Mid-Hants Railway

Last updated

The Mid-Hants Railway (MHR) originated when local people promoted a railway line between Alton and a junction near Winchester, connected to the larger London and South Western Railway at each end. It was authorised as the Alton, Alresford and Winchester Railway in 1861, and changed its name to the Mid-Hants Railway in 1865. It was opened for traffic in 1865. It was a single track 18 miles long, and had some very steep gradients. It had been unable to raise much share capital and it was heavily indebted from the outset, incurring heavy interest outlays.

Contents

The MHR was dependent on the LSWR to operate its line, but there was constant antagonism between the two companies, as the MHR felt that the LSWR ought to do more to bring traffic to the line; this included the wish that the LSWR would divert main line expresses over the MHR. The MHR talked of operating the line itself, but its massive indebtedness, and its operational dependency on the LSWR at Alton and Winchester, made this impractical. A long lease to the LSWR was agreed in 1880 and the business was sold to the LSWR in 1884.

Electric trains from London were able to reach Alton in 1937, and passenger trains were only shuttle services from Alton, but the introduction of diesel trains on a frequent timetable in 1957 improved the meagre passenger business. Nevertheless the passenger and goods use of the line was unsustainable and the line closed in 1973. A heritage operator, the Watercress Line, works trains on the line between Alton and Alresford.

Mid-Hants Railway on opening Mid-hants-rly.png
Mid-Hants Railway on opening

History

Promotion of the Alton, Alresford and Winchester Railway

In 1852 Alton was connected to the emerging railway network when it became the terminus of an LSWR branch line from Guildford. [1]

In the following years it became evident that communities that were not connected to a railway experienced a major disadvantage compared to those that were: the transport costs of heavy commodities being brought in were very high, and locally manufactured goods and agricultural products suffered corresponding costs. People living in the villages between Alton and Winchester now sought a railway connection to Winchester. However the area was thinly populated and lacked industry; moreover the terrain was challenging and any line would necessitate a daunting climb to Medstead, to get out of the valley of the River Wey and cross the watershed into the valley of the River Itchen. The LSWR made it clear that it was not interested in co-operating with a local scheme. [1]

Nevertheless a projected line was submitted to the 1861 session of Parliament; it was to be called the Alton, Alresford and Winchester Railway. In March 1861 the promoters issued a prospectus acknowledging that villages on the intended route were held back by lack of railway access, and that the cost of their necessities of life had greatly increased. A single line would be constructed as economically as possible, and with gradients suitable to the improvements in the present powers of traction. In addition, it was claimed, the line would connect the major Army depot at Aldershot with military establishments at Winchester, Dorchester, Netley Hospital and the coast. A line had been designed with the professional help of J E Errington. [1] [2]

When the Bill was under consideration in Parliament, the LSWR opposed it, and declined to negotiate an arrangement to operate the line when it was built. However there was reason to be concerned that rejection of the AAWR would encourage it to align with the Petersfield Railway, which was then seeking an extension to Southampton. The LSWR did not want to encourage an incursion into its established territory, so it made a concession to the promoters over the working agreement, and indicated the possibility that it would take shares in the line. The LSWR also conceded clauses stipulating the arrangements at junctions with the LSWR and use of its stations at Alton and Winchester stations. [1]

Authorisation of the AAWR

The Alton, Alresford & Winchester Railway (AAWR), got its authorising Act of Parliament on 28 June 1861; permitted share capital was set at £150,000, and the LSWR could take up to £25,000 in shares if it wished. The AAWR line authorised was 18+12 miles in length, from the LSWR near Alton station, through Medstead and Ropley, passing near Alresford church, and onwards via Tichborne and Itchen Abbas to a junction with the LSWR about two miles north of Winchester station. [1] [2] [3] [4] [5]

At a board meeting immediately after getting the Act, held on 6 July 1861, the directors expressed concern about the severe 1 in 60 gradients on the authorised line, and they asked Errington to survey an alternative route. He did so, and suggested an alternative route that limited the gradients to 1 in 75, but at the expense of an 800 yard tunnel. It was noted that an altered line of route would require a fresh authorising Act of Parliament, at a cost of about £25,000, and the Board decided to leave matters as they were. [2]

Itchen Abbas station Itchen-Abbas-railway-station-1979-by-Clive-Warneford.jpg
Itchen Abbas station

