Ares I-X launch | |
---|---|
Launch | October 28, 2009, 15:30 UTC |
Operator | NASA |
Pad | Kennedy LC-39B |
Outcome | Success |
Apogee | c. 28 miles (45 km) |
Launch duration | 6 minutes |
Components | |
First stage | 4-segment SRB with a fifth segment mass simulator |
Second stage | Upper stage simulator (USS) |
Ares I-X insignia |
Ares I-X was the first-stage prototype and design concept demonstrator of Ares I, a launch system for human spaceflight developed by the National Aeronautics and Space Administration (NASA). Ares I-X was successfully launched on October 28, 2009. [1] [2] The project cost was $445 million. [3] It was the final launch from LC-39B until Artemis 1 13 years later.
The Ares I-X vehicle used in the test flight was similar in shape, mass, and size to the planned configuration of later Ares I vehicles, but had largely dissimilar internal hardware consisting of only one powered stage. Ares I vehicles were intended to launch Orion crew exploration vehicles. Along with the Ares V launch system and the Altair lunar lander, Ares I and Orion were part of NASA's Constellation program, which was developing spacecraft for U.S. human spaceflight after the Space Shuttle retirement.
Ares I-X was the only test flight of a launch vehicle like the Ares I. The test flight objectives included: [4]
The flight also had several secondary objectives, including: [5]
The Ares I-X flight profile closely approximated the flight conditions that the Ares I would expect to experience through Mach 4.5, at an altitude of about 130,000 feet (40,000 m) and through a maximum dynamic pressure ("Max Q") of approximately 800 pounds per square foot (38 kPa). [6] : 3
The Ares I-X flight profile resembled the uncrewed Saturn I flights of the 1960s, which tested the Saturn propulsion concept. [6] : 2
By flying the vehicle through first-stage separation, the test flight also verified the performance and dynamics of the Ares I solid rocket booster in a "single stick" arrangement, which is different from the solid rocket booster's then-current "double-booster" configuration alongside the external tank on the space shuttle. [7]
The Ares I-X vehicle consisted of a functional four-segment solid rocket booster (SRB) stage, a fifth segment mass simulator, an upper-stage simulator (USS), which was similar in shape and heavier than the actual upper stage, as well as a simulated Orion crew module (CM) and launch abort system (LAS). Since the actual upper-stage hardware could not be produced in time for the flight test, the upper-stage mass simulator allowed the booster to fly approximately the same trajectory through the first stage of flight. The USS and the CM/LAS mass simulators launched by the Ares I-X were not recovered and fell into the Atlantic Ocean. The first stage, including the fifth segment mass simulator, was recovered to retrieve flight data recorders and reusable equipment. [8]
The four-segment solid rocket motor and aft skirt for Ares I-X was drawn directly from the Space Shuttle inventory. The motor was manufactured by ATK Launch Services of Promontory, Utah. [9] [10] The new forward structures were manufactured by Major Tool & Machine of Indianapolis, Indiana. The first-stage element was managed by Marshall Space Flight Center in Huntsville, Alabama. [9] Modifications to the solid rocket booster include:
For the Ares I-X flight test, the frustum and forward skirt extension were made of aluminum. The forward skirt and fifth segment simulator were made of steel. [11]
The upper-stage simulator (USS) was manufactured by NASA personnel at Glenn Research Center in Cleveland. [9] Because of transportation limitations (bridge heights on highways and rivers), the simulator was built out of eleven steel segments 9.5 feet (2.9 m) tall by 18 feet (5.5 m) wide. The USS simulated the shape, mass, and center of gravity characteristics of Ares I from the interstage to the top of the service module of the Orion Crew exploration vehicle. The centers of mass for the liquid hydrogen and liquid oxygen tanks were simulated through the use of steel ballast plates. [6] : 7
