Northern Railway of Canada

Last updated
Northern Railway of Canada
Map
A map showing the route of the Northern at its maximum extent in the late 1800s. Only the portion from Toronto to Barrie and a small section running west remain in service, while the section north of Orillia has merged with another line. Northern Railway of Canada map.jpg
A map showing the route of the Northern at its maximum extent in the late 1800s. Only the portion from Toronto to Barrie and a small section running west remain in service, while the section north of Orillia has merged with another line.

The Northern Railway of Canada was a railway in the province of Ontario, Canada. It was the first steam railway to enter service in what was then known as Upper Canada. It was eventually acquired by the Grand Trunk Railway, and is therefore a predecessor to the modern Canadian National Railway (CNR). Several sections of the line are still used by CNR and GO Transit.

Contents

First known as the Toronto, Simcoe and Huron Railway, and then the Ontario, Simcoe and Huron Railway, the aim was to provide a portage route from the upper Great Lakes at Collingwood to Toronto. The plan for the railway was largely executed by Frederick Chase Capreol who was fired as manager of the company the day before the ground broke. [1] Financial difficulties and a government bailout led to a reorganization of the company as the Northern Railway of Canada in 1859. The line saw three major expansions; North Grey Railway extended the original mainline to Meaford, the North Simcoe Railway ran to the port town of Penetanguishene, and the Muskoka Branch ran northeast to Gravenhurst. This last expansion would be the starting point for the Northern and Pacific Junction Railway, connecting to the Canadian Pacific Railway mainline outside of North Bay. In 1887, the Grand Trunk Railway (GTR) gained a controlling interest, and the takeover was formalized in January 1888.

The line primarily served the port towns on Georgian Bay, where it faced increasing competition over the years. A combination of factors, including the Great Depression and the opening of a wider Welland Canal led to decreased use of the ports, and traffic fell. The closure of Collingwood Shipbuilding in 1986 led to the abandonment of the sections in Collingwood and to the west. The line is intact from Barrie all the way to Union Station, with the section between Toronto and Barrie used by GO Transit as the Barrie line. The Muskoka Junction has been combined with the Ontario Northland Railway to form CNR's mainline in the area north of Orillia. Section west of Collingwood now form the Georgian Trail. The Meaford station was dismantled after 1960 [2] and two stations along this section of the line remain:

Several sections of the line have been turned over to rail trail use. The section of the mainline from the western side of Collingwood to Meaford is now the high-quality 34 kilometres (21 mi) Georgian Trail, which is being expanded towards Owen Sound as the Tom Thompson Trail. Sections from Collingwood to Stayner have a trail running beside them. [lower-alpha 1] The North Simcoe Railway now forms the 22.5 kilometres (14.0 mi) Tiny Beaches Trail with sections south of this also in use.

History

Construction

Cover of the Act of the Province of Canada chartering the Ontario, Simcoe and Huron Railroad Union Company, 1851 Ontario simcoe and huron railroad union company.jpg
Cover of the Act of the Province of Canada chartering the Ontario, Simcoe and Huron Railroad Union Company, 1851

Talk about a line from Toronto to the upper Great Lakes has been recorded to as early as 1834, but no serious effort was taken until 1848 when Frederick Chase Capreol announced he was going to build a line to the Collingwood area under the name Toronto, Simcoe and Huron Railroad Union Company. He suggested a novel method to raise the funds for construction, using a $2 million lottery. The proposition was considered so scandalous it was put to a referendum and defeated. With the passage of the Railway Guarantee Act in 1849, Capreol joined forces with Charles Albert Berczy and chartered the company in July 1849, now having to raise conventional bonds for the first 75 miles (121 km), from which point government funding would be available.

Continued difficulties delayed construction, during which time the company re-chartered as the Ontario, Simcoe and Huron Union Railroad in 1850. [3] Capreol was fired as manager two days before the official sod turning, which was carried out on 15 October 1851 by Lady Elgin. The occasion was marked with a parade, to which an estimated 20,000 people attended of a total population of the city of only 31,000. Sandford Fleming took the sod and preserved it for history. A party later that night at St. Lawrence Hall was capped by a performance by Jenny Lind organized by P.T. Barnum.

