Pensacola Dam | |
---|---|
Country | United States |
Location | Mayes County, near Disney and Langley, Oklahoma |
Coordinates | 36°28′19″N95°01′57″W / 36.47194°N 95.03250°W |
Status | In use |
Construction began | February 1938 |
Opening date | March 21, 1940 |
Construction cost | $21 million USD |
Dam and spillways | |
Impounds | Grand River |
Height | 150 ft (46 m) |
Length | Total: 6,565 ft (2,001 m) Multiple-arch section: 4,284 ft (1,306 m) Arches and spillways: 5,145 ft (1,568 m) |
Spillways | 3 |
Spillway type | Ogee-type, tainter gate-controlled |
Spillway capacity | 525,000 cu ft/s (14,900 m3/s) |
Reservoir | |
Creates | Grand Lake o' the Cherokees |
Total capacity | 1,672,000 acre⋅ft (2.062×109 m3) |
Surface area | 46,500 acres (18,800 ha) |
Maximum length | 66 mi (106 km) |
Normal elevation | 742 ft (226 m) (normal) |
Power Station | |
Operator(s) | Grand River Dam Authority |
Commission date | 1941 |
Turbines | 6 x 20 MW Francis-type |
Installed capacity | 120 MW |
Pensacola Dam | |
Architect | John Duncan Forsyth, W. R. Holway |
NRHP reference No. | 03000883 [1] [2] |
Added to NRHP | September 9, 2003 |
The Pensacola Dam, also known as the Grand River Dam, is a multiple-arch buttress dam located between the towns of Disney and Langley on the Grand River in Mayes County, Oklahoma. The dam is operated by the Grand River Dam Authority and creates Grand Lake o' the Cherokees. After decades of vision and planning, it was constructed between 1938 and 1940 for the purposes of hydroelectric power generation, flood control and recreation. It is Oklahoma's first hydroelectric power plant and is referred to as the longest multiple-arch dam in the world. [3] [4] [5]
The idea to construct a dam on the Grand River originated in the late 1800s with Henry C. Holderman, a Cherokee Nation citizen, who wanted to provide electric power to the Cherokee Nation. Holderman and a few colleagues soon conducted the first survey of the river in 1895 on their own handmade houseboat. [4] Holderman later left the United States at the age of 16 and worked on dam projects in India and Africa before returning to Oklahoma. He sold his land holdings and borrowed money from friends in order to purchase rights to the dam sites he had prospected. [3] Over several decades, Holderman and a group known as the "Rainbow Chasers" tried to secure funding to construct the dam; making several trips to Washington DC. [4]
The dam was almost built in 1914 by British capitalists but plans were halted due to World War I. In 1920, Holderman refused an offer given by Chicago businessmen and in 1929, the Wall Street Crash ended the hopes of Canadian engineers and investors building the dam for Holderman. [3] In DC, supporters of the dam, which later included state and federal officials, argued for the dam as a source of hydroelectric power and that it could stimulate the state's economy but local energy providers opposed the possibility of a state-run electric utility. [5] The onset of the Great Depression would revive and accelerate plans to construct the dam. Just prior in 1928, Oklahoma Representative Everette B. Howard secured $5,000 in funding for the U.S. Army Corps of Engineers to survey the Grand River. The results of the study concluded that it would cost over $6.2 million to construct a dam at the "Pensacola site" for flood control. [6] The name "Pensacola" was derived from the only available means of identifying the site at the time: an old store on a Cherokee plantation. [3] Because of limited state funding and a limited water supply on the Grand River, the project was not proposed at first for federal funding under the scope of hydroelectric power but instead for flood control. [6]
Oklahoma set up the Grand River Dam Authority (GRDA) on January 10, 1935. Eventually, on September 18, 1937, with the help of Oklahoma Representative Wesley E. Disney, Senator Elmer Thomas and engineer W. R. Holway, President Franklin D. Roosevelt approved $20 million in funding through the New Deal's Public Works Administration for the dam. The higher cost for the dam was attributed to a project that was approved for additional purposes, including hydroelectric power generation and recreation. [5] Additional costs for the dam were covered by the state government and by GRDA municipal bond auctions which appropriated or raised $11 million. [6] Disney had pushed much of the legislation for the dam, comparing the higher electric utility rates in Oklahoma compared to other states. [5] Senator Thomas helped appropriate additional state and public funding for the dam while also being instrumental in its legislation. [6]
