LCDR Echo class

Last updated

The LCDR Echo class was a class of five steam locomotives, initially of the 4-2-0 wheel arrangement. They were designed by Thomas Russell Crampton for the London, Chatham and Dover Railway (LCDR) as "1st class fast passenger" locomotives.

During 1859–60 the LCDR board considered the need for new locomotives to operate lines then under construction. After consultation with various engineers, including Charles Patrick Stewart (of Sharp, Stewart and Company), Robert Sinclair (of the Eastern Counties Railway) and Crampton, they decided upon forty new locomotives: eight 1st class fast locomotives, seventeen general purpose passenger locomotives, and fifteen goods locomotives. After discussion with William Martley, the quantities needed for the two passenger types were revised to five and 24 respectively. Tenders were sought, and these were considered in July 1860, when orders were placed with several firms for what were to become the Echo, Tiger and Acis classes. [1]

The Echo class were ordered from the firm of Robert Stephenson & Co. at a price of £3,400 each. [2] As with the Tiger and Acis classes, the locomotives were equipped with the Cudworth coal-burning firebox. [3] They were delivered to the LCDR between March and May 1862. [4] During 1863–64, the locomotives were rebuilt to the 4-4-0 wheel arrangement. [5]

Like other LCDR locomotives delivered prior to 1874, the locomotives had no numbers at first, being distinguished by name. [6] In November 1875, William Kirtley (who had replaced Martley following the latter's death in 1874) allotted the class letter K. [7] The locomotives were then given the numbers 27–31. One was withdrawn in 1896, but four lasted long enough to enter South Eastern and Chatham Railway (SECR) stock when the SECR was formed at the start of 1899. Their numbers were to be increased by 459 to avoid duplication with former South Eastern Railway locomotives, but before this was done, one more had been withdrawn. Accordingly, three became SECR nos. 487, 488 and 490, but soon after, the numbers of the first two were needed for new construction, so they were transferred to the duplicate list and had their SECR numbers suffixed with the letter A. The last one was withdrawn in August 1906. [4]

NameWorks no.BuiltRebuiltLCDR NumberSECR NumberWithdrawn
Coquette 1381April 1862October 186328487; 487A from August 1902August 1906
Echo 1382March 1862May 186327(486)July 1901
Flora 1383April 1862December 186329488; 488A from September 1902July 1903
Flirt 1384May 1862January 186430November 1896
Sylph 1385May 1862February 186431490October 1902

Notes

  1. Bradley 1979, p. 33.
  2. Bradley 1979, pp. 33, 38.
  3. Bradley 1979, pp. 34, 38, 42.
  4. 1 2 Bradley 1979, p. 40.
  5. Bradley 1979, p. 39.
  6. Dendy Marshall & Kidner 1963, p. 349.
  7. Bradley 1979, pp. 8, 14.

Related Research Articles

London, Chatham and Dover Railway British pre-grouping railway company (1859–1899/1922)

The London, Chatham and Dover Railway was a railway company in south-eastern England created on 1 August 1859, when the East Kent Railway was given Parliamentary approval to change its name. Its lines ran through London and northern and eastern Kent to form a significant part of the Greater London commuter network. The company existed until 31 December 1922 when its assets were merged with those of other companies to form the Southern Railway as a result of the grouping determined by the Railways Act 1921. The railway was always in a difficult financial situation and went bankrupt in 1867, but was able to continue to operate. Many of the difficulties were caused by the severe competition and duplication of services with the South Eastern Railway (SER). However, in 1898 the LCDR agreed with the SER to share the operation of the two railways, work them as a single system and pool receipts: but it was not a full amalgamation. The SER and LCDR remained separate companies with separate shareholders until both becoming constituents of the Southern Railway on 1 January 1923.

Crampton locomotive

A Crampton locomotive is a type of steam locomotive designed by Thomas Russell Crampton and built by various firms from 1846. The main British builders were Tulk and Ley and Robert Stephenson and Company.

SECR H class

The South Eastern and Chatham Railway (SECR) H Class is a class of 0-4-4T steam locomotive originally designed for suburban passenger work, designed by Harry Wainwright in 1904. Most of the sixty-six members of the class were later equipped for push-pull working for use on rural branch lines.

Harry Smith Wainwright was an English railway engineer, and was the Locomotive, Carriage and Wagon Superintendent of the South Eastern and Chatham Railway from 1899 to 1913. He is best known for a series of simple but competent locomotives produced under his direction at the company's Ashford railway works in the early years of the twentieth century. Many of these survived in service until the end of steam traction in Britain in 1968, and are regarded as some of the most elegant designs of the period.

SECR L class

The SECR L class was a class of 4-4-0 steam tender locomotive built for express passenger service on the South Eastern and Chatham Railway. Although designed by Harry Wainwright, they were built during the Maunsell era.

William Kirtley was an English railway engineer, and was the Locomotive Superintendent of the London Chatham and Dover Railway (LCDR) in England from 1874 until the merger to form the South Eastern and Chatham Railway at the end of 1898.

