Stafford and Uttoxeter Railway

Last updated

Contents

Stafford and
Uttoxeter Railway
BSicon CONTg.svg
BSicon HST.svg
Uttoxeter
BSicon dCONTgq.svg
BSicon xABZgr.svg
BSicon exTUNNEL1.svg
Bromshall Tunnel
BSicon exHST.svg
Grindley
BSicon exHST.svg
Chartley
BSicon dCONTgq.svg
BSicon xKRZo.svg
BSicon dCONTfq.svg
BSicon exHST.svg
Ingestre and Weston
BSicon exHST.svg
Salt and Sandon
BSicon exHST.svg
Stafford Common
BSicon dCONTgq.svg
BSicon xABZg+r.svg
BSicon BHF.svg
Stafford
BSicon CONTf.svg

The Stafford and Uttoxeter Railway was authorised by Act of Parliament on 29 July 1862, [1] to build a line between the towns of Stafford and Uttoxeter in Staffordshire, England. It opened for traffic in 1867. It opened on 23 December 1867. Construction cost had much exceeded estimates, and income was poor, so that the company was always in financial difficulty. It was placed in receivership in 1875. The Great Northern Railway (GNR) had running powers to Uttoxeter and was persuaded to acquire the company, which it did in 1881. The GNR spent a considerable sum on improving the line, but it never made money and it was closed to passengers on 4 December 1939. Goods traffic ceased in 1951, except for a short stub to RAF Stafford; this too closed in 1975.

Before the Stafford and Uttoxeter Railway

The Stafford & Uttoxeter Railway system in 1867 Stafford & uttox 1867.png
The Stafford & Uttoxeter Railway system in 1867

Prior to the establishment of railways, Stafford was an important manufacturing town; especially dominant was the footwear industry, supported by ancillary manufactures; in addition salt was extracted, and to a lesser extent gypsum. Later a number of heavy engineering works were established in the town The intervening land between Stafford and Uttoxeter was high quality grazing land, devoted to cattle farming. Uttoxeter itself had numerous smaller-scale manufacturing activities, but later became the home of J C Bamford, a large-scale maker of, at first, agricultural machinery, and later construction and excavating machines. [2]

On 4 July 1837 the Grand Junction Railway opened, forming a north–south trunk link through Stafford. The London and North Western Railway (LNWR) was formed on 16 July 1846, consolidating the GJR with other trunk lines, connecting London and Manchester and Liverpool. [3] The North Staffordshire Railway (NSR) was incorporated in 1845, its scope being amplified in 1846. It was a compact and dense system centred on Stoke-on-Trent. [4] In 1848 the line between Stoke-on-Trent and Uttoxeter and on to Burton upon Trent was opened, and in the following year the line from Macclesfield was opened. The two lines converged at Uttoxeter Junction station. [5] Thus Stafford and Uttoxeter were well served by railway connections. Proposals began to be put forward for an east–west line across the intervening agricultural terrain, and after a number of unfulfilled projects, ideas for a Stafford and Uttoxeter Railway began to take shape. In support of the line were the interests of the growing shoe-making industry in Stafford and the Leighton Ironworks in Uttoxeter, of the Bamford family. [2]

