General information
StatusDecommissioned
Address10155 96 Avenue NW, Edmonton, Alberta, Canada
Coordinates 53°31′45.512″N113°29′54.985″W / 53.52930889°N 113.49860694°W / 53.52930889; -113.49860694 Coordinates: 53°31′45.512″N113°29′54.985″W / 53.52930889°N 113.49860694°W / 53.52930889; -113.49860694
Construction started1932 (Low Pressure Plant)
1937 (Pumphouse No. 1)
Closed2012
Owner EPCOR Utilities
Design and construction
ArchitectMaxwell Dewar (Low Pressure Plant)
Official nameRossdale Power Plant
Designated17 October 2001

The Rossdale Power Plant is a decommissioned natural gas power plant located in Edmonton, Alberta, Canada. The power plant is located along the North Saskatchewan River in the Rossdale community, neighbouring the EPCOR water treatment plant to the east and a native burial ground to the west. The plant's remaining three remaining structures, the Low Pressure Plant, Pumphouse No. 1 and the Administration building are designated as Alberta Provincial Historic Resources. [1]

Contents

History

The first power plant on the Rossdale site dates back to 1902, [2] prior to Alberta entering Confederation in 1905. Originally built by Alex Taylor, owner of the Edmonton Electric Lighting and Power Company, the plant was sold to the City of Edmonton in 1902 for $13,000. [2] Various expansions would take place on the Rossdale site and Edmonton continued to grow. In 1928 a report would be commissioned projecting the power production requirements for the City of Edmonton, followed by a Five-Year Plan for expansion of the power capacity of the Rossdale site in 1930. [2]

Low Pressure Plant

In 1931 construction would begin on the Low Pressure Plant, designed by architect Maxwell Dewar, the Plant was designed to allow the continued expansion as more capacity was necessary. Dewar would eventually serve as the City of Edmonton's chief architect. The Low Pressure Plant was expanded in six phases [1] which were completed in the 1950s. [3] Elements of the construction of the Low Pressure Plant were completed by workers on relief during the Great Depression. [3]

The Rossdale Power Plant would be hailed as the largest municipal power plant in Canada, and the machines it housed, the most advanced in the nation. [2]

Pumphouse

Pumphouse No. 1, a small one-storey reinforced concrete structure, [1] was completed in 1937 to the immediate south of the Low Pressure Plant. [3] Below the pumphouse is a series of lower chambers, catwalks which extend to a depth of 50 feet below grade. [1] The engineering on the pumphouse was completed by John Poole following his graduation from the University of Alberta. [4] Pumphouse No. 1 remains standing in the Edmonton River Valley, and continues to house the original machinery. [3]

Pumphouse No. 2 was constructed in 1955 between the Low Pressure Plant and the Walterdale Bridge. [3]

Later history

The Rossdale Power Plant remained the only electrical generation facility within the City of Edmonton until 1970, when it was estimated to generate one-quarter of the province's electricity. [3] At its peak the Rossdale Power Plant would produce 400MW of electricity. [5] The High Pressure Plant would be constructed on the site to the west of the Low Pressure Plant, and generation units 8, 9 and 10 would be commissioned in 1960, 1963 and 1966. [5] The Low Pressure Plant which housed steam turbine units 1 to 5 would be decommissioned in 1993, and the gas generation equipment was subsequently removed. [5]

In 1999 EPCOR Utilities would file an application with the Alberta Energy and Utilities Board to add 170MW natural gas-fired turbine (designated RD 11) to the Rossdale Power Plant, the application was subsequently approved in 2001. [5] However, a few months later the Government of Alberta would designate the Rossdale Power Plant a Provincial Historical Resource, ending any hope of new power generation constructed at the site.

The Rossdale Power Plant's remaining generators (8, 9 and 10) with a capacity of 203MW [6] would be decommissioned in 2008, with the process completing in 2012. [3] The Rossdale Power Plant and surrounding land is owned by the municipally-controlled corporation EPCOR Utilities. [3]

Future use

Rossdale Power Plant in 2010. Power Outage (32827973).jpeg
Rossdale Power Plant in 2010.

Following the decommissioning of the Rossdale Power Plant, Edmonton City Council unanimously voted to invest $3-million to stabilize the Power Plant over a 10-year period in August 2013, with construction proceeding on the Rossdale Power Plant's roof and exterior walls beginning in Spring 2015. [7] A feasibility report commissioned by the City of Edmonton pegged the cost of upgrading the facility to be suitable for commercial tenants at $87.3-million. [8]

In September 2019 the Edmonton City Council approved a redevelopment plan for the Rossdale area called River Crossing, which would see much of the Rossdale community redeveloped incorporating mixed-use development and new public park spaces. [9] The plan called for the restoration and use of the Rossdale Power Plant structures. [9]

The Rossdale Power Plant has been promoted as the northern terminus for proposed Edmonton Gondola Project. [10] In an effort to showcase the historic Rossdale Power Plant, walking tours of the interior began in August of 2020. [11]

