LNER P2 Class 2007 Prince of Wales

Last updated

LNER 2007 Prince of Wales
The frame of new P2 Class steam locomotive at Darlington Railway Works - geograph.org.uk - 5282200.jpg
Type and origin
Power typeSteam
Designer Sir Nigel Gresley (original designer)
BuilderP2 Steam Locomotive Company
Specifications
Configuration:
   Whyte 2-8-2
Gauge 4 ft 8+12 in (1,435 mm) standard gauge
Leading dia. 3 ft 2 in (0.97 m)
Driver dia.6 ft 2 in (1.88 m)
Trailing dia. 3 ft 8 in (1.12 m)
Loco weight110 long tons 5 cwt (247,000 lb or 112 t) max.
Tender weight55 long tons 6 cwt (123,900 lb or 56.2 t) max.
Fuel type Coal
Boiler pressure250 psi (1.72 MPa)
Cylinders Three
Cylinder size 19.75 in × 26 in (502 mm × 660 mm)
Loco brake Air (Vacuum for heritage railways)
Performance figures
Tractive effort 43,684 lbf (194.32 kN)
Career
Numbers2007 (display)
98807 (TOPS)
DispositionUnder construction

LNER Class P2 No. 2007 Prince of Wales is a 2-8-2 "Mikado" steam locomotive being built at Darlington Locomotive Works, England, and managed by the A1 Steam Locomotive Trust. It will be the seventh member of its class and the only P2 in existence; the original six were built between 1934 and 1936 for the London and North Eastern Railway (LNER) to a design by Nigel Gresley, and employed to haul heavy passenger trains on the Edinburgh to Aberdeen line. The P2s were declared Britain's most powerful express passenger engines, although none were preserved.

Contents

The A1 Trust announced the project in 2013, following the completion and success of its first new build locomotive, LNER Peppercorn Class A1 No. 60163 Tornado , in 2008. Construction on Prince of Wales began in 2014 with its design based on P2 No. 2001 Cock o' the North with some modifications to improve maintenance, address historic problems, and comply with modern railway operations. It is expected to be complete in 2025 at an estimated cost of £6 million, after which it will run on the mainline and heritage railways.

Background

The first original P2, No. 2001 Cock o' the North LNER P2 Cock O' The North, 1934 (Our Generation, 1938).jpg
The first original P2, No. 2001 Cock o' the North

The original six Class P2 locomotives (Nos. 2001 to 2006) were built at Doncaster Works between 1934 and 1936 to a design by chief mechanical engineer Nigel Gresley. They were employed to haul express trains over the Edinburgh to Aberdeen line of the London and North Eastern Railway (LNER) and were the most powerful in Great Britain, capable of hauling 600-ton trains. [1] However, restrictions brought on by World War II caused them to suffer mechanical problems during the 1940s, which contributed to the decision to rebuild the class into LNER Thompson Class A2/2s by Gresley's successor, Edward Thompson. The rebuilt engines were withdrawn between 1959 and 1961, and none survived into preservation.

In 2008, the A1 Steam Locomotive Trust completed its first new build steam locomotive project, the LNER Peppercorn Class A1 No. 60163 Tornado, which marked the first British mainline steam engine built since 1960. The success of Tornado gave the A1 Trust the opportunity to look into a second new build project. In December 2010, it announced its intention to conduct a feasibility study into building a seventh Class P2, the most frequently requested engine. [1] The study included the examination of commercial, engineering, and certification challenges that may arise and discussions amongst the trust and regulatory bodies were "very positive". [1] A 3D computer model of the P2 was created using original drawings kept in the National Railway Museum and used for track dynamic analysis using Tornado as the basis and track position data from Network Rail to validate the modelling data. [2] [3]

The project officially launched in September 2013. On 14 November, Prince Charles' 65th birthday, the A1 Trust announced that No 2007 would be named Prince of Wales . [4] Despite Charles ascending to the throne in September 2022, the engine's name will not change. [5] [6]