Authorisation and construction

A public meeting took place in Stafford on 31 March 1862 to confirm interest in a railway connecting Stafford and Uttoxeter; general approval was expressed, and it was resolved to progress the proposal. [note 1] [6] A Parliamentary Bill went forward to the 1862 session. Support had come initially from the Shropshire Union Railway, for transport of cattle from Wales, but when the SUR was taken over by the LNWR this was withdrawn. The line was fiercely opposed by the LNWR and the NSR, and the Parliamentary process was difficult. However the Royal Assent was given to the Stafford and Uttoxeter Railway Act for the formation of the company on 29 July 1862. [1] [7] [6] The line was to be single track, 12+12 miles long, from Bromshall Junction, [note 2] on the North Staffordshire Railway near Uttoxeter, to Stafford. At Bromshall Junction there were to be running powers over the NSR into Uttoxeter. The Engineer was Thomas Charles Townsend. [8] The authorisation included a spur connection to the NSR near Weston-on-Trent, but this was never built. [note 3] William Field was appointed as contractor for the construction, which was put in hand almost immediately. [8] However construction of the considerable earthworks and a tunnel pushed the cost of the works above the engineering estimate, in addition to high land acquisition costs. In 1865 the company had to return to Parliament for authorisation of additional share capital to the extent of a further £50,000. [9] Colonel Yolland of the Board of Trade inspected the line on 23 May 1867, but found a number of deficiencies. Chief among these were the quality of the rail chairs, which he considered were too light; in addition holding-down bolts for longitudinal timbers on underbridges were to be improved. The method of working the line was not yet settled, and Yolland seems to have been irritated by this, making the unusual stipulation that tank locomotives must not be run bunker first on the line. A second platform was to be provided at Salt station. [10] A reinspection took place on 25 September 1867 under Lt Col Hutchinson, and although not every detail had been rectified, he approved the opening of the line. [10] The earthworks and bridges were constructed for double track, but single track was laid, and the tunnel was single. There were some stiff climbs, including one of over two miles at 1 in 70. [11] Evidently arrangements to work the line had not been concluded, and both the LNWR and the NSR had declined to work the line and the S&YR had no locomotives of its own. Accordingly, there was a delay while working arrangements were negotiated. [12]

Operation

The line opened for general traffic on 23 December 1867. [13] [1] The Company owned seven coaches, sixteen wagons and one goods van but, initially, no locomotive. Motive power line was probably provided by the contractor for the construction, who had become major shareholders in the company. [note 4] Instead of employing booking office staff, the Company issued tickets on the train, and there was little in the way of telegraphic or signalling equipment. The first locomotive owned by the company was a 2-4-0 tank engine supplied in 1868 by Beyer, Peacock and Company and was named Shrewsbury and Talbot. [note 5] A second locomotive, named Ingestre, was acquired second-hand in May 1873; It was a Beyer Peacock 0-4-2T. The purchase was probably prompted by the accident at Hopton Tunnel, in which Shrewsbury and Talbot was damaged. [12] By 1874, Stafford had expanded northwards and a new station was built at Stafford Common, where there were horseracing, fairs and agricultural shows. [14] The line was never productive of much traffic and was not kept in very good order. In the summer of 1875 the Board of Trade sent Colonel Rich to report on its condition, and he required certain improvements to ensure safety. Losses, and debts, mounted, and a receiver was appointed in 1875. [11] Operationally, there was continuing opposition from the London and North Western Railway (LNWR) and the North Staffordshire Railway (NSR). There were disputes over the maintenance of train connections at the junction stations, and over the handling of goods traffic. By 1878 it was clear that operating costs were exceeding traffic receipts and a receiver was appointed. The suggestion was made that, since it seemed likely that the LNWR and the NSR would continue to be uncooperative, approaches should be made to the Great Northern Railway or the Midland. The aim of connecting to Derby had still not been achieved. While the LNWR and NSR were on good terms with the Midland Railway and exercised running powers over its lines into Derby and Burton, the GNR had built a new line in competition with all three – its Derbyshire extension – and was anxious to penetrate further westward—to Wales if possible. [15]

Hopton Bank derailment, 1873

In 1873 there was a derailment at Hopton Bank. (The location was spelt Hoopton in contemporary reports.) On 1 February 1873 the 12:10 train from Uttoxeter to Stafford derailed "at high speed" about two miles before reaching Stafford. The driver and fireman were killed, and eight other persons were injured. The derailment took place on a right hand curve of 40 to 60 chains radius, and on a falling gradient of 1 in 70. There were some defects in the leaf springs of the locomotive, but these were not considered to be contributory. The main cause was stated to be excessive speed, associated with reaching Stafford to make a connection with a main line train there. The driver had previously been warned several times about excessive speed. Frost heave may have affected the stability of the track. [16]

