USS Altair (AD-11)

Last updated

USS Altair (AD-11), in 1921 (NH 57796).jpg
USS Altair in  1921.
History
US flag 48 stars.svgUnited States
NameSS Edisto
Operator United States Shipping Board
Builder Skinner & Eddy Corporation, Seattle   Washington
Laid down18 December 1918
Launched10 May 1919
Fate
  • Transferred to U.S. Navy 29 October 1921
  • Delivered to U.S. Navy 5 December 1921
US flag 48 stars.svgUnited States
NameUSS Altair
Namesake Altair, the brightest star in the constellation Aquila
Operator United States Navy
Acquired
  • Transferred to U.S. Navy 29 October 1921
  • Named USS Altair 2 November 1921
  • Delivered to U.S. Navy 5 December 1921
Commissioned6 December 1921
Decommissioned8 July 1946
Stricken21 July 1946
Fate
General characteristics
as destroyer tender
TypeAltair-class destroyer tender
Displacement
  • 6,250 long tons (6,350 t) light
  • 10,000 long tons (10,160 t) full
Length423 ft 9 in (129.16 m)
Beam54 ft 3 in (16.54 m)
Draft20 ft 7 in (6.27 m)
PropulsionGeared turbine, single propeller
Speed10.5 knots (19.4 km/h; 12.1 mph)
Complement481 officers and enlisted
Armament
  • 4 × 5 in (130 mm) guns
  • 2 × 3 in (76 mm) guns (authorized but never installed)

USS Altair (AD-11) was the lead ship of a class of three United States Navy destroyer tenders. [1] She was named for Altair, the brightest star in the constellation Aquila, and was in commission from 1921 to 1946, seeing service during World War II.

Contents

Service history

United States Shipping Board, 19191921

Altair was laid down as the steel-hulled, single-screw cargo ship SS Edisto under a United States Shipping Board (USSB) contract on 18 December 1918 at Seattle, Washington, by the Skinner & Eddy Corporation. Launched on 10 May 1919, Edisto came under U.S. Navy scrutiny in the 13th Naval District, being given the identification number (Id. No.) 4156 and initially earmarked for potential service as a collier. After a brief period of operation by the USSB, Edisto was transferred to the Navy by executive order on 29 October 1921 and renamed USS Altair (AD-11) on 2 November 1921. Classified as a destroyer tender, she was delivered to the Navy on 5 December 1921 and commissioned at the New York Navy Yard in Brooklyn, New York, the following day, 6 December 1921.

19211939

Altair with destroyers at Pearl Harbor, Hawaii, on 8 February 1925. Among the destroyers alongside her are USS Marcus (DD-321), next to Altair; USS Sloat (DD-316), third outboard of Altair; and USS Litchfield (DD-336), furthest outboard. USS Altair (AD-11) moored in Pearl Harbor with destroyers on 8 February 1925.jpg
Altair with destroyers at Pearl Harbor, Hawaii, on 8 February 1925. Among the destroyers alongside her are USS Marcus (DD-321), next to Altair; USS Sloat (DD-316), third outboard of Altair; and USS Litchfield (DD-336), furthest outboard.

Converted to a destroyer tender at the New York Navy Yard, and equipped with surplus and salvaged machine tools and shop equipment selected from dismantled U.S. Navy and United States Army war plants in the demobilization after World War I, Altair underwent her metamorphosis in nine months and then fitted out at her conversion yard into late November 1922. She then proceeded to the west coast of the United States via Newport, Rhode Island; Hampton Roads, Virginia, and the Panama Canal Zone, reaching San Diego, California, on 17 December 1922. She was assigned to Destroyer Squadron 12, Destroyer Squadrons, Battle Fleet — a unit of 19 destroyers (one "leader" and three six-ship divisions) operating at that time with 84% complements as part of the "rotating reserve." From 1922 to 1939, Altair followed her destroyers and provided support services wherever required, perfomring work that varied from simple repairs to reblading turbines. She underwent yearly upkeep at the Mare Island Navy Yard at6 Mare Island in Vallejo, California.