Design

Prince of Wales, like Tornado, will be built as a new member of its class rather than a replica. Its design is based on the original drawings of P2 No. 2001 Cock o' the North, but with extensive alterations to improve maintenance, lower life-cycle costs, address historic problems, and comply with modern operating requirements and standards. [2] Modifications include roller bearings, an all-welded, all-steel boiler and Lentz poppet valve gear. [3] The external appearance will match Cock o' the North in its original configuration before it was streamlined. [3] Components in common with Tornado have been incorporated into Prince of Wales as a cost-saving measure. [2] The A1 Trust estimates both locomotives will have about 70% of their parts in common, including the boiler and tender. [7]

A1 Trust director of engineering David Elliott observed that the original P2s had several shortcomings, difficulties when traversing tight curves, and being prone to crank axle failures but was confident that these will be resolved by contemporary engineering techniques. [2] To address crank axle fatigue failures, Finite Element Analysis has resulted in the axle diameter being increased to 10 inches (250 mm), compared the original 9+58 inches (240 mm). The curve problem was studied using Resonate Group's Vampire software to simulate the vehicle's rail dynamics. [3] The simulation determined optimal coupled wheelset clearances and design of a pony truck with side-spring control. [2]

The original P2 cylinder diameter of 21 inches (530 mm) is out-of-gauge where track has been positioned for a reduced platform gap. [2] To avoid excessive route limitations, the cylinder diameter on Prince of Wales has been reduced to 19+34 inches (500 mm), and 34 inch (19 mm) was saved by using fabricated steel instead of cast iron for the cylinder block. To retain the same power output as the P2s, the boiler operates at 250 psi instead of 220 psi. [2] Because of improved heat treatment methods and modern tooling, a durable infinitely-variable cam can be used instead of the stepped cam adopted for the early P2s, enabling greater efficiency. [2] Prince of Wales's boiler is 17 inches (430 mm) shorter than the original, and the smokebox is 17 inches longer. [2] The change was made because the extra boiler length failed to raise extra steam as firebox gases cooled towards its far end and the longer smokebox will provide a larger vacuum reservoir to smooth exhaust pulses. The boiler is based on Tornado's as is the complex superheater header and electrical system. The sloped smokebox meant that the chimney on Prince of Wales required a unique casting. [2]

Manufacture

A Solidworks computer aided design (CAD) model was created for use in the manufacturing process. The frames have been built using CNC machines from the CAD data. [2] Modelling data for Prince of Wales and a modified design with a LNER Class V2-type pony truck, was released in early 2013. [3] In April 2014, construction commenced at Scunthorpe Steelworks, where the frame plates were rolled and flame profiled. [2]

Construction was expected to take seven years, and the A1 Trust projected that the cost will be £6 million. [8]

Project milestones

Related Research Articles

<span class="mw-page-title-main">Steam locomotive</span> Railway locomotive that produces its pulling power through a steam engine

A steam locomotive is a locomotive that provides the force to move itself and other vehicles by means of the expansion of steam. It is fuelled by burning combustible material to heat water in the locomotive's boiler to the point where it becomes gaseous and its volume increases 1,700 times. Functionally, it is a steam engine on wheels.

<span class="mw-page-title-main">LNER Gresley Classes A1 and A3</span> Class of 4-6-2 pacific locomotive designed by Sir Nigel Gresley

The London and North Eastern Railway Gresley Classes A1 and A3 locomotives represented two distinct stages in the history of the British 4-6-2 "Pacific" steam locomotives designed by Nigel Gresley. They were designed for main line passenger services and later express passenger services, initially on the Great Northern Railway (GNR), a constituent company of the London and North Eastern Railway after the amalgamation of 1923, for which they became a standard design. The change in class designation to A3 reflected the fitting to the same chassis of a higher pressure boiler with a greater superheating surface and a small reduction in cylinder diameter, leading to an increase in locomotive weight. Eventually all of the A1 locomotives were rebuilt, most to A3 specifications, but no. 4470 was completely rebuilt as Class A1/1.

Arthur Henry Peppercorn, was an English railway engineer, and was the last Chief Mechanical Engineer (CME) of the London and North Eastern Railway.