Once approved and funded, Holway, the main engineer on the project and previous engineer of the nearby Spavinaw Dam, began survey and engineering work on October 25, 1937. The multiple-arch buttress design was adopted because materials were expensive at the time of the Great Depression and the limestone and chert foundation was considered "ideal" for the design. [3] [4] John Duncan Forsyth served as the architect for the dam and applied an Art Deco-style to it and the power house. [7] [8] Massman Construction Company out of Kansas City, Missouri was selected to construct the major superstructures, including the dam and power plant. Thousands of workers moved to the area to work on the dam before construction began and 3,000 eventually did, earning about $16 a week. [4]
Initial construction began in February 1938 and included the excavation of over 1,600,000 cu yd (1,200,000 m3) of earth and rock. Workers also constructed the first cofferdam on the east side of the river and left it in place until the arches were above the normal water level. Once this was achieved, workers removed the east cofferdam and constructed another on the west side of the river to divert water from the location of the future power plant. [3] On December 30, 1938, Massman began the first concrete pour. Pouring was conducted 24-hours a day for 20 months, totaling 510,000 cu yd (390,000 m3). A total of 23.9 million pounds of steel and iron were placed into the dam's structure to reinforce it. Major works on the dam were complete on March 21, 1940 and the lake was filled by the end of that year's summer. [4] The dam's power plant, with four original hydroelectric generators, began commercial operation in 1941. [9] The dam was finished in 26 months, ahead of schedule. Much of this was attributed to eastern Oklahoma having its 18 driest months on record during construction which alleviated obstacles from flooding. The federal government took control of the dam in November 1941 to aid in the World War II effort and returned it to the GRDA in 1946. [3]
The construction of the Pensacola Dam resulted in the loss of 1,285 acres (520 ha) of Cherokee land and 802 acres (325 ha) of the Quapaw Indian Agency, most of which belonged to the Seneca-Cayuga Tribe. This land was condemned and later flooded by the reservoir in 1940. Half of the Seneca-Cayuga Elk River ceremonial area was flooded as well. Although losing significant portions of land, some tribe members were forced to find work on the dam project. [10]
In the 1950s, two additional generators were added to the power station, bringing the total to six. [3] Between 1995 and 2003, the dam's six hydroelectric generators were upgraded, bringing the installed capacity of the power plant from 92 MW to 120 MW and increasing its generation 20%. Each autumn, a generator was taken out of service, upgraded and returned to service by spring of the next year. The sixth and final generator upgrade was completed in May 2003. Among the components principally upgraded were the turbine shafts and runners. [9]
Pensacola Dam is a multiple-arch buttress type consisting of 51 arches and one main spillway, two auxiliary. It has a maximum height of 150 ft (46 m) above the river bed. The total length of the dam and its sections is 6,565 ft (2,001 m) while the multiple-arch section is 4,284 ft (1,306 m) long and its combination with the spillway sections measure 5,145 ft (1,568 m). Each arch in the dam has a clear span of 60 ft (18 m) and each buttress is 24 ft (7.3 m) wide. The thickness of the buttress sidewalls ranges from 5 ft (1.5 m) at the base to 2.2 ft (0.67 m) at the crest. Inside of each buttress are 18 in (460 mm) thick transverse walls that act as "stiffeners". The buttresses were the widest of their type prior to 1938 and are designed to withstand 500 lbf/in2 (3,400 kPa; 35 kgf/cm2). [3]
The main spillway, part of the eastern end of the dam, is a 861 ft (262 m) long Ogee-type and utilizes twenty-one 25 ft (7.6 m) tall and 36 ft (11 m) wide tainter gates that are operated by two 60-ton hoists. [4] The auxiliary spillways are located about 1 mi (1.6 km) northeast of the dam and are controlled by another twenty-one 37 ft (11 m) wide and 15 ft (4.6 m) high tainter gates stretched over their combined 860 ft (260 m) length. The lip of the spillways lie at an elevation of 730 ft (220 m) above sea level while the tops of the gates are 755 ft (230 m). All three spillways have a combined maximum discharge of 525,000 cu ft/s (14,900 m3/s). [11] The two-lane State Highway 28 crosses over the top of the dam and a bridge that stretches over the main spillway. It is accessible by cars and trucks within weight. [4] [12] [13]