In 1925, Altair supported her assigned destroyers in Hawaiian waters during joint U.S. Army-U.S. Navy maneuvers designed to test Hawaii's defenses, and that summer and autumn, when the United States Fleet carried out an Australian cruise, Altair visited Tutuila, American Samoa; Port Phillip, Australia; and Lyttelton, New Zealand. In 1926, the occupation of Nicaragua prompted the dispatch of sailors and Marines from ships of the Special Service Squadron, and later from other ships in the fleet. However, "as the danger points moved inland", the United States Secretary of the Navy's report for 1928 states, "it became advisable to use Marines for this duty." Accordingly, a Marine expeditionary force, some 3,000-men strong, was dispatched to Nicaragua early in 1927. Altair participated in this troop lift, when she and the destroyer tender USS Melville (AD-2) transported Marine Observation Squadron 1 and a rifle company from San Diego to Corinto, a port on the west coast of Nicaragua, reaching their destination on 16 February 1927. Altair then resumed her operations providing services to the destroyers of Squadron 12, accompanying them to Narragansett Bay in Rhode Island for tactical exercises before ultimately returning once more to San Diego.

19391941

When World War II began in Europe in the autumn of 1939, Altair was tending Destroyer Squadrons 4 and 6, of Destroyer Flotilla 2, Battle Force, still based at San Diego. In March 1940, however, to service the destroyers of the Hawaiian Detachment sent to Pearl Harbor in December 1939, Altair was shifted to Pearl Harbor. En route to her new duty station, she served as plane guard for U.S. Navy Consolidated PBY Catalina flying boats being ferried to Oahu, arriving at Pearl Harbor on 16 April 1940. She tended destroyers there through the end of 1940 and into 1941 as the fleet based permanently on Pearl Harbor following the conclusion of Fleet Problem XXI.

Overhauled at Mare Island Navy Yard from 6 April to 6 June 1941, Altair returned to Pearl Harbor on 26 June 1941. For the next three months she discharged her duty there until she departed Hawaiian waters on 30 September 1941 for the U.S. West Coast. Pausing briefly at San Diego from 12 to 18 October 1941, the ship pushed south, transited the Panama Canal on 2 and 3 November 1941, and arrived at her new duty station, Hamilton, Bermuda, on 11 November 1941, to provide support for destroyers operating on the Neutrality Patrol in the North Atlantic Ocean.

World War II

19411943

After the Japanese attack on Pearl Harbor brought the United States into World War II on 7 December 1941, Altair maintained a routine of carrying out upkeep and repairs on United States Atlantic Fleet destroyers at Bermuda that continued into the summer of 1942. Underway for San Juan, Puerto Rico, on 3 July 1942 escorted by the destroyers USS Bernadou (DD-153) and USS Cole (DD-155), Altair arrived at her destination on 6 July 1942, detaching the two destroyers and picking up another, USS Hilary P. Jones (DD-427), which escorted the tender to Trinidad, where she arrived on 11 July 1942. Except for brief periods at Aruba and Curaçao in the Dutch West Indies in early September 1942, Altair tended destroyers at Trinidad through mid-July 1943.

Altair in what appears to be Measure 12 (modified) camouflage, moored at Port of Spain, Trinidad, on 1 October 1942, tending the gunboat USS Spry (PG-64), the destroyers USS Bainbridge (DD-246) and USS Goff (DD-247), and the Royal Netherlands Navy minelayer and patrol vessel HNLMS Jan van Brakel (M-80). USS Altair (AD-11) moored at Port of Spain, Trinidad, on 1 October 1942 (80-G-31669).jpg
Altair in what appears to be Measure 12 (modified) camouflage, moored at Port of Spain, Trinidad, on 1 October 1942, tending the gunboat USS Spry (PG-64) , the destroyers USS Bainbridge (DD-246) and USS Goff (DD-247) , and the Royal Netherlands Navy minelayer and patrol vessel HNLMS Jan van Brakel (M-80).

19431946

Following repairs at the Norfolk Navy Yard in Portsmouth, Virginia, Altair reported to Commander, Operational Training Command, Atlantic Fleet, on 21 August 1943 and soon resumed active tender operations at Bermuda, this time in support of the destroyer and destroyer escort shakedown group (Task Group 23.1) until shifted to Guantanamo Bay Naval Base, Cuba, where she arrived on 11 March 1945. Providing tender services at Guantánamo Bay until 3 May 1945, Altair then returned to the Norfolk Navy Yard to prepared for service in the Pacific theater. While the ship was on her way, Nazi Germany surrendered unconditionally and the European war ended on 8 May 1945. Prepared for "distant service," Altair emerged from the Norfolk Navy Yard on 26 July 1945 and set course for the Pacific. Arriving in the Panama Canal Zone on 4 August 1945, the ship was still there when hostilities with Japan ended on 14 August 1945 (15 August 1945 on the other side of the International Date Line in the Western Pacific and East Asia.

