Modern Continental

Last updated
Modern Continental
Company typePrivate
IndustryConstruction
Founded1967
FounderLes Marino, Kenneth Anderson
DefunctJune 23, 2008
FateChapter 11 Bankruptcy
SuccessorLM Heavy Civil Construction LLC (2005 - 2021), Manafort Transit
Headquarters,
United States
Key people
John Pastore (President)

Les Marino (President 1967 - 2004)

Charlie Madden (Vice President)
ServicesConstruction, Land Development
Number of employees
4,200 (2001)
Subsidiaries Modern Continental Enterprises (MCE), Modern Continental Pacific, Spearin Preston & Burrows Inc (SPB)

Modern Continental was a construction company based in Cambridge, Massachusetts, which was involved in the Boston "Big Dig" Central Artery/Tunnel Project. On June 23, 2008, the company filed for Chapter 11 bankruptcy in federal court in Boston. [1]

Contents

History

Modern Continental Construction was a heavy-construction company and the original business in the Modern Continental group. Modern was one of the major contractors on the Central Artery/Tunnel Project, the largest single public works project in United States history. Modern was founded in 1967 by Kenneth Anderson and Italian immigrant Les Marino. Beginning with a single sidewalk contract in Peabody MA, the company grew into a regional heavy construction giant. [2]

Marine construction firm Spearin, Preston & Burrows of Staten Island NY was acquired by Modern Continental. [3]

Modern Continental specialized in:

Diversification

Modern Continental Enterprises was a division of the company that built housing developments, built and managed office buildings, operated marinas, operated charter and tendered bus (Paul Revere Transportation) and ferry services *Boston Harbor Cruises), owned and operated an organic produce farm in Natick, Massachusetts, and operated an Italian restaurant (Ristorante Marino) in Cambridge, Massachusetts. [4] Boston Harbor Cruises and Paul Revere Transportation were originally joint ventures meant to transport workforces to and from Deer Island during the construction of the Wastewater Treatment Plant.

List of Businesses

  • Boston Harbor Cruises
  • Paul Revere Transportation
  • Boston Yacht Haven
  • The Marina at James Landing
  • Marino Center for Progressive Health
  • Modern Health Store
  • Marino Lookout Farm
  • Ristorante Marino [5]

Criticism

Throughout 2004, Modern Continental Construction endured mounting criticism for its failure to complete multiple projects on schedule and its financial stability was questioned. These including the Route 3 North highway-widening project in northeastern Massachusetts and a major drinking-water pipeline in the San Francisco Bay Area. MCC was to finish the widening of Route 3 in 42 months by early 2005, but incurred delays of an additional 8 months. The State of Massachusetts fined Modern $10,000 for each day the project was unfinished.

The East Bay Municipal Utility District terminated a $24.5 million contract with Modern in early 2004 due to Modern's failure to meet construction schedules, insufficient staffing and oversight, and numerous pipe defects that Modern was unable to correct. [6] [lower-alpha 1] East Bay Municipal Utility District reversed the termination for cause to a termination for convenience.

Modern was also briefly dropped from Massachusetts' list of highway contractors qualified to bid on state-funded projects. Later that year, questions were raised about the workmanship on a Central Artery contract, for which Modern was the lead contractor, after a large leak was found in the Interstate 93 tunnel beneath downtown Boston which led to the disclosure and discovery of "thousands of leaks."

On September 23, 2004, Marino announced plans to merge Modern Continental Construction and a subdivision of Jay Cashman, Inc. [8] This was at the urging of insurance firms that bonded Modern's projects. Cashman was to oversee the company and finish out any remaining work.

Ceiling collapse

On July 10, 2006, four three-ton concrete ceiling panels on Interstate 90 in South Boston, Massachusetts fell onto a car driven by Boston resident Angel Del Valle, injuring him and killing his wife Milena. The ceiling panel collapse has been attributed to the failure of bolts anchored into the structure with an epoxy adhesive from which the panels are hung. Modern Continental built that section of the highway in 1999. (See Big Dig for more details.)

