Rossdale Power Plant | |
---|---|
![]() Rossdale Power Plant in 2010 | |
![]() | |
General information | |
Status | Decommissioned |
Address | 10155 96 Avenue NW, Edmonton, Alberta, Canada |
Coordinates | 53°31′45.512″N113°29′54.985″W / 53.52930889°N 113.49860694°W |
Construction started | 1932 (Low Pressure Plant) 1937 (Pumphouse No. 1) |
Closed | 2012 |
Owner | EPCOR Utilities |
Design and construction | |
Architect(s) | Maxwell Dewar (Low Pressure Plant) |
Official name | Rossdale Power Plant |
Designated | 17 October 2001 |
The Rossdale Power Plant is a decommissioned natural gas power plant located in Edmonton, Alberta, Canada. The power plant is located along the North Saskatchewan River in the Rossdale community, neighbouring the EPCOR water treatment plant to the east and a native burial ground to the west. The plant's remaining three remaining structures, the Low Pressure Plant, Pumphouse No. 1 and the Administration building are designated as Alberta Provincial Historic Resources. [1]
The first power plant on the Rossdale site dates back to 1902, [2] prior to Alberta entering Confederation in 1905. Originally built by Alex Taylor, owner of the Edmonton Electric Lighting and Power Company, the plant was sold to the City of Edmonton in 1902 for $13,000. [2] Various expansions would take place on the Rossdale site and Edmonton continued to grow. In 1928 a report would be commissioned projecting the power production requirements for the City of Edmonton, followed by a Five-Year Plan for expansion of the power capacity of the Rossdale site in 1930. [2]
In 1931 construction would begin on the Low Pressure Plant, designed by architect Maxwell Dewar, the Plant was designed to allow the continued expansion as more capacity was necessary. Dewar would eventually serve as the City of Edmonton's chief architect. The Low Pressure Plant was expanded in six phases [1] which were completed in the 1950s. [3] Elements of the construction of the Low Pressure Plant were completed by workers on relief during the Great Depression. [3]
The Rossdale Power Plant would be hailed as the largest municipal power plant in Canada, and the machines it housed, the most advanced in the nation. [2]
Pumphouse No. 1, a small one-storey reinforced concrete structure, [1] was completed in 1937 to the immediate south of the Low Pressure Plant. [3] Below the pumphouse is a series of lower chambers, catwalks which extend to a depth of 50 feet below grade. [1] The engineering on the pumphouse was completed by John Poole following his graduation from the University of Alberta. [4] Pumphouse No. 1 remains standing in the Edmonton River Valley, and continues to house the original machinery. [3]
Pumphouse No. 2 was constructed in 1955 between the Low Pressure Plant and the Walterdale Bridge. [3]
The Rossdale Power Plant remained the only electrical generation facility within the City of Edmonton until 1970, when it was estimated to generate one-quarter of the province's electricity. [3] At its peak the Rossdale Power Plant would produce 400MW of electricity. [5] The High Pressure Plant would be constructed on the site to the west of the Low Pressure Plant, and generation units 8, 9 and 10 would be commissioned in 1960, 1963 and 1966. [5] The Low Pressure Plant which housed steam turbine units 1 to 5 would be decommissioned in 1993, and the gas generation equipment was subsequently removed. [5]
In 1999 EPCOR Utilities would file an application with the Alberta Energy and Utilities Board to add 170MW natural gas-fired turbine (designated RD 11) to the Rossdale Power Plant, the application was subsequently approved in 2001. [5] However, a few months later the Government of Alberta would designate the Rossdale Power Plant a Provincial Historical Resource, ending any hope of new power generation constructed at the site.
