Transport in Bucharest

Last updated

CAF subway train at Universitate metro station Universitate Station, Bucharest Metro 3.jpg
CAF subway train at Universitate metro station

Bucharest has the largest transport network in Romania, and one of the largest in Europe. The Bucharest transport network is made up of a subway network and a ground transport network. Although there are multiple connection points, the two systems operate independently of each other, and are run by different organisations (the subway is run by Metrorex and the ground transport network by Bucharest-Ilfov Intercommunity Development Association for Public Transport. The two companies used separate ticketing systems until 2021, when a new smartcard was introduced alongside the old tickets, which allows travel on both the TPBI and the Underground.

Contents

Bucharest Subway

Bucharest has a fairly extensive subway system consisting of five lines (M1, M2, M3, M4, and M5) ran by Metrorex. In total, the network is 80.1 km (49.8 mi) long and has 64 stations, [1] with 1.5 km (0.9 mi) average distance between stops. It is one of the fastest ways to get around the city. The oldest metro line is M1, which was opened in 1979. [2] The newest metro line is M5, which was opened in 2020. [3] A sixth metro line, M6 line, is currently under construction.

Ground transport

Ground transport in Bucharest is run by Bucharest-Ilfov Intercommunity Development Association for Public Transport (TPBI) and it is operated by Societatea de Transport București (STB), Societatea de Transport Voluntari (STV), a.o..

TPBI consists of an extensive network of buses, trolleybuses, trams and light rail. The TPBI network is one of the densest in Europe, and the fourth largest on the continent, carrying about 1.7 million passengers daily on 85 bus lines, 23 tram lines, 2 light rail lines and 15 trolleybus lines. At times, however, it suffers from severe overcrowding.

TPBI is a reasonably efficient and a very frequently-used way of getting around Bucharest. As with the subway, the system is undergoing a period of renewal. Some new features are the upgrade of tram/trolleybus infrastructure and the replacement of old rolling stock.

Network map of public transport in Bucharest region Harta transportului in comun Bucuresti.svg
Network map of public transport in Bucharest region

Buses

With a total route length of 1,374 km (854 mi), [4] the TPBI urban bus network is the densest of all the transport types in Bucharest. There are 85 bus lines (plus 25 night routes) operating mostly in the municipality of Bucharest, as well as over 39 bus lines serving commuters from surrounding towns and villages in Ilfov County. In mid-2005, the lines that linked the city to the peripheral area were licensed out to independent transportation providers, but in early 2006, they were returned to STB control due to a wide range customer complaints about the private operators. Sometime in 2010, all the STB lines of the peripheral network were removed, leading to an increase in minivans owned by private transport companies, and so far only a few of these lines have been put back.

In 2017 was founded Bucharest-Ilfov Intercommunity Development Association for Public Transport, and with that STV took over most of the peripheral bus routes.

Fleet

The main public transport operator in Bucharest ( STB ) has a bus fleet made up of 1,143 vehicles (2018), which are all wheelchair-accessible (low floor) and around 55% are air-conditioned. [5] The fleet utilisation rate during workdays stood at 78.1% in 2018. [6]

Between 2005 and 2009, the fleet underwent its most substantial renewal since 1989, and is now among the most modern in Europe. In December 2005, STB signed a contract for 500 Mercedes Citaro low-floor, wheelchair-accessible buses. The buses were delivered between June 2006 and April 2007. In January 2008, the first of a further series of 500 Citaro low-floor buses were put into service.

The fleet makeup, as of 2019, is as follows, with years of delivery shown in brackets:

Central Lines are usually populated by Electric and Hybrid buses, while lines connecting residential areas tend to use the Otokar and Mercedes Citaro buses.

Trolleybuses

Trolleybuses supplement buses on the TPBI system network, which operates 15 trolleybus lines (mainly on high-usage routes), measuring 164.1 km (102.0 mi) of routes [4] on 73.2 km (45.5 mi) network. [7] During the 1990s, the fleet was updated with modern trolleybuses manufactured by Ikarus, in light blue and yellow livery, which have acoustic station announcements and digital display screens. These trolleybuses now make up the majority of the fleet.

In early 2007, 100 wheelchair-accessible Irisbus Citelis trolleybuses were introduced on routes 61, 62, 69, 70, 86, 90, 91, and 92.

Two distinct, non-interconnected networks exist in Bucharest, the main network (comprising the two main east–west lines as well as a spur in the northern part of town) and a relatively small southern network in Berceni. Each of the networks has its own, separate trolleybus depots (including separate fleets) and is not connected to the other in any way, in 1987 being separated after the opening of M2 subway line. The trolleybus network is currently[ when? ] being overhauled or expanded — a goal is to eventually unite the two networks.

