Suction caissons (also referred to as suction anchors, suction piles or suction buckets) are a form of fixed platform anchor in the form of an open bottomed tube embedded in the sediment and sealed at the top while in use so that lifting forces generate a pressure differential that holds the caisson down. They have a number of advantages over conventional offshore foundations, mainly being quicker to install than deep foundation piles and being easier to remove during decommissioning. Suction caissons are now used extensively worldwide for anchoring large offshore installations, like oil platforms, offshore drillings and accommodation platforms to the seafloor at great depths. In recent years, suction caissons have also seen usage for offshore wind turbines in shallower waters.

Contents

Oil and gas recovery at great depth could have been a very difficult task without the suction anchor technology, which was developed and used for the first time in the North Sea 30 years ago. [1] The use of suction caissons/anchors has now become common practice worldwide. Statistics from 2002 revealed that 485 suction caissons had been installed in more than 50 different localities around the world, in depths to about 2000 m. Suction caissons have been installed in most of the deep water oil producing areas around the world: The North Sea, Gulf of Mexico, offshore West Africa, offshore Brazil, West of Shetland, South China Sea, Adriatic Sea and Timor Sea. No reliable statistics have been produced after 2002, but the use of suction caissons is still rising. [2]

Description

A suction caisson can effectively be described as an inverted bucket that is embedded in the marine sediment. Attachment to the sea bed is achieved either through pushing or by creating a negative pressure inside the caisson skirt by pumping water out of the caisson; both of these techniques have the effect of securing the caisson into the sea bed. The foundation can also be rapidly removed by reversing the installation process, pumping water into the caisson to create an overpressure. [3]

The concept of suction technology was developed for projects where gravity loading is not sufficient for pressing foundation skirts into the ground. The technology was also developed for anchors subject to large tension forces due to waves and stormy weather. The suction caisson technology functions very well in a seabed with soft clays or other low strength sediments. The suction caissons are in many cases easier to install than piles, which must be driven (hammered) into the ground with a pile driver. [4]

Mooring lines are usually attached to the side of the suction caisson at the optimal load attachment point, which must be calculated for each caisson. Once installed, the caisson acts much like a short rigid pile and is capable of resisting both lateral and axial loads. Limit equilibrium methods or 3D finite element analysis are used to calculate the holding capacity. [5]

History

One of the 17 suction anchors for the Aasta Hansteen platform in the Norwegian Sea SugeankerMomek.JPG
One of the 17 suction anchors for the Aasta Hansteen platform in the Norwegian Sea

Suction caissons were first used as anchors for floating structures in the offshore oil and gas industry, including offshore platforms such as the Draupner E oil rig.

There are great differences between the first small suction caissons that were installed for Shell at the Gorm field in the North Sea in 1981 and the large suction caissons that were installed for the Diana platform in the Gulf of Mexico in 1999. The twelve suction caissons on the Gorm field were intended to secure a simple loading buoy device at a depth of 40 metres, while the installation of suction anchors for the Diana platform was a world record in itself at that time, concerning water depth and size of anchors. The height of the Diana suction caissons is 30 metres, their diameter 6.5 metres, and they were installed at a depth of about 1500 m on soft clay deposits. Since then, suction caissons have been installed at even larger depths, but the Diana installation was a technology breakthrough for the 20th century. [6] An important development step for the suction caisson technology emerged from cooperation between the former operator in the North Sea, Saga Petroleum AS, and Norwegian Geotechnical Institute (NGI). Saga Petroleum's oil-producing Snorre A platform was a tension-leg platform of a type that in other parts of the world would have been founded with up to 90 metres long piles. Unfortunately on the Snorre oil field, it was difficult to use long piles due to the presence of huge pebbles at 60 m depth under the seabed. Saga Petroleum decided therefore to use suction caissons, which were analysed by NGI. These analyses were verified from extensive model tests. The calculations showed that the platform could be safely secured by suction caissons of only 12 m in length. Snorre A started to produce oil in 1992 and is now operated by the Norwegian oil company Statoil.

Suction buckets were tested with offshore wind turbines at Frederikshavn in 2002, at Horns Rev in 2008 [7] [8] and Borkum Riffgrund in 2014, and are to be used in a third of the foundations at the initial development at Hornsea Wind Farm. [9] Statoil have gone on to use the technology for windfarms. [10] They are also planned to be used for some of the wind turbines in the Hornsea Project One wind farm scheduled to be completed in 2020. [11] [12] Similarly, a suction bucket contract has been awarded for the Aberdeen Bay Wind Farm.