Great Northern Railway

The Stafford & Uttoxeter Railway system in 1881 Stafford & uttox 1881.png
The Stafford & Uttoxeter Railway system in 1881

For three years the S&UR company had been in receivership; its income was only £12 per mile per week. In 1878 a representative of the major creditor approached the Great Northern Railway, proposing that they should take over the working of the line. In that year the GNR opened its Derbyshire and Staffordshire Extension Line from Nottingham and Derby to Egginton Junction, on the North Staffordshire Railway Churnet Valley Extension line. The GNR had expressed an interest in reaching Holyhead, and the S&UR might be a stepping stone in that direction. [11]

Stafford and Uttoxeter Railway Act 1879
Act of Parliament
Coat of Arms of the United Kingdom (1837).svg
Long title An Act to confer further powers on the Stafford and Uttoxeter Railway Company; and for other purposes.
Citation 42 & 43 Vict. c. cciii
Dates
Royal assent 11 August 1879
Text of statute as originally enacted

The GNR declined the approach, but in fact negotiations continued regarding an outright purchase. The GNR were given running powers over the Stafford and Uttoxeter Railway by Act of 11 August 1879, and into Stafford station. [11] Further negotiations took place, and notwithstanding the poor state of the S&UR infrastructure, a price of £100,000 was agreed: the purchase was authorised by Act of 18 July 1881, effective from 1 August. Plant was transferred at a valuation of £1,450, which included two locomotives. [11] [17] If the GNR's interest in reaching Holyhead was definite, it was never realised, and in fact Stafford remained the westernmost outpost of the GNR. [15] Wrottesley is frank about the dubious value the GNR got for its outlays:

Not very willingly, the GN came into possession of the Stafford & Uttoxeter. Other than as a possible western outlet for Derbyshire coal, the line offered little prospect of much revenue. [11]

The advantage to the GNR was mitigated by a clause interested the Act authorising the purchase, which prevented the GNR using the running powers over the NSR to divert traffic by any circuitous routes from the lines of the LNWR or North Staffordshire Companies. [15] At the time of the transfer to the GNR takeover, the line was completely run down, and the GNR invested £40,000 in improving the facilities at Stafford Common, providing passing loops at Ingestre and Chartley, and later on at Grindley. Block signalling was installed. The GNR operated a through passenger service from Grantham via Nottingham and Derby to Stafford, and about the end of the nineteenth century Boston enginemen worked a lodging turn to Stoke. [11] The S&UR passenger train service had consisted of four trains daily, five on Saturdays, none on Sundays, between Stafford and Uttoxeter Junction. From November 1881 the GNR integrated these trains with its Derby services, and six trains ran daily, one on Sundays, throughout from Stafford to Derby. From 1900 to 1916 these were extended eastward to Grantham. [18] There was a stationmaster and a staff of eleven at Stafford LNWR [note 6] until 1915, and Stafford Common had its own stationmaster. [15] The Great Northern Railway set about considering what needed to be done to put its newly acquired line to rights. The goods station facilities available to the GNR at Stafford were poor, and a new, more central goods depot was planned, to the north of the River Sow on a short branch line. It was authorised in the 1883 Parliamentary session, and was called Doxey Road goods station. The gas works was later (in 1891) connected to the same branch line; the LNWR was allowed to access the gas works over the branch. [19] The line from Stafford Common into Stafford itself was doubled in 1882. [20] In 1892 large salt deposits were discovered at Stafford Common, and this brought considerable mineral traffic to the line. [21]

