History | |
---|---|
United States | |
Ordered |
|
Laid down | 12 October 1942 |
Launched | 12 June 1943 |
Commissioned |
|
Decommissioned | late 1968 |
Stricken | 1 October 1976 |
Fate | Scrapped 17 January 1984 |
General characteristics | |
Displacement | 7,700 t.(lt) 13,893 t.(fl) |
Length | 469 ft 9 in (143.18 m) |
Beam | 63 ft (19 m) |
Draught | 25 ft 11 in (7.90 m) |
Propulsion | steam turbine, single shaft, 6,300shp |
Speed | 16 kts. |
Complement | 252 |
Armament |
|
USS Hyades (AF-28) was the lead ship of her class of stores ships acquired by the U.S. Navy for service in World War II. Her task was to carry stores, refrigerated items, and equipment to ships in the fleet and to remote stations and staging areas.
Hyades, ex.-SS Iberville, was launched under Maritime Commission contract by Gulf Shipbuilding Co., Chickasaw, Alabama, 12 June 1943; sponsored by Mrs. L. R. Sanford; and commissioned at Bethlehem Steel, Baltimore, Maryland, after conversion, 1 August 1944.
Hyades got underway 11 September 1944 for Trinidad and the Panama Canal, escorted by destroyer Warrington (DD-383).
In the Caribbean Hyades and Warrington encountered a severe hurricane. By 13 September Warrington was foundering. The heavy weather had separated the two ships. When the destroyer went down, Hyades proceeded to her last known position to pick up survivors. She rescued 61 before proceeding to Panama, where she arrived 19 September.
The refrigerator ship steamed to Majuro to supply the fleet with foodstuffs 10 October, touching at Kwajalein, Eniwetok, and other bases before returning to San Francisco, California. Underway again 1 December 1944, the ship made two more voyages to the advance bases and the Philippines with stores, returning to Seattle, Washington, from the second cruise 13 April 1945. She continued on this duty, so vital to the support of the huge U.S. Pacific Fleet, until well after the surrender of Japan. In addition to supplying ships she brought food and supplies to many shore bases.
In 1946 Hyades brought supplies to American ground troops in China, spending March at Qingdao and April at Hong Kong. In 1947 she spent several months at Shanghai. She then operated out of San Francisco, bringing supplies to the various occupation groups and island outposts in the Pacific Ocean.
The ship sailed through the Panama Canal to Norfolk, Virginia, to join the Atlantic Fleet, arriving 14 June 1948. She departed for her first cruise to the Mediterranean 12 July 1948, during which she operated with the fast Carrier forces serving as a mobile replenishment ship. Hyades brought supplies and showed the flag in many Mediterranean ports, including Piraeus, Greece, Naples, Italy, Valencia, Spain, and Gibraltar.
As tension mounted in the Mediterranean in early 1956, Hyades replenished destroyers patrolling the eastern Mediterranean, returning to Norfolk 28 February. She later rendezvoused with powerful fleet units in July, including Iowa (BB-53), New Jersey (BB-62), Des Moines (CA-134), and Macon (CA-132), as American naval power moved in to prevent the widening of the Suez Crisis. In April 1957 the ship replenished carrier Lake Champlain (CV-39) during moves to support the threatened government of Jordan and took part in an important NATO fleet exercise during September–October in northern European waters.
In the years that followed, Hyades continued to support the U.S. 6th Fleet in its cold war operations in the Mediterranean. During August–September 1958, she visited Crete and Turkey when the latter country was threatened. In 1959, she sailed 11 May for fleet replenishment in response to the heightened Berlin crisis. The veteran stores ship returned twice more to the Mediterranean in 1959, and again in 1960 and 1961.
Hyades responded quickly in the Cuban Missile Crisis of 1962, arriving at Guantanamo Bay 22 October to evacuate dependents as the introduction of offensive missiles resulted in a U.S. naval quarantine of Cuba. After the safe evacuation, the ship returned to the quarantine line for underway replenishment of the ships patrolling off the island. After the easing of the situation in December, Hyades entered Home Bros. Shipyard in Newport News, Virginia, for the installation of a helicopter deck aft to increase her versatility and replenishment capabilities.
During 1963 the ship cruised with the 6th Fleet in July and August. In 1964 she took part in Operation Springboard in the Caribbean, returning to Norfolk 1 February 1964. Hyades continued to serve the Fleet through the mid-1960s and in late 1967 was based at Norfolk, Virginia.
In May 1968, the Hyades was near the Azores en route to the Mediterranean when she received word of the disappearance of the U.S. Navy submarine USS Scorpion. She was the first to arrive, finding nothing. When other ships joined the search, the Hyades continued on. A lookout aboard the Hyades had earlier reported spotting an orange distress buoy in the water, but it did not get reported to the captain, and as a result of the responsible lieutenant's inaction, he was later court-martialed.
Hyades was decommissioned in late 1968 at the Naval shipyard in Philadelphia, and struck from the Naval Register, 1 October 1976. After being laid up in the Reserve Fleet, she was transferred to the Maritime Administration (MARAD) for disposal, 13 October 1983.
She was sold to the Jacobson Metal Co on 17 January 1984 and broken up. [1]
Hyades’ crew was eligible for the following medals and ribbons:
USS Wright (CVL-49/AVT-7) was a Saipan-class light aircraft carrier of the U.S. Navy, later converted to the command ship CC-2. It is the second ship named "Wright". The first Wright (AV-1) was named for Orville Wright; the second honored both Wright brothers: Orville and Wilbur.