Investigation

During the period after the ceiling panel collapse, a memo allegedly written in 1999 by John J. Keaveney, a former Modern Continental employee, to his Project Manager warning of the potential for failure of the hanger system was sent to the Boston Globe. Keaveney said that he sent it to the Globe with a current Modern Continental employee's name and office address on the envelope because he feared the consequences if it were known that he provided the newspaper with the memo. "I was worried about the repercussions and that it might affect my family and my livelihood," stated Keaveney.

Bankruptcy

On June 23, 2008, Modern Continental filed for Chapter 11 bankruptcy in federal court in Boston.

LM Holdings LLC & LM Heavy Civil Construction, LLC

Following the bankruptcy of Modern Continental, a series of companies were formed by key executive personnel. LM Holdings LLC of Westford MA was established by Massimo (Max) Marino in 2005. [9] In 2010, the company was renamed LMH (LM Heavy Civil Construction, LLC) as part of an emphasis on establishing itself in the industry void once filled by Modern Continental.

Growth and Major Projects

LMH was fully acquired by Italy based C.M.C. di Ravenna (Cooperativa Muratori Cementisti) in 2011 and was held by its subsidiary CMC Holding Overseas S.p.a. [10] LMH performed both site development/earthmoving for private clients and heavy construction for public agencies such as the MBTA and MassDOT. LMH continually won a slew of MBTA contracts as the apparent low bidder and quickly became a major player in trackwork.

The MBTA awarded the Wollaston Station Improvements and Quincy Center Garage Demolition contract, valued at $67,867,000, to a Joint Venture of LM Heavy and CMC in June 2016. [11]

In 2017 LMH was shortlisted for the MBTA Green Line Extension (GLX) as part of the design-build consortium "Green Line Partners". This group was made up of The Lane Construction Corporation, Salini Impregilo, Judlau Contracting, and LMH-C.M.C. di Ravenna Joint Venture. Ultimately, the group failed to secure the project.

A $214-million project to renovate the MBTA Red Line Cabot Yard was awarded to LMH Lane, a Joint Venture of LM Heavy Civil and Cheshire CT based Lane Construction Co. Work proceeded in July 2018. [12]

Demise

On December 7, 2018, CMC issued a press release stating that it had begun the process of insolvency according to Italian Law. [13] Following the insolvency of CMC, LMH faced financial challenges that threatened its ability to complete its contracts with clients namely the MBTA. LMH had stated it had "essentially no money and as a result is unable to continue daily operations.” [14] During 2019, CMC and CMC Holding Overseas sought to find solutions to the "serious crisis situation of LMH" by negotiating with the creditors Zurich NA, Unicredit NY, and McCourt Legal Advisor. [15] Projects such as the Wollaston Station Improvements were taken over by bond holders Zurich American Insurance Co. and its subsidiary, Fidelity and Deposit Co. of Maryland. [16]

Notes

  1. While Modern was responsible for determining the location of utilities at the project site, Modern blamed project delays on inaccurate information regarding the location of gasoline pipelines received from Kinder Morgan, an energy infrastructure corporation. These inaccuracies later resulted in an explosion which killed 5 workers from the firm which replaced Modern. [7]

Related Research Articles

<span class="mw-page-title-main">Big Dig</span> 1991–2007 megaproject in Boston, Massachusetts

The Big Dig was a megaproject in Boston that rerouted the then elevated Central Artery of Interstate 93 that cut across Boston into the O'Neill Tunnel and built the Ted Williams Tunnel to extend Interstate 90 to Logan International Airport. Those two projects were the origin of the official name, the Central Artery/Tunnel Project. Additionally, the project constructed the Zakim Bunker Hill Bridge over the Charles River, created the Rose Kennedy Greenway in the space vacated by the previous I-93 elevated roadway, and funded more than a dozen projects to improve the region's public transportation system. Planning for the project began in 1982; the construction work was carried out between 1991 and 2006; and the project concluded on December 31, 2007. The project's general contractor was Bechtel and Parsons Brinckerhoff was the engineer, who worked as a consortium, both overseen by the Massachusetts Highway Department.

