stated that it had sent notices to all generators, requesting a market response due to increased demand but it did not receive sufficient bids into the market to maintain the supply/demand balance in South Australia. [36] Engie, the operator of Pelican Point, responded that the Market Rules did not permit it to make a market response unless directed by the market operator. [37] This was authorised the next day to avoid a repeat on 9 February. [35] The owner later clarified that it was not allowed to bid into the market if supply cannot be guaranteed, and it did not have a current gas supply contract for the second unit. It was able to respond promptly once directed to do so on 9 February during continuing high temperature weather. [38]

See also

Related Research Articles

<span class="mw-page-title-main">Power outage</span> Loss of electric power to an area

A power outage is the loss of the electrical power network supply to an end user.

<span class="mw-page-title-main">National Grid (Great Britain)</span> High-voltage electric power transmission network in Great Britain

The National Grid is the high-voltage electric power transmission network serving Great Britain, connecting power stations and major substations, and ensuring that electricity generated anywhere on the grid can be used to satisfy demand elsewhere. The network serves the majority of Great Britain and some of the surrounding islands. It does not cover Northern Ireland, which is part of the Irish single electricity market.

<span class="mw-page-title-main">Rolling blackout</span> Intentionally engineered electrical power shutdown

A rolling blackout, also referred to as rota or rotational load shedding, rota disconnection, feeder rotation, or a rotating outage, is an intentionally engineered electrical power shutdown in which electricity delivery is stopped for non-overlapping periods of time over different parts of the distribution region. Rolling blackouts are a last-resort measure used by an electric utility company to avoid a total blackout of the power system.

The National Electricity Market (NEM) is an arrangement in Australia's electricity sector for the connection of the electricity transmission grids of the eastern and southern Australia states and territories to create a cross-state wholesale electricity market. The Australian Energy Market Commission develops and maintains the Australian National Electricity Rules (NER), which have the force of law in the states and territories participating in NEM. The Rules are enforced by the Australian Energy Regulator. The day-to-day management of NEM is performed by the Australian Energy Market Operator.

<span class="mw-page-title-main">Wind power in South Australia</span> South Australian use of wind turbines to generate electricity

Wind power became a significant energy source within South Australia over the first two decades of the 21st century. In 2015, there was an installed capacity of 1,475 MW, which accounted for 34% of electricity production in the state. This accounted for 35% of Australia's installed wind power capacity. In 2021, there was an installed capacity of 2052.95 MW, which accounted for 42.1% of the electricity production in the state in 2020.

Electricity in Pakistan is generated, transmitted and distributed by two vertically integrated public sector companies, first one being Water and Power Development Authority (WAPDA) responsible for the production of hydroelectricity and its supply to the consumers by electricity distribution companies (DISCOS) under the Pakistan Electric Power Company (PEPCO) being the other integrated company. Currently, there are 12 distribution companies and a National Transmission And Dispatch Company (NTDC) which are all in the public sector except Karachi Electric in the city of Karachi and its surrounding areas. There are around 42 independent power producers (IPPs) that contribute significantly in electricity generation in Pakistan.

Tamar Valley Power Station is a $230 million natural gas-fired power station located in Bell Bay in the Tamar Valley, Tasmania. It is owned by Hydro Tasmania, and is immediately adjacent to the decommissioned Bell Bay Power Station, which is also owned by Hydro Tasmania.

The Australian Energy Market Operator (AEMO) performs an array of gas and electricity market, operational, development and planning functions. It manages the National Electricity Market (NEM), the Wholesale Electricity Market (WA) (WEM) and the Victorian gas transmission network. AEMO also facilitates electricity and gas full retail contestability, overseeing these retail markets in eastern and southern Australia. It is additionally responsible for national transmission planning for electricity and the establishment of a Short Term Trading Market (STTM) for gas.

South Australia is a leader in utility-scale renewable energy generation, and also produces gas and uranium for electricity generation. Gas production is mostly concentrated in the Cooper Basin in the state's north-east. Gas is delivered from these fields by pipeline to users interstate and to Port Adelaide where it fuels three separate gas-fired power plants. Uranium is also mined in South Australia, though nuclear power generation is prohibited nationally. The Olympic Dam mine is the world's single largest known deposit of uranium and represents 30% of the world's total uranium resource. Many utility-scale wind farms and solar farms have been commissioned during the 21st century and geology with potential for geothermal energy has also been identified but is yet to be developed.

<span class="mw-page-title-main">Pelican Point Power Station</span> Engie power station near Adelaide, South Australia

The Pelican Point Power Station is located at Pelican Point, 20 km from the centre of Adelaide, South Australia on the Lefevre Peninsula. It is operated by Engie, which owns 72 per cent of the power station. Mitsui owns the remaining 28 per cent. It burns natural gas in a combined cycle power station, comprising two 160 MW gas turbines and one 165 MW steam turbine, to generate up to 485 MW of electricity.

