The Max Launch Abort System (MLAS) was a proposed alternative to the Maxime Faget-invented "tractor" launch escape system (LES) that was planned for use by NASA for its Orion spacecraft in the event an Ares I malfunction during launch required an immediate abort. [1]
Designed by NASA engineers and reported on the website NASASpaceFlight.com on December 6, 2007, the proposed MLAS used four existing Huntsville-built Thiokol solid-rocket motors (built in 1988) placed at 90° intervals within the Orion's bullet-shaped fairing. [2] The fairing was originally designed to protect the Orion spacecraft from aerodynamic stresses during launch and to provide an interface between the spacecraft's crew module with the LES.
The MLAS was designed with the aim of reducing the height of the Orion/Ares I stack while also reducing weight and center-of-gravity issues of a traditional LES. [3] The bullet-shaped MLAS was also expected to provide better aerodynamic qualities during the first two minutes of flight, reducing stresses when the vehicle encounters the "max Q" region of hypersonic flight. [4] The MLAS was also expected to simplify production, as existing hardware would be employed. [5]
There are several drawbacks to MLAS. First, the bullet-shaped protective cover would have to be modified and reinforced to allow for the use of the solid-rocket motors, something not needed with the LES, which bolts on top of the LIDS docking ring assembly. [6] Second, the necessity to fire multiple motors (LES uses one motor and multiple nozzles) simultaneously for an abort decreases the theoretical reliability of the launch abort system by introducing more failure modes. [7]
Like the existing LES, the MLAS would provide protection to the Orion spacecraft crew during the first 2+1⁄2 minutes of flight, with the MLAS being jettisoned, along with the service module's fairing panels, after the solid-rocket first stage was jettisoned. [8] If implemented, the Orion/Ares I stack would have resembled the towerless Gemini-Titan stack used between 1965 and 1966, in which ejection seats were used as the primary form of escape for the astronauts who flew on the ten Gemini missions. [9]
The MLAS concept was dropped with the transformation of the Crew Exploration Vehicle into the Orion Multi-Purpose Crew Vehicle, and the switch of the launch vehicle from Ares I (with its perennial underperformance) to the Delta IV Heavy or Space Launch System. [10]
A "pad abort" flight test of the Max Launch Abort System was performed at NASA's Wallops Flight Facility on July 8, 2009, at 10:26 UTC. [11] [12] A primary test goal was the successful separation of a mock crew capsule from the abort system. [11] The test vehicle weighed over 45,000 pounds (20,000 kg) and was over 33 feet (10 m) tall. [13]
The test vehicle had several differences from the actual proposed system. The main difference was that the four propulsion rockets were not located in the forward fairing, but in a boost skirt located at the bottom of the test vehicle. [14] The rockets in the fairing were represented by geometric dummies. [11] The propulsion thrust was not balanced between the rockets by a manifold system, contrary to what was foreseen with the actual system. [15]
The Constellation program was a crewed spaceflight program developed by NASA, the space agency of the United States, from 2005 to 2009. The major goals of the program were "completion of the International Space Station" and a "return to the Moon no later than 2020" with a crewed flight to the planet Mars as the ultimate goal. The program's logo reflected the three stages of the program: the Earth (ISS), the Moon, and finally Mars—while the Mars goal also found expression in the name given to the program's booster rockets: Ares. The technological aims of the program included the regaining of significant astronaut experience beyond low Earth orbit and the development of technologies necessary to enable sustained human presence on other planetary bodies.
The Apollo spacecraft was composed of three parts designed to accomplish the American Apollo program's goal of landing astronauts on the Moon by the end of the 1960s and returning them safely to Earth. The expendable (single-use) spacecraft consisted of a combined command and service module (CSM) and an Apollo Lunar Module (LM). Two additional components complemented the spacecraft stack for space vehicle assembly: a spacecraft–LM adapter (SLA) designed to shield the LM from the aerodynamic stress of launch and to connect the CSM to the Saturn launch vehicle and a launch escape system (LES) to carry the crew in the command module safely away from the launch vehicle in the event of a launch emergency.
Little Joe 1 (LJ-1) was a failed launch of a Little Joe by NASA, a solid fuel rocket that was designed for a Max Q abort and launch escape system test for the Mercury capsule. The objective was to determine how well the escape rocket would function under the most severe dynamic loading conditions anticipated during a Mercury-Atlas launching.
Little Joe II was an American rocket used from 1963 to 1966 for five uncrewed tests of the Apollo spacecraft launch escape system (LES), and to verify the performance of the command module parachute recovery system in abort mode. It was named after a similar rocket designed for the same function in Project Mercury. Launched from White Sands Missile Range in New Mexico, it was the smallest of four launch rockets used in the Apollo program.
Little Joe was a solid-fueled booster rocket used by NASA for eight launches from 1959 to 1961 from Wallops Island, Virginia to test the launch escape system and heat shield for Project Mercury capsules, as well as the name given to the test program using the booster. The first rocket designed solely for crewed spacecraft qualifications, Little Joe was also one of the pioneer operational launch vehicles using the rocket cluster principle.
