Ticket for a 1938 trip on the Cleveland Mercury | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Service type | Inter-city rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Discontinued | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Midwestern United States | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
First service | July 15, 1936 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Last service | July 11, 1959 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Former operator(s) | New York Central Railroad | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | Chicago, Illinois (1948, complete circuit) Cleveland, Ohio (1948, complete circuit) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service frequency | Daily | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Train number(s) | 75 westbound / 76 eastbound | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
On-board services | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Class(es) | K-5b | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Seating arrangements | Coaches | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Catering facilities | Dining service; buffet-lounge car | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Observation facilities | Parlor car | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 100 mph (160 km/h) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Mercury was the name used by the New York Central Railroad for a family of daytime streamliner passenger trains operating between midwestern cities. The Mercury train sets were designed by the noted industrial designer Henry Dreyfuss, and are considered a prime example of Streamline Moderne design. The success of the Mercury led to Dreyfuss getting the commission for the 1938 redesign of the NYC's flagship, the 20th Century Limited , one of the most famous trains in the United States of America.
The first Mercury, operating on a daily roundtrip between Cleveland and Detroit, was introduced on July 15, 1936. [1] [2] [3] [note 1] The Chicago Mercury, between Chicago and Detroit, and the Cincinnati Mercury, between Cincinnati and Detroit, followed. [5] The Mercurys lasted until the 1950s, with the final survivor, the original Cleveland Mercury, making its last run on July 11, 1959. [6]
A fourth train, the James Whitcomb Riley between Chicago and Cincinnati, used the same design for its train sets and is considered part of the Mercury family, although it did not bear the Mercury name. The Riley debuted in 1941 and lasted into the Amtrak era, though no longer a streamliner. [7] [8]
In the mid-1930s, the New York Central launched an experiment to enhance its passenger traffic in the midwest. The goal was a new streamlined service focusing on speed and innovation. "Mercury," the name of the Roman god of messengers (and commerce), was chosen for its connotations of speed; the name was announced to the public on May 14, 1936. [9] The new train was marketed as the "Train of Tomorrow" [10] [11] (not to be confused with the General Motors concept train of the same name in the 1940s), reflecting the emphasis on innovation.
In 1934, Dreyfuss gained attention for the New York Central with his streamlined design for the Commodore Vanderbilt locomotive. [12] This was his first railroad design; he was best known for his work on consumer products like telephones, fountain pens, and vacuum cleaners. In 1935, the Central asked him to take on the new project.
Here is his description of how the plan developed:
The final designs were approved ... but when they were put out for bid prices were so out of line that the project was canceled. It was a heavy blow when I received the bad news, for the trains had been a major effort for our office. I decided to take the rest of the day off, and I boarded a train for the country. En route, traveling the railroad yards of Mott Haven, I saw the answer. I got off the train, returned to New York and suggested [to the Central president] that some of the used cars in the yards might be converted. Out of them the successful Mercurys were built at one quarter of the original figure. The Mercurys have been called a turning point in railroad design. They were the first streamliners done as a unit, inside and out, integrating everything from locomotives to dinner china. [13]
The train's first cars were rebuilt from surplus suburban commuter coaches like those that Dreyfuss saw unused. [14]
Of Dreyfuss's railroad designs, the locomotives got the most notice, so much so that his work on passenger cars is often overlooked entirely. For the Mercury, he achieved a streamlined appearance by covering the exterior pipes, whistles, and other fittings in a smooth "bathtub" cowl. The sides of the cowl were cut away to show the driving wheels.
"The ... drivers sported centers painted in aluminum with a black band separating the aluminum discs from the aluminum rim and tire. Dreyfuss had installed three 50-watt and two 15-watt lamps under the cowling on either side to illuminate the drivers and rods. The effect at night was most striking. [15] [16]
The lights illuminating the driving wheels was a novel concept and purported to be the first of their kind. [17] The Mercury trains also incorporated roller bearings on their axles, [10] which helped them reach their speed limit of 80 miles per hour (130 km/h), but also made them harder to stop. [18] Although in service the speed would be restricted to 80 mph, it was reported that the train's top speed was over 100 miles per hour (160 km/h). [19]
It has been said that, "As opposed to [some of his] contemporaries, Dreyfuss was not a stylist: he applied common sense and a scientific approach to design problems." However, it can be seen from his treatment of the driving wheels that Dreyfuss was not above paying close attention to merely stylistic, non-functional details.