The dam's reservoir, Grand Lake o' the Cherokees (Grand Lake over the Cherokees), has a storage capacity of 1,672,000 acre⋅ft (2.062×109 m3) of which 540,000 acre⋅ft (670,000,000 m3) is flood storage. The reservoir's surface area is 46,500 acres (188 km2) and it extends 66 mi (106 km) upstream, creating 1,300 mi (2,100 km) of shoreline. Normal surface elevation is 742 ft (226 m) above sea level. [14] [15]
The dam's power station is located at the base of the dam's western end and its building is 279 ft (85 m) long, 72 ft (22 m) wide and 60 ft (18 m) tall. The building houses six 20 MW Francis turbine generators [15] that generate 335 million kWh annually and are each fed with their own individual penstock. [4] The power plant is designed to accommodate four additional generators. [3] It operates at its highest generation levels during the summer and lowest during the winter. [9] Just west of the power station is its substation and an observation house. [4]
The power station is regulated by the Federal Energy Regulatory Commission (FERC), under the Federal Power Act, with the current license issued in 1992 and set to expire in 2022. [16] The first license was granted by the FERC's predecessor, the Federal Power Commission in 1939. [17] When the reservoir's elevation exceeds 745 ft (227 m), control of the dam's discharges are transferred to the U.S. Army Corps of Engineers (USACE) who manage flood control in the larger basin. By federal regulation, the GRDA and the Corps of Engineers often coordinate discharges and reservoir levels. [18]
FERC and USACE regulated releases downstream from the dam have been the center of controversy in recent years. Since the dam is a multi-purpose project, there are conflicting interests between flood control, environmental conservation, recreation and hydroelectric power production. [19] The USACE may request minimal releases to prevent flooding in areas downstream and in hot mid-summer periods, releases can be minimal. This reduces dissolved oxygen (DO) levels in the river downstream. Such reductions resulted in the death of at least 5,000 fish downstream in July 2007. [19] [20] Significant releases from the dam have drawn opposition from people such as Oklahoma State Representative Doug Cox. He argues that the large releases effect the state's economy as an off-road recreational rock park is flooded downstream. [19] [21] Inconsistent releases are blamed for the overall problem and a better regulation of releases has been proposed while the GRDA is contemplating the installation of aeration devices and conducting studies along with other measures. [22] [23] [24] The 1992 FERC license had addressed problematic DO levels and required the GRDA to plan methods to monitor and improve DO levels to a consistency with state water quality standards. [17] [23]
In 2019-2020, residents of the town of Miami and neighboring Native American groups have objected to proposals to increase high water levels at Pensacola Dam and Grand Lake, on the grounds that when water backs up downstream, it can increase Miami's flooding problems. [25] [26] [27]
Between Memorial Day and Labor Day, the GRDA offers free tours of the dam. In 2010, there were over 9,000 visitors; a number which has been steadily growing in recent years. Additionally in 2010, the Ecosystems and Education Center was completed and has become part of the tour. [28] The center serves as a water and fish monitoring research lab while offering visitors information about hydropower and water/electrical safety. [29]
A dam is a barrier that stops or restricts the flow of surface water or underground streams. Reservoirs created by dams not only suppress floods but also provide water for activities such as irrigation, human consumption, industrial use, aquaculture, and navigability. Hydropower is often used in conjunction with dams to generate electricity. A dam can also be used to collect or store water which can be evenly distributed between locations. Dams generally serve the primary purpose of retaining water, while other structures such as floodgates or levees are used to manage or prevent water flow into specific land regions.
Mayes County is a county located in the U.S. state of Oklahoma. As of the 2020 census, the population was 39,046. Its county seat is Pryor Creek. Named for Samuel Houston Mayes, Principal Chief of the Cherokee Nation from 1895 to 1899, it was originally created at the Sequoyah Convention in August 1905.