<span class="mw-page-title-main">Red Line (MBTA)</span> Rapid transit line in Massachusetts, US

The Red Line is a rapid transit line operated by the Massachusetts Bay Transportation Authority (MBTA) as part of the MBTA subway system. The line runs south and east underground from Alewife station in North Cambridge through Somerville and Cambridge, surfacing to cross the Longfellow Bridge then returning to tunnels under Downtown Boston. It continues underground through South Boston, splitting into two branches on the surface at JFK/UMass station. The Ashmont branch runs southwest through Dorchester to Ashmont station, where the connecting light rail Mattapan Line continues to Mattapan station. The Braintree branch runs southeast through Quincy and Braintree to Braintree station.

<span class="mw-page-title-main">Green Line (MBTA)</span> Light rail system

The Green Line is a semi-metro system run by the Massachusetts Bay Transportation Authority (MBTA) in the Boston, Massachusetts, metropolitan area. It is the oldest MBTA subway line, and with tunnel sections dating from 1897, the oldest subway in North America. It runs underground through downtown Boston, and on the surface into inner suburbs via six branches on radial boulevards and grade-separated alignments. With an average daily weekday ridership of 101,000 in 2023, it is among the most heavily used light rail systems in the country. The line was assigned the green color in 1967 during a systemwide rebranding because several branches pass through sections of the Emerald Necklace of Boston.

<span class="mw-page-title-main">Orange Line (MBTA)</span> Rapid transit line in Greater Boston

The Orange Line is a rapid transit line operated by the Massachusetts Bay Transportation Authority (MBTA) as part of the MBTA subway system. The line runs south on the surface from Oak Grove station in Malden, Massachusetts through Malden and Medford, paralleling the Haverhill Line, then crosses the Mystic River on a bridge into Somerville, then into Charlestown. It passes under the Charles River and runs through Downtown Boston in the Washington Street Tunnel. The line returns to the surface in the South End, then follows the Southwest Corridor southwest in a cut through Roxbury and Jamaica Plain to Forest Hills station.

<span class="mw-page-title-main">Blue Line (MBTA)</span> Rapid transit line in Boston

The Blue Line is a rapid transit line in the Greater Boston metropolitan area, one of four rapid transit lines operated by the Massachusetts Bay Transportation Authority (MBTA). It runs from Bowdoin station in downtown Boston under Boston Harbor to East Boston and Revere on the inner North Shore, where it terminates at Wonderland. The stop at Airport Station, by way of a free shuttle bus, is one of two rapid transit connections to Logan International Airport. In 1967, during a systemwide rebranding, the line was assigned the blue color because it passes under the Boston Harbor. With an end-to-end travel time of less than twenty minutes, the Blue Line is the shortest of Boston's heavy-rail lines and the only line to have both third rail and overhead catenary sections.

<span class="mw-page-title-main">State station</span> Subway station in Boston, Massachusetts, US

State station is an underground Massachusetts Bay Transportation Authority (MBTA) rapid transit station located in downtown Boston, Massachusetts. It is the transfer point between the Orange Line and the Blue Line, and one of four "hub stations" on the MBTA subway system. The Orange Line has two side platforms on two levels, while the Blue Line has two side platforms on a single level. The station is fully accessible.

<span class="mw-page-title-main">Aquarium station (MBTA)</span> Subway station in Boston, Massachusetts, US

Aquarium station is an underground rapid transit station on the MBTA Blue Line in Boston, Massachusetts, United States. It is located under State Street at Atlantic Avenue on the eastern edge of Boston's Financial District near Boston Harbor. The station is named for the nearby New England Aquarium. It is adjacent to Long Wharf, which is used by two MBTA Boat lines. The station has two side platforms serving the two tracks of the Blue Line; an arched ceiling runs the length of the platform level. With the platforms 50 feet (15 m) below street level, it is the second-deepest station on the MBTA system.

<span class="mw-page-title-main">Hynes Convention Center station</span> Subway station in Boston, Massachusetts, US

Hynes Convention Center station is an underground light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line. It is located at the intersection of Newbury Street and Massachusetts Avenue near the western end of the Back Bay neighborhood of Boston, Massachusetts. The station is named for the Hynes Convention Center, which is located about 700 feet (210 m) to the east along Boylston Street. It has two side platforms serving the two tracks of the Boylston Street subway, which are used by the Green Line B branch, C branch, and D branch. The main entrance to the station from Massachusetts Avenue leads to a fare lobby under the 360 Newbury Street building.