<span class="mw-page-title-main">Electricity sector in Australia</span>

The electricity sector in Australia has been historically dominated by coal-fired power stations, but renewables are forming a rapidly growing fraction of supply. In 2021, Australia's electricity production reached 265 TWh, with coal accounting for 52.9% and natural gas for 18.8%. Renewable sources, comprising solar, wind, hydro, and bioenergy with waste, collectively made up 26.7% of the total electricity generation mix.

The 2016 Tasmanian energy crisis was an ongoing energy storage situation in the state of Tasmania, Australia in 2016. Two years of high volumes of energy exported to Victoria via the Basslink HVDC cable, followed by low rainfall, and a fault which rendered the cable inoperable, resulted in record low storage levels in Tasmania's hydro-electric system. This resulted in a number of contingency plans to be enacted by Hydro Tasmania and the Hodgman Government.

The Hornsdale Wind Farm is an electricity generator in the locality of Hornsdale in the south-west of the Narien Range, north of Jamestown, South Australia. It consists of 99 wind turbines with a generation capacity of 315 megawatts (422,000 hp). The plant is owned and operated by Neoen, a French renewable energy company.

Hornsdale Power Reserve is a 150 MW grid-connected energy storage system owned by Neoen co-located with the Hornsdale Wind Farm in the Mid North region of South Australia, also owned by Neoen.

Marinus Link is a proposed 750 megawatt capacity high voltage direct current (HVDC) electricity interconnector, to strengthen the connection between the Australian states of Tasmania and Victoria, on Australia's National Electricity Market. Due to inflation, Marinus link was scaled back from an initial plan of 1500 MW via two cables, down to 750 MW via one cable. It involves approximately 250 km of subsea cables and approximately 90 km of underground land cables. Marinus Link will also incorporate significant optical fibre capacity for system control, with the remaining capacity available to strengthen telecommunications and data connectivity between the regions. Marinus Link will be supported by approximately 220 km of high voltage alternating current (HVAC) of proposed transmission developments in North West Tasmania, known as the North West Transmission Developments (NWTD). Collectively, Marinus Link and the North West Transmission Developments are known as Project Marinus. In October 2022, authorities pledged loans for the project, as well as supporting facilities such as pumped hydro in Tasmania.

Temporary Generation North and its smaller sibling Temporary Generation South were gas turbine power stations in South Australia. They were bought by the Government of South Australia in 2017 as a response to the 2016 South Australian blackout and load-shedding in February 2017.

The Heywood interconnector is a 275 kV AC overhead electricity transmission line with two circuits connecting the electricity grids in South Australia and Victoria, two states of Australia. Both are part of the National Electricity Market. The nominal capacity of the interconnector is 650 MW since an upgrade in 2016. The interconnector was commissioned in 1988 and was the first connection between the two state electricity grids.

Warradarge Wind Farm is located 15 kilometres (9.3 mi) northeast of Warradarge, and 30 kilometres (19 mi) southeast of Eneabba in the Mid West region of Western Australia. Construction commenced in 2019 and the first of its planned 51 turbines was completed on 21 January 2020. The wind farm has been operational since then.

