N767BA | |
---|---|
General information | |
Type | Boeing 767-200 |
Manufacturer | Boeing |
Registration | N767BA [1] |
History | |
Manufactured | 4 August 1981 |
First flight | 26 September 1981 |
In service | 1981–2003 |
Last flight | 20 September 2003 |
Fate | Scrapped |
N767BA was a Boeing 767 aircraft that was built by Boeing Commercial Airplanes as the prototype of the 767. The aircraft type was launched as the 7X7 program on 14 July 1978 and rolled off the assembly line on 4 August 1981, later achieving its maiden flight on 26 September. Boeing retained the prototype aircraft for testing throughout its lifetime. Starting in 1984, Boeing converted the aircraft to an Airborne Surveillance Testbed for a United States Army program. [2]
In 1972, Boeing had intentions to replace their quad-engined Boeing 707 with an aircraft smaller than the three large widebody aircraft then in production: the Boeing 747, McDonnell Douglas DC-10, and Lockheed L-1011 TriStar. Boeing partnered with Italian corporation Aeritalia and the Civil Transport Development Corporation (CTDC) to share the development costs. This was Boeing's first major international joint venture. In return for their early participation, Aeritalia and CTDC received supply contracts. The initial 7X7 design was planned as a short take-off and landing airliner for short-distance flights, but it was later redefined as a mid-size, transcontinental-range airliner due to lack of customer interest in the original concept. [3] Aircraft development began on 6 July 1979. [4]
The Boeing 767 incorporated several new technologies for its time, including an advanced two-crew Electronic Flight Instrument System (EFIS) flight deck, which featured six color Cathode Ray Tube (CRT) displays. The aircraft also introduced improved avionics systems, more fuel-efficient engines, and a new wing design with greater sweepback, specifically optimized for high-altitude performance and efficiency. [5] This was Boeing's first twin-engined wide-body aircraft.[ citation needed ]
The type was certified by the Federal Aviation Administration (FAA) on 30 July 1982, and entered service with United Airlines later that year. [6] [7]
On 4 August 1981, the Boeing 767-200 prototype, which was equipped with two Pratt & Whitney JT9D-7R4D engines, rolled off the assembly line at Boeing Everett Factory, [2] a facility that was originally constructed to produce the Boeing 747. [8] N767BA's serial number was 22233. [1]
Between 1984 and 1987, Boeing converted the aircraft to an Airborne Surveillance Testbed for a United States Army program intended to collect data on ICBM tests. Initially designated the Airborne Optical Adjunct, the program was renamed to the Airborne Surveillance Testbed in 1991. [9] The first flight after the conversion occurred on 21 August 1987. The primary external modification was an 86-foot-long (26 m) radome atop the forward fuselage, which contained a long-wavelength infrared sensor. Operator stations and processors were installed in the main cabin. [10] In this capacity, it was used to track ballistic missile test launches at the Kwajalein Missile Range and other U.S. military facilities in the Pacific Ocean, with various upgrades installed over time. [11]
On 20 September 2003, N767BA performed its final flight to Southern California Logistics Airport in Victorville, California for storage. On 16 April 2007, the aircraft's civil registration was cancelled and the aircraft dismantled shortly thereafter. [12]
The Boeing 767 is an American wide-body airliner developed and manufactured by Boeing Commercial Airplanes. The aircraft was launched as the 7X7 program on July 14, 1978, the prototype first flew on September 26, 1981, and it was certified on July 30, 1982. The initial 767-200 variant entered service on September 8, 1982, with United Airlines, and the extended-range 767-200ER in 1984. It was stretched into the 767-300 in October 1986, followed by the extended-range 767-300ER in 1988, the most popular variant. The 767-300F, a production freighter version, debuted in October 1995. It was stretched again into the 767-400ER from September 2000.
The Boeing 747 is a long-range wide-body airliner designed and manufactured by Boeing Commercial Airplanes in the United States between 1968 and 2023. After the introduction of the 707 in October 1958, Pan Am wanted a jet 2+1⁄2 times its size, to reduce its seat cost by 30%. In 1965, Joe Sutter left the 737 development program to design the 747. In April 1966, Pan Am ordered 25 Boeing 747-100 aircraft, and in late 1966, Pratt & Whitney agreed to develop the JT9D engine, a high-bypass turbofan. On September 30, 1968, the first 747 was rolled out of the custom-built Everett Plant, the world's largest building by volume. The 747's first flight took place on February 9, 1969, and the 747 was certified in December of that year. It entered service with Pan Am on January 22, 1970. The 747 was the first airplane called a "Jumbo Jet" as the first wide-body airliner.