<span class="mw-page-title-main">Quincy Center station</span> Transit station in Quincy, Massachusetts, US

Quincy Center station is an intermodal transit station in Quincy, Massachusetts. It is a transfer station between the MBTA Red Line subway, MBTA Commuter Rail's Old Colony Lines and Greenbush Line, and a number of MBTA bus routes. It is located between Hancock Street and Burgin Parkway in the Quincy Center district. Opened in 1971, the station was covered by a large parking garage which was closed in 2012 due to structural problems and removed several years later. The station is accessible on all modes.

<span class="mw-page-title-main">Wood Island station</span> Rapid transit station in Boston, Massachusetts, US

Wood Island station is an MBTA Blue Line rapid transit station located off Bennington Street in the Day Square section of East Boston, Boston, Massachusetts. The station is adjacent to and named for the former Wood Island Park, a once heavily used recreational area for East Boston residents. Most of the park was destroyed in the mid 1960s to expand Logan International Airport. It was built in 1952, replacing a pair of Boston, Revere Beach and Lynn Railroad stations that served the area.

<span class="mw-page-title-main">Symphony station (MBTA)</span> Subway station in Boston, Massachusetts, US

Symphony station is an underground light rail station in Boston, Massachusetts on the E branch of the MBTA Green Line. It is located at the intersection of Massachusetts Avenue and Huntington Avenue. Symphony is the outermost underground station on the E branch; after leaving Symphony, outbound trains emerge onto the surface and continue down the median of Huntington Avenue. Symphony station is named after the nearby Symphony Hall.

Jay Cashman, Inc. is a privately held multi-disciplinary construction and development company, founded and owned by Jay M. Cashman. It is one of the largest privately held contracting firms in the northeastern United States. The company has moved offices several times within the Boston area and has offices in three states and India. As of 2006, the company had approximately 1,000 employees. The company was one of the major contractors on Boston's Central Artery/Tunnel Project. In 2004, the company took over financial management of a competing firm, Modern Continental Construction, at the request of Modern Continental's bondholders; the company does not, however, have an ownership stake in Modern Continental.

J. F. White Contracting Co. is a Massachusetts-based contracting company specializing in heavy civil construction, deep foundations, pile driving, and mechanical/electrical construction. Founded in 1924, the company is headquartered in Framingham, Massachusetts. The company has performed work primarily in the New England area of America. In 2014, J.F. White Contracting Company was acquired by Dragados USA.

<span class="mw-page-title-main">Wollaston station</span> Rapid transit station in Quincy, Massachusetts, US

Wollaston station is a rapid transit station in Quincy, Massachusetts. Located in the Wollaston neighborhood, it serves the MBTA's Red Line. It was opened in September 1971 as the second of three stations in the original South Shore Extension, replacing a mainline rail station which had been located there from 1845 to 1959. Wollaston station was closed from January 8, 2018, to August 16, 2019, for renovations to the station, including flood mitigation and accessibility improvements.

<span class="mw-page-title-main">Beachmont station</span> Rapid transit station in Revere, Massachusetts, US

Beachmont station is an elevated rapid transit station in Revere, Massachusetts. It serves the MBTA Blue Line, and is located above Winthrop Avenue in the Beachmont neighborhood. Beachmont station is fully accessible, with elevators from the lobby to the platforms.

The Haymarket North Extension is a section of the Massachusetts Bay Transportation Authority's rapid transit Orange Line which currently constitutes the northern section of the line. It runs from North Station through an underground crossing of the Charles River, then along the Haverhill Line right-of-way to Oak Grove station in Malden, Massachusetts. Built to replace the Charlestown Elevated and originally intended to be extended as far as Reading, it opened in stages between 1975 and 1977.