Indecisive management by the Board was also exhibited at the first Shareholders’ General Meeting, when the Chairman stated that “the line was being staked out by the engineer, or at least he would commence doing so this week.” It was also announced that there had been a disappointing take-up of shares, only £20,000 having been subscribed: [note 1] obviously construction could not start in earnest. [6]

Some limited construction work probably started in late December 1861 or soon after, by Smith & Knight, contractors, under the engineer, J H Tolme. [note 2] Some landowners agreed to take payment for their land in shares rather than cash. The original intention to build a line as cheaply as possible had to be modified when the LSWR’s requirements (as prospective operator) were taken into account. Bridges had to be built sufficient for widening to a double line later, and the track had to be made to the LSWR’s main line standards. These stipulations generated bad feeling against the LSWR. [1]

The situation naturally became well known in financial circles, and in August 1862 a Mr Arthur Hankey wrote to the board offering to finance the construction personally subject to certain financial considerations. Hankey was going to loan the money against Lloyds Bonds. The Board was uncertain whether it had the power to accept this financing arrangement, but it was persuaded after taking legal advice. Hankey’s financial considerations would obviously involve the company paying more for their line, but the alternative was to abandon the project. Hankey entered into a contract with the company on 3 February 1863 and engaged Smith and Knight as contractors for the construction. [7]

Proposed extension, and name change to the Mid-Hants Railway

Notwithstanding the poor take-up of shares, the AAWR published plans early in 1864 for another line, from Ropley to Fareham. The original main line, now under construction, was directed to Winchester and Southampton, but this new proposal pointed towards Portsmouth. As a direct railway from Woking through Aldershot to Farnham (not Fareham) was planned, the directors expected greatly to increase their traffic and to become part of the shortest main route from London to the Isle of Wight, via Stokes Bay. Reflecting the wider scope of its planned network, the AAWR changed its name to become the Mid-Hants Railway Company (MHR) [note 3] When the matter was considered in Parliament, however the new line was cut back to run only from Ropley to Meonstoke. The name changed, and this stub were passed in the Act of 29 July 1864, effective from 1 January 1865, with extra capital powers of £25,000. The Meonstoke line was never built and no capital was ever raised for it; it was formally abandoned by Board of Trade Warrant of 29 October 1869. [1] [8] [9]

Opening; and difficult relations with the LSWR

Expecting soon to open its original line between Alton and Winchester, the company made a ten year working agreement with the LSWR on 17 February 1865. The line had to be "at least as substantial and complete in all respects as the Portsmouth Railway (Godalming to Havant)" of the LSWR, and if traffic justified it, the MHR was to double the line. The LSWR was to stock, staff and work the line, but the MHR would appoint the secretary and office staff except booking clerks. The LSWR would receive 42.5% of gross receipts until the MHR was able to pay dividends of 4%, when the LSWR could take 45%. [1]

The LSWR built a new through station at Alton; the old terminus station buildings were converted to house the stationmaster. The single line between Alton and Winchester Junction opened to the public on 2 October 1865, with one goods and four passenger trains each way on weekdays only; some of the passenger trains were LSWR Guildford to Alton trains extended to Southampton. While earthworks settled, trains covered the 19 miles between Alton and Winchester in one hour, but from 1 August 1866 the fastest journey was 47min. Journeys from Southampton to London using the line via Guildford were now possible, but slow; a typical journey time was 3 hours 26 minutes compared with 2 hours 18 minutes via Basingstoke. [1] [10] [3]

There were already clear signs of tension between the LSWR and the MHR company; this was illustrated when MHR directors asked for free passes over the LSWR between London and Alton, Winchester and Southampton. The LSWR told them that as a matter of right they were not entitled to travel free on the line now that it was leased. In January 1866 the MHR complained repeatedly that the LSWR was not operating the railway to achieve best results. [1]

Average receipts for the operation of the line averaged about £7,000 for the first three years, giving the MHR an annual profit of about £3,675. [note 4] On 31 January 1867 a bill in Chancery was filed against the company, in respect of unpaid interest owed, and on 4 July 1867 a receiver was appointed. While the situation lasted the MHR share of receipts had to be handed direct to the receiver. The MHR was released from receivership when it filed a scheme of arrangement-with its creditors, confirmed in April 1869, making a rearrangement of its stock. [1]