Altair departed the Panama Cana Zone for Pearl Harbor on 15 August 1945. She reached Pearl Harbor on 6 September 1945 and provided tender services to small ships and craft into the early spring of 1946. She departed Hawaiian waters for the last time on 27 April 1946 and reached San Francisco, California, on 8 May 1945, slated for disposal within the 12th Naval District.

Decommissioning and disposal

Decommissioned at the Mare Island Naval Shipyard (formerly the Mare Island Navy Yard) on 21 June 1946, Altair was transferred to the United States Maritime Commission on 8 July 1946, and her name was struck from the Naval Vessel Register on 21 July 1946. Laid up in the National Defense Reserve Fleet's Suisun Bay, California, berthing area, the ship remained there until sold on 9 March 1948 to the Basalt Rock Company, which subsequently took delivery of and scrapped her.

Honors and awards

Related Research Articles

USS <i>Arnold J. Isbell</i> Gearing-class destroyer

USS Arnold J. Isbell (DD-869), a Gearing-class destroyer, was the only ship of the United States Navy to be named for Arnold J. Isbell, an aircraft carrier captain during World War II. The ship was laid down on 14 March 1945 at Staten Island, New York, by Bethlehem Mariners Harbor, launched on 6 August 1945 and commissioned on 5 January 1946. Constructed too late to see action in World War II, the vessel initially served as a training ship with the United States Atlantic Fleet, before transferring to the Pacific and deploying to Korea during the Korean War and off the Vietnam coast during the Vietnam War. In 1972 Arnold J. Isbell was made part of the reserve training fleet and in 1974, sold to Greece where the ship was renamed Satchouris and served with the Hellenic Navy until being sold for scrap in 2002.

USS <i>Austin</i> (DE-15) Evarts-class destroyer escort

USS Austin (DE-15), was an Evarts-class destroyer escort of the United States Navy during World War II. The ship was named for Chief Carpenter John Arnold Austin (1905-1941) who was killed in action on board USS Oklahoma during the attack on Pearl Harbor by Japanese forces on 7 December 1941, and was posthumously awarded the Navy Cross.

<i>Mahan</i>-class destroyer Former class of US Navy destroyers

Mahan-class destroyers of the United States Navy were a series of 18 destroyers of which the first 16 were laid down in 1934. The last two of the 18, Dunlap and Fanning, are sometimes considered a separate ship class. All 18 were commissioned in 1936 and 1937. Mahan was the lead ship, named for Rear Admiral Alfred Thayer Mahan, an influential historian and theorist on sea power.

USS <i>Skipjack</i> (SS-184) Submarine of the United States

USS Skipjack (SS-184), was a Salmon-class submarine, the second ship of the United States Navy to be named after the skipjack tuna. She earned multiple battle stars during World War II and then was sunk, remarkably, by an atomic bomb during post-World War II testing in Operation Crossroads. Among the most "thoroughly sunk" ships, she was refloated and then sunk a second time as a target ship two years later.

USS <i>Blackfin</i> Submarine of the United States

USS Blackfin (SS-322), a Balao-class submarine in commission from 1944 to 1948 and from 1951 to 1972, was a ship of the United States Navy named for the blackfin cisco, a food fish of the Great Lakes.

USS <i>Bumper</i> Submarine of the United States

USS Bumper (SS-333), a Balao-class submarine, was a ship of the United States Navy named for the bumper, a small fish of the North and South Atlantic Ocean.

USS <i>Wright</i> (AV-1) Tender of the United States Navy

USS Wright (AZ-1/AV-1) was a one-of-a-kind auxiliary ship in the United States Navy, named for aviation pioneer Orville Wright. Originally built as a kite balloon tender, she was converted into a seaplane tender after kite balloons were no longer used.

USS <i>Dixie</i> (AD-14) Tender of the United States Navy

The second USS Dixie (AD-14) was the first of her class of destroyer tenders built just before the start of World War II for the U.S. Navy. Her task was to service destroyers in, or near, battle areas and to keep them fit for duty.