The exterior of locomotive and cars was medium gray with brushed aluminum trim (though there have been incorrectly colorized images of the Mercury in a light blue livery which never existed[ citation needed ]). On each side, the passenger cars displayed the Mercury logo in the form of a silver medallion, showing the god Mercury in traditional representation with winged cap and sandals. [20]
For the Mercury, Dreyfuss, approached the design of the train as an integrated whole, interior and exterior, from the locomotive to the rear observation car. His goal was to recreate the atmosphere of a private club. [21] His primary concern toward that end was to mitigate the rigid uniformity and long, narrow form of the conventional railroad car. [22] Although each car was functionally separate, Dreyfuss's design minimized the divisions between cars. He did this partly by having interior sections that spanned car boundaries. For instance, the coach section comprised the rear of the first car, the whole of the second, and the forward part of the third. The kitchen was in the rear of the third, while the dining room was in the following car.
He also sought to integrate the cars by the design of the vestibules. [10] He made each vestibule semi-circular and widened the passageway between cars to 1.60 meters (5 feet, 3 inches). The intended effect, when cars were coupled together, was of a single circular room, like a miniature rotunda. [23] Fabric and rubber buffers between cars and above bogie springs were also added to reduce vibrations. [10]
Within cars, Dreyfuss applied several techniques to break up the space and make it less linear. In the second car, for instance, he interrupted the rows of seating by placing two pairs of seats facing each other across the aisle in the middle of the coach section. Similarly, in the sixth, a parlor car, he broke the seating into two sections with a small private compartment, seating six, in between them. The dining room had three sections. Two of them were conventional seating, but the middle section was made up of tables for two people seated side-by-side, facing the center aisle. The dining car also had a small lounge section, seating six, for people waiting to be seated. [24]
Dreyfuss also applied innovation to the round-ended observation car, a common amenity of premier trains of the time. To maximize the view, he lowered the sills in the observation area by 30 cm (12 inches), allowing 1.23 m (four foot) high windows. Instead of having the seating around the walls, facing in, he placed the seating in the center, facing out towards the windows. There were banquettes for three facing each side, and one for two facing the rear. In an extra touch, a speedometer was built into the center banquette, a reminder of how the Central was marketing speed with the Mercury. [23]
The original, Dreyfuss-designed Mercury train set comprised nine cars: [25]
The cars were modified for Mercury service in New York Central's Beech Grove, Indiana, shops; the first train operated on test runs in June 1936 on a 200-mile (320 km) stretch between Indianapolis and Sheff [26] reaching speeds of 93 miles per hour (150 km/h). [27] [28] For the demonstration runs in early July 1936, the two coaches between the dining and lounge cars were omitted. [3] [10]
The inaugural Mercury trainset was taken on an exhibition tour throughout the New York Central system in late June and early July 1936. [10] [19] The train was displayed [38] and christened in Indianapolis on June 25, [39] then made exhibit stops from Indianapolis to New York City, where it was displayed for two days at Grand Central Terminal on June 28 and 29. [40] In Chicago, it was estimated that about 17,250 people viewed the train in one day when it was on display on July 6 at LaSalle Street Station. [41]
Revenue service for the Cleveland Mercury, with only a stop in Toledo between its two end points, began on July 15, 1936. [1] [2] [3] By September 1936, New York Central found that the new Mercury service did not impact the ridership on other trains it operated between those two cities. [42] It proved so popular that another train was built and displayed in Indianapolis in October 1939; [43] it was built for the Chicago Mercury and was introduced in regular service on November 12, 1939. [44] [45] These two train sets serviced both Cleveland Mercury and Chicago Mercury service, but the schedule was such that one train set began the day in Cleveland, ran to Detroit as the Cleveland Mercury, and ran from Detroit to Chicago as the Chicago Mercury, while the other set did the reverse run (the eastbound Chicago Mercury arrived in Detroit after its westbound counterpart had left, so the NYC would have needed an extra train set, if it had not shared sets across trains). The Cleveland run was on a 2:50 hour schedule and the Chicago run took 4:45. [46]
The James Whitcomb Riley was introduced on April 28, 1941, running between Cincinnati and Chicago on a 5:15 hour schedule. It was named after the popular poet because of his association with Indiana and Americana. The equipment was basically the same as the other Mercurys, although it was an all-coach train. The Cincinnati Mercury, running between Cincinnati and Detroit on a 6:30 schedule, followed the Riley into service.