Gravity oil platforms

Suction caissons have a lot of similarities with foundation design principles and solutions for the big gravity oil platforms that were installed in the North Sea when the offshore oil production started there in the beginning of 1970's. The first gravity oil platform on the Ekofisk oil field had a foundation area that was as big as a football field, and it was placed on a seabed with very dense sand. The platform was designed to tolerate waves up to 24 m in height.

As the installation of oil platforms continued in the North Sea, in areas with poor ground conditions such as soft clays, they were designed to survive even higher storm waves. These platforms were founded on a system of cylindrical skirts that were penetrated into the ground under combined gravity load and underpressure. The oil platform at the Gullfaks C field was equipped with 22 m long skirts. The Troll A platform is founded in 330 m depth with 30 m long skirts and is the world's biggest gravity platform.

Research and development

The Norwegian Geotechnical Institute (NGI) has been heavily involved with the concept development, design and installation of suction anchors from the start. The project "Application of offshore bucket foundations and anchors in lieu of conventional designs" (1994-1998) was sponsored by 15 international petroleum and industry companies and was one of the most important studies. The project “Skirted foundations and anchors in clay” (1997-1999) was sponsored by 19 international companies organized through the Offshore Technology Research Center (OTRC) in the US, and the project “Skirted offshore foundations and anchors in sand” (1997-2000) was sponsored by 8 international companies. The main conclusions from the projects were presented in the 1999 OTC paper no 10824.

An industry sponsored study on the design and analysis of deepwater anchors in soft clay was completed in 2003, where NGI participated together with OTRC and Centre for Offshore Foundation Systems (COFS) in Australia. The overall objective was to provide the API Geotechnical Workgroup (RG7) and the Deepstar Joint Industry Project VI with background, data and other information needed to develop a widely applicable recommended practice for the design and installation of deepwater anchors.

The Norwegian classification society DNV (Det Norske Veritas), active worldwide in risk analysis and safety evaluation of special constructions, has produced a recommended practice report on the design procedures for suction anchors which is based on close cooperation with NGI. The main information from the project was presented in the 2006 OTC paper no 18038.

In 2002 NGI established the subsidiary NGI Inc in Houston. The subsidiary has since been awarded the detailed geotechnical design for more than 15 suction anchor projects in the Gulf of Mexico, and among these the challenging Mad Dog Spar project involving design of anchors located in old slide deposits below the Sigsbee Escarpment. For further information reference can be made to the 2006 OTC papers no 17949 and 17950. [13]

See also

Related Research Articles

<span class="mw-page-title-main">Geotechnical engineering</span> Scientific study of earth materials in engineering problems

Geotechnical engineering is the branch of civil engineering concerned with the engineering behavior of earth materials. It uses the principles of soil mechanics and rock mechanics for the solution of its respective engineering problems. It also relies on knowledge of geology, hydrology, geophysics, and other related sciences. Geotechnical (rock) engineering is a subdiscipline of geological engineering.

<span class="mw-page-title-main">Oil platform</span> Large offshore structure with oil drilling and related facilities

An oil platform, oil rig, offshore platform, or oil and/or gas production platform is a large structure with facilities to extract, and process petroleum and natural gas that lie in rock formations beneath the seabed. Many oil platforms will also contain facilities to accommodate their workforce, although it is also common for there to be a separate accommodation platform bridge linked to the production platform. Most commonly, oil platforms engage in activities on the continental shelf, though they can also be used in lakes, inshore waters, and inland seas. Depending on the circumstances, the platform may be fixed to the ocean floor, consist of an artificial island, or float. In some arrangements the main facility may have storage facilities for the processed oil. Remote subsea wells may also be connected to a platform by flow lines and by umbilical connections. These sub-sea solutions may consist of one or more subsea wells or of one or more manifold centres for multiple wells.

<span class="mw-page-title-main">Foundation (engineering)</span> Lowest and supporting layer of a structure

In engineering, a foundation is the element of a structure which connects it to the ground, transferring loads from the structure to the ground. Foundations are generally considered either shallow or deep. Foundation engineering is the application of soil mechanics and rock mechanics in the design of foundation elements of structures.

<span class="mw-page-title-main">Tension-leg platform</span> Type of offshore platform used in production of oil or gas

A tension-leg platform (TLP) or extended tension leg platform (ETLP) is a vertically moored floating structure normally used for the offshore production of oil or gas, and is particularly suited for water depths greater than 300 metres and less than 1500 metres. Use of tension-leg platforms has also been proposed for offshore wind turbines.

<span class="mw-page-title-main">Caisson (engineering)</span> Rigid structure to provide workers with a dry working environment below water level

In geotechnical engineering, a caisson is a watertight retaining structure used, for example, to work on the foundations of a bridge pier, for the construction of a concrete dam, or for the repair of ships. Caissons are constructed in such a way that the water can be pumped out, keeping the work environment dry. When piers are being built using an open caisson, and it is not practical to reach suitable soil, friction pilings may be driven to form a suitable sub-foundation. These piles are connected by a foundation pad upon which the column pier is erected.

