Union Station (Burlington, Vermont)

Last updated

Burlington, VT
Street side at Burlington Union Station.jpg
View of Union Station from Main Street in July 2022
General information
Location1 Main Street
Burlington, Vermont
United States
Coordinates 44°28′33″N73°13′10″W / 44.4757°N 73.2195°W / 44.4757; -73.2195
Owned byMain Street Landing Company
Line(s) NECR Burlington Subdivision
VRS Northern Subdivision
Rutland Railroad Island Line (former)
Platforms1 side platform
Tracks1
ConnectionsAiga bus trans.svg Green Mountain Transit
Maki7-ferry.svg Burlington - Port Kent Ferry
Construction
ParkingYes
AccessibleYes
Other information
StatusUnstaffed station with waiting room
Station code Amtrak: BTN
History
OpenedJanuary 23, 1916
July 29, 2022
ClosedJune 26, 1953
Passengers
FY 202321,150 [1] (Amtrak)
Services
Preceding station BSicon LOGO Amtrak2.svg Amtrak Following station
Terminus Ethan Allen Express Ferrisburgh–Vergennes
toward New York
Former services
Preceding station Vermont Railway Following station
Terminus Champlain Flyer
2000–2003
General Dynamics
toward Charlotte
Preceding station Central Vermont Railway Following station
TerminusWinooski Subdivision
Service ended 1938
Winooski
Preceding station Rutland Railroad Following station
South Hero
toward Rouses Point
Main Line Shelburne
South Hero
toward Montreal
Green Mountain Flyer / Mount Royal Shelburne
toward New York or Boston
Union Station
Part of Battery Street Historic District
NRHP reference No. 77000098
Designated CPNovember 2, 1977
Location
Union Station (Burlington, Vermont)

Burlington Union Station is a train station and office building located in downtown Burlington, Vermont, United States. It is the northern terminal of the Amtrak Ethan Allen Express service. A single side platform on the west side of the station serves Vermont Railway excursion trains and Amtrak trains. The symmetrical Beaux Arts building, built of buff brick with limestone and granite trim, has a central pilaster over two entrances. The main building is divided for use by a variety of tenants.

Contents

Rail service to Burlington began in December 1849 with the completion of the Rutland and Burlington Railroad (which later became the Rutland Railroad) and the Vermont Central Railroad (VC). The VC replaced its original station by 1853; it constructed a new line into Burlington in 1861, with a temporary station on the waterfront. It built a permanent station with an arched trainshed in 1866–67. This became a union station in 1871 when the VC leased the Rutland. After local advocacy for a new station, an expansion was built in 1895–96. The Rutland became independent again in 1898 and soon constructed an extension northwards from Burlington.

Planning for a new union station began in 1909, but the railroads and the city struggled to reach an agreement about whether to eliminate grade crossings. After years of discussion and a legal battle about one design, a design with at-grade tracks was approved in 1914. Construction began that November, and the new Union Station opened on January 23, 1916. Passenger service began to decline shortly afterwards; the CV replaced most shuttle trains to Burlington with buses in 1932, and ended its rail service to the station in 1938. Rutland service to Burlington, including the Green Mountain Flyer , lasted until 1953. The building was sold to Green Mountain Power in 1955 and renovated for use as offices.

After the Rutland attempted to abandon its system, most lines were taken over by Vermont Railway in 1964. It soon began operating excursion trains from Burlington. Union Station was added to the National Register of Historic Places in 1977 as a contributing property to the Battery Street Historic District. It was purchased by a private developer in 1985. After a failed attempt that year, a waterfront development was built in the 1990s, with Union Station renovated and an addition built. It served as the terminal of Champlain Flyer commuter service from 2000 to 2003. Construction of a new platform for Amtrak service took place from 2020 to 2022, and Ethan Allen Express service began on July 29, 2022.

