Dartmouth Dam | |
---|---|
Location of the Dartmouth Dam in Victoria | |
Country | Australia |
Location | Victoria |
Coordinates | 36°33′29″S147°31′25″E / 36.55806°S 147.52361°E |
Status | Operational |
Construction began | 1973 |
Opening date | 1979 |
Construction cost | A$139 million |
Owner(s) | Murray Darling Basin Authority |
Operator(s) | Goulburn–Murray Water |
Dam and spillways | |
Type of dam | Embankment dam |
Impounds |
|
Height (thalweg) | 180 m (591 ft) |
Length | 92 m (302 ft) |
Elevation at crest | 486 m (1,594 ft) AHD |
Width (crest) | 670 m (2,198 ft) |
Width (base) | 700 m (2,297 ft) |
Dam volume | 14.1 million m3 (498 million cu ft) |
Spillway type | Uncontrolled chute |
Spillway capacity | 2,750 m3/s (97,115 cu ft/s) |
Reservoir | |
Creates | Dartmouth Reservoir |
Total capacity | 3,856 GL (848 billion imp gal; 1 trillion US gal) |
Inactive capacity | 71 GL (16 billion imp gal; 19 billion US gal) |
Catchment area | 3,600 km2 (1,390 sq mi) |
Surface area | 6,300 ha (15,568 acres) |
Dartmouth Power Station | |
Operator(s) | AGL Energy |
Commission date | January 1981 |
Type | Francis-type |
Turbines | 1 × 180 MW (241,384 hp) |
Installed capacity | 150 MW (201,153 hp) |
Annual generation | 310 GWh (1,116 TJ) |
Website Dartmouth Dam at the Murray–Darling Basin Authority |
Dartmouth Dam is a large rock-fill embankment dam with an uncontrolled chute spillway across the Mitta Mitta, Gibbo and Dart rivers, the Morass Creek and a number of small tributaries. The dam is located near Mount Bogong in the north-east of the Australian state of Victoria. The dam's purpose includes irrigation, the generation of hydro-electric power, water supply and conservation. The impounded reservoir is called Dartmouth Reservoir, sometimes called Lake Dartmouth. The Dartmouth Power Station, a hydro-electric power station that generates power to the national grid, is located near the dam wall.
A smaller pond, called the Dartmouth Dam Regulating Pond or Banimboola Pondage, approximately 9 kilometres (6 mi) downstream of the main dam, also across the Mitta Mitta River, is located adjacent the Banimboola Hydroelectric Power Station and forms part of the Dartmouth Dam complex of facilities.
Designed by the State Rivers & Water Supply Commission of Victoria, construction commenced in 1973 and was completed in 1979 by Thiess Brothers, at a cost of A$179 million. [1] The embankment dam wall is constructed with an earth core and rock fill, rising to a height of 180 metres (591 ft) from the lowest part of the foundation to the roadway across the top of the dam, making the dam wall the highest in Australia. [2]
The core component materials of the wall include 10.5 million m3 (370 million cu ft) of rock, 0.8 million m3 (28 million cu ft) of filter material made from crushed quarried rock, and 2.8 million m3 (99 million cu ft) of earth for the core. [3] The reservoir has a capacity of 3,856 GL (1 trillion US gal), [4] or approximately 6.7 times the capacity of Sydney Harbour; and can release a maximum outflow of approximately 12 GL (3.2 billion US gal) per day in normal operation. [3]
The crest of the uncontrolled spillway is 486 metres (1,594 ft) AHD and is approximately 92 metres (302 ft) long. When full, flood flows spill over the crest and down an 80-metre-long (260 ft) concrete chute. The water then returns to the river via an open rock cascade which gradually widens to 300 metres (984 ft) at river level. Once Dartmouth Reservoir reaches 99% capacity, it is considered to be 'operationally full'. Releases are then set to pass inflows downstream to prevent the level rising further. [3]
Releases are passed through the outlet works and power station whenever possible. Water will only flow over the spillway if significant flood inflows enter from upstream when the storage is close to full. This approach reduces the chance of downstream flooding, maximises operating flexibility for hydro-power generation, and protects the spillway. [3]
The Dartmouth Dam stores water from the Victorian High Country's snow fields for summer release into the Mitta Mitta, and the downstream Lake Hume, and into the greater Murray River for irrigation. The reservoir's inflow and outflow capacity is quite small considering its size, meaning that its levels vary little compared with some other dams on the Murray and their tributaries. [5]
The reservoir is a popular recreational trout fishery, being regularly restocked by the Victorian Department of Primary Industries.
Designed by the State Electricity Commission of Victoria, and constructed by Lewis Constructions, and commissioned in January 1981, Dartmouth Power Station has one Francis turbine-generator, with a generating capacity of 180 megawatts (240,000 hp), the largest single installed hydroelectric turbine in Australia. It is owned and operated by AGL Energy. [6]
On 2 May 1990, the 180 MW Francis turbine-generator running at full speed was instantaneously stopped by a foreign body left in the penstock following maintenance. [7] The installation shifted about 2 m within the base of the 180-metre-high (590 ft) earth and rock fill gravity dam wall of the 3,906 GL reservoir. After initial consternation regarding the integrity of the wall, declared safe after lengthy assessment), the hydro installation was repaired/replaced, but was off-line for several years.