Architecture

The Rossdale Power Plant was, at least in part, designed by Maxwell Dewar, and the design reflects characteristics of the late-1920s and early 1930s. The design was influenced by contemporary industrial and factory architecture from the United States, featuring steel and brick construction. [1] The Rossdale Power Plant remains one of the oldest surviving examples of mid-twentieth century industrial design in Alberta. [1] The Low Pressure Plant is highlighted by the numerous glass block factory windows and seven roof stacks on top of the structure. [1]

Related Research Articles

Kevin Taft

Kevin Taft is a best-selling author, consultant, speaker, and former provincial politician in Alberta, Canada. Prior to his election, he worked in various public policy roles (1973-2000) in the Government of Alberta, private and non-profit sectors, in the areas of health, energy, and economic policy. From 1986 to 1991 he was CEO of the ExTerra Foundation, which mounted one of history's largest paleontological expeditions in China's Gobi Desert, Alberta's badlands, and the Canadian Arctic. He is the author of five books and many research studies and articles on political and economic issues in Alberta. In the mid-late 1990s Dr. Taft wrote two books critical of the ruling Progressive Conservatives, causing the Premier of Alberta at the time to insult him in the Alberta Legislature and solidifying Taft's desire to run for office to defend his perspective on public policy. He was an Alberta Liberal member of the Legislative Assembly of Alberta from 2001 to 2012, and Leader of the Official Opposition from 2004 to 2008. Taft continues his career as an author, speaker, and consultant. He is father to two adult sons and currently resides in Edmonton, Alberta, Canada with his partner Jeanette Boman.

1st Alberta Legislature

The 1st Alberta Legislative Assembly was in session from November 9, 1905, to Monday, March 22, 1909, with the membership of the assembly determined by the results of the 1905 Alberta general election which was held on November 9, 1905. The Legislature officially began on November 9, 1905, and continued until the fourth session was prorogued on February 25, 1909, and dissolved the next day on February 26, 1909, prior to the 1909 Alberta general election.

Manulife Place

Manulife Place is a highrise office building and shopping mall in Edmonton, Alberta, Canada. It was completed in 1983 and designed by Clifford Lawrie Bolton Ritchie Architects. It is located at the corner of 102 Avenue and 101 Street in Downtown Edmonton. Naming rights of the complex are held by insurer Manulife.

ENMAX

ENMAX Corporation (ENMAX) is a vertically integrated utility that generates and distributes electricity, natural gas, renewable energy, and value-added services to customers in Alberta, Canada.

EPCOR Utilities

EPCOR Utilities Inc., formerly known as Aqualta and Eltec, is a utility company based in Edmonton, Alberta. EPCOR manages water, wastewater, natural gas, and electricity distribution systems in the Canadian provinces of Alberta, British Columbia, and Ontario, and the American states of Arizona, New Mexico, and Texas. In addition, the company maintains and provides engineering support for traffic signals and street lights within the City of Edmonton, as well as other cities in Alberta. EPCOR is a municipally owned corporation with the City of Edmonton as sole shareholder.

23rd Alberta Legislature

The 23rd Alberta Legislative Assembly was in session from August 30, 1993, to February 11, 1997, with the membership of the assembly determined by the results of the 1993 Alberta general election held on June 15, 1993. The Legislature officially resumed on August 30, 1993, and continued until the fifth session was prorogued and dissolved on February 11, 1997, prior to the 1997 Alberta general election on March 11, 1997.

Nanticoke Generating Station

The Nanticoke Generating Station is a 44 MW solar power station which started operation in April 2019. Previously from 1972 to 2013, it was the largest coal-fired power plant in North America. At full capacity, it could provide 3,964 MW of power into the southern Ontario power grid from its base in Nanticoke, Ontario, Canada, and provided as much as 15% of Ontario's electricity.

Downtown Edmonton Neighbourhood in Edmonton, Alberta, Canada

Downtown Edmonton is the central business district of Edmonton, Alberta. Located at the geographical centre of the city, the downtown area is bounded by 109 Street to the west, 105 Avenue to the north, 97 Street to the east, 97 Avenue and Rossdale Road to the south, and the North Saskatchewan River to the southeast.

Rossdale, Edmonton Neighbourhood in Edmonton, Alberta, Canada

Rossdale is a river valley neighbourhood in the city of Edmonton, Alberta, Canada, located immediately south of the downtown core. It is a popular residential neighbourhood with easy access to downtown, the University of Alberta, the Edmonton river valley park system, and other amenities.

Riverdale, Edmonton Neighbourhood in Edmonton, Alberta, Canada

Riverdale is a river valley neighbourhood located just east of the downtown core in the city of Edmonton, Alberta, Canada. Its boundaries on the east and south are the North Saskatchewan River from which the name of the community is associated with. Immediately across the river to the south is another Edmonton river valley neighbourhood--Cloverdale. Riverdale shares the approaches to the Low Level Bridge with a third river valley neighbourhood, Rossdale. To the north, is the neighbourhood of Boyle Street. Riverdale's boundary with the downtown core runs approximately along Grierson Hill Road.