The newer fleet of Solaris Trollino 12 trolleybuses is used to convert diesel bus routes to trolleybus routes (Eg.: Bus route 133 became part of Trolleybus route 97).

Fleet

In 2022, the STB had a fleet of 265 trolleybuses spread across 3 depots and 1 mixed tram-trolleybus depot. Most of them were Astra-Ikarus 415T (163 trolleybuses). The fleet utilisation rate during workdays stood at 67.66% in 2022. [8] In 2024, the STB started receiving 100 Solaris Trollino 12 trolleybuses. [9]

Trams and light rail

STB operates a complex system of trams measuring 332.2 km (206.4 mi) of routes [4] on 143.9 km (89.4 mi) of lines throughout Bucharest. [7] In addition to 23 tram lines, there are two converted light rail lines called metrou uşor ("light metro"), numbered 41 and 32, which serve the western and south-western parts of Bucharest. Both use upgraded trams running on separate designated corridors for faster travel times.

67% of the city's tram infrastructure had been modernised by 2018. [10] The light rail service is expected to be expanded by upgrading existing tram lines to light rail status.

Most trams operated by STB (all V3A, Bucur 1 and Bucur LF models) are manufactured internally by STB at their subsidiary URAC Bucharest (the same subsidiary also handles tramway repairs and is in charge of scrapping vehicles reaching the end of their useful life). Currently, URAC produces three models for STB – two three-section, partially low-floor, wheelchair-accessible models (V3A-CH-PPC/CA-PPC derived from the earlier V3A-93 model and the all-new Bucur-LF model) as well as a two-section, non-wheelchair-accessible model (Bucur 1), made from scrapped Tatra axles with new equipment. It is uncertain if their production will continue, because as of now their production has been halted for the past 7 years.[ when? ]

Routes 1, 7, 10, 11, 21, 25, 32, 41 are wheelchair-accessible, using new Astra Imperio Metropolitan, V3A-93-PPC, V3A-CH-PPC/V3A-CA-PPC or Bucur LF trams. Lines 14, 16/17 (17 is an off-days variant of line 16), 19, 23, 27, 40, 42, 44, 47, 53 and 55 are also wheel chair accessible when V3A-93-PPC (number is limited to 8 vehicles at this moment, 008, 164, 169, 181, 206, 227, 303 and 343 can be seen on these routes occasionally, or CA/CH-PPC are sent on these routes. Other routes (if most) will become wheelchair-accessible as soon as more V3A-PPC will undergo reparations or modernisations, or even buy more new tramsets (is it planned an acquisition of 250 trams, of different lengths).

The maximum speed of trams in Bucharest is 60 kilometres per hour (37 mph).

Fleet

In 2018, the STB had a fleet of 486 trams, most of which were the V3A-M type (323 trams). The fleet is spread across 7 tram depots and 1 mixed tram-trolleybus depot. The fleet utilisation rate during workdays stood at 55.6% in 2018. [6] In December 2022, the first 15 Astra Imperio Metropolitan trams (out of a total order of 100 units) were put into circulation. [11]

Tickets

Ground transportation, operated by STB uses a different ticketing system from the subway network, operated by Metrorex, a separate entity. Their tickets and prices can be found on their website, available in English as well. http://www.stb.ro/

They include subscriptions, rechargeable cards as well as single use cards. A simple metropolitan ticket valid on all ground lines for 90 minutes costs 3 RON and can be activated by tapping either a STB transit card or a contactless bank card on the ticket machines present inside all vehicles. Tickets can also be bought through SMS by sending a message to 7458, with the message "C", you will be charged 0.65 EUR + VAT. You can also purchase a 24-hour pass for 8 RON at any kiosk or by sending the message "AB" to the same number, costing you 1.5 EUR + VAT.

This method of SMS-based payment is also available through the app, InfoTB. The app can also plan routes using all types of transportation in the city, and show the GPS location of vehicles. Approximately 85% of vehicles are equipped with a GPS positioning system.

A separate app, 24Pay, can be used to pay for fares using a credit card.

An online account can also be created on the website, that allows clients to add credit to their STB cards.

BCR (Romanian Commercial Bank) ATMs also allow clients to recharge their physical cards with money.