After World War II, the Mercury trains were re-equipped with new lightweight cars. [14] In February 1950, the westbound Detroit-Chicago Mercury was suspended due to coal shortages while the eastbound counterpart remained in service. The cancellation was the result of an Interstate Commerce Commission order to all railroads still using coal-powered locomotives to reduce services. [47] Service was restored on the westbound route in March 1950. [48]
The Mercury was touted as one of six convenient passenger trains between Detroit and Chicago (with the Wolverine,Michigan, Twilight , Motor City Special and North Shore Limited) with "departure and arrival times made most convenient for you." [49] The Mercury trains operated at speeds up to 80 miles per hour (130 km/h) throughout their service career. [50]
The Cincinnati Mercury was the first to fall as rail service contracted, eliminated in October 1957. [37] The Chicago Mercury was eliminated in April 1958. [31] The Cleveland Mercury was discontinued on July 11, 1959.
The Riley was retained, although it was no longer a streamliner. In 1971, Amtrak combined the Riley with the Chesapeake and Ohio Railway's George Washington . The combined service was renamed Cardinal in 1977, which is still running to this day.
Because the trains regularly operated at speeds of 75–80 miles per hour (121–129 km/h), accidents occurred at level crossings along their routes. The Mercury's inaugural run between Detroit and Cleveland saw a collision that killed the automobile's driver. [51] In another accident in Michigan in 1940, the train hit a car at a level crossing, completely destroying the car and killing the driver; the wreckage was pushed about 3⁄4 mile (1.2 km) from the scene of the collision. [52] In another incident in Ohio in 1938, a truck crossing the track in front of a Mercury train was struck and thrown several hundred feet from the collision site. [53] The Mercury was also used in an apparent suicide attempt in Niles, Michigan, in December 1940. [54] Not all level crossing collisions led to death, such as happened in 1958 near Millbury, Ohio, when a car stalled on the track in front of the Mercury; the driver and passenger of the car were able to jump before the car was destroyed with only the passenger's coat getting caught and torn off. [50]
The railroad's Commodore Vanderbilt shared part of the route with the Mercury in Ohio. This was a factor in a 1938 collision where the Mercury had hit a car at a crossing, then stopped to investigate; while the Mercury was stopped, the Commodore Vanderbilt, which had been only 5 minutes behind the Mercury by schedule, collided with the rear of the Mercury, resulting in at least 50 people injured, some seriously. [55] [56] The engineer of the Vanderbilt had applied the brakes when the signal changed in front of him, but wet rails were attributed as the cause of wheel slipping preventing the Vanderbilt from coming to a stop. [57] [58] This was one of several major passenger rail accidents in the United States in 1938, which followed a period of three years when only 10 fare-paying passengers were killed on major rail systems in the country. [59]
The Mercury was also affected by other incidents on the system, such as on July 25, 1957, when a freight train derailed 22 cars at Ceylon in Erie County, Ohio. The derailment scene was severe enough that New York Central rerouted all of its major passenger trains over a lesser-used branch line to bypass the accident. The detour made the Mercury one hour late that day. [60]
The New York Central Railroad was a railroad primarily operating in the Great Lakes and Mid-Atlantic regions of the United States. The railroad primarily connected greater New York and Boston in the east with Chicago and St. Louis in the Midwest, along with the intermediate cities of Albany, Buffalo, Cleveland, Cincinnati, Detroit, Rochester and Syracuse. The New York Central was headquartered in the New York Central Building, adjacent to its largest station, Grand Central Terminal.
