The Moorina Power Station is a decommissioned hydroelectric power station, located near the hamlet of Moorina in far north-eastern Tasmania, Australia. Opened in 1909 and decommissioned in 2008, at the time of its closure, Moorina Power Station was the oldest operating electricity generator in Australia. [1] :35

Contents

Concept and construction

In 1900, the Pioneer Tin Mining Co. was formed to extract tin (cassiterite) from Tertiary alluvial deposits found in abundance in the far north-east of Tasmania, at the town of Pioneer. At the time there was only one dedicated power station in Tasmania (Duck Reach, near Launceston) which was entirely devoted to street lighting and the general needs of the city of Launceston. In addition, "Water shortages for sluicing and the consumption of 30,000 tonnes (30,000 long tons; 33,000 short tons) of firewood per annum for steam raising had, by 1907, led to the proposal to develop the Moorina Scheme to provide both electricity and sluicing water". [2] [3] The station itself is reported by the Tasmanian Hydro-Electric Commission website as having opened in 1906, but REGA reports this as 1907. Construction of the station proceeded during 1908 with and the first machine was commissioned in March 1909. [1]

Technical details

The station is housed in a small 10-by-15-metre (33 ft × 49 ft) corrugated galvanised iron building, which at one point had several out-buildings nearby. Most of these buildings remain including two 1908 houses, a 1939 build engineer's residence and a machine shed. There is limited public access to the area.

Water for operations is supplied from a dam across the Frome River 1.6 kilometres (0.99 mi) due south from the powerhouse itself. According to Australian National Committee on Large Dams publication, Dam Technology in Australia 1850-1999, the concrete-faced rockfill dam was the first of its kind in Australia. [1] From station engineering records the structure is 18 metres (59 ft) high and 197 metres (646 ft) long, following alterations carried out in 1911. From the dam a water race of 2.7 kilometres (1.7 mi) and penstock conveyed water to the power station itself, where is passed through the machinery inside.

Some sources describe the plant as having only one turbine - but this appears to be incorrect. According to REGA, the plant possessed three generating sets, each rated at 325 kilowatts (436 hp), at 50 hertz (6,000,000 m) and 6.5 kV. From these figures one would assume that the plant has a maximum output of 975 kilowatts (1,307 hp), however, the Tasmanian Hydro-Electric Commission website stated that the plant produced only 600 kilowatts (800 hp), as does the Tasmanian Greens discussion paper 'Power without Purpose - Tasmania's Energy Glut'. The reason for this variation is not known.

The actual nameplate rating of these machines, of which there were 3, was 325 kW or 360kVA giving a station total of 975 kW or 1080 kVA. The decision to fit 50 hertz (6,000,000 m) alternators made integration with the main Tasmanian hydro-electric system much easier. The turbines were built by J.M. Voight, of Heidenheim, Germany, while the alternators were built by Allgemeine Elektrizitäts-Gesellschaft (AEG), of Berlin.

Decommissioning

The Pioneer tin mine closed in the mid-1980s, and since then the plant has been owned and operated by Moorina Hydro Pty. Ltd., with a crew of two. In 2008 the power station was closed due to the high cost of upgrading equipment. [4]

Related Research Articles

<span class="mw-page-title-main">Hydro Tasmania</span> Government hydro electricity provider in Tasmania, Australia

Hydro Tasmania, known for most of its history as the Hydro-Electric Commission (HEC) or The Hydro, is the trading name of the Hydro-Electric Corporation, a Tasmanian Government business enterprise which is the predominant electricity generator in the state of Tasmania, Australia. The Hydro was originally oriented towards hydro-electricity, due to Tasmania's dramatic topography and relatively high rainfall in the central and western parts of the state. Today Hydro Tasmania operates thirty hydro-electric and one gas power station, and is a joint owner in three wind farms.

The Great Lake, officially yingina / Great Lake, is a natural lake and man-made reservoir that is located in the central northern region of Tasmania, Australia.

<span class="mw-page-title-main">Duck Reach Power Station</span> Publicly owned hydro-electric power plant near Launceston, Tasmania, operated between 1895 and 1955

Duck Reach Power Station was the first publicly owned hydro-electric plant in the Southern Hemisphere, and provided the Tasmanian city of Launceston with hydro-electric power from its construction in 1895 to its closure in 1955.

The Lake Margaret Power Stations comprise two hydroelectric power stations located in Western Tasmania, Australia. The power stations are part of the King – Yolande Power Scheme and are owned and operated by Hydro Tasmania. Officially the Upper Lake Margaret Power Station, a conventional hydroelectric power station, and the Lower Lake Margaret Power Station, a mini-hydroelectric power station, the stations are generally collectively referred to in the singular format as the Lake Margaret Power Station. The stations are located approximately 2.5 kilometres (1.6 mi) apart.

<span class="mw-page-title-main">Waddamana Power Stations</span> Hydro-electric power plant in Tasmania

Waddamana Hydro-Electric power station was the first hydro-electric power plant ever operated by the Tasmanian Hydro-Electric Department, opened in 1916.