The USS included a variety of temperature, vibration, thermal, and acoustic sensors to collect the primary data needed to meet the mission objectives. It also housed the Fault Tolerant Inertial Navigation Unit (FTINU), which controlled the vehicle's flight and primary avionics functions. For stability, the FTINU was mounted on the underside of the lower ballast plates. Ground operations personnel accessed the FTINU through a crew hatch on the side of the interstage segment, which also housed the roll control system. Each USS segment included a ladder and ring-shaped platform to allow access to the sensors and cabling for the developmental flight instrumentation. The stairs and platforms were necessary because Launch Complex 39B is not tall enough to provide crew access to the upper parts of Ares I-X. [12]
The active roll control system (RoCS) was needed because the flight test vehicle had a tendency to roll around its axis of forward motion. The RoCS for Ares I-X consisted of two modules containing engines originally used on now-decommissioned Peacekeeper missiles. [13] The RoCS performed two primary functions: [6] : 8
The RoCS modules, placed on opposite sides of the outer skin of the Upper Stage Simulator, used hypergolic monomethyl hydrazine (MMH) and nitrogen tetroxide (NTO) for propellants and each included two nozzles, which fired tangential to the skin and at right angles to the roll axis in order to provide a controlling roll torque. The propellants were loaded into the modules at Kennedy Space Center's Hypergol Maintenance Facility (HMF) and transported on the ground for installation into the USS in the Vehicle Assembly Building (VAB) prior to rollout to Launch Complex 39B.
The RoCS modules were designed and constructed to fit into the Interstage segment of the USS by Teledyne Brown Engineering in Huntsville, Alabama. [9] [14] The engines were hot-fire tested at White Sands Test Facility in 2007 and 2008 to verify that they could perform the pulsing duty cycle required by Ares I-X. [9]
At the top of the Ares I-X flight test vehicle was a combined Orion crew module and launch abort system simulator, resembling the structural and aerodynamic characteristics of Ares I. The full-scale crew module (CM) is approximately 16 feet (4.9 m) in diameter and 7 feet (2.1 m) tall, while the launch abort system (LAS) is 46 feet (14 m) long.
The CM/LAS simulator was built with high fidelity to ensure that its hardware components accurately reflect the shape and physical properties of the models used in computer analyses and wind tunnel tests. This precision enables NASA to compare CM/LAS flight performance with preflight predictions with high confidence.
Ares I-X flight data were collected with sensors throughout the vehicle, including approximately 150 sensors in the CM/LAS simulator that recorded thermal, aerodynamic, acoustic, vibration and other data. Data were transmitted to the ground via telemetry and also stored in the First Stage Avionics Module (FSAM), located in the empty fifth segment.
Aerodynamic data collected from sensors in the CM/LAS contribute to measurements of vehicle acceleration and angle of attack. [6] : 9 How the tip of the rocket slices through the atmosphere is important because that determines the flow of air over the entire vehicle.
The CM/LAS splashed down in the ocean along with the upper-stage simulator (USS) after the boost phase of the mission.
This simulator was designed and built by a government-industry team at Langley Research Center in Virginia. It was flown to Kennedy Space Center by C-5 transport and was the last piece of hardware stacked onto the rocket in the Vehicle Assembly Building. [9] [15]
Ares I-X used avionics hardware from the Atlas V Evolved Expendable Launch Vehicle (EELV) to control its flight. This hardware included the Fault Tolerant Inertial Navigation Unit (FTINU) and Redundant Rate Gyro Units (RRGUs), and cable harnesses. The first stage was controlled primarily by heritage hardware from existing Space Shuttle systems. A new electronics box, the Ascent Thrust Vector Controller (ATVC), acted as a translation tool to communicate commands from the Atlas-based flight computer to the solid rocket booster's thrust vector control system. The ATVC was the only new avionics box for the flight. All other components were existing or off-the-shelf units. Ares I-X also employed 720 thermal, acceleration, acoustic, and vibration sensors as part of its developmental flight instrumentation (DFI) to collect the data necessary for the mission. Some of this data was transmitted real-time via telemetry while the rest was stored in electronics boxes located in the First Stage Avionics Module (FSAM), located inside the hollow first-stage fifth segment.