In February 1853, the railway commissioned the construction of the first locomotive built in any British colony. [4] Early construction required the line to pass over the Oak Ridges Moraine, and it was not until 16 May 1853 that the first train reached Machell's Corners, today's Aurora, Ontario. Work north of there was much more rapid; the line reached Allandale in Barrie later in 1853, and Collingwood in 1855. Early traffic was dominated by agricultural products, earning it the nickname "Oats, Straw, and Hay". [5] [lower-alpha 2]

Northern Railway

Map of the Northern and its various expansions, circa 1877. Map of the North Simcoe Railway, and its connections.jpg
Map of the Northern and its various expansions, circa 1877.

In spite of reasonable volumes of traffic the line was never very profitable, and by 1858 the company was in financial difficulty. Frederick William Cumberland agreed to take control of the railway, after reorganizing as the Northern Railway Company of Canada in August 1858. Cumberland focused on profitability, cutting any train that didn't pay for itself, strongly resisting any expansion plans, and selling off their small fleet of ships operating on the Great Lakes.

View of the station in Collingwood, before the tracks were laid to the building. It burned down in 1873. Ontario, Simcoe and Huron Railway Collingwood Stn.jpg
View of the station in Collingwood, before the tracks were laid to the building. It burned down in 1873.

This resistance to expansion would ultimately backfire; in 1864 the company was approached by businessmen from Grey and Bruce counties about building a line through their burgeoning agricultural areas. Cumberland refused, stating that traffic would be too low. This left an opening for the formation of the Toronto, Grey and Bruce Railway (TG&B), which began construction toward Owen Sound in the spring of 1869.

Faced with their first real competition, the Northern chartered their own North Grey Railway on 15 February 1871, with plans to extend out of Collingwood to Meaford and authority to continue to Owen Sound. Construction between Collingwood and Meaford took place over the flat terrain between the Niagara Escarpment and the southern shore of Georgian Bay, and the line was completed on 1 April 1872. However, the expansion to Owen Sound was never completed; a combination of much more difficult terrain west of Meaford, the impending arrival of the TG&B, and demand for other expansions that were considered more important.

The company had continually been at odds with a number of groups in Simcoe County, especially those in Barrie who continually pushed for an expansion of the line into the downtown area. This was eventually solved through the late 1869 formation of the Toronto, Simcoe and Muskoka Junction Railway, or Muskoka Branch, which branched off at the Allendale station and ran north-east to Orillia and then on to Lake Muskoka outside Gravenhurst. The line was officially absorbed into the Northern in 1875.

Upset with the Northern remained, and demand for additional shipping routes on the Lakes led to intense building through the entire area. Businessmen in Hamilton took the opportunity to plan a second line to Barrie as the Hamilton and North-Western Railway (H&NW), with their proposed line passing through several towns along the way. The Northern countered with the suggestion for a South Simcoe Junction Railway, splitting off the existing line at King City or Bolton, and then meeting the Northern again west of Barrie and continuing on to Penetanguishene as the North Simcoe Railway. [6]

Comparing the two, business interests in Simcoe County and towns along the route demanded additional work from both companies. The H&NW finally agreed to run a branch line to Collingwood, splitting off the mainline some distance west of Newmarket, and added optional plans for an extension north from Barrie to Midland. Bonuses from Simcoe County totalling $300,000 were given to the H&NW, along with about $150,000 from towns along the route, some indication of the area's upset with the Northern. The line reached Barrie in 1877 and Collingwood in mid-1879. The H&NW never completed their northern expansion to Midland.

The Northern went ahead with one portion of their own expansion plans, dropping plans for the line from King City and instead splitting off west of Barrie to run north to Penetanguishene as the North Simcoe Railway. Construction began in January 1878.

Regauging, merger, buyout

In 1881, the entire line was regauged in sections. The entire mainline to Gravenhurst was converted to standard gauge in a single day on 9 July 1881. Work gangs were located all along the line waiting for the 7:45 AM mail train leaving Toronto, which carried a large card reading "Last Train". The crews moved the rails as soon as the train passed them, having already half driven the spikes.

The cost of construction, general financial difficulties of the era, and the enormous cost of an expansion to North Bay led the Northern and H&NW to organize a new joint management agreement, forming the Northern and North Western Railway in June 1879. This provided the funding and income needed to begin construction of the Northern and Pacific Junction Railway, which ran between Gravenhurst and Nipissing. This reached the Canadian Pacific Railway transcontinental lines at North Bay in 1886.

The Northern Railway was purchased by Grand Trunk Railway in 1888, and through its amalgamation, became part of the Canadian National Railway. CNR operated the mainline as the CN Newmarket Subdivision, selling off the branches to the west, and pulling up the section between Barrie and Orillia. It is now the Barrie line after its purchase by Metrolinx.