Edward Thompson was an English railway engineer, and was Chief Mechanical Engineer of the London and North Eastern Railway between 1941 and 1946. Edward Thompson was born at Marlborough, Wiltshire on 25 June 1881. He was the son of Francis Thompson, assistant master at Marlborough College. He was educated at Marlborough before taking the Mechanical Science Tripos at Pembroke College, Cambridge, earning a third class degree. Thompson entered the railway scene after education, contrasting that of his predecessor Nigel Gresley, who had also attended Marlborough after gaining practical experience as a pupil at Horwich Works.

<span class="mw-page-title-main">LNER Class B17</span> Class of LNER 4-6-0 steam locomotives

The London and North Eastern Railway (LNER) Class B17, also known as "Sandringham" or "Footballer" class was a class of 4-6-0 steam locomotive designed by Nigel Gresley for hauling passenger services on the Great Eastern Main Line. In total 73 were built.

<span class="mw-page-title-main">A1 Steam Locomotive Trust</span>

The A1 Steam Locomotive Trust is a Darlington, England based charitable trust formed in 1990 for the primary purpose of completing the next stage of the locomotive heritage movement, the building of a new steam locomotive from scratch. This project became the construction of 60163 Tornado, carried out by Locomotive Construction Co Ltd, a wholly owned subsidiary of the A1 Trust. After over 15 years of fundraising and construction, Tornado steamed for the first time in January 2008.

LNER Peppercorn Class A1 60163 <i>Tornado</i> British steam locomotive built in 2008

LNER Peppercorn Class A1 No. 60163 Tornado is a 4-6-2 steam locomotive completed in 2008 to an original design by Arthur Peppercorn. It is the first new build British mainline steam locomotive since 1960, and the only Peppercorn Class A1 in existence after the original batch were scrapped. In 2017, Tornado became the first steam locomotive to officially reach 100 mph (160 km/h) on British tracks in over 50 years.

<span class="mw-page-title-main">LNER Class W1</span> Experimental steam locomotive with Yarrow boiler

The LNER W1 No. 10000 was an experimental steam locomotive fitted with a high pressure water-tube boiler. Nigel Gresley was impressed by the results of using high-pressure steam in marine applications and so in 1924 he approached Harold Yarrow of shipyard and boilermakers Yarrow & Company of Glasgow to design a suitable boiler for a railway locomotive, based on Yarrow's design.

<span class="mw-page-title-main">LNER Class P2</span> Class of 6 three-cylinder 2-8-2 locomotives

The London and North Eastern Railway Class P2 was a class of 2-8-2 steam locomotives designed by Sir Nigel Gresley for working heavy express trains over the harsh Edinburgh to Aberdeen Line. As they were to serve on Scottish expresses, they were given famous names from Scottish lore.

<span class="mw-page-title-main">LNER Class V4</span>

The London and North Eastern Railway Class V4 was a class of 2-6-2 steam locomotive designed by Sir Nigel Gresley for mixed-traffic use. It was Gresley's last design for the LNER before he died in 1941. The V4s had similarities in their appearance and mechanical layout to the V2 "Green Arrow" class. The V2s, introduced some years before, were large and heavy locomotives, with very limited route availability. The V4 was a lightweight alternative, suitable for use over the whole of the LNER network.

<span class="mw-page-title-main">LNER Thompson Class A1/1</span>

The LNER Class A1/1 consisted of a single 4-6-2 "Pacific" express passenger locomotive rebuilt in 1945 from an A1 class locomotive, by Edward Thompson. It was intended as the prototype of a new design of pacific locomotives improving the A4 design of Thompson's predecessor Sir Nigel Gresley. No further examples were built due to Thompson's retirement in 1946.