The LSWR opened a new line from Pirbright Junction (near Brookwood) to Farnham Junction on 2 May 1870. This formed a direct route from London to Alton: up until that time the eastward connection to Alton had only been via Guildford, making a rather roundabout journey from London. The new line put the MHR potentially on a direct line between London and Southampton. However the MHR naively imagined that the LSWR ought to transfer through traffic between London and Southampton away from the main line over the MHR, an operationally difficult single line with steep gradients. The friction between the MHR and the LSWR led to a Parliamentary Commission hearing. The MHR listed a series of complaints and demands for facilities off its own route, while the LSWR indicated a number of technical matters that had needed to be attended to so as to improve the MHR line. [1] [11]

Revised working agreement, and sale of the business

The original working agreement had been for ten years and MHR dissatisfaction was such that the directors decided not to renew it. They were going to seek running powers between Guildford and Winchester, and were preparing to work their line with their own rolling stock. The LSWR promised another agreement on improved terms, and negotiations began: the LSWR continued to work the line meanwhile, and matters dragged on 15 August 1878, when a new agreement was reached. This was for seven years. from 1 January 1878, giving the MHR the same proportions of gross receipts, but including a mileage proportion of all goods. and mineral traffic passing between stations in the Guildford and Alton areas and the LSWR system west of Winchester.

Another agreement of 3 August 1880 cancelled that of 1878 as from 31 December 1879, and gave the LSWR a 999 year lease from 1 January 1880 for £9,200 yearly. The MHR could within two years require the LSWR to purchase it, or the LSWR could give three months' notice of doing so for £130,000 in cash and £100,000 in 4 per cent LSWR preference stock. The LSWR Act of 22 August 1881 confirmed this, and the LSWR acquired the MHR on those terms on 30 June 1884. [1] [11] [8]

No longer independent

The line continued in operation as a minor part of the LSWR system. As the LSWR had been operating the line, there was no outward indication of the change.

In 1923 the LSWR was transferred into the larger Southern Railway as part of the process known as the Grouping of the Railways, following the Railways Act 1921.

Prior to 1937, the Mid-Hants passenger service included trains from Waterloo to Southampton. There was one through train a day from Bournemouth to Margate via Alresford, Guildford and Redhill. [12]

The fortunes of rural railway lines were not good, as road transport for agricultural produce became more efficient, and the low level of passenger and goods business declined. In July 1930 the passing loops at Ropley and Itchen Abbas were removed as an economy measure. [13] [3]

Other lines at Butts Junction

Basingstoke and Alton Light Railway

On 1 June 1901 the Basingstoke and Alton Light Railway opened. It joined the Mid-Hants Railway by a junction called Butts Junction, a mile west of Alton. The line from Butts junction through Alton had been doubled in readiness, but Butts Junction handled three converging single lines. [14]

The line was temporarily closed in 1916 to release materials for the war effort, [15] resuming in 1924. [16] It finally closed to passengers in 1932 [17] and when goods traffic ceased in 1936 the line closed completely. [18]

Meon Valley Line

Undeterred by the poor outcome of the Mid-Hants line, the LSWR promoted the Meon Valley Railway, which was to run between Alton and a junction at Fareham, giving access to Gosport and Stokes Bay, a pier for steamers to the Isle of Wight. It was opened in 1903. It too joined the Mid-Hants line at Butts Junction. [19] Passenger train operation ended in 1955, [20] and the goods train connection to a residual stub of the line at Alton was closed down in 1968. [21]

Butts Junction simplification

The closure of the Basingstoke line meant that there were only two routes converging on Alton, and in 1935 Butts Junction signal box was abolished. The former double track from there to Alton became two single tracks: the Mid-Hants line and the Meon Valley line continued into Alton independently. [13] [3]

Electric trains at Alton, and diesels on the MHR

On 4 July 1937 electric trains started operating to Alton (and to Portsmouth Direct). A frequent train service between Alton and London was operating, and the MHR was now a non-electrified extension. There was no operational convenience in running through trains from east of Alton on to the MHR, and so a shuttle passenger service operated by push and pull trains worked between Alton and Winchester. [13] [3] [22]

A Hampshire diesel electric multiple unit Hampshire Unit DEMU No 205025 (1125) (7248942966).jpg
A Hampshire diesel electric multiple unit