Uttoxeter developments

The original layout at Uttoxeter had consisted of a southward junction where the Churnet Valley line and the Stoke to Derby line converged; there was a junction station there, but it was an exchange passenger station only with no public access. There were two ordinary stations, Dove Bank (to the north, on the Churnet Valley line) and Bridge Street to the east, towards Bromshall. Now in 1881 the North Staffordshire Railway provided a new west-to-north double track curve, completing a triangle. A new Uttoxeter station was provided at the western apex of the triangle, and the other stations were closed. [18]

Twentieth century

During the First World War cutbacks were made to passenger services and facilities. However, there was considerable freight movement westwards from the armament factories at Branston Depot and Chilwell Ordnance Depot. Royal Engineers personnel who had been trained at Longmoor Military Railway were drafted in to work parts of the line. In 1919 plans to extend the railway (particularly at Stafford Common) were announced but they were not proceeded with after the announcement of the Railways Act 1921. In 1923, the Grouping of the Railways of Great Britain took place pursuant to the Railways Act 1921, and the Great Northern Railway, owner of the S&UR line, was a constituent of the new London and North Eastern Railway. Through the 1920s and early 1930, some enhancement to passenger receipts took place because of the popularity of inward excursions to places such as the village of Salt, and through traffic to the racecourses at Uttoxeter and Doncaster, and to East Coast seaside destinations.

Decline and closure

In 1938, a public bus service was introduced (by the Green Bus Company) between Stafford and Uttoxeter, leading to a fall in railway passenger numbers. [22] With the outbreak of World War II, passenger services were reduced to one return train a day from 2 October 1939, and on 4 December 1939, all civilian passenger services were suspended, as a means of dealing with staff shortages resulting from enlistment. [22] Special trains ran to RAF Stafford, near Stafford Common station, and to a Royal Ordnance Factory at Bromshall. [13] [23] After the war, civilian passenger and freight services briefly resumed. In 1949 the line became part of British Railways| [note 7] on the nationalisation of the British railway network. On 5 March 1951 the line was closed to all through services except military traffic using the extensive sidings at RAF Stafford, and to Stafford Common goods yard. [13] [24] Stafford Common goods yard closed in August 1968. On 28 November 1975 the final movement from RAF Stafford took place, and the line was now closed completely. [24] A special train organised by the Stephenson Locomotive Society became the last train to travel the entire route, on 23 March 1957, except that Bramshall Junction had been removed. The train returned from just short of the junction to Stafford. [13] [24] Track from Hopton and Uttoxeter was lifted between 1957 and 1962. The railway bridge over the Trent and Mersey Canal at Weston was eventually removed in the 1990s; it had been used by a local farm to let dairy cattle cross the canal. There is now no railway use of the former line.

Stations

Station NameCo-ordinates
Stafford 52°48′13″N2°07′23″W / 52.80359°N 2.12307°W / 52.80359; -2.12307 [25]
Stafford Common 52°49′17″N2°07′01″W / 52.8214°N 2.1169°W / 52.8214; -2.1169 [25]
Salt and Sandon 52°50′50″N2°03′55″W / 52.8472°N 2.0654°W / 52.8472; -2.0654 [25]
Ingestre 52°50′15″N2°02′05″W / 52.8375°N 2.0348°W / 52.8375; -2.0348 [25]
Chartley 52°50′47″N1°59′41″W / 52.8465°N 1.9948°W / 52.8465; -1.9948 [25]
Grindley 52°51′38″N1°56′41″W / 52.8605°N 1.9447°W / 52.8605; -1.9447 [25]
Uttoxeter 52°53′48″N1°51′27″W / 52.8968°N 1.8575°W / 52.8968; -1.8575 [25]