USS Shasta (AE-6), an ammunition ship, was laid down under Maritime Commission contract on 12 August 1940 by the Tampa Shipbuilding Company, Tampa, Fla., initially as a C2 type cargo ship. She was acquired by the Navy on 16 April 1941 and launched on 9 July 1941, sponsored by Mrs. Spessard L. Holland. She was commissioned on 20 January 1942. She was named after Mount Shasta, a volcano in the Cascade Range in northern California, USA.
USS Wrangell (AE-12) was laid down under a Maritime Commission contract as SS Midnight during February 1944 at Wilmington, North Carolina, by the North Carolina Shipbuilding Company; launched on 14 April 1944; sponsored by Mrs. G. T. Cambell; delivered to the Navy, incomplete, on 28 May 1944; moved to Hampton Roads; converted to an ammunition ship by the Norfolk Shipbuilding and Drydock Co.; and commissioned on 10 October 1944 at the Norfolk Navy Yard.
USS Goff (DD-247) was a United States Navy Clemson-class destroyer in commission from 1921 to 1931 and from 1932 to 1945. She saw service during the Second Nicaraguan Campaign and World War II. She was named for Secretary of the Navy Nathan Goff, Jr.
USS Warrington (DD-843) was a Gearing-class destroyer that served the U.S. Navy from the end of World War II to the Vietnam War, when she was damaged by two underwater explosions, causing her to be listed as "beyond repair" and excessed to the Navy of the Republic of China.
USS English (DD-696) was an Allen M. Sumner-class destroyer. She was named for Rear Admiral Robert Henry English, a submariner who commanded the light cruiser Helena and had been awarded the Navy Cross and the Navy Distinguished Service Medal. English died in the crash of Pan Am Flight 1104 on 21 January 1943.
USS Noxubee (AOG-56) was a Patapsco-class gasoline tanker acquired by the U.S. Navy for the task of transporting gasoline to warships in the fleet, and to remote Navy stations. She served in a commissioned status from 1945 to 1959, and 1965–1975. She was named for a river in Mississippi.
USS Sylvania (AFS-2), a Mars-class combat stores ship, was the second ship of the United States Navy to be named Sylvania.
USS Warrington (DD-383) was a Somers-class destroyer, laid down on 10 October 1935 at Kearny, New Jersey, by the Federal Shipbuilding and Drydock Company; launched on 15 May 1937; sponsored by Miss Katherine Taft Chubb; and commissioned at the New York Navy Yard on 9 February 1938.
USS Graffias (AF-29), a Hyades-class stores ship, is the only ship of the United States Navy to have this name. The name Graffias is another name for the star Beta Scorpii in the constellation Scorpius.
USS Rankin (AKA-103/LKA-103) was a Tolland-class attack cargo ship in service with the United States Navy from 1945 to 1947 and again from 1952 to 1971. She was finally sunk as an artificial reef in 1988.
USS Holder (DD/DDE-819) was a Gearing-class destroyer of the United States Navy, the second Navy ship named for Lieutenant (jg) Randolph Mitchell Holder, a Navy pilot who was killed during the Battle of Midway.
USS Aldebaran (AF-10), the lead ship of her class of stores ship is the only ship of the United States Navy to have this name. She is named after Aldebaran, a star of the first magnitude in the constellation Taurus.
USS Basilone (DD/DDE-824) was a Gearing-class destroyer of the United States Navy, named for Gunnery Sergeant John Basilone (1916–1945), who was awarded the Medal of Honor for "extraordinary heroism and conspicuous gallantry in action...." in the defense of Henderson Field during the 1942 Guadalcanal campaign.
USS Waccamaw (AO-109) was a Cimarron-class replenishment oiler in the United States Navy. She was named after Waccamaw River. The original capacity was 146,000 barrels (23,200 m3).
USS Sierra (AD-18) was a Dixie-class destroyer tender built just before the start of World War II for the U.S. Navy. Her task was to service destroyers in, or near, battle areas and to keep them fit for duty.
USS Adria (AF-30) was an Adria-class stores ship in service with the United States Navy from 1944 to 1954. She was scrapped in 1977.
USS Alstede (AF-48) was an Alstede-class stores ship acquired by the U.S. Navy at the end of World War II. Her task was to carry stores, refrigerated items, and equipment to ships in the fleet, and to remote stations and staging areas.
USS Denebola (AF-56) was a Denebola-class stores ship acquired by the U.S. Navy. She was built as SS Hibbing Victory as a type VC2-S-AP2 Victory ship built by Oregon Shipbuilding Corporation of Portland, Oregon, under a Maritime Commission. The Maritime Administration cargo ship was the 113th ship built. Its keel was laid on 2 May 1944. The ship was christened on 30 June 1944. She was built at the Oregon Shipbuilding yards in just 59 days, under the Emergency Shipbuilding program for World War II. The 10,600-ton ship was constructed for the Maritime Commission. She was operated by the (Pacific-Atlantic SS Company under the United States Merchant Marine act for the War Shipping Administration. The other two ships in her class were USS Regulus and USNS Perseus. USS Denebola's task was to carry stores, refrigerated items, and equipment to ships in the fleet, and to remote stations and staging areas.
The second USS Altair (AK-257) was a United States Navy Greenville Victory-class cargo ship in commission from 1952 to 1953. She was converted into a Antares-class general stores issue ship (AKS-32) in 1953 and was in commission as such from 1953 to 1969, seeing extensive service during the Cold War. Prior to her U.S. Navy career, she had operated as the merchant ship SS Aberdeen Victory during the latter stages of World War II.
This article incorporates text from the public domain Dictionary of American Naval Fighting Ships .The entry can be found here.