GWR 6800 Class 6880 <i>Betton Grange</i> New-build British 4-6-0 locomotive

GWR 6800 Class No. 6880 Betton Grangeis a steam locomotive built between 1998 and 2024 as a "new-build" project, originally based on the Llangollen Railway in Denbighshire, Wales, then subsequently at Tyseley Locomotive Works. Described as "building the 81st Grange", the project started in 1998, and the locomotive was earlier expected to be operational by 2013, but subsequently by Autumn 2021, which was then pushed back to 2024. It was expected to be launched under steam in a private member event in January 2024 but was postponed a week before the event. On 11 April 2024, 6880 was steamed up for the first time after more than 25 years of work. All of the original GWR 6800 Class Grange locomotives were withdrawn for scrap by the end of 1965; this project is a creation, from an assemblage of original GWR and newly manufactured components, of a member of this class.

<span class="mw-page-title-main">NZR V class</span>

The New Zealand V class steam locomotive was used on New Zealand's railway network from 1885 onwards. They were operated by New Zealand Government Railways and the Wellington and Manawatu Railway Company.

<span class="mw-page-title-main">LNER Thompson Class A2/1</span>

The London and North Eastern Railway (LNER) Thompson Class A2/1 was a class of 4-6-2 steam locomotives built at Darlington locomotive works during 1944. They were originally ordered as Class V2 locomotives, as designed by Sir Nigel Gresley, but were revised during construction into a 4-6-2 'Pacific' arrangement under the instruction of Edward Thompson.

<span class="mw-page-title-main">LNER Thompson Class A2/2</span> British steam locomotive

The London and North Eastern Railway Class A2/2 was a class of six 4-6-2 steam locomotives rebuilt by Edward Thompson in 1943 and 1944 from his predecessor Sir Nigel Gresley's P2 Class of 2-8-2 express passenger locomotives. The rebuilds improved reliability and reduced maintenance, but also suffered from a variety of issues during service, and all were withdrawn and scrapped between 1959 and 1961.

<span class="mw-page-title-main">SR Merchant Navy class</span> Class of 30 three-cylinder 4-6-2 locomotives

The SR Merchant Navy class is a class of air-smoothed 4-6-2 (Pacific) steam locomotives designed for the Southern Railway by Oliver Bulleid. The Pacific design was chosen in preference to several others proposed by Bulleid. The first members of the class were constructed during the Second World War, and the last of the 30 locomotives in 1949.

<span class="mw-page-title-main">Steam locomotives of the 21st century</span> Steam power on modern railways

Despite the advent of electric and diesel locomotives in the mid-20th century, steam locomotives continued to be used and constructed into the 21st century. The regular use of steam locomotives in non-tourist revenue service concluded in 2024.

<span class="mw-page-title-main">GCR Class 2</span>

The GCR Class 2 steam locomotive was derived from a Kitson (Leeds) built/Thomas Parker designed prototype 4-4-0 locomotive No. 561, exhibited in Manchester in 1887. The design lead to the production of a series of express steam locomotives built between 1890 and 1894 for use on the Manchester, Sheffield and Lincolnshire Railway, later the Great Central Railway. The last batch of six, built 1894, had larger bearings for the coupled wheels, coil springs for the driving axle and was classified 2A.

<span class="mw-page-title-main">Pennsylvania Railroad 5550</span> PRR T-1 class 4-4-4-4 locomotive under construction

Pennsylvania Railroad 5550 is a mainline duplex drive steam locomotive under construction in the United States. With an estimated completion by 2030, the locomotive will become the 53rd example of the Pennsylvania Railroad's T1 steam locomotive class and the only operational locomotive of its type, as well as the largest steam locomotive built in the United States since 1952. The estimated cost of PRR 5550 was originally $10 million, but an updated projected cost of $7 million was released with the acquisition of an existing long-haul tender from the Western New York Railway Historical Society in August 2017. Construction began in 2014 with the casting of the locomotive's keystone-shaped number plate. As of February 2024 the locomotive was 43% complete.

LMS Patriot Class 5551 <i>The Unknown Warrior</i> Replica steam locomotive under construction for the LMS Patriot Project society

No.5551 The Unknown Warrior is a replica LMS Patriot Class steam locomotive which is under construction at Tyseley Locomotive Works.