Locations

Notes

  1. Baker and Miller imply (page 27) that this was a meeting to gauge interest in forming a company; but the Bill went to the 1862 session, and the project details must have been prepared at least a year previously
  2. The railway always referred to the locality as Bromshall. In medieval times that spelling was used locally, but in recent times the spelling Bramshall is used in the community.
  3. The earthworks for the spur were made, but track was never laid. The earthworks are no longer discernible in satellite imagery. Christiansen and Miller say (page 152) that this was an almost two mile branch forming a north to east spur, but this is a mistake. It was a short south-to-east spur.
  4. Shares and debenture debt had been allocated to the Contractor in lieu of cash payment, due to the Company’s desperate financial situation.
  5. The name refers to the manorial title of Charles Chetwynd-Talbot, the 19th Earl of Shrewsbury and 4th Earl Talbot.
  6. It is likely that many of the staff were employed at the goods depot.
  7. At first in the Eastern Region as a 2penetrating line” but after a year transferred to the London Midland Region.
  8. The local community is named Bramshall, but the railway used the name Bromshall for the junction and the tunnel.

Related Research Articles

<span class="mw-page-title-main">Great Northern Railway (Great Britain)</span> British railway company, 1846 to 1922

The Great Northern Railway (GNR) was a British railway company incorporated in 1846 with the object of building a line from London to York. It quickly saw that seizing control of territory was key to development, and it acquired, or took leases of, many local railways, whether actually built or not. In so doing, it overextended itself financially.

<span class="mw-page-title-main">North Staffordshire Railway</span> Former British railway company

The North Staffordshire Railway (NSR) was a British railway company formed in 1845 to promote a number of lines in the Staffordshire Potteries and surrounding areas in Staffordshire, Cheshire, Derbyshire and Shropshire.

<span class="mw-page-title-main">Manchester, Sheffield and Lincolnshire Railway</span> Former British railway company

The Manchester, Sheffield and Lincolnshire Railway (MS&LR) was formed in 1847 when the Sheffield, Ashton-under-Lyne and Manchester Railway joined with authorised but unbuilt railway companies, forming a proposed network from Manchester to Grimsby. It pursued a policy of expanding its area of influence, especially in reaching west to Liverpool, which it ultimately did through the medium of the Cheshire Lines Committee network in joint partnership with the Great Northern Railway and the Midland Railway.

<span class="mw-page-title-main">Stoke-on-Trent railway station</span> Railway station in Staffordshire, England

Stoke-on-Trent railway station is a mainline railway station serving the city of Stoke-on-Trent, on the Stafford to Manchester branch of the West Coast Main Line. It also provides an interchange between local services running through Cheshire, Staffordshire and Derbyshire.

<span class="mw-page-title-main">Uttoxeter railway station</span> Railway station in Staffordshire, England

Uttoxeter railway station serves the town of Uttoxeter, Staffordshire, England. It is on the Crewe–Derby line, which is also a Community rail line known as the North Staffordshire line. The station is owned by Network Rail and managed by East Midlands Railway.

<span class="mw-page-title-main">Shrewsbury and Birmingham Railway</span> Railway in England

The Shrewsbury and Birmingham Railway was authorised in 1846. It agreed to joint construction with others of the costly Wolverhampton to Birmingham section, the so-called Stour Valley Line. This work was dominated by the hostile London and North Western Railway, which used underhand and coercive tactics. The section between Shrewsbury and Wellington was also built jointly, in this case with the Shropshire Union Railway.

The Derbyshire and Staffordshire extension of the Great Northern Railway was an English railway network built by the GNR to get access to coal resources in the area to the north and west of Nottingham. The Midland Railway had obstructed the GNR in its attempts to secure a share of the lucrative business of transporting coal from the area, and in frustration the GNR built the line. The line was forked: it reached Pinxton in 1875 and a junction with the North Staffordshire Railway at Egginton, approaching Burton on Trent in 1878. The line cut through Derby, resulting in considerable demolition of housing there.