Metrorex and STB have integrated tickets and passes, information which is available on their websites, but also on the Bucharest Metro page. An integrated fare costs 5 RON and can be used simultaneously on both ground lines and the subway, with a time limit of 120 minutes.

The Bucharest Subway uses a per-entry constant fare system, every entry costing 3 RON, regardless of stations travelled, time spent or zones used, changing lines doesn't require additional pay and is free, the only exception is Gara De Nord, where the 2 corresponding stations are separate and thus you are required to exit the system and pay again at the other station to transfer lines, tho free transfers from the M1 to the M4 can be done at the neighbouring Basarb station.

Passengers can purchase paper tickets loaded with 1, 2 or 10 fares or simply tap their contactless bank cards at the turnstiles, which will charge them 3 RON. Rechargeable contactless subway cards can also be issued and loaded with passes available for either a day, a week, a month or a year. The most commonly used pass is the 1 month pass priced at 80 RON.

Personal cars

At the end of 2008, in Bucharest there were 1.24 million vehicles, of which 985.000 were personal cars. In 2007 there were 150.000 fewer vehicles, which means the number of vehicles increased by 13.76% in one year. [12]

With so many cars and a very high population density (50% higher than Tokyo and 4 times bigger than Rome for example), parking is a problem in Bucharest.

CFR Trains

In 2011, Bucharest had 99 km of railway lines, 79 of which were electric. [13]

Bucharest has several train stations throughout and around the city, the main one being Gara de Nord where trains depart to all destinations. Other main stations include Baneasa, Obor and Basarab.

Gara de Nord is a relatively modern station. It was opened in 1872 and has undergone modernization and refurbishment several times. From here, trains leave to every destination in Romania and to other European cities. The other stations only see around five trains a day and are not considered "important" stations by CFR.

Bucharest was once home to a vast system of industrial railways that sprawled all over the city, linking factories to the surrounding neighbourhoods and towns. However most of these are now[ when? ] gone and what remains has fallen into disrepair. Therefore, Bucharest doesn't have an RER/S-Bahn type of commuter network. Attempts have been made in the past to introduce such a system, but so far not much has been achieved. It is true that there are trains operated by CFR from Bucharest to neighbouring towns, however due to long journey times and poor rolling stock most people tend to use personal cars to get into the city.

Road network

Magheru Boulevard at night Bucharest at night.jpg
Magheru Boulevard at night

The city's municipal road network is centred on a series of high-capacity boulevards (6 to 10 lanes), which generally radiate out from the city centre to the outskirts and are arranged in geographical axes (principally north–south, east–west and northwest–southeast). The principal and thus most congested boulevards are Calea Victoriei, Bulevardul Unirii and Șoseaua Mihai Bravu, which is the longest in Bucharest and forms a sort of semicircle around the northeastern part of the old district. The city also has two ring roads, one internal (Mihai Bravu is part of it) and one external, which are mainly used for cars that bypass the city as well as trucks, which aren't allowed in the city centre, Works on a third ring road (the A0), which would be mainly used for transit and freight traffic around the city, began in 2020 on some segments. Aside from the main roads, the city also has a number of secondary roads, which connect the main boulevards. In the historical city centre, particularly the Lipscani area, many streets are cobbled and are classified as pedestrian zones.

The city's roads are usually very crowded during rush hours, due to an increase in car ownership in recent years. Every day, there are more than one million vehicles travelling within the city limits. [14] This has resulted in wearing of the upper layer of tarmac on many of roads in Bucharest, particularly secondary roads which are now used in an equal amount, this being identified as one of Bucharest's main infrastructural problems. The pothole problem is notorious enough to have inspired a song by the band Taxi with a chorus "Cratere ca-n București, nici pe luna nu gaseşti!" ("Craters like in Bucharest you won't even find on the moon"). [15] However, in recent years,[ when? ] there has been a comprehensive effort on behalf of the City Hall to boost improvement of road infrastructure, mainly by resurfacing and widening roads, and repairing footpaths. Faulty urban planning will likely lead to an increase in traffic and parking problems, since new housing areas are built with houses and apartment buildings literally squeezed into existing small grid roads, a problem commonly identified in the "suburbs" of the city.

Bucharest is one of the principal junctions of Romania's national road network, which links the city to all of Romania's major cities as well as to neighbouring countries such as Hungary, Bulgaria and Ukraine. Furthermore, the city is the starting point of the A1 motorway, towards Pitești, the A2, linking the capital with the country's ports and seaside resorts on the Black Sea and the A3, towards Ploiești.