The Rossdale Power Plant's remaining generators (8, 9 and 10) with a capacity of 203MW [6] would be decommissioned in 2008, with the process completing in 2012. [3] The Rossdale Power Plant and surrounding land is owned by the municipally-controlled corporation EPCOR Utilities. [3]
Following the decommissioning of the Rossdale Power Plant, Edmonton City Council unanimously voted to invest $3-million to stabilize the Power Plant over a 10-year period in August 2013, with construction proceeding on the Rossdale Power Plant's roof and exterior walls beginning in Spring 2015. [7] A feasibility report commissioned by the City of Edmonton pegged the cost of upgrading the facility to be suitable for commercial tenants at $87.3-million. [8]
In September 2019 the Edmonton City Council approved a redevelopment plan for the Rossdale area called River Crossing, which would see much of the Rossdale community redeveloped incorporating mixed-use development and new public park spaces. [9] The plan called for the restoration and use of the Rossdale Power Plant structures. [9]
In an effort to showcase the historic Rossdale Power Plant, walking tours of the interior began in August of 2020. [10]
The Rossdale Power Plant was, at least in part, designed by Maxwell Dewar, and the design reflects characteristics of the late-1920s and early 1930s. The design was influenced by contemporary industrial and factory architecture from the United States, featuring steel and brick construction. [1] The Rossdale Power Plant remains one of the oldest surviving examples of mid-twentieth century industrial design in Alberta. [1] The Low Pressure Plant is highlighted by the numerous glass block factory windows and seven roof stacks on top of the structure. [1]
The CANDU is a Canadian pressurized heavy-water reactor design used to generate electric power. The acronym refers to its deuterium oxide moderator and its use of uranium fuel. CANDU reactors were first developed in the late 1950s and 1960s by a partnership between Atomic Energy of Canada Limited (AECL), the Hydro-Electric Power Commission of Ontario, Canadian General Electric, and other companies.
The British Columbia Hydro and Power Authority, operating as BC Hydro, is a Canadian electric utility in the province of British Columbia. It is the main electricity distributor, serving more than 4 million customers in most areas, with the exception of the City of New Westminster, where the city runs its own electrical department and portions of the West Kootenay, Okanagan, the Boundary Country and Similkameen regions, where FortisBC, a subsidiary of Fortis Inc. directly provides electric service to 213,000 customers and supplies municipally owned utilities in the same area. As a provincial Crown corporation, BC Hydro reports to the BC Ministry of Energy, Mines and Low Carbon Innovation, and is regulated by the British Columbia Utilities Commission (BCUC). Its mandate is to generate, purchase, distribute and sell electricity.
Fort Saskatchewan is a city along the North Saskatchewan River in Alberta, Canada. It is 25 kilometres (16 mi) northeast of Edmonton, the provincial capital. It is part of the Edmonton census metropolitan area and one of 24 municipalities that constitute the Edmonton Metropolitan Region Board. Its population in the 2021 federal census was 27,464.
Kevin Taft is an author, consultant, speaker, and former provincial politician in Alberta, Canada. Prior to his election, he worked in various public policy roles (1973-2000) in the Government of Alberta, private and non-profit sectors, in the areas of health, energy, and economic policy. From 1986 to 1991 he was CEO of the ExTerra Foundation, which conducted paleontological expeditions in China's Gobi Desert, Alberta's badlands, and the Canadian Arctic. He is the author of five books as well as several research studies and articles on political and economic issues in Alberta. In the mid-late 1990s Dr. Taft wrote two books critical of the ruling Progressive Conservatives. The Premier of Alberta at the time insulted Taft in the Alberta Legislature, which solidified Taft's desire to run for office to defend his perspective on public policy. He was an Alberta Liberal member of the Legislative Assembly of Alberta from 2001 to 2012, and Leader of the Official Opposition from 2004 to 2008. Taft is currently an author, speaker, and consultant. He is father to two adult sons and currently resides in Edmonton, Alberta, Canada with his partner Jeanette Boman.
The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.
TransAlta Corporation is an electricity power generator and wholesale marketing company headquartered in Calgary, Alberta, Canada. It is a privately owned corporation and its shares are traded publicly. It operates 76 power plants in Canada, the United States, and Australia. TransAlta operates wind, hydro, natural gas, and coal power generation facilities. The company has been recognized for its leadership in sustainability by the Dow Jones Sustainability North America Index, the FTSE4Good Index, and the Jantzi Social Index. TransAlta is Canada's largest investor-owned renewable energy provider.
The Saxton Nuclear Experiment Station, also known as the Saxton Nuclear Generating Station or Saxton Nuclear Experimental Corporation Facility, was a small nuclear power plant located in Bedford County, near Saxton, Pennsylvania.
