LCDR M1 class

Last updated

LCDR M1 class
Type and origin
Power typeSteam
Designer William Kirtley
Builder Longhedge Works
Build date1880-1881
Total produced4
Specifications
Configuration:
   Whyte 4-4-0
Gauge 4 ft 8+12 in (1,435 mm)
Driver dia.6 ft 6 in (1.981 m)
Loco weight74 long tons (75.2 t)
Fuel typeCoal
Water cap2,550 imperial gallons (11,592.5 l; 3,062.4 US gal)
Boiler pressure140 psi (0.97 MPa)
Cylinders Two,
Stephenson valve gear
Cylinder size 17.5 in × 26 in (444 mm × 660 mm)
Career
Operators LCDR   SECR  
Class M1
Number in class1 January 1923: 1
Withdrawn1912-1923
DispositionAll scrapped

The LCDR M1 class was a class of 4-4-0 steam locomotives of the London, Chatham and Dover Railway (LCDR), very similar to the earlier M class but with steel frames, larger tenders and other detailed differences. The class was designed by William Kirtley and introduced in 1880. [1]

History

Kirtley had requested six more examples of his earlier M class built by Neilson and Company for the London-Dover boat trains, but this request was turned down by the LCDR board, although he was given permission to build similar locomotives at the company's Longhedge Works in Battersea. Two locomotives were built during 1880 and a further two in 1881. However a fire in the machine shop seriously delayed work on the final two which eventually appeared as members of the M2 class in 1885. The class proved to be successful and completed high mileages. on the heaviest semi-fast trains. The locomotives passed to the South Eastern and Chatham Railway in 1899 and were considered to be sufficiently useful to be worth re-boilering between 1898 and 1904. [1] The class began to be withdrawn and scrapped from 1912. Only one example survived into Southern Railway ownership in 1923, but was withdrawn almost immediately thereafter.

Related Research Articles

Crampton locomotive

A Crampton locomotive is a type of steam locomotive designed by Thomas Russell Crampton and built by various firms from 1846. The main British builders were Tulk and Ley and Robert Stephenson and Company.

SECR H class

The South Eastern and Chatham Railway (SECR) H Class is a class of 0-4-4T steam locomotive originally designed for suburban passenger work, designed by Harry Wainwright in 1904. Most of the sixty-six members of the class were later equipped for push-pull working for use on rural branch lines.

Harry Smith Wainwright was an English railway engineer, and was the Locomotive, Carriage and Wagon Superintendent of the South Eastern and Chatham Railway from 1899 to 1913. He is best known for a series of simple but competent locomotives produced under his direction at the company's Ashford railway works in the early years of the twentieth century. Many of these survived in service until the end of steam traction in Britain in 1968, and are regarded as some of the most elegant designs of the period.

Longhedge railway works was a locomotive and carriage works built by the London, Chatham and Dover Railway in the borough of Battersea, South London to serve their new London terminus at Victoria. The facility existed between 1862 until the mid-1950s.

William Kirtley was an English railway engineer, and was the Locomotive Superintendent of the London Chatham and Dover Railway (LCDR) in England from 1874 until the merger to form the South Eastern and Chatham Railway at the end of 1898.

SECR E class

The SECR E class was a class of 4-4-0 tender locomotives designed by Harry Wainwright for express passenger trains on the South Eastern and Chatham Railway. It was a larger version of the D class incorporating a Belpaire firebox

LCDR R class

The LCDR R class was a class of 0-4-4T locomotives on the London, Chatham and Dover Railway (LCDR). No. 207 is notable as being the last former LCDR locomotive to be withdrawn from service. The whole class was fitted with condensing apparatus for working on the Widened Lines.

LCDR R1 class

The LCDR R1 class was a class of 0-4-4T locomotives on the South Eastern and Chatham Railway, which were based on an existing London, Chatham and Dover Railway design.

The LCDR A class was a class of 0-4-4T steam locomotives of the London, Chatham and Dover Railway. The class was designed by William Kirtley and introduced in 1884. The A1 and A2 classes were similar, but had larger driving wheels. The differences between the A1 and A2 classes were minor: in particular, the A2 class had a larger heating surface.

The LCDR M3 class was a class of 4-4-0 steam locomotives of the London, Chatham and Dover Railway. The class was designed by William Kirtley and introduced in 1891.

The LCDR M2 class was a class of 4-4-0 steam locomotives of the London, Chatham and Dover Railway. The class was designed by William Kirtley and introduced in 1884.

The LCDR B class was a class of 0-6-0 steam locomotives of the London, Chatham and Dover Railway. The class was designed by William Kirtley and introduced in 1876.

The LCDR M class was a class of 4-4-0 steam locomotives of the London, Chatham and Dover Railway. The class was designed by William Kirtley and introduced in 1877, intended for the heaviest express services between London and Dover.

LCDR Europa class

The LCDR C class or Europa Class was a class of 2-4-0 steam locomotives of the London, Chatham and Dover Railway (LCDR). The class was designed by William Martley and introduced in 1873, intended for the heaviest express services between London and Dover.

The LCDR L class or Enigma Class was a class of 2-4-0 steam locomotives of the London, Chatham and Dover Railway (LCDR). The class was designed by William Martley and introduced in 1869, intended for services between London and Dover.

The LCDR Second Sondes class was a class of six 2-4-0T steam locomotives. They were designed by William Martley for the London, Chatham and Dover Railway (LCDR), and built at the LCDR's Longhedge works during 1865, using components from the Sondes class 4-4-0ST locomotives, including the boilers.

The LCDR Aeolus class was a class of four 4-4-0 steam locomotives. They were supplied to the London, Chatham and Dover Railway (LCDR) by R. & W. Hawthorn & Co. acting as agents for Robert Stephenson & Co. which built the locomotives, but had subcontracted some components to Hawthorn. They were delivered to the LCDR between September 1860 and April 1861. They were all renewed by William Martley as 2-4-0T at the LCDR's Longhedge works in 1872–73, using components from the original locomotives, including the boilers.

The LCDR Brigand class was a pair of steam locomotives of the 0-4-2 wheel arrangement supplied to the London, Chatham and Dover Railway (LCDR). They were designed by Patrick Stirling for the Glasgow and South Western Railway (GSWR), which ordered twenty in 1860 from Sharp, Stewart & Co.. At this time, the LCDR needed more locomotives but had little money available, so their locomotive superintendent, William Martley, visited various manufacturers to find out what was available quickly and cheaply. He arranged for two of the locomotives ordered by the GSWR to be delivered instead to the LCDR – they arrived in August 1861, two more being ordered from Sharp, Stewart for the GSWR as replacements.

LCDR <i>Tiger</i> class

The LCDR Tiger class was a class of twenty-four steam 4-4-0 locomotives. They were designed by Thomas Russell Crampton for the London, Chatham and Dover Railway (LCDR) as general purpose passenger locomotives.

The LCDR Echo class was a class of five steam locomotives, initially of the 4-2-0 wheel arrangement. They were designed by Thomas Russell Crampton for the London, Chatham and Dover Railway (LCDR) as "1st class fast passenger" locomotives.

References

  1. 1 2 Bradley 1979, pp. 108–110.