The ground-based portion of the mission's avionics included a ground control, command, and communications (GC3) unit, which was installed on Mobile Launcher Platform-1 (MLP-1) for launch at Launch Complex 39B at Kennedy Space Center. The GC3 unit enabled the flight control system to interface with computers on the ground. The flight test vehicle flew autonomously and was controlled by the FTINU, located on the underside of the lower ballast plates of the upper-stage simulator (USS).
The avionics were developed by Lockheed-Martin of Denver, Colorado, a subcontractor to Jacobs Engineering of Huntsville, Alabama, and is managed by Marshall Space Flight Center in Huntsville, Alabama. [9]
Three shoebox-size packages were affixed inside the fifth segment simulator of the first stage to carry:
Ground operations include activities such as vehicle stacking, integration, rollout, and liftoff, while ground systems include vehicle interfaces and lightning protection. Several new procedures and hardware items were developed for Ares I-X, including:
Ground operations and ground systems were handled by United Space Alliance and NASA personnel at Kennedy Space Center.
The Ares I-X Systems Engineering & Integration (SE&I) Office, managed by the NASA Langley Research Center, was responsible for integrating the vehicle's parts into a complete rocket and making sure they work together as a system to meet flight test objectives. SE&I was responsible for ensuring all components functioned collectively to satisfy primary and secondary mission objectives. Detailed management of system interfaces, mission level requirements, validation plans, and flight instrumentation management were key SE&I contributions. SE&I provided the structural, thermal and aerodynamic analyses for the overall system to allow the components to be designed and built. SE&I also managed the mass of the vehicle and developed the trajectory and the guidance, navigation, and control algorithms used for vehicle flight.
To complete these tasks, wind tunnel testing and computational fluid dynamics (CFD) were used to investigate forces acting on the vehicle in various phases of flight, including lift-off, ascent, stage separation and descent. Once the basic design was understood SE&I provided structural analyses for the system to assure the rocket would behave properly once it was integrated.
Schedule development, management and control was provided by ATK Schedule Analysts permanently located at the NASA Langley Research Center working through the TEAMS contract agreement between ATK and NASA Langley.[ citation needed ]
Attempt | Planned | Result | Turnaround | Reason | Decision point | Weather go (%) | Notes |
---|---|---|---|---|---|---|---|
1 | 27 Oct 2009, 8:00:00 am | Scrubbed | — | Weather | 27 Oct 2009, 11:20 am (T−00:04:00 hold) | High clouds compounded by numerous technical problems and range safety concerns. | |
2 | 28 Oct 2009, 11:30:00 am | Success | 1 day 3 hours 30 minutes |
Ares I-X had been scheduled for launch on October 27, 2009, the 48th anniversary of the first Saturn I launch. The launch attempt was delayed due to weather plus other last-minute concerns. [17] The ground crew experienced difficulty removing a protective cover from an important nose-mounted five-port sensor package. [18] A private watercraft had blundered into the restricted downrange safety zone and had to be chased away. Launching through the day's high cirrus clouds could have caused triboelectrification, potentially interfering with range safety communication and hampering the RSO's ability to issue the self-destruction command. Launch Director Ed Mango repeatedly delayed resumption of the countdown from the planned hold point at T−00:04:00. [19] [20] Ultimately, constraints of the 4-hour launch window, coupled with high clouds and other last-minute concerns, caused the mission to be scrubbed for the day at 15:20 UTC on October 27, 2009. Launch was rescheduled for a four-hour window opening at 12:00 UTC on October 28, 2009. [19] [21]
Ares I-X launched on October 28, 2009, at 11:30 EDT (15:30 UTC) from Kennedy Space Center LC-39B, successfully completing a brief test flight. The vehicle's first stage ignited at T−0 seconds and Ares I-X lifted off from Launch Complex 39B. [22] The first stage separated from the upper-stage simulator and parachuted into the Atlantic Ocean roughly 150 miles (240 km) downrange of the launch site. The maximum altitude of the rocket was not immediately known, but had been expected to be 28 miles (45 km).