References

  1. "Thousands still without power as wild weather continues". InDaily . 28 September 2016. Retrieved 30 September 2016.
  2. "Kangaroo Island Project Profile". SDA Engineering. Archived from the original on 19 February 2017. Retrieved 13 September 2017.
  3. Waldhuter, Lauren; staff (29 September 2016). "SA weather: Worsening conditions cause more blackouts as BOM warns of more storms". ABC News . Retrieved 29 September 2016.
  4. "SA weather: Blyth residents cleaning up after tornadoes sweep through state's mid north". ABC News . 29 September 2016. Retrieved 29 September 2016.
  5. "SA blackout: Why and how?". Australian Broadcasting Corporation . 28 September 2016. Retrieved 2 October 2016.
  6. 1 2 3 4 Bourke, Latika; Koziol, Michael (28 September 2016). "Minister Josh Frydenberg, senator Nick Xenophon question renewables in wake of South Australia blackout". Sydney Morning Herald . Retrieved 30 September 2016.
  7. Velay, Maxime; Vinyals, Meritxell; Besanger, Yvon; Retière, Nicolas (September 2018). An analysis of large-scale transmission power blackouts from 2005 to 2016. 53rd International Universities Power Engineering Conference. Glasgow. p. 8541901. doi:10.1109/UPEC.2018.8541901. HAL   hal-02330748.
  8. "SA-Vic (Heywood) Interconnector Upgrade". ElectraNet. 30 January 2012. Retrieved 30 September 2016.
  9. Fact sheet, Heywood interconnector
  10. "SA power outage: How did it happen?". ABC News . 29 September 2016. Retrieved 29 September 2016.
  11. 1 2 "UPDATE REPORT – BLACK SYSTEM EVENT IN SOUTH AUSTRALIA ON 28 SEPTEMBER 2016" (PDF). Australian Energy Market Operator. 19 October 2016. pp. 14–22, 36 (Table 4). Retrieved 25 December 2016. 'voltage ride-through' settings were set to disconnect or reduce turbine output when between three and six 'voltage ride-through' events were detected within a given timeframe. Investigations to date indicate that information on the control system involved and its settings was not included in the models of wind turbine operation provided to AEMO during NEM registration processes prior to connection of the wind farms. Approximately 20 MW of wind power was disconnected due to excessive wind during the event.
  12. 1 2 3 "Integrated Final Report SA Black System 28 September 2016" (PDF). AEMO. 28 March 2017. Retrieved 4 April 2017.
  13. Washington, David; Siebert, Bension (5 October 2016). "Blackout report leaves renewables debate dangling in the breeze". InDaily . Retrieved 5 October 2016.
  14. "AER commences legal proceedings in South Australia". AGL Energy. 7 August 2019. Retrieved 7 August 2019.
  15. Keane, Daniel (7 August 2019). "Energy regulator launches legal action against wind farm operators over SA statewide blackout". ABC News . Retrieved 7 August 2019.
  16. Parkinson, Giles; Mazengarb, Michael (7 August 2019). "AER sues four wind farm companies over South Australian blackout". Renew Economy . Retrieved 7 August 2019.
  17. 1 2 "SA weather: Restoring power 'very delicate affair'". ABC News . 29 September 2016. Retrieved 29 September 2016.
  18. "Flood risks for SA as Premier flies into blacked-out region". InDaily . 30 September 2016. Retrieved 4 October 2016.
  19. Weber, David (29 September 2016). "Western Australia sends transmission towers to storm-affected SA". Australian Broadcasting Corporation. ABC News . Retrieved 30 September 2016.
  20. Edwards, Verity; Puddy, Rebecca; Owen, Michael (29 September 2016). "Storm leaves SA without power, heads to NSW, Victoria, Tasmania". The Australian . Retrieved 30 September 2016.
  21. Shepherd, Tory (30 September 2016). "Power blackouts from storm have destroyed embryos at Flinders Fertility, leaving families and medics distressed by their loss". The Advertiser . Retrieved 30 September 2016.
  22. Riordan, Primrose; Evans, Simon (28 September 2016). "SA blackout: Nick Xenophon, Barnaby Joyce blame renewables". Australian Financial Review . Retrieved 30 September 2016.
  23. 1 2 Anderson, Stephanie (29 September 2016). "Malcolm Turnbull criticises state governments for 'unrealistic' emissions targets over energy security". ABC News . Retrieved 30 September 2016.
  24. Lane, Sabra (29 September 2016). "Politicians put their spin on the blackout that plunged all of South Australia into darkness". 7.30 . Retrieved 30 September 2016.
  25. Doran, Matthew (29 September 2016). "SA weather: No link between blackout and renewable energy, experts say" . Retrieved 30 September 2016.
  26. Hutchens, Gareth (30 September 2016). "'Ignorant rubbish': Daniel Andrews slams Malcolm Turnbull over SA blackout comments" . Retrieved 30 September 2016.
  27. "'Unrelenting': flood emergency north of Adelaide as rivers continue to rise" . Retrieved 3 October 2016.
  28. "SA weather: More wild weather hits state after Adelaide storm leaves trail of destruction". ABC News. Australian Broadcasting Corporation. 28 December 2016. Retrieved 1 January 2017.
  29. "SA storms: Thousands still without power as businesses suffer losses in blackout". ABC News. Australian Broadcasting Corporation. 29 December 2016. Retrieved 1 January 2017.
  30. https://outage.apps.sapowernetworks.com.au/outagereport/outagesearch?AspxAutoDetectCookieSupport=1%5B%5D
  31. "OutageSearch". Archived from the original on 16 March 2016. Retrieved 29 December 2016.
  32. "OutageMap". Archived from the original on 16 March 2016. Retrieved 30 December 2016.
  33. 1 2 "Load shedding in SA heatwave three times amount ordered". Australian Broadcasting Corporation . 15 February 2017. Retrieved 11 October 2017.
  34. Rolling blackouts ordered as Adelaide swelters in heatwave (News.com.au)
  35. 1 2 SA power crisis: Will there be more blackouts?
  36. "Media Statement - South Australia Update" (Press release). Australian Energy Market Operator. 9 February 2017. Retrieved 9 February 2017.
  37. "Pelican Point" (Press release). Engie. 9 February 2017. Retrieved 9 February 2017.[ permanent dead link ]
  38. "Pelican Point second unit" (PDF) (Press release). Engie. 10 February 2017. Archived from the original (PDF) on 11 February 2017. Retrieved 10 February 2017.