The Boeing 777, commonly referred to as the Triple Seven, is an American long-range wide-body airliner developed and manufactured by Boeing Commercial Airplanes. The 777 is the world's largest twinjet and the most-built wide-body airliner. The jetliner was designed to bridge the gap between Boeing's other wide body airplanes, the twin-engined 767 and quad-engined 747, and to replace aging DC-10 and L-1011 trijets. Developed in consultation with eight major airlines, the 777 program was launched in October 1990, with an order from United Airlines. The prototype aircraft rolled out in April 1994, and first flew in June of that year. The 777 entered service with the launch operator United Airlines in June 1995. Longer-range variants were launched in 2000, and first delivered in 2004.
The Boeing 757 is an American narrow-body airliner designed and built by Boeing Commercial Airplanes. The then-named 7N7, a twinjet successor for the trijet 727, received its first orders in August 1978. The prototype completed its maiden flight on February 19, 1982, and it was FAA certified on December 21, 1982. Eastern Air Lines placed the initial 757-200 variant in commercial service on January 1, 1983. A package freighter (PF) variant entered service in September 1987 and a combi model in September 1988. The stretched 757-300 was launched in September 1996 and began service in March 1999. After 1,050 had been built for 54 customers, production ended in October 2004, while Boeing offered the largest 737 NG variants as a successor to the -200.
The Boeing YAL-1 airborne laser testbed was a modified Boeing 747-400F with a megawatt-class chemical oxygen iodine laser (COIL) mounted inside. It was primarily designed to test its feasibility as a missile defense system to destroy tactical ballistic missiles (TBMs) while in boost phase. The aircraft was designated YAL-1A in 2004 by the U.S. Department of Defense.
A wide-body aircraft, also known as a twin-aisle aircraft and in the largest cases as a jumbo jet, is an airliner with a fuselage wide enough to accommodate two passenger aisles with seven or more seats abreast. The typical fuselage diameter is 5 to 6 m. In the typical wide-body economy cabin, passengers are seated seven to ten abreast, allowing a total capacity of 200 to 850 passengers. Seven-abreast aircraft typically seat 160 to 260 passengers, eight-abreast 250 to 380, nine- and ten-abreast 350 to 480. The largest wide-body aircraft are over 6 m (20 ft) wide, and can accommodate up to eleven passengers abreast in high-density configurations.
The Boeing 787 Dreamliner is an American wide-body airliner developed and manufactured by Boeing Commercial Airplanes. After dropping its unconventional Sonic Cruiser project, Boeing announced the conventional 7E7 on January 29, 2003, which focused largely on efficiency. The program was launched on April 26, 2004, with an order for 50 aircraft from All Nippon Airways (ANA), targeting a 2008 introduction. On July 8, 2007, a prototype 787 without major operating systems was rolled out; subsequently the aircraft experienced multiple delays, until its maiden flight on December 15, 2009. Type certification was received in August 2011, and the first 787-8 was delivered in September 2011 before entering commercial service on October 26, 2011, with All Nippon Airways. (ANA).
The Boeing 747-400 is a large, long-range wide-body airliner produced by Boeing Commercial Airplanes, an advanced variant of the initial Boeing 747. The "Advanced Series 300" was announced at the September 1984 Farnborough Airshow, targeting a 10% cost reduction with more efficient engines and 1,000 nautical miles [nmi] of additional range. Northwest Airlines became the first customer with an order for 10 aircraft on October 22, 1985. The first 747-400 was rolled out on January 26, 1988, and made its maiden flight on April 29, 1988. Type certification was received on January 9, 1989, and it entered service with Northwest on February 9, 1989.
The Extended-range Twin-engine Operations Performance Standards (ETOPS) are safety standards set by the International Civil Aviation Organization (ICAO) for twin-engine commercial passenger aircraft operations. They are a safety measure intended to ensure that in the event of a single engine failure, an aircraft will still be able to reach a diversion airport using the remaining operational engine. This may be at a reduced speed and/or height, and usually applies to flights over water or remote lands, typically routes previously restricted to three- and four-engine aircraft.