After nationalisation of the railways in 1948, a programme of introduction of diesel traction was implemented, and local trains on the Hampshire group of services began to be operated by diesel-electric multiple units that came to be known as Hampshire units. After 3 November 1957 steam passenger operation ceased on the MHR route, and the Hampshire units took over. An hourly regular interval service operated seven days a week, and the journey time between Alton and Southampton Terminus was reduced from 75 minutes to 55. Good connections were made at Alton with London trains. Passenger numbers increased markedly: carryings were 50% up (from a very low base). At the same time goods business declined steeply. [23] [3]

Diverted services, but ultimately closure

Medstead & Four Marks station in modern times Medstead ^ Four Marks railway station, Hampshire - geograph.org.uk - 3293474.jpg
Medstead & Four Marks station in modern times

In the period 1963 to 1967, the process of electrification of the main Bournemouth line was under way, and frequently main line trains were diverted over the MHR. [24]

The decline in ordinary use of the line continued, and moves were made to close it. After a considerable series of hearings and appeals, it was announced that last day of operation would be 4 February 1973. [25] [3]

Heritage railway

Closure of the line on 5 February 1973 by British Rail did not mean the end of train operation on the line. A heritage operator, the Mid-Hants Railway Limited, was formed to preserve and operate the Alton to Alresford section. It opened from Alresford to Ropley on 30 April 1977, reached Medstead & Four Marks on 28 May 1983 and finally ran through to Alton, enabling cross-platform passenger interchange from British Rail trains there, on 25 May 1985. [3]

Topography

Gradients

The line climbed at 1 in 100 from Alton station, to Butts Junction, which itself was level, then stiffening to 1 in 60. The climb is five miles to Boyneswood summit, 652 feet above sea level. The line then falls at 1 in 60 for just over 2 miles, then almost continuously 1 in 80 to Winchester Road, a mile west of Alresford station. The fall was 437 feet in a little under 7 miles. From that point to Winchester includes some 1 in 100 gradients, but these are not consistent. [7]

Locations

Notes

  1. Investors would ‘’subscribe’’ for shares, and a railway company would make periodical ‘’calls’’ for relatively small parts of the total value of subscription, as work progressed. There was almost always a specified limitation on this, so the company could not demand the whole of the £20,000 to be paid in at once.
  2. According to Williams; but Hardingham states that Smith and Knight were appointed later by Hankey.
  3. Formally the Mid-Hants (Alton Lines) Railway.
  4. On capital outlay of £200,000 this equates to 1.8% (2020).

Related Research Articles

<span class="mw-page-title-main">London and South Western Railway</span> British pre-grouping railway company

The London and South Western Railway was a railway company in England from 1838 to 1922. Originating as the London and Southampton Railway, its network extended to Dorchester and Weymouth, to Salisbury, Exeter and Plymouth, and to Padstow, Ilfracombe and Bude. It developed a network of routes in Hampshire, Surrey and Berkshire, including Portsmouth and Reading.

<span class="mw-page-title-main">Watercress Line</span> 10 mile heritage railway in Hampshire, England

The Watercress Line is the marketing name of the Mid-Hants Railway, a heritage railway in Hampshire, England, running 10 miles (16 km) from New Alresford to Alton where it connects to the National Rail network. The line gained its popular name in the days when it was used to transport locally grown watercress to markets in London. The railway currently operates regular scheduled services, along with dining trains, real ale trains and numerous special events throughout the year.

<span class="mw-page-title-main">Winchester railway station</span> Railway station in Hampshire, England

Winchester railway station is a railway station in Winchester in the county of Hampshire, England. It is on the South West Main Line and was known as Winchester City from 1949–67 to distinguish it from Winchester (Chesil) station. It is 66 miles 39 chains (107.0 km) down the line from London Waterloo.

<span class="mw-page-title-main">Portsmouth Direct line</span> Railway line from London to Portsmouth, England

The Portsmouth Direct line is a railway route between Woking in Surrey and Portsmouth Harbour in Hampshire, England. It forms the principal route for passenger trains between London, Guildford and Portsmouth; connections are made to the ferry services which operate between Portsmouth and the Isle of Wight. The final section of line from Havant to Portsmouth is shared with other passenger routes.

<span class="mw-page-title-main">Alton line</span> Railway line in southeast England

The Alton line is a railway line in Hampshire and Surrey, England, operated by South Western Railway as a relatively long branch of the South West Main Line.