Locomotives

Lady Elgin, Engine No. 1 of the Ontario, Simcoe and Huron Union Railroad. Ontario Simcoe and Huron Railroad Union Company locomotive a138682.jpg
Lady Elgin, Engine No. 1 of the Ontario, Simcoe and Huron Union Railroad.

The first locomotive of the Ontario, Simcoe and Huron Union Railroad was named Lady Elgin and built in Portland, Maine. [7] It was named for Mary Lambton, second wife of James Bruce, 8th Earl of Elgin, the 42nd Governor General of Canada (1847–1854); she had also lifted a ceremonial silver spade for the sod-turning ceremony of the construction of the railway at Front Street and Simcoe Street on 15 October 1851. [7] Because of the high customs duties and shipping costs for the locomotive, executives of the Ontario, Simcoe and Huron Union Railroad decided that subsequent locomotives would be built in Ontario. [7]

Engine No. 2, The Toronto, seen in 1881 in Toronto. Ontario, Simcoe & Huron Railroad, Engine No. 2, "The Toronto", in Northern Railway yards, west side foot of Spadina Ave., Toronto, Ont. (16742309887).jpg
Engine No. 2, The Toronto, seen in 1881 in Toronto.

The James Good foundry Toronto Locomotive Works, located at the corner of Queen and Yonge Street, [8] would manufacture nine locomotives for the Ontario, Simcoe and Huron railway at an average cost of $5000. [5] [9] The first of these was named Toronto, built in its namesake city and the first locomotive built in Canada [10] or in any colony of the British Empire. [8] Commissioned in February 1853, its construction was completed by 16 April. [10] Over five days, it was rolled along temporary wooden rails on Queen Street and York Street, and on 26 April it was lifted onto the new OSH railway tracks on Front Street. [5] [10] Torontonians would monitor the locomotive's progress from the foundry to the Front Street tracks, and the event was the subject of a later artistic rendering. [8] Its first duty was three weeks later, transporting passengers and freight between the city of Toronto and the community of Machell's Corner, now known as Aurora. [5] This first duty is commemorated by a plaque installed in 1953 at Union Station in Toronto. [11] The Toronto and other locomotives were scrapped after Canadian railways converted from the 5'6" track gauge to the 4'812" American standard gauge starting in the 1870s. [9]

Finances

The railway earned revenues from passenger, freight, postal, and sundry other sources. The total earnings for 1 January to 7 July 1860 were $166,108.64, and for 1 January to 6 July 1861 were $210,177.46. [12]

YearWeekPassengerFreightPostal and sundryTotal
1860ending 14 April7012.86 [13]
ending 19 May8645.63 [14]
ending 7 July6824.88 [12]
ending 14 July6409.73 [15]
ending 8 August6564 [16]
1861ending 13 April8953.38 [13]
ending 18 May8724.89 [14]
ending 6 July [12] 1810.927168.3584.729064.00
ending 13 July [15] 1728.207412.9081.669222.81
ending 8 August9224 [16]

Recognition of the Ontario, Simcoe & Huron Railway

In 2010, the Ontario, Simcoe and Huron Railway was inducted to the North America Railway Hall of Fame. [17] The OS&HR was recognized for its contribution to railroading as a "Community, Business, Government or Organization" in the "National" category (pertaining specifically to the area in and around St. Thomas, Ontario.)

See also

Notes

  1. As of 2014 the condition of the rails through Stayner suggest this section of the line has been unused for some time. The line in this area is significantly rusted and heavily overgrown.
  2. Based on the original acronym for Ontario, Simcoe and Huron.

Related Research Articles

<span class="mw-page-title-main">Barrie</span> City in Ontario, Canada

Barrie is a city in Southern Ontario, Canada, about 90 kilometres (56 mi) north of Toronto. The city is within Simcoe County and located along the shores of Kempenfelt Bay, the western arm of Lake Simcoe. Although physically in Simcoe County, Barrie is politically independent. The city is part of the extended urban area in southern Ontario known as the Greater Golden Horseshoe. As of the 2021 census, the city's population was 147,829, while the census metropolitan area had a population of 212,667 residents.

<span class="mw-page-title-main">Simcoe County</span> County in Ontario, Canada

Simcoe County is located in the central portion of Southern Ontario, Canada. The county is just north of the Greater Toronto Area, stretching from the shores of Lake Simcoe in the east to Georgian Bay in the west. Simcoe County forms part of the Greater Golden Horseshoe area, a densely populated and industrialized region, centred on the Greater Toronto Area.