Airports

Bucharest has one international airport:

Until 2012 there was also another airport which is no longer used, except for charter/private flights:

Water transport

Although it is situated on the banks of a river, Bucharest has never functioned as a port city, with other Romanian cities such as Constanţa and Brăila acting as the country's main ports. However, the Danube-Bucharest Canal, which is 73 km long, was under construction until 1990 and is not being worked on as of 2015. When eventually finished, the canal will link Bucharest to the Danube River and, via the Danube-Black Sea Canal, to the Black Sea. This transport corridor is expected to be a significant component of the city's transport infrastructure and increase sea traffic by a large margin.

Notes

  1. "METROREX". www.metrorex.ro. Retrieved 2015-07-21.
  2. "16 noiembrie, Ziua Metroului. Ce amintiri au Octavian Udriște și alți foști directori". 16 November 2020.
  3. "Linia M5 Râul Doamnei - Eroilor".
  4. 1 2 3 Statistics-Length of public transport network
  5. Parc autobuze RATB Archived 2011-11-07 at the Wayback Machine (RATB bus fleet), BucureștiTransport, fan site by Dr2005 (in Romanian)
  6. 1 2 Raport de Activitate 2022, Societatea de Transport Bucuresti
  7. 1 2 Trams and trolleybuses system networks in Romanian cities
  8. "Raport de Activitate 2022, Societatea de Transport Bucuresti" (PDF).
  9. "Primele troleibuze cu autonomie vor circula pe linia 61". 18 January 2024.
  10. "Raport de Activitate 2018, Societatea de Transport Bucuresti" (PDF).
  11. Andreea Rubica (10 December 2022). "Tramvaiele noi de la Astra Arad au ieșit pe traseu" (in Romanian). adevarul.ro.
  12. Hot News Parcul Auto din Romania a trecut de cinci milioane vehicule. Un sfert din ele sunt in Bucuresti.
  13. Planul de Dezvoltare Regionala a Regiunii Bucuresti-Ilfov 2014–2020, Iulie 2015, pg.70
  14. Governing programme of Adriean Videanu, General Mayor of Bucharest
  15. Simona Tudorache, Taxi a iesit cu Politica in strada, Curierul Naţional, 23 October 2004.

Related Research Articles

<span class="mw-page-title-main">Bucharest Metro</span> Rapid transit system in Romania

The Bucharest Metro is an underground rapid transit system that serves Bucharest, the capital of Romania. It first opened for service on 16 November 1979. The network is run by Metrorex. One of two parts of the larger Bucharest public transport network, Metrorex has an average of approximately 720,000 passenger trips per weekday, compared to the 1,180,000 daily riders on Bucharest's STB transit system. In total, the Metrorex system is 80.1 kilometres (49.8 mi) long and has 64 stations.

<span class="mw-page-title-main">Budapesti Közlekedési Zrt.</span>

Budapesti Közlekedési Zrt. or BKV Zrt. is the main public transport operator in Budapest, Hungary. BKV was established in 1968 as a unified public transport company with the merger of the companies responsible for the different means of transport; bus operator FAÜ, tram and trolleybus operator FVV, suburban railway operator BHÉV and riverboat operator FHV. The metro was added in 1973. The transport in Budapest underwent another reorganization in 2010 when the BKK was founded for the management of the city transport and infrastructure.

<span class="mw-page-title-main">Societatea de Transport București</span>

Societatea de Transport București is the main public transit operator in Bucharest, Romania, owned by the Municipality of Bucharest. From 1990 to 2018, the company had a different legal status and was known as the Regia Autonomă de Transport București (RATB).

<span class="mw-page-title-main">Obor metro station</span> Bucharest metro station

Obor is a metro station in Bucharest, Romania, near one of the city's largest open-air markets, also named Obor. The station, part of the M1 line, originally opened on August 17, 1989, as part of the metro extension from Gara de Nord to Dristor.

<span class="mw-page-title-main">Sector 3 (Bucharest)</span> Sector in Municipality of Bucharest, Romania

Sector 3 is an administrative unit of Bucharest. It is the most populous, most densely populated and also the third-largest division of the city. With a total population of over 460 thousand, it is actually the second-most populated administrative area of Romania, only after the capital city. It is also the most important of all six sectors of Bucharest, as it includes the Downtown Bucharest, the Kilometre Zero and other significant landmarks. It is bordered by Sector 2 to the North, Ilfov County to the East, Sector 4 to the South, Sector 5 to the Southwest, and Sector 1 to the Northwest.