References

  1. 1 2 3 "P2 Project - Introduction". A1 Steam Locomotive Trust. 1 December 2010. Retrieved 5 April 2021.
  2. 1 2 3 4 5 6 7 8 9 10 11 12 "Building the P2". Rail Engineer. 20 May 2016.
  3. 1 2 3 4 5 Design, The P2 Steam Locomotive Company, retrieved 12 November 2013
  4. "News - P2 Steam Locomotive Company". P2 Steam Locomotive Company. November 2013.
  5. https://www.bbc.co.uk/news/uk-59135132 Prince of Wales becomes Charles III
  6. "News - 2007's name confirmed as Prince of Wales". P2 Steam Locomotive Company. 14 November 2017.
  7. Mission / Introduction, The P2 Steam Locomotive Company, [it] has around 70% commonality with Tornado, including the boiler, tender and many other detailed fittings
  8. "LNER P2 Class 2007 Prince of Wales". www.a1steam.com.
  9. "Prince of Wales name confirmed". P2 Steam Locomotive Company. 14 November 2013.
  10. "News - James May makes first P2 component". P2 Steam Locomotive Company. February 2014.
  11. "News - Forged in Fire". P2 Steam Locomotive Company. April 2014.
  12. "Driving Wheels Ordered". P2 Steam Locomotive Company. 16 June 2014.
  13. "Frames Dedicated". P2 Steam Locomotive Company. 21 July 2014.
  14. "2007's roller bearings ordered". P2 Steam Locomotive Company. 24 October 2014.
  15. "2007's construction 1/3 complete". P2 Steam Locomotive Company. 28 July 2015.
  16. "£2m raised". P2 Steam Locomotive Company. 2 October 2015.
  17. "News - The Mikado Club launched". P2 Steam Locomotive Company. March 2016.
  18. "James Mays slacking cock flange". P2 Steam Locomotive Company. 24 January 2017.
  19. "Tender frames ordered". P2 Steam Locomotive Company. May 2017.
  20. "News - Boiler campaign passes half-way". P2 Steam Locomotive Company. October 2017.
  21. "News - Cylinder block campaign two-thirds funded". P2 Steam Locomotive Company. January 2018.
  22. "News - P2's Cylinder block fully funded". P2 Steam Locomotive Company. March 2018.
  23. "2007's boiler 50% funded". P2 Steam Locomotive Company. 18 April 2018.
  24. "Prince of Wales 40% funded". P2 Steam Locomotive Company. 23 April 2018.
  25. "Mikado Club passes £3m". P2 Steam Locomotive Company. 16 May 2018.
  26. "Motion Components ordered". P2 Steam Locomotive Company. 31 May 2018.
  27. "Wheels tyred and crankpins fitted". P2 Steam Locomotive Company. 2 June 2018.
  28. "Boiler construction tender issued". P2 Steam Locomotive Company. 7 June 2018.
  29. "Boiler cladding trial fitted". P2 Steam Locomotive Company. 27 June 2018.
  30. "Wheelsets arrive". P2 Steam Locomotive Company. 23 July 2018.
  31. "Mainline equipment ordered". P2 Steam Locomotive Company. 8 August 2018.
  32. "V4 reaches pre-launch stage". P2 Steam Locomotive Company. 6 September 2018.
  33. "We have a Mikado". P2 Steam Locomotive Company. 18 September 2018.
  34. "Order placed with DB Meiningen". P2 Steam Locomotive Company. 8 October 2018.
  35. "First cylinder components arrive". P2 Steam Locomotive Company. 29 October 2018.
  36. "2007's construction 50% funded". P2 Steam Locomotive Company. 14 November 2018.
  37. "December construction progress". P2 Steam Locomotive Company. 21 December 2018.
  38. "Eight wheels on my tender......part one". P2 Steam Locomotive Company. 28 December 2019.
  39. "Eight wheels on my tender......part two". P2 Steam Locomotive Company. 24 March 2020.
  40. "P2 July 2022 Engineering update". P2 Steam Locomotive Company. 14 July 2023.