<span class="mw-page-title-main">Green Line Extension</span> Light rail system in greater Boston, US

The Green Line Extension (GLX) was a construction project to extend the Massachusetts Bay Transportation Authority (MBTA) Green Line light rail system northwest into Somerville and Medford, two inner suburbs of Boston, Massachusetts. The project opened in two phases in 2022 at a total cost of $2.28 billion. Total ridership on the 4.3-mile (6.9 km) extension is estimated to reach 45,000 one-way trips per day in 2030.

<span class="mw-page-title-main">Boston University Central station</span> Light rail station in Boston, Massachusetts, US

Boston University Central station is a surface-level light rail station on the MBTA Green Line B branch, located the center median of Commonwealth Avenue west of St. Marys Street in Boston, Massachusetts, surrounded by the Boston University campus. It consists of two side platforms, which serve the B branch's two tracks. The station is accessible, with raised platforms to allow level boarding onto low-floor trams and a high platform on the inbound side to serve high-floor light rail vehicles.

<span class="mw-page-title-main">Boston University East station</span> Light rail station in Boston, Massachusetts, US

Boston University East station is a surface-level light rail station on the MBTA Green Line B branch located in Boston, Massachusetts. The station is located in the center median of Commonwealth Avenue, between Granby Street and the eastern end of Cummington Street, surrounded by the Boston University campus. It consists of two side platforms, which serve the B branch's two tracks.

<span class="mw-page-title-main">North Station (subway)</span> Rapid transit station in Boston, Massachusetts, US

North Station is an underground MBTA subway station in downtown Boston, Massachusetts. Served by the Massachusetts Bay Transportation Authority (MBTA) Green Line and Orange Line, it is connected to the surface terminal of the same name used by MBTA Commuter Rail and Amtrak. The station is fully accessible.

References

  1. Jewell, Mark. "Big Dig contractor files for bankruptcy protection". The Patriot Ledger. Retrieved 2024-03-28.
  2. "About Us". Modern Continental. Archived from the original on 2011-08-08.
  3. "Marine". Modern Continental. Archived from [/http://www.moderncontinental.com/marine.htm the original] on 2011-08-08.{{cite web}}: Check |url= value (help)
  4. sydney.primo.exlibrisgroup.com https://sydney.primo.exlibrisgroup.com/discovery/fulldisplay?docid=alma991031404179505106&context=L&vid=61USYD_INST:sydney&search_scope=MyInst_and_CI&tab=Everything&lang=en . Retrieved 2019-04-01.{{cite web}}: Missing or empty |title= (help)
  5. "Companies". Modern Continental. Archived from the original on August 7, 2011.
  6. "California Pipeline Blast Delays Troubled East Bay Water System Expansion" . Engineering News-Record. November 15, 2004.
  7. Taugher, Mike (22 September 2007). "Corporation to pay $15M for Walnut Creek blast". East Bay Times.
  8. "Modern Continental Merges with Jay Cashman | 2004-09-24 | ENR | Engineering News-Record". www.enr.com. Retrieved 2024-03-28.
  9. "About Us - LM Holdings, LLC". 2009-11-23. Archived from the original on 2009-11-23. Retrieved 2024-10-15.
  10. "Consolidated Financial Report as at December 31, 2014" (PDF).
  11. "MBTA > Business Center > Bidding and Solicitations > Awarded Contracts > Awarded Contract: A47CN01". old.mbta.com. Retrieved 2024-10-15.
  12. "Maybe it's just as well those new Red Line trains are late: Upgrade of the yard where they'd be maintained is delayed and mired in lawsuits". Universal Hub. Retrieved 2024-10-15.
  13. "Press Release" (PDF). December 7, 2018. Retrieved October 15, 2024.
  14. "Commonwealth of Massachusetts – Suffolk, ss. Superior Court – 2184CV01838-BLS2 – Zurich American Insurance Company and Fidelity and Deposit Company of Maryland v. LM Heavy Civil Construction, LLC, and Others – Memorandum and Order Denying Defendant's Motion for Dissolution of Trustee Process Attachments" (PDF).
  15. "Financial Report As at December 31, 2019" (PDF). CMC Gruppo. December 31, 2019.
  16. Difazio, Joe. "Bondholders sue MBTA for more than $8 million over delayed Wollaston project". The Patriot Ledger. Retrieved 2024-10-15.