<span class="mw-page-title-main">Blackpool Transport</span> Bus and tram operator in Blackpool, England

Blackpool Transport Services Limited is a bus and tram operator running within the boroughs of Blackpool and Fylde and into the surrounding area, including Fleetwood, Lytham St Annes, Poulton-le-Fylde, Cleveleys, Fleetwood and Preston. Blackpool Transport is owned by Blackpool Council.

<span class="mw-page-title-main">Tatra T4</span>

T4 is a tram produced by ČKD Tatra. It is the narrower variant of the Tatra T3 model. A large number of cars was supplied to the GDR, the USSR, Romania and the former Yugoslavia using names T4D, T4SU, T4R and T4YU, respectively. The T4 was originally developed in 1968 and has been continuously modernized or copied since.

Verkehrsbetriebe Luzern AG is the main provider of public transport in the Swiss city of Lucerne. It operates 8 Hybrid buses, 3 electric buses, 34 double-articulated trolleybuses, 30 articulated trolleybuses and 76 buses for a total of 159 buses on 23 daytime routes, as well as 11 overnight services and one funicular service.

<span class="mw-page-title-main">Bi-articulated bus</span> Bus formed of three sections

A bi-articulated bus or double-articulated bus and sometimes train-bus, tram-bus, trackless tram or double bendy bus is a type of high-capacity articulated bus with an extra axle and a second articulation joint, as well as extended length. Bi-articulated buses tend to be employed in high-frequency core routes or bus rapid transit schemes rather than in conventional bus routes.

<span class="mw-page-title-main">Bucharest Light rail</span> Service of public transport in Bucharest

The Bucharest light rail is a light rail transit system in Bucharest, Romania.

<span class="mw-page-title-main">Trolleybuses in Glasgow</span> Public transport system in Glasgow, Scotland

The Glasgow trolleybus system operated in and immediately surrounding the city of Glasgow, Scotland, between 1949 and 1967, with the network reaching its largest extent in 1959. It was the only British system to open after World War II.

The public transport in Sofia consists of a comprehensive network of bus, trolleybus, tram and metro lines. It is overseen by the Sofia Urban Mobility Center, a municipal enterprise responsible for route planning, scheduling, fare collection and ticket inspection. It also pays the various transport operators for their service on a per-kilometer basis. Sofia is the only city in Bulgaria that operates the four modes of public transport.

<span class="mw-page-title-main">Trolleybuses in Zurich</span> Public transport system in Zurich, Switzerland

The Zurich trolleybus system is part of the public transport network of Zurich, Switzerland. Opened in 1939, it combines the Zurich S-Bahn, the Zurich tramway network and Zurich's urban motorbus network to form an integrated all-four style scheme.

<span class="mw-page-title-main">RATBV</span> Public transit operator in Brașov, Romania

RATBV S.A., formerly Regia Autonomă de Transport Brașov, and commonly referred to as RAT Brașov, is the only public transport operator in the city of Brașov, Romania. It is owned by the Brașov Municipality and it operates on a network of 43 routes inside Brașov, summing up to 664 km (413 mi), with a fleet of over 300 vehicles. It is also operating 23 routes within the Brașov metropolitan area.

<span class="mw-page-title-main">Transports publics de la région lausannoise</span>

Transports publics de la région lausannoise, often abbreviated simply to tl, are the main operator of public transport in Lausanne and the wider agglomeration. As of 2012, TL operates a network of 10 trolleybus routes, 25 conventional bus routes and two métro lines, using more than 290 vehicles. TL operates weekend night services and demand responsive transport.

<span class="mw-page-title-main">Transport Călători Express Ploiești</span>

Transport Călători Express (TCE) is a local government body responsible for the transport system in Ploiești, Romania.

<span class="mw-page-title-main">Bucharest Articulated Tramcar</span> Series of Romanian tram vehicles

The Bucharest Articulated Tramcar series is a series of tram vehicles produced between 1971 and 1992 by URAC, the main workshops of the Bucharest Transit Company. Various modernized variants have also been delivered since 1993. For the last 50 years they have been the backbone of the tram network in Bucharest, replacing motor-trailer formations that had run in the city since the introduction of electric trams.

<span class="mw-page-title-main">Lujerului tram accident</span>

The Lujerului tram crash took place on 10 May 2012 in Militari, a neighborhood in Bucharest, Romania. During rush hour, a tram broke down and the driver of a third tram failed to stop, hitting a second tram that had stopped.

<span class="mw-page-title-main">TPBI</span>

Bucharest has the largest public transportation network in Romania and one of the largest in Europe.