Whitewood is a closed Albertan coal mine located just north of Lake Wabamun, about sixty-five kilometres west of Edmonton, Alberta. Owned by the TransAlta Corporation of Calgary, the mine was run by Luscar Ltd. (Edmonton) since that company acquired the extraction contract from Fording Coal Ltd. (Calgary) in 2003 until closure in 2010.

Epcor Tower

Epcor Tower is an office tower in downtown Edmonton, Alberta, Canada. The tower is capped by two spires that are capped with four flagpoles each. When the spires were taken into account, it was the tallest building in Edmonton from 2011 to 2017. Epcor Tower is the first building in the Station Lands project. Tenants includes EPCOR Utilities, Capital Power, Ernst & Young, Intuit, and BioWare.

In 1996, Alberta began to restructure its electricity market away from traditional cost-of-service regulation to a market-based system. The market now includes a host of buyers and sellers, and an increasingly diverse infrastructure.

Natural gas was the Canada's third largest source of energy production in 2018, representing 22.3% of all energy produced from fuels in the country. By contrast, the share of fuel-based energy production from natural gas in 2013 was 17.0%, indicating a growth rate of approximately 1.06% per year.

History of Edmonton

The first inhabitants settled in the area that is now Edmonton, Alberta, Canada around 3,000 BC and perhaps as early as 10,000 BC, when an ice-free corridor opened up as the last ice age ended and timber, water, and wildlife became available in the region.

The timeline of Edmonton history is a chronology of significant events in the history of Edmonton, Alberta.

Capital Power Corporation Canadian power generation

Capital Power is an independent power generation company based in Edmonton, Alberta, Canada. Capital Power develops, acquires, owns and operates power generation facilities using a variety of energy sources. Capital Power owns approximately 5,100 megawatts of power generation capacity at 25 facilities across North America.

Genesee Generating Station is a coal fired station owned by Capital Power Corporation, located near Genesee, Alberta, Canada; 71 km southwest of Edmonton, Alberta. Fuel is provided by the nearby coal mine, a joint venture of EPCOR and Westmoreland Prairie Resources. The Genesee cooling pond is an artificial pond covering 735 hectares. The pond is topped up with water from the North Saskatchewan River.

The Papaschase are a group of Cree people descended from Chief Papaschase's Band of the 19th century, who were a party to Treaty 6 with Canada. A modern-day group of Papaschase descendants are working to advance their treaty rights and reclaim their reserve lands, which they claim were surrendered unlawfully in 1888, but they have not been recognized yet by the Canadian government.

References

  1. 1 2 3 4 5 6 7 "Rossdale Power Plant". Canada's Historic Places. Canadian Register of Historic Places . Retrieved 20 July 2020.CS1 maint: discouraged parameter (link)
  2. 1 2 3 4 "Rossdale Power Plant". Heritage Resource Management Information System. Government of Alberta. Retrieved 20 July 2020.CS1 maint: discouraged parameter (link)
  3. 1 2 3 4 5 6 7 8 "Rossdale Power Plant". edmonton.ca. City of Edmonton. Retrieved 20 July 2020.CS1 maint: discouraged parameter (link)
  4. Zwarun, Suzanne (2 February 2007). "PCL co-founder, John Poole, leaves lasting legacy in construction field". canada.constructconnect.com. Daily Construction News. Retrieved 20 July 2020.CS1 maint: discouraged parameter (link)
  5. 1 2 3 4 EPCOR Power Development Corporation and EPCOR Generation Inc. - Rossdale Power Plant Unit 11 (RD 11) Application No. 990289 (PDF). Calgary: Alberta Energy and Utilities Board. May 2001. Retrieved 21 July 2020.CS1 maint: discouraged parameter (link)
  6. Government of Alberta, "Electricity Statistics", Alberta Energy, archived from the original on 26 August 2010, retrieved 27 August 2010CS1 maint: discouraged parameter (link)
  7. "Rossdale Power Plant". nationaltrustcanada.ca. National Trust for Canada . Retrieved 20 July 2020.CS1 maint: discouraged parameter (link)
  8. Ramsay, Caley (10 February 2013). "Future of the old Rossdale power plant up in the air". Global News . Edmonton. Retrieved 21 July 2020.CS1 maint: discouraged parameter (link)
  9. 1 2 Cook, Dustin (3 September 2019). "City moving ahead on power plant reuse, riverfront promenade as part of Rossdale redevelopment". Edmonton Journal . Retrieved 21 July 2020.CS1 maint: discouraged parameter (link)
  10. Parsons, Paige (28 January 2020). "Gondola over Edmonton river valley is feasible, proponent's study finds". Canadian Broadcasting Corporation . Edmonton. Retrieved 20 July 2020.CS1 maint: discouraged parameter (link)
  11. Lawrence, Jeff (17 June 2020). "Historic Rossdale Power Plant to host walking tours this August". CTV News . Edmonton. Retrieved 20 July 2020.CS1 maint: discouraged parameter (link)