Station design

Detail of the station's center section Union Station Burlington Vermont central section.jpg
Detail of the station's center section

Union Station is located at the west end of Main Street in downtown Burlington near the Lake Champlain waterfront. It is built into a hillside, with two stories aboveground plus a basement level accessed from the west side. It is 5 by 13 bays – approximately 55 ft × 138 ft (17 m × 42 m) – oriented north-south, with the bays defined by pilasters. [2] The symmetrical Beaux Arts building is built of buff brick with limestone and granite trim. It has a hip roof with a central flat section; on the Main Street side, a pediment with tops the three central bays. The central bay has ornamental grillwork and a large clock; the flanking bays have carvings of Mercury and the entrance doors. [2] [3]

When the station was originally opened, those doors led directly into the 30 ft × 75 ft (9.1 m × 22.9 m) main waiting room, which was finished with white oak and Vermont marble. The ticket office was between the doors. The baggage office and women's waiting room were at the north side of the station, with the main baggage room below. At the south end was the station restaurant, with the express office and mail room below. [3] Two island platforms serving four passenger tracks were located on the west side of the station, with freight bypass tracks to their west. An enclosed footbridge ran west from the waiting room, with stairs down to the covered platforms. [3] [4]

The Union Station building is owned by Main Street Landing Company. It has been substantially renovated since its use as a station; the main floors are subdivided for use by tenants including art studios and other businesses, nonprofit organizations, and the Vermont Agency of Transportation. [5] The original platforms and footbridge are no longer extant; a semicircular addition is located on the rear of the basement level, with a plaza on its roof. [6] The modern Amtrak platform is a single side platform serving the single track, with the Island Line Trail on the west side of the track. [7] The station is the junction of the New England Central Railroad Burlington Subdivision (Winooski Branch) and the Vermont Railway Northern Subdivision. [8] The dock for the Burlington - Port Kent Ferry is on King Street about 600 ft (180 m) southwest of Union Station, while several Green Mountain Transit bus routes stop on nearby streets. [9]

Four steel statues of winged monkeys sit on the roof of Union Station. Two were originally commissioned in 1976 for a local waterbed store, named "Emerald City" after the capital city of the fictional Land of Oz. [10] They were purchased by Main Street Landing to add "whimsy and fun" to the building and were installed in June 1997. [11] [12] Two "babies" were added in 2004. [10]

History

Early stations

The Rutland and Burlington Railroad (R&B) opened between Burlington and Bellows Falls on December 18, 1849, with regular service beginning December 24. [13] [8] :41 [14] :74 Its Burlington terminal was along the waterfront at the intersection of Water Street (now Battery Street) and South Street (Maple Street). [15] The competing Vermont Central Railroad (VC) was completed between Burlington and White River Junction on December 25, 1849. [16] [14] :74 The first VC station in Burlington, at St. Paul Street and Maple Street, was converted from an unfinished house. [17]

A track continued through downtown from the VC station to reach the waterfront industries and the Lake Champlain ferries. By 1853, a new VC passenger station was located between College Street and Main Street at Water Street (now Winsooki Avenue) – now the site of Fletcher Free Library. [15] The R&B tracks were extended north along the waterfront in 1850 to connect with the VC. [18] By 1851, connecting railroads allowed Boston and New York City connections from Burlington via both the VC and R&B. [8] :41,170

The two railroads quickly developed a bitter rivalry. The Vermont and Canada Railroad (V&C) was chartered in 1845 to connect with both railroads in Burlington and continue north to Canada. The VC leased the V&C in 1849; the V&C was terminated (in violation of its charter) at a connection with the VC at Essex Junction in 1851. To spite the Rutland, the VC and V&C made connections at Burlington and Essex Junction deliberately poor. [8] :171 [19] :264 In May 1861, the VC opened a new route from Winooski to Burlington via the Burlington Tunnel. A temporary depot was placed near College Street on the waterfront, and the old line into Burlington was abandoned. [17] [20]

1867 station

The 1867-built station around 1910 Union Depot, Burlington, VT.jpg
The 1867-built station around 1910