The South Staffordshire Railway (SSR) was authorised in 1847 to build a line from Dudley in the West Midlands of England through Walsall and Lichfield to a junction with the Midland Railway on the way to Burton upon Trent, with authorised share capital of £945,000. It was supported by the newly-formed London and North Western Railway (LNWR) and the Midland Railway, giving each company access to important areas. It completed its main line in 1849. As collieries in the Cannock region rose in importance, it built a second main line from Walsall to Rugeley, as well as numerous short spurs and connections to lines it intersected. Colliery working in the Cannock area expanded enormously, and mineral traffic carryings increased in step.

The Midland Railway branches around Walsall were built to give the Midland Railway independent access to Wolverhampton, and to a colliery district at Brownhills. The Midland Railway had a stake in the South Staffordshire Railway giving it access to Walsall, and the Walsall and Wolverhampton Railway (W&WR) was opened in 1872. At first the W&WR was independent and neutral, but it was acquired by the London and North Western Railway (LNWR), and then sold by that company to the Midland Railway.

The Cheadle branch line was a railway line of just under 4 miles (6.4 km) in length that served the town of Cheadle, Staffordshire. It was in operation as a passenger line from 1892 to 1963, and closed altogether in 1986. It took 46 years from conception to completion and was notable in that part of the line had to be practically rebuilt partway through its existence.

The Ashbourne line was a 33+12 mi (53.9 km) railway from Buxton via Ashbourne to Uttoxeter. It was built by the London and North Western Railway using a section of the Cromford and High Peak Railway (C&HPR) and it joined the North Staffordshire Railway at Ashbourne, proceeding to Uttoxeter with a junction onto the main line at Rocester.

The Great Northern and Great Eastern Joint Railway, colloquially referred to as "the Joint Line" was a railway line connecting Doncaster and Lincoln with March and Huntingdon in the eastern counties of England. It was owned jointly by the Great Northern Railway (GNR) and the Great Eastern Railway (GER). It was formed by transferring certain route sections from the parent companies, and by the construction of a new route between Spalding and Lincoln, and a number of short spurs and connections. It was controlled by a Joint Committee, and the owning companies operated their own trains with their own rolling stock. The Joint Line amounted to nearly 123 miles (198 km) of route.

<span class="mw-page-title-main">Rocester railway station</span> Former railway station in England

Rocester railway station was a railway station built by the North Staffordshire Railway (NSR) located at Rocester in Staffordshire.

<span class="mw-page-title-main">Egginton Junction railway station</span> Former railway station in Derbyshire, England

Egginton Junction railway station is a disused railway station in Egginton, Derbyshire.

<span class="mw-page-title-main">Ashbourne railway station</span> Former railway station in Derbyshire, England

Ashbourne railway station formerly served the town of Ashbourne in Derbyshire. There have been two stations in the town. The first, opened in 1852, was operated by the North Staffordshire Railway (NSR); it was replaced in 1899 by a station at a new location, jointly operated by the NSR and the London and North Western Railway (LNWR). In 1923 the station passed into the ownership of the London, Midland and Scottish Railway and in 1948 that of the London Midland Region of British Railways. It was finally closed to all traffic in 1963.

The Great Northern and London and North Western Joint Railway was a British railway line, almost entirely within Leicestershire. Authorised by the same Act of Parliament, the Great Northern Railway Leicester Branch was built, branching from the Joint Line; on the same basis the Newark to Bottesford Line was built. The lines opened progressively between 1879 and 1883. The dominant traffic was iron ore, and the agricultural produce of the area served also generated considerable business. The passenger usage was never heavy, although some unusual through services were attempted at first.

The Churnet Valley line was one of the three original routes planned and built by the North Staffordshire Railway. Authorised in 1846, the line opened in 1849 and ran from North Rode in Cheshire to Uttoxeter in East Staffordshire. The line was closed in several stages between 1964 and 1988 but part of the central section passed into the hands of a preservation society and today operates as the Churnet Valley Railway.

The Cannock Mineral Railway was a railway company that built a line from Cannock to join the London and North Western Railway (LNWR) at Rugeley, in England. It was conceived and authorised as the Derbyshire, Staffordshire and Worcestershire Junction Railway, with the intention of connecting Dudley and Uttoxeter, but it was hopelessly undercapitalised and badly managed.