<span class="mw-page-title-main">Oro-Medonte</span> Township in Simcoe County, Ontario

Oro-Medonte is a township in south-central Ontario, Canada, on the northwestern shores of Lake Simcoe in Simcoe County.

King's Highway 11, commonly referred to as Highway 11, is a provincially maintained highway in the Canadian province of Ontario. At 1,784.9 kilometres (1,109.1 mi), it is the second longest highway in the province, following Highway 17. Highway 11 begins at Highway 400 in Barrie, and arches through northern Ontario to the Ontario–Minnesota border at Rainy River via Thunder Bay; the road continues as Minnesota State Highway 72 across the Baudette–Rainy River International Bridge. North and west of North Bay, Highway 11 forms part of the Trans-Canada Highway. The highway is also part of MOM's Way between Thunder Bay and Rainy River.

<span class="mw-page-title-main">Great Western Railway (Ontario)</span> Historic railway in Ontario, Canada

The Great Western Railway was a railway that operated in Canada West, today's province of Ontario, Canada. It was the first railway chartered in the province, receiving its original charter as the London and Gore Railroad on March 6, 1834, before receiving its final name when it was rechartered in 1845.

<span class="mw-page-title-main">Maple GO Station</span> Train station in Vaughan, Ontario

Maple GO Station is a train and bus station on GO Transit's Barrie line, located in Maple, Ontario, Canada. It is Ontario's oldest operating railway station, with passenger service dating back to 1853.

King's Highway 26, commonly referred to as Highway 26, is a provincially maintained highway in the Canadian province of Ontario, connecting the cities of Owen Sound and Barrie. Between these two cities, the highway serves the southern shoreline of Georgian Bay, passing through Meaford, Collingwood and Stayner, as well as passing the Blue Mountain Resort. In addition, the highway serves as the main route to Wasaga Beach, a popular recreational destination during the summer months.

Severn Bridge is a small community in the Town of Gravenhurst, of the District of Muskoka in the province of Ontario, Canada. It is located approximately 160 kilometres north of Toronto, on the Severn River, roughly halfway between Orillia and Gravenhurst. Its population was around 300 in 1992. It was founded in the nineteenth century. The village is served by important road, rail, water links and its postal services and rural route are handled in Washago, Ontario.

<span class="mw-page-title-main">Huron Central Railway</span> Railway in Ontario, Canada

The Huron Central Railway is a railway operating in northern Ontario, Canada. It is operated by Genesee & Wyoming Canada, the Canadian subsidiary of Genesee & Wyoming.

<span class="mw-page-title-main">Barrie Collingwood Railway</span>

The Barrie-Collingwood Railway, commonly referred to as the BCRY, is a shortline railway operating between the towns of Innisfil and Utopia in south central Ontario, Canada. The line was started in 1998 and runs on abandoned Canadian National (CN) trackage which was collectively purchased by the railway's namesake municipalities. The BCRY continues to run under the ownership of the City of Barrie and is operated by Cando Rail Services Ltd., based in Brandon, Manitoba.

<i>Barrie Advance</i>

The Barrie Advance is a weekly newspaper serving Barrie, Ontario.

<span class="mw-page-title-main">Frederick Chase Capreol</span> Canadian businessman and railway promoter

Frederick Chase Capreol was an English-born Canadian businessman and railway promoter. He is noted for having promoted the construction of the Toronto, Simcoe & Lake Huron Union Railroad.

King's Highway 169, commonly referred to as Highway 169, was a provincially maintained highway in the Canadian province of Ontario. The highway connected Highway 12 at Brechin, southeast of Orillia, with Highway 69 at Foot's Bay. The 91.40 km (56.79 mi) route included an 18.20 km (11.31 mi) concurrency with Highway 11 between Washago and Gravenhurst. Located within Simcoe County and the District Municipality of Muskoka, the highway also provided access to the community of Bala.

South River Railway Station is located in the community of South River in Ontario. The station was originally constructed by the Northern and Pacific Junction Railway, a subsidiary of the Northern and Northwestern Railway, in 1884. It was subsequently owned and operated by the Grand Trunk Railway and Canadian National Railways. It was a significant station stop along the historic route connecting Toronto to North Bay, and the Canadian Pacific Railway (1885). Transcontinental trains traveling between Toronto and Vancouver once frequented the station. It is likely the oldest wooden railway station in north-eastern Ontario. It is now a community heritage building in the town of South River.