The Lake Shore Limited is an overnight passenger train operated by Amtrak between Chicago and the Northeastern United States, with sections to New York City and Boston. The central segment of the route runs along the southern shore of Lake Erie. East of Chicago, the Lake Shore Limited follows the former main line of the Lake Shore and Michigan Southern Railway to South Bend, Toledo, Cleveland, and Buffalo. From here the train takes the Empire Corridor through Rochester and Syracuse to Albany–Rensselaer station in Rensselaer, New York. At that station, the train divides, with one section continuing to Springfield and Boston in Massachusetts, while the other continues along the Empire Corridor to New York City. The train is scheduled for 19+1⁄2–20+1⁄4 hours for the 959 miles (1,543 km) between Chicago and New York, and 21+1⁄2–22 hours for the 1,018 miles (1,638 km) between Chicago and Boston.
The Cardinal is a long-distance passenger train operated by Amtrak between New York Penn Station and Chicago Union Station via Philadelphia, Washington, D.C., Charlottesville, Charleston, Huntington, Cincinnati, and Indianapolis. Along with the Capitol Limited and Lake Shore Limited, it is one of three trains linking the Northeast and Chicago. The 1,146-mile (1,844 km) trip between New York and Chicago is scheduled for 281⁄4 hours.
The Aerotrain was a streamlined trainset that the General Motors (GM) Electro-Motive Division (EMD) introduced in 1955. GM originally designated the light-weight consist as Train-Y before the company adopted the Aerotrain marketing name.
The Denver Zephyr was a streamlined passenger train operated by the Chicago, Burlington and Quincy Railroad between Chicago, Illinois, and Denver, Colorado. In peak years it ran to Colorado Springs. It operated from 1936 to 1973. The Denver Zephyr continued operating after the Burlington Northern Railroad merger in 1970. BN conveyed the train to Amtrak in 1971; Amtrak merged it with the Denver–Oakland City of San Francisco to form the San Francisco Zephyr and dropped the "Denver" name in 1973.
The Empire State Express was one of the named passenger trains and onetime flagship of the New York Central & Hudson River Railroad. On September 14, 1891, it covered the 436 miles (702 kilometers) between New York City and Buffalo in 7 hours and 6 minutes, averaging 61.4 miles-per-hour (98.8 km/h), with a top speed of 82 mph (132 km/h).
The Cincinnatian was a named passenger train operated by the Baltimore and Ohio Railroad (B&O). The B&O inaugurated service on January 19, 1947, with service between Baltimore, Maryland and Cincinnati, Ohio, carrying the number 75 westbound and 76 eastbound, essentially a truncated route of the National Limited which operated between Jersey City, New Jersey and St. Louis.
The Royal Palm was a named train of the Southern Railway that ran from Cincinnati, Ohio, to Jacksonville, Florida, and then on the Florida East Coast Railway's East Coast Champion to Miami, Florida. The train was discontinued in 1970.
The Xplorer, or Ohio Xplorer, was a named train of the New York Central Railroad (NYC) that traveled between Cleveland and Cincinnati, Ohio. Although the railroad first announced the train in its April 29, 1956, timetable, that timetable did not contain its schedule. The train entered revenue service on June 3, 1956.
The Diplomat was a named passenger train of the Baltimore and Ohio Railroad (B&O) during the 1930s–1950s connecting New York City and St. Louis, Missouri, via Washington, D.C. Other B&O trains on the route during that period were the premier National Limited and the workhorse Metropolitan Special. The train was inaugurated in August 1930 after several changes to trains along the St. Louis Route. After World War II, the Diplomat operated as Train No. 3 westbound, and No. 4 eastbound. It was timed to provide connections to several western railroads that terminated in St. Louis, including the Frisco, the Santa Fe, Cotton Belt and Missouri Pacific, among others.