A breach of the wall would have obliterated a couple of small towns and a sparsely settled agricultural area in the relatively narrow 120 km Mitta Mitta valley below the dam. More significantly, it would have resulted in the over-topping and probable failure of the earthen walls of the 40-metre-high (130 ft), 3,038 GL Lake Hume, 200 km downstream on the Murray River. This is immediately upstream of the regional cities of Albury and Wodonga, and a much more intensively settled irrigation area, and consequences would have been disastrous.
In May 1990, the turbine casing and concrete machine block surrounding the power station were destroyed, when two steel beams entered the turbine. The resulting force ruined the power station and the dam's control systems, making it impossible to gradually release water from the near-capacity dam by conventional means. An improvised system, placing large pipes over the spillway to siphon water over it, was soon installed. The inflow from an unusually wet spring meant that the dam would have overflowed anyway, leading to a spectacular cascade over the huge rock steps, formed when the rock used for the dam was quarried from the valley walls. The station was re-built and recommissioned in 1993. [8]
In 2003, the capacity of the regulating pondage was increased to further optimise the power station's generation flexibility. The station is connected to the electricity grid via a 220 kV transmission line to Mount Beauty, 40 kilometres (25 mi) away. [6]
The construction and operation of Dartmouth Dam has caused significant changes to the flow patterns and ecology of the Mitta Mitta and Murray rivers. In particular, the unnaturally cold water released from the dam, up to 10 °C (50 °F) colder than it naturally should be, contributed directly to the disappearance of the Murray cod, trout cod and Macquarie perch from the Mitta Mitta River within the first few years of the start of the dam's existence. Cold water pollution caused by Dartmouth Dam is also considered to have contributed to the disappearance of the freshwater catfish from the upper reaches of the Murray River. [9]
Climate data for the region are sourced at the bottom of the dam wall, in a relatively sheltered spot at 365 metres (1,198 ft) above sea level. Rainfall records began in 1918. Temperature records began in 1975. Winter is twice as wet as summer, and occasionally it may snow.
Climate data for Dartmouth Reservoir (1975–2022, rainfall to 1918); 365 m AMSL; 36.54° S, 147.50° E | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Month | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Year |
Record high °C (°F) | 42.2 (108.0) | 43.0 (109.4) | 39.0 (102.2) | 33.4 (92.1) | 24.7 (76.5) | 20.0 (68.0) | 19.6 (67.3) | 27.2 (81.0) | 28.4 (83.1) | 33.2 (91.8) | 37.9 (100.2) | 39.2 (102.6) | 43.0 (109.4) |
Mean daily maximum °C (°F) | 29.5 (85.1) | 29.0 (84.2) | 25.8 (78.4) | 20.7 (69.3) | 15.9 (60.6) | 12.5 (54.5) | 11.8 (53.2) | 13.4 (56.1) | 16.6 (61.9) | 20.5 (68.9) | 24.0 (75.2) | 26.9 (80.4) | 20.6 (69.0) |
Mean daily minimum °C (°F) | 14.0 (57.2) | 13.7 (56.7) | 11.1 (52.0) | 7.3 (45.1) | 4.7 (40.5) | 3.1 (37.6) | 2.3 (36.1) | 2.8 (37.0) | 4.6 (40.3) | 7.0 (44.6) | 9.9 (49.8) | 11.8 (53.2) | 7.7 (45.8) |
Record low °C (°F) | 2.8 (37.0) | 2.3 (36.1) | 1.9 (35.4) | −1.6 (29.1) | −3.5 (25.7) | −5.0 (23.0) | −5.4 (22.3) | −5.0 (23.0) | −3.7 (25.3) | −1.5 (29.3) | −0.2 (31.6) | 1.4 (34.5) | −5.4 (22.3) |
Average precipitation mm (inches) | 65.1 (2.56) | 55.6 (2.19) | 61.2 (2.41) | 57.9 (2.28) | 85.8 (3.38) | 100.6 (3.96) | 111.3 (4.38) | 121.4 (4.78) | 102.5 (4.04) | 97.4 (3.83) | 71.8 (2.83) | 73.9 (2.91) | 1,006.2 (39.61) |
Average precipitation days (≥ 0.2 mm) | 6.3 | 5.9 | 6.7 | 7.7 | 10.5 | 12.5 | 14.8 | 14.6 | 12.9 | 11.0 | 8.8 | 7.6 | 119.3 |
Source: Australian Bureau of Meteorology; Dartmouth Reservoir |
Hume Dam, formerly the Hume Weir, is a major dam across the Murray River downstream of its junction with the Mitta River in the Riverina region of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-power, irrigation, water supply and conservation. The impounded reservoir is called Lake Hume, formerly the Hume Reservoir. It is a gated concrete gravity dam with four earth embankments and twenty-nine vertical undershot gated concrete overflow spillways.
