Completed removals

Dam [1] HeightYear removedLocationWatercourseWatershedNotes
Bayou Dupont Number 13 Dam23 ft (7.0 m) Sabine Parish
31°40′02″N93°21′28″W / 31.6672°N 93.3578°W / 31.6672; -93.3578 (Bayou DuPont No. 13 Dam)
Tributary to Bayou Dupont Red River Flood control dam.
Kisatchie Lake Dam (upper)25 ft (7.6 m) Grant Parish
31°27′19″N92°26′29″W / 31.4552°N 92.4414°W / 31.4552; -92.4414 (Kisatchie Lake Dam (upper))
Dry Prong Creek Dam was a causeway carrying a road. The area behind the removed dam remains largely flooded by the main Kisatchie Lake Dam.
Castor Lake Dam13 ft (4.0 m) Vernon Parish
31°08′21″N93°12′35″W / 31.1393°N 93.2096°W / 31.1393; -93.2096 (Castor Lake Dam)
Pond Branch Sabine River Dam built for recreation.

Related Research Articles

<span class="mw-page-title-main">Çınarcık Dam</span> Dam in Mustafakemalpaşa, Bursa Province

Çınarcık Dam is a rock-fill dam on the Orhaneli River about 30 km (19 mi) east of Mustafakemalpaşa in Bursa Province, Turkey. It serves several purposes to include power, irrigation, flood control and municipal water supply to the city of Bursa. The dam was constructed between 1996 and 2002. Construction of the Uluabat Hydroelectric Station, which the dam supplies water to, began in 2006 and it was commissioned in 2010. The 125 m (410 ft) tall dam diverts water north through an 11.27 km (7.00 mi) long tunnel where it reaches the power station on the southern bank of Lake Uluabat. Water discharged from the 100 MW power station then enters the lake. The dam and power station are owned by the Turkish State Hydraulic Works.

<span class="mw-page-title-main">Kiğı Dam</span> Dam in Bingöl

Kiğı Dam is a rock-fill embankment dam on the Peri River in Bingöl Province, Turkey. Its primary purpose is hydroelectric power generation and is the first dam in the Peri River cascade, serving as the headwaters. Construction began in 1998 and is backed by the Turkish State Hydraulic Works. When commissioned, it will support a 180 MW power station. Water from the reservoir will be diverted to an underground power station downstream via an 8.5 km (5.3 mi) long tunnel. In August 2015, suspected Kurdistan Workers' Party militants set fire to three cement trucks associated with the dam construction site. In January 2016, the dam was completed and the reservoir began to impound water.

The Torul Dam is a concrete-face rock-fill dam on the Harşit River located 10 km (6 mi) northwest of Torul in Gümüşhane Province, Turkey. The development was backed by the Turkish State Hydraulic Works. Construction on the dam began in 1998 and was completed in 2007. The dam's hydroelectric power plant was commissioned in 2008. Water is diverted through a tunnel and penstock on the river's north side where it reaches the power plant located about 4 km (2 mi) downstream. It has an installed capacity of 121.5 MW.

The Güllübağ Dam is a gravity dam near the town of Güllübağ on the Çoruh River in Erzurum Province, Turkey. The primary purpose of the dam is hydroelectric power production. Construction on the river diversion tunnel began in 2009 and the dam was complete in 2012. That same year the first generator became operational and the final generator was operational in March 2013. Water from the dam is sent down downstream through a 3,200 m (10,500 ft) long penstock where it reaches an 84 MW power station. The dam is part of the Çoruh Development Plan and it is owned by Turkey's State Hydraulic Works.

The Sırımtaş Dam is a gravity dam and one of the 22 dams of the Southeastern Anatolia Project. It is located on the Birimşe River near the town of Alancık in Adıyaman Province, Turkey. Construction on the 92 m (302 ft) tall dam began in 2009 and was completed in May 2013. The primary purpose of the dam is hydroelectric power production and its power station has a 28 MW installed capacity.

The Kavşak Bendi Dam is a concrete-face rock-fill dam on the Seyhan River bordering Kozan and Aladağ districts in Adana Province, Turkey. Construction on the dam began in 2008 and the first generator was commissioned in 2013. The two remaining generators were commissioned by April 2014. The primary purpose of the dam is hydroelectric power generation. Water is sent about 2.5 km (1.6 mi) downstream where it meets the power station which contains three 59 MW Francis turbine-generators.

<span class="mw-page-title-main">Alloway Creek (Monocacy River tributary)</span> River in Maryland, United States

Alloway Creek is a 13.5-mile-long (21.7 km) tributary of the Monocacy River in Pennsylvania and Maryland in the United States. Via the Monocacy River, it is part of the Potomac River watershed.

The Burç Bendi Dam is a gravity dam on the Göksu River, near the village of Burç in Adıyaman district, Adıyaman Province, Turkey. Its primary purpose is hydroelectric power generation and it supports a 27.9 MW run-of-the-river power station. Construction on the dam began in January 2008 and it was fully operational by 3 November 2010. The 57 m (187 ft) tall concrete dam withholds a reservoir of 26,600,000 m3 (21,600 acre⋅ft). Water is diverted through a 536 m (1,759 ft) long tunnel to the power station downstream which contains three 9.3 vertical Kaplan turbine-generators. It is owned and operated by ČEZ Group.

References