The James Whitcomb Riley was a passenger train that operated between Chicago, Illinois, and Cincinnati, Ohio, via Indianapolis, Indiana. Originally operated by the New York Central Railroad, it was taken over by Amtrak in 1971. Under Amtrak, it merged with the Chesapeake & Ohio Railway's George Washington to become a Chicago-Washington/Newport News train. In 1977, it was renamed the Cardinal, which remains in operation.
The Lake Shore Limited was a passenger train service operated by the New York Central Railroad between New York City and Chicago, Illinois, from 1897 to 1956. Separate sections linked to Boston and St. Louis. The Lake Shore Limited was the New York Central's first luxury passenger train, and paved the way for its more famous cousin the 20th Century Limited. The 1897 name is now used by Amtrak's Lake Shore Limited, which follows much the same route.
The Nickel Plate Limited, later known as the City of Cleveland and City of Chicago, was a passenger night train operated by the New York, Chicago and St. Louis Railroad between Chicago and Buffalo, New York via Cleveland, Ohio, with through service to Hoboken, New Jersey via Binghamton and Scranton and the Delaware, Lackawanna and Western Railroad for the Buffalo-Hoboken segment.
The Twilight Limited was a named passenger train in the United States which initially operated between Chicago, Illinois, and Detroit, Michigan. The New York Central Railroad introduced the train in 1926, and it continued until the formation of Amtrak in 1971, although it lost its name in 1967. Amtrak renamed the train St. Clair, feeling that the name "Twilight Limited" had undesirable connotations and imagery for a company trying to save passenger rail service. Amtrak revived the name in 1976 for a new train frequency on the Chicago–Detroit corridor, and kept the name until all trains on that corridor were renamed Wolverine in 2004.
The Ohio State Limited was a named passenger train operated by the New York Central Railroad (NYC) between New York City and Cincinnati, Ohio, via Buffalo and Cleveland, Ohio. Service began in 1924 and continued until 1967, with some vestiges remaining until 1971.
The Carolina Special was a passenger train operated by the Southern Railway between Cincinnati, Ohio, and the Carolinas. It operated from 1911 to 1968. It was the last passenger train to use the route of the Charleston and Hamburg Railroad, which, as the South Carolina Canal and Railroad Company, began operation in December 1830, as one of the oldest railroads in the United States, and, by 1833, operated a 136-mile (219 km) line to Hamburg, South Carolina, on the Savannah River, the country's longest at that time. All Southern Railway Pullman service to Charleston rode over that historic, if bucolic, route from Branchville to the port city.
The Green Diamond was a streamlined passenger train operated by the Illinois Central Railroad between Chicago, Illinois and St. Louis, Missouri. It operated from 1936 until 1968. It was the Illinois Central's first streamliner. Initially it operated with Illinois Central 121, the last of the 1930s fixed-consist articulated streamliners built in the United States.
The Maple Leaf was a passenger train pool operated by the Canadian National and the Grand Trunk Western Railroad between Chicago, Illinois and Toronto, Ontario. It operated from 1927 to 1971. The train took its name from the maple leaf, the national symbol of Canada. The Maple Leaf was one of many trains discontinued when Amtrak began operations in 1971, and is unrelated to the Maple Leaf which Amtrak now operates between Toronto and New York City. The train operated on Canadian National railroad territory through Ontario, but west of Lake Huron it operated via Grand Trunk Railroad.
The Canadian and later, Canadian-Niagara, was the longest running named international train from Chicago to Upper Canada via Detroit, for its first two decades running to Montreal. This overnight train was operated by the Michigan Central Railroad from Chicago to Detroit, and in a pool arrangement, it operated over Canadian Pacific Railway tracks and used the same train number from Detroit eastward. The train would carry a second section, bound, variously for Buffalo or New York City via Buffalo.
{{cite book}}
: CS1 maint: location missing publisher (link) (quoted by Cook){{cite magazine}}
: Missing or empty |title=
(help) (cited by Cook)