The launch accomplished all primary test objectives, [23] and many lessons were learned in preparing and launching a new vehicle from Kennedy Space Center. [24]
Prior to the flight there had been some concern among NASA scientists and among Ares critics and skeptics that the thrust oscillation would prove too violent for human astronauts to safely ride an Ares rocket. NASA Watch revealed that the first-stage solid rocket booster of the Ares I could create high vibrations during the first few minutes of ascent. The vibrations are caused by sudden acceleration pulses due to thrust oscillations inside the first stage. NASA admitted that this potential problem was very real, rating it four out of five on a risk scale. NASA was very confident it could solve the problem, referring to a long history of successful problem solving. [25] NASA officials had known about the problem since fall 2007, stating in a press release that they had wanted to solve it by March 2008. [25] [26] According to NASA, analysis of the data and telemetry from the Ares I-X flight showed that vibrations from thrust oscillation were within the normal range for a Space Shuttle flight. [27]
Approximately two hours after launch of Ares I-X, safing crews entering pad LC-39B reported a small cloud of residual nitrogen tetroxide leaking from an obsolete shuttle oxidizer line at the 95-foot (29 m)-level of the Fixed Service Structure, where it connects to the Rotating Service Structure. At 8:40 am on October 29, 2009, a hydrazine leak was detected on the 95-foot (29 m)-level, between the Payload Changeout Room and the Fixed Service Structure. Both leaks were capped without injury to personnel. [28]
Due to the Pad Avoidance Maneuver performed by Ares I-X, shortly after liftoff, the Fixed Service Structure at LC-39B received significantly more direct rocket exhaust than occurs during a normal Space Shuttle launch. The resulting damage was reported as "substantial," with both pad elevators rendered inoperable, all communication lines between the pad and launch control destroyed and all outdoor megaphones melted. The vehicle-facing portions of the Fixed Service Structure appear to have suffered extreme heat damage and scorching, as do the hinge columns supporting the Rotating Service Structure. [29] This damage was anticipated as NASA intended to remove the FSS and launch future Ares flights from a "clean pad".
During the flight, a pyrotechnic charge on the reefer, which holds the chute together, was set off early while still inside the parachute, causing the parachute to overload and fail on deployment. The added stress on the second parachute caused it to overload and partially fail as well. The two remaining parachutes guided the booster to a rough landing, but it luckily sustained minimal damage. [30] The parachute lanyard design was changed as well to prevent repeat incidents. [30]
According to NASA, partial parachute failures were common in Space Shuttle Solid Rocket Boosters, from which the Ares I-X is derived. Eleven partial parachute failures occurred on Space Shuttle SRBs, including on STS-128. [27]
The first stage was found floating upright, as is typical of expended Space Shuttle Solid Rocket Boosters. However, recovery divers noted buckling of the lower portion. [31] [32] Reports also note an apparent fracture of the booster's forward segment casing and a fractured bracket that held an actuator, part of the SRM's nozzle vectoring system. [32] A NASA memo states that engineers believe that the lower segment buckled when the first stage landed at a much higher speed than designed as a result of one of three main parachutes failing to deploy, as well as the failure of a second main parachute to remain deployed. [29] It is unclear, at this point, what caused the apparent casing fracture and broken bracket, and NASA has not commented on this damage.
The unpowered Upper Stage Simulator (USS), which was not meant to be retrieved, impacted further out into the Atlantic Ocean. [33] The USS began to tumble, in a counterclockwise flat spin, almost immediately after staging. After initial concerns that the motion might have been caused by a collision between the USS and the first stage, [34] further analysis showed that no actual recontact happened and that the tumble had been one of the possible behaviours predicted by pre-flight simulations. [35]
The USS was not a precise match to the characteristics of a real Ares I upper stage, and was not intended to test the upper stage's independent performance. The fact that the upper stage was not powered, and separated at a lower altitude than the real upper stage would on the final Ares I, contributed to the spin. [27]
The Vehicle Assembly Building, or VAB, is a large building at NASA's Kennedy Space Center (KSC) in Florida, designed to assemble large pre-manufactured space vehicle components, such as the massive Saturn V, the Space Shuttle and the Space Launch System, and stack them vertically onto one of three mobile launcher platforms used by NASA. As of March 2022, the first Space Launch System (SLS) rocket was assembled inside in preparation for the Artemis I mission, launched on November 16, 2022.