USS <i>Williamson</i> Tender of the United States Navy

USS Williamson (DD-244/AVP-15/AVD-2/APD-27) was a Clemson-class destroyer in the United States Navy during World War II. She was named for Commander William Price Williamson.

USS <i>Sicard</i> Clemson-class destroyer

USS Sicard (DD-346/DM-21/AG-100) was a Clemson-class destroyer in the United States Navy following World War I. She was named for Montgomery Sicard.

USS <i>Balch</i> (DD-363) Porter-class destroyer

USS Balch (DD-363) was a Porter-class destroyer in the United States Navy. She is named for Admiral George Beall Balch.

USS <i>Holland</i> (AS-3) Tender of the United States Navy

USS Holland (AS-3) was a submarine tender that served in the United States Navy before and during World War II. Holland was launched by the Puget Sound Naval Shipyard, Bremerton, Washington on 12 April 1926, sponsored by Miss Elizabeth Saunders Chase, daughter of Admiral J. V. Chase, and commissioned on 1 June. Stationed at San Diego, California, tending submarine divisions there with periodic tours to Panama to service submarines based at the Canal Zone pre-World War two. Later serving in the Pacific theatre, by close of hostilities having given 55 instances of refit to submarines, provided repair and service to 20 surface craft and completed various jobs on shore installations.

USS <i>Dobbin</i> Tender of the United States Navy

USS Dobbin (AD-3) is the name of a United States Navy destroyer tender of World War II, named after James Cochrane Dobbin, the Secretary of the Navy from 1853 to 1857.

USS <i>Argonne</i> (AS-10) Tender of the United States Navy

USS Argonne (AP-4/AS-10/AG-31) was a Design 1024 cargo ship built under United States Shipping Board contract by the International Shipbuilding Corp., Hog Island, Pennsylvania, for the United States Department of War. Named Argonne for the U.S. Army's Meuse-Argonne campaign in World War I, she was completed in 1920, delivered to the War Department in December 1920, laid up in February 1921, and loaned to the Navy on 3 November 1921. Accepted preliminarily by the Navy on that date, she was commissioned as Argonne on 8 November 1921 at the Philadelphia Navy Yard. The ship was permanently transferred to the Navy 6 August 1924 by Executive Order.

USS <i>Whitman</i> Evarts-class destroyer escort

USS Whitman (DE-24) was an Evarts-class destroyer escort constructed for the United States Navy during World War II. It was promptly sent off into the Pacific Ocean to protect convoys and other ships from Japanese submarines and fighter aircraft. By the end of the war, when she returned to the United States, she had accumulated four battle stars.

USS <i>Griffin</i> Tender of the United States Navy

USS Griffin (AS-13), originally Mormacpenn, a United States Maritime Commission Type C3 pre-war cargo ship, was launched by Sun Shipbuilding & Dry Dock, Chester, Pennsylvania, 11 October 1939. She served briefly with Moore-McConnack, Inc., was acquired by the Navy in 1940, renamed Griffin (AS-13) and converted to a submarine tender at Robbins Dry Dock and Repair Company, Brooklyn, N.Y. Griffin commissioned 31 July 1941.

USS <i>Pelias</i> Tender of the United States Navy

USS Pelias (AS–14) was a Griffin-class submarine tender in service with the United States Navy from 1941 to 1970.

USS <i>Wiseman</i> Buckley-class destroyer escort

USS Wiseman (DE-667) was a Buckley-class destroyer escort in service with the United States Navy for several periods between 1944 and 1973. She was scrapped in 1974.

USS <i>Kinzer</i>

USS Kinzer (APD-91), ex-DE-232, was a United States Navy high-speed transport in commission from 1944 to 1946.

<i>Altair</i>-class destroyer tender

The Altair class destroyer tender was a class of three United States Navy destroyer tenders. These ships were built in Skinner & Eddy's Seattle shipyard as commercial cargo ships during World War I, and acquired by the Navy when the shipyard closed in 1921. All three served through World War II, and were decommissioned and scrapped shortly after the war.

References

Notes

  1. Silverstone, Paul H. (1968). U.S. Warships of World War II. Garden City, New York: Doubleday & Company. p. 283.