Work on a permanent station for the VC, located north of College Street near Lake Street, began in early 1866. The new station was made of brick with a granite foundation. The main structure was 204 ft (62 m) long north–south and 88 ft (27 m) wide, with an arched train shed covering three tracks. The walls were 27 ft (8.2 m) high, with 11 ft (3.4 m)-square towers for storage and ornamentation at each corner. A 102 ft (31 m)-long wing on the west side, with a center section 40 ft (12 m) high flanked by two 64 ft (20 m)-high towers, housed the waiting rooms and railroad offices. [21] [22] The station was completed in late 1866 or early 1867. [23] [24] The cost was estimated at $50,000 (equivalent to $900,000in 2023). [25]

The R&B became the Rutland Railroad in 1867. [8] :41 In December 1870, the VC reached an agreement to lease the Rutland. [14] :76 [8] :42 This took effect on January 8, 1871. [26] On January 13, the Rutland depot was closed, and all Rutland trains began using the VC station. [27] The acquisition of the Rutland and other properties pushed the VC into bankruptcy in 1873; it emerged as the Central Vermont Railroad (CV). [8] :173 By 1875, the former Rutland station was reused as a machine shop. [28]

The Burlington and Lamoille Railroad opened between Burlington and Cambridge Junction via Essex Junction on July 2, 1877. Passenger trains used the CV station in Burlington, while the old Rutland station was leased for use as the railroad's offices and maintenance shops. [29] [30] Passenger trains were rerouted over the CV between Burlington and Essex Junction on June 1, 1880; the corresponding section of the Burlington and Lamoille was quickly abandoned. [31] [32] [33] The CV took control of the Burlington and Lamoille in 1889; it continued to use the former Rutland station as maintenance shops for several years. [34] [8] :326 [35] The building was demolished in August 1897. [36]

In mid-1889, the Burlington Board of Trade began advocating for the construction of a new union depot. [37] The city council passed a resolution supporting the effort in November 1889. [38] In January 1890, the CV presented potential plans to either built a new station or improve the existing one. [39] The original twenty-year lease of the Rutland expired in 1890; after initially making an agreement with the Delaware and Hudson Railroad (D&H), the Rutland signed a renewed lease with the CV. [14] :78 Not until February 1895 did the CV announce plans for a major renovation of the station, with new waiting rooms on the east side of the station and a covered platform for the east track. [40] The work also included replacement of the original brick arches of the trainshed with modern supports, and construction of a spur track for the Burlington Traction Company that allowed streetcars to load from the south portion of the new platform. [41] Construction began on July 3, 1895; the new waiting rooms opened in December, with the platform canopies completed in early 1896. [42] [41] [43]

For a second time, leasing the Rutland bankrupted the CV, and it entered receivership on March 20, 1896. The Rutland was separated on May 7 and entered control of the D&H (which owned the majority of its stock), though it continued to use the CV station in Burlington. [14] :79 [44] A group including William Kissam Vanderbilt, William Seward Webb, and Rutland president Percival W. Clement purchased control of the Rutland Railroad from the D&H effective October 22, 1898, and the railroad became fully independent. [44] The Rutland immediately moved to build the long-planned Rutland–Canadian Railroad (Island Line) between Burlington and Rouses Point, New York, with a branch to Noyan, Quebec. [45] Regular passenger service on the new line began on January 7, 1901. [46] The south portion of the canopy at Burlington station was removed between 1900 and 1906. [47] [48]

Union Station planning

The 1867-built station, which had been built by the CV primarily for Essex Junction–Burlington shuttle trains, proved inadequate for the increased traffic of the Rutland and its 1901 extension plus the Burlington and Lamoille. [49] Planning for a new union station began in 1909. [50] In February 1911, the state legislature authorized the state public service commission to select a site and order the railroads to build a new union station. [51] Hearings before the commission began in July 1911. [52] The two railroads disagreed about numerous facets of the project; the CV wanted to elevate the tracks to eliminate several grade crossings, which the Rutland opposed. [53] The commission chairman remarked in August that the results of the proceedings up to that point were "about on par with a man dragging a cat by the tail across a carpet." [54]