<span class="mw-page-title-main">Bell Bay Power Station</span> Former power station in Tasmania

The Bell Bay Power Station was a power station located in Bell Bay, on the Tamar River, Tasmania, Australia, adjacent to the Tamar Valley Power Station, with which it was often confused. It was commissioned between 1971 and 1974 as an oil fired thermal power station, and was converted to natural gas in 2003, after the commissioning of the Tasmanian Gas Pipeline, a submarine gas pipeline which transports natural gas from Longford, Victoria, under Bass Strait, to Bell Bay, Tasmania. As the power station's primary role was to provide system security in the event of drought for Tasmania's predominantly hydro-electric based generation system it only was rarely called on to operate, resulting in intervals of five to eight years between periods of significant use. After the commissioning of Basslink in 2006, the power station was decommissioned in 2009.

<span class="mw-page-title-main">Mount Bischoff</span> Mountain and former mine in Tasmania

Mount Bischoff is a mountain and former tin mine in the north-western region of Tasmania, Australia. The mountain is situated adjacent to Savage River National Park near the town of Waratah.

<span class="mw-page-title-main">Butlers Gorge Power Station</span> Dam in Central Highlands, Tasmania

The Butlers Gorge Power Station is a conventional hydroelectric power station located in the Central Highlands region of Tasmania, Australia.

<span class="mw-page-title-main">Tarraleah Power Station</span> Dam in Central Highlands, Tasmania

The Tarraleah Power Station is a hydroelectric power station located in the Central Highlands region of Tasmania, Australia. The power station is part of the Upper Derwent hydro scheme and is operated by Hydro Tasmania.

The Repulse Power Station is a conventional hydroelectric power station located in the Central Highlands region of Tasmania, Australia. The power station is situated on the Lower River Derwent catchment and is owned and operated by Hydro Tasmania.

<span class="mw-page-title-main">Meadowbank Power Station</span> Power station in Tasmania, Australia

The Meadowbank Power Station is a run-of-the-river hydroelectric power station located in the Central Highlands region of Tasmania, Australia. The power station is situated on the Lower River Derwent catchment and is owned and operated by Hydro Tasmania.

<span class="mw-page-title-main">Tungatinah Power Station</span> Power station in Tasmania, Australia

The Tungatinah Power Station is a conventional hydroelectric power station located in the Central Highlands region of Tasmania, Australia. The power station is situated on the Upper River Derwent catchment and is owned and operated by Hydro Tasmania.

The Lake Echo Power Station is a conventional hydroelectric power station located in the Central Highlands region of Tasmania, Australia. The power station is situated on the Upper River Derwent catchment and is owned and operated by Hydro Tasmania.

The Rowallan Power Station is a conventional hydroelectric power station located in north-western Tasmania, Australia. The station is located 25 kilometres (16 mi) south of Liena.

<span class="mw-page-title-main">Gordon Power Station</span> Power station in Tasmania, Australia

The Gordon Power Station is the largest conventional hydroelectric power station in Tasmania, Australia; located in the South West region of the state. The power station is situated on Gordon River. Water from Lake Gordon descends 183 metres (600 ft) underground past the Gordon Dam and into the power station.

<span class="mw-page-title-main">Trevallyn Power Station</span> Dam in Northern Midlands Tasmania

The Trevallyn Power Station is a run-of-the-river hydroelectric power station located in the northern Midlands region of Tasmania, Australia. The power station is situated on the Great Lake and South Esk catchment and is owned and operated by Hydro Tasmania.

<span class="mw-page-title-main">Gordon Dam</span> Dam in South West Tasmania, Australia

The Gordon Dam, also known as the Gordon River Dam, is a major gated double curvature concrete arch dam with a controlled spillway across the Gordon River, located in Southwest National Park, Tasmania, Australia. The impounded reservoir is called Lake Gordon.

The Anthony Power Development Scheme, part of the Pieman River power development scheme, was a proposed scheme for damming parts of the upper catchment of the Pieman River in Western Tasmania, Australia.

The Meander Dam is a concrete gravity dam across the Upper Meander River, located in northern Tasmania, Australia. The impounded reservoir is called Lake Huntsman.

The John Butters Power Station is a conventional hydroelectric power station located in Western Tasmania, Australia. The power station forms part of the King – Yolande River Power Scheme and is owned and operated by Hydro Tasmania.

References

  1. 1 2 3 "Lake Margaret Power Scheme" (PDF). Hydro Tasmania. Archived from the original (PDF) on 26 October 2009.
  2. "REGA newsletter". Renewable Energy Generators of Australia (REGA). February 2003.{{cite journal}}: Cite journal requires |journal= (help)
  3. "Moorina". Hydro Tasmania.{{cite journal}}: Cite journal requires |journal= (help)
  4. Lewarn, Melissa (7 March 2008). "Moorina Close" (transcript). Stateline . Tasmania: ABC TV . Retrieved 20 August 2014.