The Constellation program was a crewed spaceflight program developed by NASA, the space agency of the United States, from 2005 to 2009. The major goals of the program were "completion of the International Space Station" and a "return to the Moon no later than 2020" with a crewed flight to the planet Mars as the ultimate goal. The program's logo reflected the three stages of the program: the Earth (ISS), the Moon, and finally Mars—while the Mars goal also found expression in the name given to the program's booster rockets: Ares. The technological aims of the program included the regaining of significant astronaut experience beyond low Earth orbit and the development of technologies necessary to enable sustained human presence on other planetary bodies.
The Space Shuttle Solid Rocket Booster (SRB) was the first solid-propellant rocket to be used for primary propulsion on a vehicle used for human spaceflight. A pair of them provided 85% of the Space Shuttle's thrust at liftoff and for the first two minutes of ascent. After burnout, they were jettisoned, and parachuted into the Atlantic Ocean, where they were recovered, examined, refurbished, and reused.
Launch Complex 39 (LC-39) is a rocket launch site at the John F. Kennedy Space Center on Merritt Island in Florida, United States. The site and its collection of facilities were originally built as the Apollo program's "Moonport" and later modified for the Space Shuttle program. Launch Complex 39 consists of three launch sub-complexes or "pads"—39A, 39B, and 39C—a Vehicle Assembly Building (VAB), a Crawlerway used by crawler-transporters to carry mobile launcher platforms between the VAB and the pads, Orbiter Processing Facility buildings, a Launch Control Center which contains the firing rooms, a news facility famous for the iconic countdown clock seen in television coverage and photos, and various logistical and operational support buildings.
Shuttle-derived vehicles (SDV) are space launch vehicles and spacecraft that use components, technology, and infrastructure originally developed for the Space Shuttle program.
A mobile launcher platform (MLP), also known as mobile launch platform, is a structure used to support a large multistage space vehicle which is assembled (stacked) vertically in an integration facility and then transported by a crawler-transporter (CT) to a launch pad. This becomes the support structure for launch.
The Exploration Systems Architecture Study (ESAS) is the official title of a large-scale, system level study released by the National Aeronautics and Space Administration (NASA) in November 2005 of his goal of returning astronauts to the Moon and eventually Mars—known as the Vision for Space Exploration. The Constellation Program was cancelled in 2010 by the Obama Administration and replaced with the Space Launch System, later renamed as the Artemis Program in 2017 under the Trump Administration.
The Ares V was the planned cargo launch component of the cancelled NASA Constellation program, which was to have replaced the Space Shuttle after its retirement in 2011. Ares V was also planned to carry supplies for a human presence on Mars. Ares V and the smaller Ares I were named after Ares, the Greek god of war.
Ares I was the crew launch vehicle that was being developed by NASA as part of the Constellation program. The name "Ares" refers to the Greek deity Ares, who is identified with the Roman god Mars. Ares I was originally known as the "Crew Launch Vehicle" (CLV).
A boilerplate spacecraft, also known as a mass simulator, is a nonfunctional craft or payload that is used to test various configurations and basic size, load, and handling characteristics of rocket launch vehicles. It is far less expensive to build multiple, full-scale, non-functional boilerplate spacecraft than it is to develop the full system. In this way, boilerplate spacecraft allow components and aspects of cutting-edge aerospace projects to be tested while detailed contracts for the final project are being negotiated. These tests may be used to develop procedures for mating a spacecraft to its launch vehicle, emergency access and egress, maintenance support activities, and various transportation processes.