The CV presented a revised plan for the station and grade crossing eliminations in September 1911. [55] The CV estimated the cost at $315,000 (equivalent to $7.49 million in 2023)., while the Rutland estimated $250,000 (equivalent to $5.9 million in 2023). [56] An alternate CV plan with no grade crossing eliminations was presented that December. [57] In February 1912, local engineer Frank O. Sinclair presented a new proposal, created at the request of a city committee. It called for the station building to be on the west side of the tracks at Main Street – rather than the east side as in the CV plans – and for a road overpass to be built. [58]

In August 1912, the public service commission chose a newer CV design that had been presented that January. Main Street would be terminated at the station, while College, King, and Maple streets pass under the new elevated tracks. [59] That December, the commission issued a formal order for the railroads to construct the new union station by December 15, 1913. Total cost was estimated at $385,000 (equivalent to $8.8 million in 2023); the city would pay $15,000 (equivalent to $340,000in 2023), with the remainder split between the railroads. [60] Later that month, the Rutland petitioned the Vermont Supreme Court to vacate the commission's order, claiming that the railroad would lose valuable land from the construction of the station and elevated tracks, and that the commission had exceeded its constitutional authority. [61] A hearing before the court was held in February 1913. [62]

In April 1913, the two railroads agreed to work with the city to create a plan acceptable to all parties. [63] An agreement for at-grade tracks was reached that July; estimated cost was $165,000 (equivalent to $3.77 million in 2023). [64] The building was designed by New York architect Alfred T. Fellheimer, with Charles Schultz as supervising architect. [2] Fellheimer's plans were accepted in February 1914. The location at the foot of Main Street would be kept, with part of Lake Street rerouted to connect with Main Street. The tracks would remain at grade, with the grade crossings not eliminated; a footbridge would provide access from the station building to the platforms. [65] The city board of aldermen approved the plan that March. [66] In April, the Vermont Supreme Court modified the 1912 public service commission order, allowing the new plan to go forward. [67]

Construction and service

Union Station, c. 1920 Union Station, Burlington, Vt. - 8.jpg
Union Station, c.1920

Bids for station construction were opened in June 1914. [68] The city formally discontinued sections of Main Street and Lake Street in July, making way for construction. [69] After delays during negotiations, some related to rising steel prices due to the outbreak of war in Europe, the contract was awarded to W.S. Swallow & Company in October 1914. [70] [71] [72] Construction of the foundation began on November 3, 1914; while initial plans were for work to begin in spring 1915, the earlier start was intended to reduce costs and avoid spring flooding. [73] On February 17, 1915, the state legislature passed a bill allowing 16 ft (4.9 m) of clearance – rather than the standard 22 ft (6.7 m) – on the passenger tracks at the station. This allowed the station footbridge to be level with the station floor, and reduced the number of steps passengers would have to climb from the platforms. [74] [75]

Work resumed after the winter in late March 1915. [76] The new tracks were in place by April 1915, with the basement walls completed in May. [77] [78] July 1915 saw the second floor laid and the steel framing of the footbridge built; the roof was built in August. [79] [80] The platforms were poured in September 1915; the station was half complete by the end of the month. [81] [82] October through December 1915 saw work on the stucco and marble interior finishes, completion of plumbing and wiring, and other interior and exterior items. [83] [84] [85] Burlington Union Station opened on January 23, 1916. [3] The former station was demolished in January through March 1917; the bricks were reused to build a chocolate factory. [86] [87] [88] [89]

The railroads conducted a major renovation of the station in 1929, focusing on the footbridge and platforms. [90] Burlington's position off the New London–Montreal CV mainline – despite several proposals to reroute the mainline through Burlington – meant its CV service was primarily shuttle trains from Essex Junction. [91] On February 1, 1932, the CV dropped most passenger service between Burlington and Essex Junction. Burlington Rapid Transit ran bus service between Burlington and Essex Junction to meet all trains, while Pullman passengers were provided with limousine service between the homes and Essex Junction. Only two daily round trips continued to operate on the line: a Burlington–Boston through sleeping car on the New Englander, and the Burlington–Cambridge Junction mixed train on the B&L. [92] [93] [94]

The interior of the station, c. 1920 Interior, Union Station, Burlington, VT.jpg
The interior of the station, c.1920