The CN Newmarket Subdivision is a rail line in Ontario operated by Canadian National Railway (CNR). The original route runs northward from just west of Union Station in downtown Toronto, ending just south of North Bay. A short portion between Allandale in Barrie and Longford outside Orillia was lifted in 1996, and the southern section sold off in parts to Metrolinx. Metrolinx operates the southern section as their Barrie line, while CN continues to operate the northern section from Longford to North Bay. The severed northern section was never renamed, despite it no longer running through its namesake town. Access to Toronto is currently via the Bala Subdivision at Washago Junction, a short distance north of the remaining section's southern terminus, which is now used as a spur serving industries.

The Georgian Bay and Seaboard Railway (GB&S) was a former short-line railway in Ontario, Canada, owned and operated by Canadian Pacific Railway (CPR). The first sections opened in 1908, and the entire 140 kilometres (87 mi) route was fully completed in 1912.

The Hamilton and North-Western Railway (H&NW) is a former railway in Ontario, Canada. It ran north from Hamilton on the western end of Lake Ontario to Collingwood on Georgian Bay and Barrie on Lake Simcoe. Through the purchase of the Hamilton and Lake Erie Railway, the route continued south from Hamilton to Port Dover on Lake Erie.

<span class="mw-page-title-main">CN Bala Subdivision</span> Major railway service line in Ontario

The Canadian National Railway (CN) Bala Subdivision is a major railway line in Ontario, Canada. It runs between the provincial capital of Toronto in Southern Ontario and Capreol in Northern Ontario, where the line continues as the Ruel Subdivision. It forms part of CN's transcontinental mainline between Southern Ontario and Western Canada.

The Wellington, Grey and Bruce Railway (WG&BR) was a railway in Ontario, Canada. It ran roughly northwest from Guelph to the port town of Southampton on Lake Huron, a distance of 101 miles (163 km). It also had a 66-mile (106 km) branch line splitting off at Palmerston and running roughly westward to Kincardine, another port town. A branch running south from Southampton was built during the construction of the Bruce Nuclear Generating Station in the 1970s.

<span class="mw-page-title-main">MacTier Subdivision</span>

The MacTier Subdivision is a major rail line in Ontario, Canada, which is owned and operated by the Canadian Pacific Kansas City. The line stretches 126.9 mi (204.2 km) from Toronto in the south to MacTier in northern Muskoka. The MacTier Subdivision is the easternmost section of CPKC's present-day transcontinental route and is the railway's only connection between its eastern and western holdings which is fully within Canada. The route is single-track in its entirety and hosts only freight rail service. Between 1955 and 1978 the MacTier Subdivision hosted CPR's premier transcontinental passenger train, the Canadian, from Toronto to Vancouver. Operation of the Canadian was transferred to Via Rail in 1978, which switched over to CNR's Newmarket Subdivision, rejoining the former CPR route at Parry Sound, 23 mi (37 km) north of MacTier.

References

Citations

  1. Peppiatt, Liam. "Chapter 37: F. C. Capreol's Residences". Robertson's Landmarks of Toronto Revisited. Archived from the original on 2018-09-01.
  2. "Charles Cooper's Railway Pages - Northern Railway of Canada Group". www.railwaypages.com. Retrieved 20 April 2018.
  3. Charles Cooper, "The North Grey Railway",[ dead link ] October 2009
  4. Hind 1854, p. 76.
  5. 1 2 3 4 Filey 2014, Full steam ahead.
  6. A map of the proposed routes and extensions can be found here.
  7. 1 2 3 Boles 2009, p. 12.
  8. 1 2 3 Boles 2009, p. 13.
  9. 1 2 Mainer 1982.
  10. 1 2 3 North America Railway Hall of Fame: The Toronto.
  11. Boles 2009, p. 14.
  12. 1 2 3 Poor & Schultz 1861, p. 524, Railroad earnings.
  13. 1 2 Poor & Schultz 1861, p. 372, Railroad earnings.
  14. 1 2 Poor & Schultz 1861, p. 422, Railroad earnings.
  15. 1 2 Poor & Schultz 1861, p. 549, Railroad earnings.
  16. 1 2 Poor & Schultz 1861, p. 611, Railroad earnings.
  17. North America Railway Hall of Fame.

Bibliography

Further reading