EPCOR Utilities Inc., formerly known as Edmonton Power Corporation, is a utility company based in Edmonton, Alberta. EPCOR manages water, wastewater, natural gas, and electricity distribution systems in the Canadian provinces of Alberta, British Columbia, and Ontario, and the American states of Arizona, New Mexico, and Texas. In addition, the company maintains and provides engineering support for traffic signals and street lights within the City of Edmonton, as well as other cities in Alberta. EPCOR is a municipally owned corporation with the City of Edmonton as sole shareholder.
Downtown Edmonton is the central business district of Edmonton, Alberta. Located at the geographical centre of the city, the downtown area is bounded by 109 Street to the west, 105 Avenue to the north, 97 Street to the east, 97 Avenue and Rossdale Road to the south, and the North Saskatchewan River to the southeast.
Rossdale is a river valley neighbourhood in the city of Edmonton, Alberta, Canada, located immediately south of the downtown core. It is a popular residential neighbourhood with easy access to downtown, the University of Alberta, the Edmonton river valley park system, and other amenities.
Riverdale is a river valley neighbourhood located just east of the downtown core in the city of Edmonton, Alberta, Canada. Its boundaries on the east and south are the North Saskatchewan River from which the name of the community is associated with. Immediately across the river to the south is another Edmonton river valley neighbourhood--Cloverdale. Riverdale shares the approaches to the Low Level Bridge with a third river valley neighbourhood, Rossdale. To the north, is the neighbourhood of Boyle Street. Riverdale's boundary with the downtown core runs approximately along Grierson Hill Road.
Canada has access to all main sources of energy including oil and gas, coal, hydropower, biomass, solar, geothermal, wind, marine and nuclear. It is the world's second largest producer of uranium, third largest producer of hydro-electricity, fourth largest natural gas producer, and the fifth largest producer of crude oil. In 2006, only Russia, the People's Republic of China, the United States and Saudi Arabia produce more total energy than Canada.
Capital Power Income L.P. was a limited partnership that was engaged in the generation, acquisition, and sale of electricity in Canada and the United States.
Epcor Tower is an office tower in downtown Edmonton, Alberta, Canada. The tower is capped by two spires that are capped with four flagpoles each. When the spires were taken into account, it was the tallest building in Edmonton from 2011 to 2017. Epcor Tower is the first building in the Station Lands project. Tenants includes EPCOR Utilities, Capital Power, Ernst & Young, Intuit, and BioWare.
The electricity policy of Alberta, enacted through several agencies, is to create an electricity sector with a competitive market that attracts investors, while providing consumers with reliable and affordable electricity, as well as reducing harmful pollution to protect the environment and the health of Albertans, according to their 2022 website.
The first inhabitants hunted and gathered in the area that is now Edmonton, Alberta, Canada, around 3,000 BC and perhaps as early as 10,000 BC, when an ice-free corridor opened up as the last ice age ended and timber, water, and wildlife became available in the region.
Capital Power is a Canadian independent power generation company based in Edmonton, Alberta, Canada. It develops, acquires, owns and operates power generation facilities using a variety of energy sources.
The Alberta Electric System Operator (AESO) is the non-profit organization responsible for operating Alberta, Canada's power grid. AESO oversees the planning and operation of the Alberta Interconnected Electric System (AIES) in a "safe, reliable, and economical" manner. It is mandated by provincial legislation to act in the public interest and cannot own any transmission, distribution or generation assets.
AltaLink, L.P. is one of Canada's largest electricity transmission companies. Based in Alberta, AltaLink is responsible for the maintenance and operation of approximately 12,000 kilometres of transmission lines and 280 substations in Alberta. AltaLink is owned by Berkshire Hathaway Energy.
The Papaschase are a group of Cree people descended from Chief Papaschase's Band of the 19th century, who were a party to Treaty 6 with Canada. A modern-day group of Papaschase descendants are working to advance their treaty rights and reclaim their reserve's land or get compensation for its loss. They claim the reserve was surrendered unlawfully in 1888, but they have not been recognized yet by the Canadian Government, however they are recognized as a nation by the Assembly of First Nations Alexander First Nation #134 #134a #134b #143