Reading Southern railway station Former railway station in the English town of Reading

Reading Southern railway station was opened as the western terminus of the South Eastern Railway's route from Redhill, a junction station at the time of opening known as Reigate Junction in south-east Surrey, having direct links thence to Dover port, Brighton and London Bridge. The station was referred to for exactly one century by an identical name to its neighbour, 'Reading', until 1949. Seven years after its opening the station expanded its uses by becoming the terminus of a new company's Waterloo to Reading line from London Waterloo station. This mid-length line added to the town's connections with more intermediate stops, beyond nearby Wokingham and mid-south parts of Surrey which had been directly served by the station and added a competing service, approximately one third longer in distance to a London terminus than the adjacent Great Western Railway.

SECR E class

The SECR E class was a class of 4-4-0 tender locomotives designed by Harry Wainwright for express passenger trains on the South Eastern and Chatham Railway. It was a larger version of the D class incorporating a Belpaire firebox

LCDR R class

The LCDR R class was a class of 0-4-4T locomotives on the London, Chatham and Dover Railway (LCDR). No. 207 is notable as being the last former LCDR locomotive to be withdrawn from service. The whole class was fitted with condensing apparatus for working on the Widened Lines.

LCDR R1 class

The LCDR R1 class was a class of 0-4-4T locomotives on the South Eastern and Chatham Railway, which were based on an existing London, Chatham and Dover Railway design.

The LCDR M class was a class of 4-4-0 steam locomotives of the London, Chatham and Dover Railway. The class was designed by William Kirtley and introduced in 1877, intended for the heaviest express services between London and Dover.

William Martley was the locomotive superintendent of the London Chatham and Dover Railway (LCDR) in England from 1860 until his death.

LCDR Europa class

The LCDR C class or Europa Class was a class of 2-4-0 steam locomotives of the London, Chatham and Dover Railway (LCDR). The class was designed by William Martley and introduced in 1873, intended for the heaviest express services between London and Dover.

The LCDR L class or Enigma Class was a class of 2-4-0 steam locomotives of the London, Chatham and Dover Railway (LCDR). The class was designed by William Martley and introduced in 1869, intended for services between London and Dover.

The LCDR Sondes class was a class of six steam locomotives of the 4-4-0ST wheel arrangement. They were designed by Thomas Russell Crampton for the East Kent Railway (EKR) to specifications prepared by Joseph Cubitt. An order was placed in March 1857 with R. & W. Hawthorn & Co. for six locomotives at £2,700 each; they were delivered to the EKR between November 1857 and March 1858. The first section of the EKR opened on 25 January 1858; and the EKR became the London, Chatham and Dover Railway (LCDR) in 1859. The locomotives were prone to frequent failure: at one point, before the sixth had been received, the first five were all out of service simultaneously. The LCDR asked Daniel Gooch of the Great Western Railway to report on the condition of the locomotives; he found that there were a number of significant problems with the design. The Sondes class were all laid aside as unfit for use in mid-1863, and during 1865, all six were rebuilt by the LCDR as 2-4-0T, becoming the Second Sondes class.

The LCDR Second Sondes class was a class of six 2-4-0T steam locomotives. They were designed by William Martley for the London, Chatham and Dover Railway (LCDR), and built at the LCDR's Longhedge works during 1865, using components from the Sondes class 4-4-0ST locomotives, including the boilers.

The LCDR Aeolus class was a class of four 4-4-0 steam locomotives. They were supplied to the London, Chatham and Dover Railway (LCDR) by R. & W. Hawthorn & Co. acting as agents for Robert Stephenson & Co. which built the locomotives, but had subcontracted some components to Hawthorn. They were delivered to the LCDR between September 1860 and April 1861. They were all renewed by William Martley as 2-4-0T at the LCDR's Longhedge works in 1872–73, using components from the original locomotives, including the boilers.

The LCDR Brigand class was a pair of steam locomotives of the 0-4-2 wheel arrangement supplied to the London, Chatham and Dover Railway (LCDR). They were designed by Patrick Stirling for the Glasgow and South Western Railway (GSWR), which ordered twenty in 1860 from Sharp, Stewart & Co.. At this time, the LCDR needed more locomotives but had little money available, so their locomotive superintendent, William Martley, visited various manufacturers to find out what was available quickly and cheaply. He arranged for two of the locomotives ordered by the GSWR to be delivered instead to the LCDR – they arrived in August 1861, two more being ordered from Sharp, Stewart for the GSWR as replacements.

LCDR <i>Tiger</i> class

The LCDR Tiger class was a class of twenty-four steam 4-4-0 locomotives. They were designed by Thomas Russell Crampton for the London, Chatham and Dover Railway (LCDR) as general purpose passenger locomotives.

The LCDR Acis class was a class of fourteen steam locomotives of the 0-6-0 wheel arrangement. They were designed by William Martley for the London, Chatham and Dover Railway (LCDR) as goods locomotives.

References