Lake Overholser is a reservoir within the city limits of Oklahoma City, Oklahoma. Lake Overholser is formed by Overholser Dam on the North Canadian River in Oklahoma County, Oklahoma. The lake is 2.9 miles (4.7 km) west of Bethany and 4.4 mi (7.1 km) from Yukon. Lake Overholser is named after Ed Overholser who was the 16th Mayor of the City of Oklahoma City.
Oroville Dam is an earthfill embankment dam on the Feather River east of the city of Oroville, California, in the Sierra Nevada foothills east of the Sacramento Valley. At 770 feet (235 m) high, it is the tallest dam in the U.S. and serves mainly for water supply, hydroelectricity generation, and flood control. The dam impounds Lake Oroville, the second-largest reservoir in California, capable of storing more than 3.5 million acre-feet (1.1×10 12 US gal; 4.3×109 m3).
Grand Lake o' the Cherokees is situated in Northeast Oklahoma in the foothills of the Ozark Mountain Range. It is often simply called Grand Lake. It is administered by the Grand River Dam Authority (GRDA).
The New Waddell Dam is an embankment dam on the Agua Fria River in Maricopa County, Arizona, 35 miles (56 km) northwest of Phoenix. It serves as part of the Central Arizona Project (CAP) while also providing water for the Maricopa Water District. The dam creates Lake Pleasant with water from the Agua Fria and also the CAP aqueduct. In addition, it affords flood protection, hydroelectric power production and recreational opportunities. Construction on the dam began in 1985 and ended in 1994. Its reservoir submerged the Old Waddell Dam which was completed in 1927 after decades of planning.
Holtwood Dam is the oldest of three major dams built across the lower Susquehanna River, and the middle location of the three. It was constructed as the McCalls Ferry Dam between 1905 and 1910 by the Pennsylvania Water & Power (PW&P) Company. The dam was renamed Holtwood in honor of two company executives. PW&P merged with Pennsylvania Power & Light (PPL) in 1955. In 2015 Talen Energy took over PPL's generation and immediately sold the Holtwood plant to Brookfield Renewable Energy Partners to comply with federal antitrust requirements.
Tumut Pond Dam is a major gated concrete arch dam across the upper reaches of the Tumut River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
The Xiluodu Dam is an arch dam on the Jinsha River, i.e. the upper course of the Yangtze in China. It is located near the town of Xiluodu in Yongshan County of Yunnan Province but the dam straddles into Leibo County of Sichuan Province on the opposite side of the river. The primary purpose of the dam is hydroelectric power generation and its power station has an installed capacity of 13,860 MW. Additionally, the dam provides for flood control, silt control and its regulated water releases are intended to improve navigation downstream. Construction on the dam and power station began in 2005 and the first generator was commissioned in 2013, the last in 2014. It is operated by China Yangtze Power and is currently the fourth-largest power station in the world, as well as the fifth tallest dam world-wide.
Cherokee Dam is a hydroelectric dam located on the Holston River in Grainger County and Jefferson County, Tennessee, in the southeastern United States. The dam is operated and maintained by the Tennessee Valley Authority, which built the dam in the early 1940s to help meet urgent demands for energy at the outbreak of World War II. Cherokee Dam is 175 feet (53 m) high and impounds the 28,780-acre (11,650 ha) Cherokee Lake. It has a generating capacity of 136 megawatts. The dam was named for the Cherokee, a Native American tribe that controlled much of East Tennessee when the first European settlers arrived in the mid-18th century.
Richard B. Russell Dam is a concrete-gravity and embankment dam located on the Savannah River at the border of South Carolina and Georgia, creating Richard B. Russell Lake. The dam was built by the U.S. Army Corps of Engineers between 1974 and 1985 for the purposes of flood control, hydroelectricity, recreation, additional stream flow regulation, water supply, and fish and wildlife management. The concrete structure of the dam spans 1,904 feet (580 m) and rises 210 feet (64 m) above the riverbed, housing a hydro-power plant with an installed 600 megawatts (800,000 hp) capacity. The Richard B. Russell Dam is the final large dam completed by the U.S. Army Corps in the Savannah River Basin and lies 30 miles downstream from the Hartwell Dam (1962) and 37 miles (60 km) upstream from the J. Strom Thurmond Dam (1954).