<span class="mw-page-title-main">Deep foundation</span> Type of foundation

A deep foundation is a type of foundation that transfers building loads to the earth farther down from the surface than a shallow foundation does to a subsurface layer or a range of depths. A pile or piling is a vertical structural element of a deep foundation, driven or drilled deep into the ground at the building site.

Marine architecture is the design of architectural and engineering structures which support coastal design, near-shore and off-shore or deep-water planning for many projects such as shipyards, ship transport, coastal management or other marine and/or hydroscape activities. These structures include harbors, lighthouses, marinas, oil platforms, offshore drillings, accommodation platforms and offshore wind farms, floating engineering structures and building architectures or civil seascape developments. Floating structures in deep water may use suction caisson for anchoring.

Subsea technology involves fully submerged ocean equipment, operations, or applications, especially when some distance offshore, in deep ocean waters, or on the seabed. The term subsea is frequently used in connection with oceanography, marine or ocean engineering, ocean exploration, remotely operated vehicle (ROVs) autonomous underwater vehicles (AUVs), submarine communications or power cables, seafloor mineral mining, oil and gas, and offshore wind power.

<span class="mw-page-title-main">Sheringham Shoal Offshore Wind Farm</span>

Sheringham Shoal Offshore Wind Farm is a Round 2 wind farm in North Sea off the coast of Norfolk. A lease for use of the sea bed was obtained in 2004 by Scira Offshore Energy, the development gained offshore planning consent in 2008, and was constructed 2009–2011, being officially opened in 2012.

<span class="mw-page-title-main">Fixed platform</span> Type of offshore platform used for the extraction of petroleum or gas

A fixed platform is a type of offshore platform used for the extraction of petroleum or gas. These platforms are built on concrete and/or steel legs anchored directly onto the seabed, supporting a deck with space for drilling rigs, production facilities and crew quarters. Such platforms are, by virtue of their immobility, designed for very long-term use. Various types of structure are used, steel jacket, concrete caisson, floating steel and even floating concrete. Steel jackets are vertical sections made of tubular steel members, and are usually piled into the seabed. Concrete caisson structures, pioneered by the Condeep concept, often have in-built oil storage in tanks below the sea surface and these tanks were often used as a flotation capability, allowing them to be built close to shore and then floated to their final position where they are sunk to the seabed. Fixed platforms are economically feasible for installation in water depths up to about 500 feet ; for deeper depths a floating production system, or a subsea pipeline to land or to shallower water depths for processing, would usually be considered.

<span class="mw-page-title-main">Floating wind turbine</span> Type of wind turbine

A floating wind turbine is an offshore wind turbine mounted on a floating structure that allows the turbine to generate electricity in water depths where fixed-foundation turbines are not feasible. Floating wind farms have the potential to significantly increase the sea area available for offshore wind farms, especially in countries with limited shallow waters, such as Japan, France and US West coast. Locating wind farms further offshore can also reduce visual pollution, provide better accommodation for fishing and shipping lanes, and reach stronger and more consistent winds.

<span class="mw-page-title-main">Burbo Bank Offshore Wind Farm</span>

The Burbo Bank Offshore Wind Farm is a 348 MW offshore wind farm located on the Burbo Flats in Liverpool Bay on the west coast of the UK in the Irish Sea. It consists of an original 90 MW wind farm commissioned in 2007 and a 258 MW extension completed in 2017.

<span class="mw-page-title-main">Offshore wind power</span> Wind turbines in marine locations for electricity production

Offshore wind power or offshore wind energy is the generation of electricity through wind farms in bodies of water, usually at sea. There are higher wind speeds offshore than on land, so offshore farms generate more electricity per amount of capacity installed. Offshore wind farms are also less controversial than those on land, as they have less impact on people and the landscape.

The Draupner platform is a gas platform for the extraction of natural gas in the North Sea consisting of the Draupner S and E riser platforms. It is located in the Norwegian North Sea block 16/11 160 km (99 mi) offshore from Norway. The complex consists of seven risers and two riser platforms standing in 70 m (230 ft) water depth and linked by a bridge. Draupner E is the first major oil platform using jacket-type construction supported on a bucket foundation and suction anchors. The complex is owned by Gassled and operated by Gassco. The technical service provider is Equinor.

<span class="mw-page-title-main">InterMoor</span>

InterMoor is a global mooring, foundations, and subsea services company. Its services include rig moves, mooring and offshore operations such as engineering and design, survey and positioning, fabrication, subsea installation and chain inspections.