Glenbawn Dam is a major ungated earth and rock fill with clay core embankment dam with concrete chute spillway plus fuse plugs across the Hunter River upstream of Aberdeen in the Hunter Valley of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-electric power, irrigation, water supply and conservation. The impounded reservoir is called Lake Glenbawn.
The Eildon Dam is a rock and earth-fill embankment dam with a controlled spillway, located on the Goulburn River between the regional towns of Mansfield and Eildon within Lake Eildon National Park, in the Alpine region of Victoria, Australia. The dam's purpose is for the supply of potable water, irrigation, and the generation of hydroelectricity. The impounded reservoir is called Lake Eildon.The first cut of ground was done by Mr Bain and Mr MacLean from Scotland.
Wyangala Dam is a major gated rock fill with clay core embankment and gravity dam with eight radial gates and a concrete chute spillway across the Lachlan River, located in the south-western slopes region of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-power, irrigation, water supply and conservation. The impounded reservoir is called Lake Wyangala.
Burrendong Dam is a rock-fill embankment major gated dam with a clay core across the Macquarie River upstream of Wellington in the central west region of New South Wales, Australia. The dam's purpose includes flood mitigation, irrigation, water supply and hydro-electric power generation. The dam impounds Lake Burrendong and is filled by the waters from the Macquarie, and Cudgegong rivers as well as Meroo Creek.
Copeton Dam is a major clay core and rock fill embankment dam with nine radial gates and a gated concrete chute spillway across the Gwydir River upstream of Bingara in the New England region of New South Wales, Australia. The dam's purpose includes environmental flows, hydro-electric power generation, irrigation, and water supply. The impounded reservoir is called Lake Copeton.
The Blowering Dam is a major ungated rock fill with clay core embankment dam with concrete chute spillway impounding a reservoir under the same name. It is located on the Tumut River upstream of Tumut in the Snowy Mountains region of New South Wales, Australia. Purposes for the dam include flood mitigation, hydro-power, irrigation, water supply and conservation. The dam is part of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
Jindabyne Dam is a major ungated rockfill embankment dam across the Snowy River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is to redirect water from the Snowy River to the Murray, for the generation of hydro-power and irrigation. It is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
The Murray Region Hydroelectric Power Stations refers to two of the original seven hydroelectric power stations, both located near the town of Khancoban in the Snowy Mountains region of New South Wales, Australia. The two power stations are part of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro. Although both power stations are physically located in New South Wales, since 1 July 2008 all power generated has been allocated to the Victorian region of the National Electricity Market. The stations are not located on the Murray River.
Cochrane Dam is a minor earthfill embankment dam with concrete spillway across Georges Creek, located in the South Coast region of New South Wales, Australia. The main purpose of the dam is to supply water for hydro-power at the downstream Brown Mountain Power Station and for irrigation purposes. The impounded reservoir is called Cochrane Lake.
Pindari Dam is a minor concrete faced rockfill embankment dam with an ungated uncontrolled rock cut with concrete sill spillway across the Severn River located upstream of the town of Ashford, in the North West Slopes region of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-power, irrigation, water supply and conservation. The impounded reservoir is called Lake Pindari.
Talbingo Dam is a major ungated rock fill with clay core embankment dam with concrete chute spillway across the Tumut River upstream of Talbingo in the Snowy Mountains region of New South Wales, Australia. The impounded reservoir is called Talbingo Reservoir.
Tumut Pond Dam is a major gated concrete arch dam across the upper reaches of the Tumut River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
The Gordon Dam, also known as the Gordon River Dam, is a major gated double curvature concrete arch dam with a controlled spillway across the Gordon River, located in Southwest National Park, Tasmania, Australia. The impounded reservoir is called Lake Gordon.
Banimboola Power Station is a hydroelectric power station on the Dartmouth Dam Regulating Pond, downstream of Dartmouth Dam on the Mitta Mitta River in Victoria, Australia. Banimboola has three turbo generators, with a generating capacity of 12.2 megawatts (16,360 hp) of electricity. It is owned and operated by AGL Energy.
Jounama Dam is a major ungated rockfill embankment dam across the Tumut River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
Tumut Two Dam or Tumut Two is a major ungated concrete gravity dam across the upper reaches of the Tumut River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
Guthega Dam is concrete gravity dam with an uncontrolled spillway across the Snowy River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the storage of water used in the generation of hydro-power. It is the first to be completed of the sixteen major dams of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
Island Bend Dam is a major gated concrete gravity dam with a controlled spillway across the Snowy River in the Snowy Mountains region of New South Wales, Australia. The dam's main purpose is for the diversion of water for generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
Murray Two Dam is a major ungated concrete arch dam with a controlled spillway across Khancoban Bank, a diverted flow of the Snowy and Geehi rivers in the Snowy Mountains region of New South Wales, Australia. The impounded reservoir is called the Murray Two Pondage.