<span class="mw-page-title-main">Woking railway station</span> Railway station in Woking, England

Woking railway station is a major stop in Woking, England, on the South West Main Line used by many commuters. It is 24 miles 27 chains (39.2 km) down the line from London Waterloo. The station is managed by South Western Railway, who operate all trains serving it.

<span class="mw-page-title-main">Four Marks</span> Human settlement in England

Four Marks is a village and civil parish in the East Hampshire district of Hampshire, England. It is 4.4 miles (7.1 km) southwest of Alton, on the A31 road. It is situated on the borders of the South Downs National Park on the Pilgrims' Way that leads from Winchester to Canterbury. It contains within it the medieval hamlets of Kitwood, Hawthorn and Lymington, although now the whole parish is relatively closely settled.

<span class="mw-page-title-main">Ropley railway station</span> Heritage railway station in England

Ropley railway station is a railway station in Ropley, Hampshire, England, which opened in 1865 and reopened in 1977 after four years' closure, to be served by steam and select diesel trains on the Watercress Line which shares its terminus at Alton railway station along with the more major Alton Line.

<span class="mw-page-title-main">Alresford railway station (Hampshire)</span> Disused railway station in New Alresford, England

Alresford railway station in Hampshire, England, is the terminus of the Watercress Line from Alton. It is in the small town of New Alresford, 7½ miles (12 km) northeast of Winchester, close to the town's market square, tea rooms, many small shops and museum.

<span class="mw-page-title-main">Chertsey branch line</span> Virginia Water-Weybridge rail route

The Chertsey branch line connects Virginia Water station on the Waterloo to Reading main line to Weybridge station on the Waterloo to Woking main line. It is located in Surrey, England. Chertsey is an ancient market town and was first connected by a branch line from Weybridge in 1848. The line was continued to Virginia Water in 1866. Additional spurs were provided at each end of the line, forming triangular junctions. The southern junction to Byfleet proved useful for through trains from Windsor towards Woking and Portsmouth. The line was electrified in 1937.

The Didcot, Newbury and Southampton Railway (DN&SR) was a cross-country railway running north–south between Didcot, Newbury and Winchester. Its promoters intended an independent route to Southampton and envisaged heavy traffic from the Midlands and North of England to the port, but they ran out of funds to complete the line to Southampton. The intended heavy through traffic never materialised, and the line was dependent on larger railways—the Great Western Railway and the London and South Western Railway—for support, which was not freely given. The line opened in two stages, in 1882 and 1885.

<span class="mw-page-title-main">Basingstoke and Alton Light Railway</span>

The Basingstoke and Alton Light Railway was opened in 1901, by the London and South Western Railway. It was the first English railway authorised under Light Railway legislation. It ran through unpromising, lightly populated terrain, and was probably built only to exclude competitors from building a line in the area. It had steep gradients and a line speed limit of 20 mph, later raised to 25 mph.

The Meon Valley Railway was a cross-country railway in Hampshire, England, that ran for 22 miles between Alton and Fareham, closely following the course of the River Meon. At its northern (Alton) end, it joined with the Alton Line from London. It was conceived as an additional main line to the area around Gosport, and it was opened in 1903. It never fulfilled its planned potential, and remained a local line through sparsely populated agricultural areas, and it closed to passenger services in 1955; some local goods services continued until total closure in 1968.

The Sprat and Winkle Line was the common name of the Andover to Redbridge railway line which ran between Andover and Redbridge in Hampshire, England. In the Romsey area it joined, and then left, the Salisbury to Southampton line. It was built by the Andover and Redbridge Railway, which was incorporated in 1858. In 1863 the uncompleted railway was taken over by the London and South Western Railway (LSWR), which opened the line in 1865. The line had been conceived as part of a trunk route from Manchester to Southampton, but when the Midland and South Western Junction Railway opened, the anticipated long-distance traffic was disappointing.

The Cranleigh line was a railway line in England that connected Guildford in Surrey, with Horsham in West Sussex. Construction of the line was started by an independent company, the Horsham and Guildford Direct Railway, but management failures delayed construction, and the company was taken over by the London, Brighton and South Coast Railway (LBSCR). The LBSCR completed the construction of the line and it was opened in 1865; it was nearly 16 miles in length.