<span class="mw-page-title-main">Offshore geotechnical engineering</span> Sub-field of engineering concerned with human-made structures in the sea

Offshore geotechnical engineering is a sub-field of geotechnical engineering. It is concerned with foundation design, construction, maintenance and decommissioning for human-made structures in the sea. Oil platforms, artificial islands and submarine pipelines are examples of such structures. The seabed has to be able to withstand the weight of these structures and the applied loads. Geohazards must also be taken into account. The need for offshore developments stems from a gradual depletion of hydrocarbon reserves onshore or near the coastlines, as new fields are being developed at greater distances offshore and in deeper water, with a corresponding adaptation of the offshore site investigations. Today, there are more than 7,000 offshore platforms operating at a water depth up to and exceeding 2000 m. A typical field development extends over tens of square kilometers, and may comprise several fixed structures, infield flowlines with an export pipeline either to the shoreline or connected to a regional trunkline.

<span class="mw-page-title-main">Submarine pipeline</span> Pipeline that is laid on the seabed or below it inside a trench

A submarine pipeline is a pipeline that is laid on the seabed or below it inside a trench. In some cases, the pipeline is mostly on-land but in places it crosses water expanses, such as small seas, straits and rivers. Submarine pipelines are used primarily to carry oil or gas, but transportation of water is also important. A distinction is sometimes made between a flowline and a pipeline. The former is an intrafield pipeline, in the sense that it is used to connect subsea wellheads, manifolds and the platform within a particular development field. The latter, sometimes referred to as an export pipeline, is used to bring the resource to shore. Sizeable pipeline construction projects need to take into account many factors, such as the offshore ecology, geohazards and environmental loading – they are often undertaken by multidisciplinary, international teams.

Hornsea Wind Farm is a Round 3 wind farm which began construction in 2018. Sited in the North Sea 120 km (75 mi) off the east coast of England, the eventual wind farm group is planned to have a total capacity of up to 6 gigawatt (GW).

<span class="mw-page-title-main">Tripod (foundation)</span> Three-legged foundation for wind turbines, especially offshore structures

The tripod is a type of foundation for offshore wind turbines. The tripod is generally more expensive than other types of foundation. However, for large turbines and higher water depth, the cost disadvantage might be compensated when durability is also taken into account.

<span class="mw-page-title-main">Offshore embedded anchors</span> Type of marine mooring component

Offshore embedded anchors are anchors that derive their holding capacity from the frictional, or bearing, resistance of the surrounding soil, as opposed to gravity anchors, which derive their holding capacity largely from their weight. As offshore developments move into deeper waters, gravity-based structures become less economical due to the large size needed and the consequent cost of transportation.

References

  1. Department of Civil Engineering, The University of Texas, Austin, Suction Caissons : Model Tests, By Roy E. Olson, PhD and Robert B. Gilbert, PhD
  2. National Institutes of Health, Modeling and Simulation of Offshore Wind Power Platform for 5 MW Baseline NREL Turbine., Roni Sahroni T 2015
  3. "Suction Installed Caisson Foundations for Offshore Wind: Design Guidelines" (PDF). Carbon Trust, Offshore Wind Accelerator, February 2019, p. 77. Retrieved 7 September 2021.
  4. Department of Civil Engineering, The University of Texas, Austin , Suction Caissons : Finite Element, Modeling, by John L. Tassoulas, PhD, Dilip R. Maniar, and L.F. Gonzalo Vásquez
  5. US Department of Agriculture, Experimental studies on the anti-uplift behavior of the suction caissons in sand, Oct. 2013
  6. University of Delaware, UD Wind Power Program, Ocean Turbines, Foundations & Projects
  7. "The Suction Bucket Support Structure". LORC. 20 April 2011. Archived from the original on 29 April 2016. Retrieved 28 February 2017.
  8. Houlsby, Guy; Lars Bo Ibsen; Byron Byrne (2005). "Suction Caissons for Wind Turbines". Frontiers in Offshore Geotechnics. doi:10.1201/NOE0415390637.ch4. ISBN   978-0-415-39063-7.
  9. Test of giant offshore wind farm by Dong Energy's Hornsea Project trials German offshore wind farm. August 2014
  10. Carrington, Damian. "World's largest floating windfarm to be built off Scottish coast". The Guardian . Retrieved 17 May 2016.
  11. Financial report full year 2015 – Investor Presentation (PDF), Dong Energy, 4 February 2016, p. 6
  12. B. Sukumaran, Rowan University, "Suction Caisson Anchors - A Better Option for Deep Water Applications"
  13. Oxford University , SUCTION CAISSON FOUNDATIONS FOR OFFSHORE WIND TURBINES by, Felipe A. Villalobos