Launch Complex 39B (LC-39B) is the second of Launch Complex 39's three launch pads, located at NASA's Kennedy Space Center in Merritt Island, Florida. The pad, along with Launch Complex 39A, was first designed for the Saturn V launch vehicle, which at the time was the United States' most powerful rocket. Typically used to launch NASA's crewed spaceflight missions since the late 1960s, the pad is currently configured for use by the agency's Space Launch System rocket, a Shuttle-derived launch vehicle which is currently used in the Artemis program and subsequent Moon to Mars campaigns. The pad had also been leased by NASA to aerospace company Northrop Grumman, for use as a launch site for their Shuttle-derived OmegA launch vehicle, for National Security Space Launch flights and commercial launches, before the OmegA program was cancelled.
STS-400 was the Space Shuttle contingency support flight that would have been launched using Space ShuttleEndeavour if a major problem occurred on Space ShuttleAtlantis during STS-125, the final Hubble Space Telescope servicing mission.
The Shuttle-Derived Heavy Lift Launch Vehicle ("HLV") was an alternate super heavy-lift launch vehicle proposal for the NASA Constellation program. It was first presented to the Augustine Commission on 17 June 2009.
DIRECT was a late-2000s proposed alternative super heavy lift launch vehicle architecture supporting NASA's Vision for Space Exploration that would replace the space agency's planned Ares I and Ares V rockets with a family of Shuttle-Derived Launch Vehicles named "Jupiter". It was intended to be the alternative to the Ares I and Ares V rockets which were under development for the Constellation program, intended to develop the Orion spacecraft for use in Earth orbit, the Moon, and Mars.
The retirement of NASA's Space Shuttle fleet took place from March to July 2011. Discovery was the first of the three active Space Shuttles to be retired, completing its final mission on March 9, 2011; Endeavour did so on June 1. The final shuttle mission was completed with the landing of Atlantis on July 21, 2011, closing the 30-year Space Shuttle program.
The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle used by NASA. As the primary launch vehicle of the Artemis Moon landing program, SLS is designed to launch the crewed Orion spacecraft on a trans-lunar trajectory. The first SLS launch was the uncrewed Artemis I, which took place on 16 November 2022.
Artemis I, formerly Exploration Mission-1 (EM-1), was an uncrewed Moon-orbiting mission that was launched in November 2022. As the first major spaceflight of NASA's Artemis program, Artemis I marked the agency's return to lunar exploration after the conclusion of the Apollo program five decades earlier. It was the first integrated flight test of the Orion spacecraft and Space Launch System (SLS) rocket, and its main objective was to test the Orion spacecraft, especially its heat shield, in preparation for subsequent Artemis missions. These missions seek to reestablish a human presence on the Moon and demonstrate technologies and business approaches needed for future scientific studies, including exploration of Mars.
OmegA was a medium-lift to heavy-lift launch vehicle concept that spent several years in development by Northrop Grumman during 2016–2020, with that development substantially funded by the U.S. government. OmegA was intended for launching U.S. national security satellites, as part of the U.S. Department of the Air Force National Security Space Launch (NSSL) replacement program.
NASA's Exploration Ground Systems (EGS) Program is one of three programs based at NASA's Kennedy Space Center in Florida. EGS was established to develop and operate the systems and facilities necessary to process and launch rockets and spacecraft during assembly, transport and launch. EGS is preparing the infrastructure to support NASA's Space Launch System (SLS) rocket and its payloads, such as the Orion spacecraft for Artemis I. Artemis I is the first to launch in a series of increasingly complex missions that will enable human exploration to the Moon and Mars.
During the lifetime of the Space Shuttle, Rockwell International and many other organizations studied various Space Shuttle designs. These involved different ways of increasing cargo and crew capacity, as well as investigating further reusability. A large focus of these designs were related to developing new shuttle boosters and improvements to the central tank, but also looked to expand NASA's ability to launch deep space missions and build modular space stations. Many of these concepts and studies would shape the concepts and programs of the 2000s such as the Constellation, Orbital Space Plane Program, and Artemis program.