A launch escape system (LES) or launch abort system (LAS) is a crew-safety system connected to a space capsule. It is used in the event of a critical emergency to quickly separate the capsule from its launch vehicle in case of an emergency requiring the abort of the launch, such as an impending explosion. The LES is typically controlled by a combination of automatic rocket failure detection, and a manual activation for the crew commander's use. The LES may be used while the launch vehicle is on the launch pad, or during its ascent. Such systems are usually of three types:
Shuttle-derived vehicles (SDV) are space launch vehicles and spacecraft that use components, technology, and infrastructure originally developed for the Space Shuttle program.
The Ares V was the planned cargo launch component of the cancelled NASA Constellation program, which was to have replaced the Space Shuttle after its retirement in 2011. Ares V was also planned to carry supplies for a human presence on Mars. Ares V and the smaller Ares I were named after Ares, the Greek god of war.
Ares I was the crew launch vehicle that was being developed by NASA as part of the Constellation program. The name "Ares" refers to the Greek deity Ares, who is identified with the Roman god Mars. Ares I was originally known as the "Crew Launch Vehicle" (CLV).
A boilerplate spacecraft, also known as a mass simulator, is a nonfunctional craft or payload that is used to test various configurations and basic size, load, and handling characteristics of rocket launch vehicles. It is far less expensive to build multiple, full-scale, non-functional boilerplate spacecraft than it is to develop the full system. In this way, boilerplate spacecraft allow components and aspects of cutting-edge aerospace projects to be tested while detailed contracts for the final project are being negotiated. These tests may be used to develop procedures for mating a spacecraft to its launch vehicle, emergency access and egress, maintenance support activities, and various transportation processes.
Ares I-X was the first-stage prototype and design concept demonstrator of Ares I, a launch system for human spaceflight developed by the National Aeronautics and Space Administration (NASA). Ares I-X was successfully launched on October 28, 2009. The project cost was $445 million. It was the final launch from LC-39B until Artemis 1 13 years later.
DIRECT was a late-2000s proposed alternative super heavy lift launch vehicle architecture supporting NASA's Vision for Space Exploration that would replace the space agency's planned Ares I and Ares V rockets with a family of Shuttle-Derived Launch Vehicles named "Jupiter". It was intended to be the alternative to the Ares I and Ares V rockets which were under development for the Constellation program, intended to develop the Orion spacecraft for use in Earth orbit, the Moon, and Mars.
Liberty was a 2011 launch vehicle concept proposed by ATK and Airbus Defence and Space for phase 2 of the NASA Commercial Crew Development (CCDev) program intended to stimulate development of privately operated crew vehicles to low Earth orbit.
Orion is a partially reusable crewed spacecraft used in NASA's Artemis program. The spacecraft consists of a Crew Module (CM) space capsule designed by Lockheed Martin and the European Service Module (ESM) manufactured by Airbus Defence and Space. Capable of supporting a crew of four beyond low Earth orbit, Orion can last up to 21 days undocked and up to six months docked. It is equipped with solar panels, an automated docking system, and glass cockpit interfaces modeled after those used in the Boeing 787 Dreamliner. A single AJ10 engine provides the spacecraft's primary propulsion, while eight R-4D-11 engines, and six pods of custom reaction control system engines developed by Airbus, provide the spacecraft's secondary propulsion. Orion is intended to be launched atop a Space Launch System (SLS) rocket, with a tower launch escape system.
Exploration Flight Test-1 or EFT-1 was a technology demonstration mission and the first flight test of the crew module portion of the Orion spacecraft. Without a crew, it was launched on 5 December 2014 at 12:05 UTC by a Delta IV Heavy rocket from Space Launch Complex 37B at the Cape Canaveral Air Force Station.
The European Service Module (ESM) is the service module component of the Orion spacecraft, serving as its primary power and propulsion component until it is discarded at the end of each mission. In January 2013, NASA announced that the European Space Agency (ESA) will contribute the service module for Artemis I, based on the ESA's Automated Transfer Vehicle (ATV). It was delivered by Airbus Defence and Space in Bremen, in northern Germany to NASA at the end of 2018. After approval of the first module, the ESA will provide the ESMs from Artemis II to Artemis VI.
In the event of catastrophic failure, the Soyuz spacecraft has a series of automated and semi-automated abort modes to rescue the crew. The abort systems have been refined since the first piloted flights and all abort scenarios for the Soyuz MS are expected to be survivable for the crew.
The Crew Dragon In-Flight Abort Test was a successful test of the SpaceX Dragon 2 abort system, conducted on 19 January 2020. It was the final assessment for the Crew Dragon capsule and Falcon 9 launch system before they would be certified to carry humans into space. Booster B1046.4 and an uncrewed capsule C205 were launched from Launch Complex 39A (LC-39A) on a suborbital trajectory, followed by an in-flight abort of the capsule at max Q and supersonic speed. The test was carried out successfully: the capsule pulled itself away from the booster after launch control commanded the abort, and landed safely.
The Crew Dragon Launch Abort System is designed to propel the SpaceX Crew Dragon spacecraft away from a failing launch vehicle. It is equipped with 8 SuperDraco engines, each capable of generating 71 kN of thrust.
This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration .
{{cite journal}}
: CS1 maint: DOI inactive as of November 2024 (link){{cite book}}
: Check |isbn=
value: checksum (help)Media related to Max Launch Abort System at Wikimedia Commons