<span class="mw-page-title-main">Macclesfield Hibel Road railway station</span> Former railway station in England

Macclesfield Hibel Road railway station was a railway station serving the town of Macclesfield in Cheshire, England. It was opened as a joint station by the North Staffordshire Railway (NSR) and the London and North Western Railway (LNWR) on 13 July 1849, with the opening of the NSR route to Uttoxeter via North Rode and Leek and it replaced an earlier, temporary, LNWR station at Beech Bridge. Built right at the point where the track of the two companies made an end-on junction, the station was managed by a joint committee of the two companies.

The Stamford and Essendine Railway was built to connect Stamford, Lincolnshire, in England, to the nearby Great Northern Railway. It was a short line, and it opened in 1856. It was not commercially successful, and the directors sought a means of connecting Stamford directly to Peterborough. This was the Sibson Extension, opened from Stamford to Wansford in 1867, but the junction there did not facilitate through running to Peterborough, and the Sibson Extension was even less successful than the first line. It was closed in 1929.

References

  1. 1 2 3 Donald J Grant, Directory of the Railway Companies of Great Britain, Matador, Kibworth Beauchamp, 2017, ISBN 978 1785893 537, pages 532 and 533
  2. 1 2 Allan C Baker and Mike G Fell, The Stafford and Uttoxeter Railway, Lightmoor Press, Lydney, 2014, ISBN 9781 899889 90 7, pages 9 and 10
  3. Wilfred L Steele, The History of the London and North-Western Railway, Railway and Travel Monthly, London, 1914, pages 91 and 132
  4. Rex Christiansen and R W Miller, The North Staffordshire Railway, David & Charles, Newton Abbot, 1971, ISBN 0 7153 5121 4, pages 26 and 30
  5. Christiansen and Miller, pages 45 and 46
  6. 1 2 Baker and Fell, pages 26 and 27
  7. Christopher Awdry, Encyclopaedia of British Railway Companies, Patrick Stephens Limited, Wellingborough, 1990, ISBN 1-85260-049-7, page 162
  8. 1 2 Baker and Fell, page 36
  9. Baker and Fell, page 95
  10. 1 2 Baker and Fell, pages 39 and 40
  11. 1 2 3 4 5 6 7 John Wrottesley, The Great Northern Railway: volume II: Expansion and Competition, B T Batsford, 1979, ISBN 0 7134 1592 4, pages 103 to 106
  12. 1 2 Baker and Fell, page 81
  13. 1 2 3 4 Christiansen and Miller, pages 269 and 270
  14. Baker and Fell, page 91
  15. 1 2 3 4 Christiansen and Miller, pages 151 to 153
  16. H W Tyler, Board of Trade, "Stafford and Uttoxeter Railway", 1873, at Railways Archive https://www.railwaysarchive.co.uk/eventsummary.php?eventID=3637
  17. Charles H Grinling, The Great Northern Railway, 1845 – 1895, Methuen & Co, London, 1898, pages 344 and 345
  18. 1 2 Baker and Fell, pages 134 and 135
  19. Baker and Fell, page 119
  20. Baker and Fell, page 124
  21. Baker and Fell, page 127
  22. 1 2 Baker and Fell, page 175
  23. Baker and Fell, page 179
  24. 1 2 3 Baker and Fell, pages 187 to 191
  25. 1 2 3 4 5 6 7 Ordnance Survey (1902). "1902 Map of Staffordshire" . Retrieved 18 February 2020.

Historic Photographs along the line

Railway junctions around Stafford Colwich, Norton Bridge & Stafford RJD 97.jpg
Railway junctions around Stafford
Bromshall, Clifton (Molyneux), Hay, Liskeard, Patricroft & Uttoxeter RJD 148.jpg