The Pratt & Whitney JT9D engine was the first high bypass ratio jet engine to power a wide-body airliner. Its initial application was the Boeing 747-100, the original "Jumbo Jet". It was Pratt & Whitney's first high-bypass-ratio turbofan.
The Shuttle Carrier Aircraft (SCA) are two extensively modified Boeing 747 airliners that NASA used to transport Space Shuttle orbiters. One (N905NA) is a 747-100 model, while the other (N911NA) is a short-range 747-100SR. Both are now retired.
The Northrop Grumman E-10 MC2A was planned as a multi-role military aircraft to replace the Boeing 707-based E-3 Sentry and E-8 Joint STARS, the Boeing 747-based E-4B, and the RC-135 Rivet Joint aircraft in US military service. The E-10 was based on the Boeing 767-400ER commercial airplane.
The General Electric GEnx is an advanced dual rotor, axial flow, high-bypass turbofan jet engine in production by GE Aerospace for the Boeing 747-8 and 787. The GEnx succeeded the CF6 in GE's product line.
Boeing Commercial Airplanes (BCA) is a division of the Boeing Company. It designs, assembles, markets, and sells commercial aircraft, including the 737, 767, 777, and 787, along with freighter and business jet variants of most. The division employs nearly 35,000 people, many working at the company's division headquarters in Renton, Washington or at more than a dozen engineering, manufacturing, and assembly facilities, notably the Everett Factory and Renton Factory, and the South Carolina Factory.
The Boeing 747-8 is the final series of the large, long-range wide-body airliners in the Boeing 747 family from Boeing Commercial Airplanes. The 747-8 is the largest variant of the 747 and Boeing's largest aircraft. After introducing the 747-400, Boeing considered larger 747 versions as alternatives to the proposed double-deck Airbus A3XX, later developed as the Airbus A380. The stretched 747 Advanced was launched as the 747-8 on November 14, 2005, for a market forecast of 300 aircraft. The first 747-8F Freighter performed its maiden flight on February 8, 2010, and the passenger 747-8I Intercontinental followed suit on March 20, 2011. The cargo version was first delivered in October 2011 and the airliner began commercial service in June 2012.
The Boeing 747SP is a shortened version of the Boeing 747 wide-body airliner, designed for a longer range. It is the highest flying subsonic passenger airliner, with a service ceiling of 45,100 feet . Boeing needed a smaller aircraft to compete with the McDonnell Douglas DC-10 and Lockheed L-1011 TriStar tri-jet wide-bodies, introduced in 1971/1972. Pan Am requested a 747-100 derivative to fly between New York and the Middle East, a request also shared by Iran Air, and the first order came from Pan Am in 1973.
The ecoDemonstrator Program is a Boeing flight test research program, which has used a series of specially modified aircraft to develop and test aviation technologies designed to improve fuel economy and reduce the noise and ecological footprint of airliners.
The "City of Everett", is a Boeing 747, registered as N7470, that was built by Boeing as the prototype of the type. The aircraft rolled off the assembly line on September 30, 1968, and had its first flight on February 9, 1969. After the conclusion of the 747-flight testing program, Boeing retained the aircraft, using it for research and testing purposes until the early 1990s. The aircraft took its final flight on April 6, 1995, to the Museum of Flight in Seattle, Washington where it remains on display.
N747GE is a Boeing 747 aircraft that was used by General Electric Aircraft Engines as a testbed for several of the companies jet engines between 1992 and 2017, including the GE90 for the Boeing 777, at the time, the world’s largest jet engine.
B-HNL is a Boeing 777 aircraft that was built by Boeing Commercial Airplanes as the prototype of the 777. It rolled off the assembly line, originally registered as N7771, on 9 April 1994 and first flew on 12 June. It then spent 11 months in flight testing and certification and on 19 April 1995, the aircraft type was certified by the Federal Aviation Administration (FAA) and the European Joint Aviation Authorities (JAA) with United Airlines being its launch customer. Boeing then delivered the aircraft to Cathay Pacific in 2000, re-registered as B-HNL. It was retired 18 years later, performing its final flight on 18 September 2018 to the Pima Air & Space Museum where it was placed on static display. The Boeing 777 is the world's largest twin-engine jet and the first of two Boeing aircraft to feature fly-by-wire flight controls, followed by the Boeing 787 Dreamliner.