The Grand River Dam Authority (GRDA) is an agency of the state of Oklahoma created to control, develop, and maintain the Grand River waterway. It was created by the Oklahoma state legislature in 1935, and is headquartered in Tulsa, Oklahoma. GRDA was designed to be self-funding from the sales of electricity and water. The state of Oklahoma was to provide no funding from taxes. The Authority was authorized to issue revenue bonds to fund large-scale capital investments.
Pit-3 Dam is a hydroelectric dam on the Pit River in northern California in the United States. It forms Lake Britton, and is owned by the Pacific Gas and Electric Company (PG&E).
The Koteshwar Dam is a gravity dam on the Bhagirathi River, located 22 km (14 mi) downstream of the Tehri Dam in Tehri District, Uttarakhand, India. The dam is part of the Tehri Hydropower Complex and serves to regulate the Tehri Dam's tailrace for irrigation and create the lower reservoir of the Tehri Pumped Storage Power Station. In addition, the dam has a 400 MW run-of-the-river power station. The project was approved in 2000 and its first generator was commissioned on 27 March 2011, the second on 30 March 2011. The construction site had been inundated in September 2010 by floods. The diversion tunnel was later blocked heaving/collapse of the hill in December 2010. The spillway was commissioned in Jan, 2011. The last two generators were made operational in March 2012.
The Jinshuitan Dam is an arch dam on Longquan Creek, a tributary of the Oujiang River in Zhejiang Province, China. It is located about 47 km (29 mi) southwest of Lishui. The dam and power station were completed in 1988 and serve several purposes to include hydroelectric power generation, water supply, flood control and navigation. It is the first dam of the Oujiang River cascade to be constructed and creates the second largest lake in Zhejiang.
The Hunanzhen Dam is a trapezoidal buttress dam on the Qiantang River, located 27 km (17 mi) south of Quzhou in Zhejiang Province, China. The primary purpose of the dam is hydroelectric power generation but it also serves to provide for flood control and irrigation water supply. Construction on the dam began in 1958 but was halted in 1961. It recommenced in 1970, the first generator was operational in 1979 and the project complete in 1980. The original installed capacity of the dam's power plant was 170 MW but the plant was expanded with an additional 100 MW generator, commissioned in 2006.
Lake Hudson, also known as Markham Ferry Reservoir, is a man-made reservoir in Mayes County, Oklahoma, United States, about 2 miles (3.2 km) northwest of Locust Grove, Oklahoma and 8 miles (13 km) southeast of Pryor, Oklahoma. It was created by the completion of the Robert S. Kerr Dam on the Grand River in 1964. It is managed by the Grand River Dam Authority (GRDA).
The Salina Pumped Storage Project is a 260-megawatt (350,000 hp) pumped-storage power station near Salina, Oklahoma. It is owned and operated by the Grand River Dam Authority (GRDA). Its construction was in response to growing power demands and a lack of dam sites on the Grand River. The first phase was completed in 1968 and the second in 1971. The upper reservoir for the power station is Lake W. R. Holway which was built on Saline Creek and the lower reservoir is Lake Hudson on the Grand River. During periods of lower power demand, water is pumped from Lake Hudson to Lake Holway and released back down through the pump-generators during periods of high energy demand.
Masinga Hydroelectric Power Station, also Masinga Dam, is an embankment dam on the Tana River, the longest river in Kenya and straddles the border of Embu and Machakos Counties in Eastern Province and is located about 106 km. (66 mi.), by road, northeast of Nairobi, Kenya's capital and largest city. Construction of the dam began in 1978, and was completed in 1981. It is owned by Tana and Athi Rivers Development Authority (TARDA). The dam is used for power production and is part of the Seven Forks Scheme.
In February 2017, heavy rainfall damaged Oroville Dam's main and emergency spillways, prompting the evacuation of more than 180,000 people living downstream along the Feather River and the relocation of a fish hatchery.
{{cite book}}
: |first=
has generic name (help)CS1 maint: multiple names: authors list (link){{cite book}}
: CS1 maint: multiple names: authors list (link)