The Boston–Burlington sleeper was dropped by 1936. [95] [8] The Burlington–Cambridge Junction mixed train was cut on June 17, 1938, ending CV passenger service to Burlington. [96] [8] In the 1940s, Green Mountain Power rented a portion of the station as offices. [97] Passenger service on the Rutland declined as well. By 1953, only three daily round trips served Burlington: the New York/Boston–Montreal Mount Royal, the New York/Boston–Burlington Green Mountain Flyer (cut back from Montreal in 1951 [98] ), and a Rutland–Alburgh local (which also served as the northbound Boston section of the Green Mountain Flyer). [99] A strike on June 26, 1953, ended Rutland Railway passenger service – and passenger service to Burlington. [8] [100]

Reuse and modern service

In March 1955, Green Mountain Power purchased Union Station. [101] The building was substantially renovated; the ceiling of the waiting room was lowered to provide a larger second floor. Part of the platform area was enclosed for use as a garage and storage space. [102] The CV and Rutland continued to operate freight service to Burlington. After a second strike in 1961, the Rutland attempted to abandon its entire system. Most of the system, including the Burlington–Rutland mainline, was taken over by the Vermont Railway in early 1964. [8] The railway began operating excursion services out of Burlington soon after taking over the line, and has continued to operate them since under its Green Mountain Railroad subsidiary. [103] [104]

The Champlain Flyer platform in 2006, prior to the 2020s construction of the Amtrak platform Burlington Union Station platform.jpg
The Champlain Flyer platform in 2006, prior to the 2020s construction of the Amtrak platform

Most of the Island Line was abandoned with end of the Rutland Railway. The Vermont Railway operated a 1.8 mi (2.9 km) section in Burlington until 1975. Beginning in 1971, the portion in Burlington was turned into a rail trail, which eventually became part of the Island Line Trail. [105] [106] CV passenger service to Essex Junction station, about 5.5 mi (8.9 km) east, lasted until 1966; Amtrak resumed service there in 1972 with the Montrealer . [8] Union Station was added to the National Register of Historic Places in 1977 as a contributing property to the Battery Street Historic District. [2] The New England Central Railroad took over the CV in 1995; that year, the Montrealer was truncated as the Vermonter . [8]

The Alden Waterfront Company (later renamed Main Street Landing [107] ) purchased Union Station in 1985 as part of plans for a large waterfront development. [108] A city bond for the development was rejected by city voters that December. [109] Part of the building was converted to serve as a homeless service center; other portions were rented out as studios, political campaign offices, and other uses. [108] [110]

In 1992, Main Street Landing proposed a new version of its waterfront development plans, including renovation of Union Station for use as shops and office space. [111] A $1.5 million addition on the rear of the station building was constructed in 1997–98; the old footbridge was removed. Located at the basement level with a street-level plaza on its roof, the expansion was intended to serve as a train station for planned commuter rail service. [6] From August 16 to October 31, 1999, the Vermont Railway operated the Ethan Allen Connection between Burlington and Rutland, where connection could be made to the Amtrak Ethan Allen Express . [112] [113] A new platform behind Union Station was constructed in 2000 for the Champlain Flyer commuter rail service, which began operation between Burlington and Charlotte on December 4, 2000. [114] Never successful at attracting riders, the service only ran until February 28, 2003. [115]

The new Amtrak platform in August 2022 Burlington Union Amtrak.jpg
The new Amtrak platform in August 2022

Even before the Ethan Allen Express began service to Rutland in 1996, state planners intended to extend the train to Burlington. [116] Three state applications for American Recovery and Reinvestment Act of 2009 funds were unsuccessful, but $19 million in Transportation Investment Generating Economic Recovery monies awarded in 2013 and 2015 funded the $26 million project. [117] [118] [119] In June 2019, the Chittenden County Regional Planning Commission recommended Union Station as the location where Amtrak trains would lay over and be serviced overnight. A siding track and three-phase power connection were to be constructed at the station. [120] After nearby residents objected to having the locomotive idle there, VTrans indicated in March 2020 that the Vermont Railway yard to the south would instead be modified to accommodate the train. [121]