<span class="mw-page-title-main">Medstead</span> Human settlement in England

Medstead is a village and civil parish in the East Hampshire district of Hampshire, England. Its nearest town is Alton, which lies 4.3 miles (6.9 km) northeast of the village. According to the 2011 census, the village had a population of 2,036 people. The parish covers an area of 1,536 acres (622 ha) and has an average elevation of approximately 600 feet (180 m) above sea level. One of the county's high points at 716 feet (218 m), King's Hill, runs through Medstead and Bentworth.

BR Standard Class 5 73096

British Railways Standard Class 5 No. 73096 is a preserved British steam locomotive, unnamed in service. It has spent most of its time in preservation in the care of the Watercress Line.

The Gosport and Cosham lines were a collection of railway lines in southern Hampshire. Most of the lines are now closed but some elements are still in use, forming part of the West Coastway line. The lines originally linked to the main London to Southampton line via the Eastleigh–Fareham line and subsequently with a line from Southampton via Bursledon, both of which are still in use.

The Watercress Line is a heritage railway in Hampshire, England, running 10 miles (16 km) from New Alresford to Alton where it connects to the National Rail network. The line has four stations and operates scheduled and special services. The line was opened as the Mid-Hants Railway in 1865 and was purchased by the London & South Western Railway in 1884.

The Aldershot and Alton lines of the LSWR were railways developed from 1849 onwards in the region in Surrey and Hampshire, England, between the Southampton main line and Guildford. First was a line from Guildford to Farnham, soon extended to Alton in 1852. The Reading, Guildford and Reigate Railway, an affiliate of the South Eastern Railway (SER), used part of that line by running powers. When the Aldershot Garrison and associated camps opened, suddenly Aldershot had a large population, both civilian and military, and the LSWR built a line from Pirbright Junction, on the Southampton main line. As well as serving Aldershot, this line gave a more direct route from London. It opened in 1870.

References

  1. 1 2 3 4 5 6 7 8 9 10 11 12 13 R A Williams, The London and South Western Railway: volume 2: Growth and Consolidation, David and Charles, Newton Abbot, 1973, ISBN   0 7153 5940 1, page 81
  2. 1 2 3 Roger Hardingham, The Mid Hants Railway, From Construction to Closure, Runpast Publishing, Cheltenham, 1995, ISBN   978-1870754293, page 7
  3. 1 2 3 4 5 6 7 8 Colin G Maggs, The Branch Lines of Hampshire, Amberley Books, Stroud, 2010, ISBN   978-1848683433, pages 77 and 78
  4. Donald J Grant, Directory of the Railway Companies of Great Britain, Matador, Kibworth Beauchamp, 2017, ISBN   978 1785893 537, page 11
  5. Ernest F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959, page 321
  6. Hardingham, page 9
  7. 1 2 Hardingham, pages 9 and 11
  8. 1 2 Grant, page 374
  9. Railways Abandonment: The Mid-Hants Line (Ropley to Meonstoke), Board of Trade, London, 29 October 1869
  10. Hardingham, page 41
  11. 1 2 Hardingham, pages 42 and 43
  12. Course, pages 62 and 63
  13. 1 2 3 Hardingham, pages 47 and 49
  14. Martin Dean, Kevin Robertson and Roger Simmonds, The Basingstoke and Alton Light Railway, 1998, second edition 2003 by Barton Publishing, Southampton, ISBN   0953419703, pages 35, 36 and 38
  15. Dean, Robertson and Simmonds, page 52
  16. Dean, Robertson and Simmonds, page 63
  17. Dean, Robertson and Simmonds, page 74
  18. Dean, Robertson and Simmonds, page 76
  19. R A Stone, The Meon Valley Railway, Kingfisher Railway Productions, Southampton, 1983, ISBN   0 946184 04 6, page 36
  20. Stone, page 95
  21. Stone, page 104
  22. Edwin Course, The Railways of Southern England: Secondary and Branch Lines, B T Batsford Ltd, London, 1974, ISBN   0 7134 2835 X, page 57
  23. Hardingham, pages 64, 74 and 76
  24. Hardingham, page 95
  25. Hardingham, page 111
  26. M E Quick, Railway Passenger Stations in England, Wales and Scotland: A Chronology, version 5.04, September 2022, Railway and Canal Historical Society, electronic download