Construction work at Union Station in preparation for the extension took place in late 2020 to early 2022. Work included construction of a longer platform for Amtrak trains, realignment of the single track, and relocation of the Island Line Trail to the west side of the track. [122] [7] Ethan Allen Express service to Burlington began on July 29, 2022. [123] Potential future Ethan Allen Express service expansions include a second daily frequency to Burlington (using a different route between Albany and Rutland) and an extension to Essex Junction to provide a connection with the Vermonter (after the planned re-extension of the latter to Montreal). [124] The station is also served by excursion trains operated by the Vermont Rail System. [125]

Related Research Articles

<span class="mw-page-title-main">Rutland Railroad</span> Former US railway company

The Rutland Railroad was a railroad in the northeastern United States, located primarily in the state of Vermont but extending into the state of New York at both its northernmost and southernmost ends. After its closure in 1961, parts of the railroad were taken over by the State of Vermont in early 1963 and are now operated by the Vermont Railway.

<i>Ethan Allen Express</i> Intercity rail service in the United States

The Ethan Allen Express is a daily passenger train operated by Amtrak in the United States between New York City and Burlington, Vermont, via Albany, New York. One daily round trip is operated on a 310-mile (500 km) north–south route with a 7-hour 35 minute scheduled running time. The train is subsidized by New York and Vermont for the portion north of Albany. It is named for Vermont cofounder and American Revolutionary War hero Ethan Allen.

<span class="mw-page-title-main">Fitchburg Railroad</span> American railroad company

The Fitchburg Railroad is a former railroad company, which built a railroad line across northern Massachusetts, United States, leading to and through the Hoosac Tunnel. The Fitchburg was leased to the Boston and Maine Railroad in 1900. The main line from Boston to Fitchburg is now operated as the MBTA Fitchburg Line; Pan Am Railways runs freight service on some other portions.

<span class="mw-page-title-main">Fort Edward station</span> Intercity train station in Fort Edward, New York

Fort Edward station is an intercity train station in Fort Edward, New York. It was originally built as a Delaware and Hudson Railroad depot in 1900, as a replacement for two earlier stations. The first was built in 1840 but was later converted into a store in 1880, the same year it was replaced with a second depot on the existing site. The third and current station has been listed on the National Register of Historic Places since December 13, 2000. The station serves both Fort Edward and nearby Glens Falls. It has one low-level side platform to the west of the single track of the Canadian Pacific Railway Canadian Subdivision.

<span class="mw-page-title-main">Whitehall station</span> Train station in Whitehall, New York, US

Whitehall station is an Amtrak intercity train station in the village of Whitehall, New York. It is served by the Adirondack. It has one low-level side platform with a small shelter on the east side of the track.

<span class="mw-page-title-main">Ticonderoga station</span> Amtrak intercity train station in Ticonderoga, New York

Ticonderoga station is an Amtrak intercity train station in Ticonderoga, New York. It is served by the single daily round trip of the Adirondack. The station is located about 2 miles (3.2 km) east of downtown Ticonderoga and 0.2 miles (0.32 km) west of the Fort Ticonderoga–Shoreham Ferry landing. It has one low-level side platform on the west side of the single track.

<span class="mw-page-title-main">Union Station (Brattleboro, Vermont)</span> Railway station in Brattleboro, Vermont

Union Station is an Amtrak intercity rail station located in downtown Brattleboro, Vermont, United States. It is served by the one daily round trip of the Vermonter service. Most of the 1915-built station is occupied by the 1972-opened Brattleboro Museum and Art Center, while Amtrak uses a waiting room on the lower floor. The building was added to the National Register of Historic Places in 1974.

<span class="mw-page-title-main">Bellows Falls station</span> Railroad station in Bellows Falls, Vermont, US

Bellows Falls station is an Amtrak intercity rail station located in the Bellows Falls village of Rockingham, Vermont, United States. The station is served by the single daily round trip of the Washington, D.C.–St. Albans Vermonter. It has a single side platform adjacent to the single track of the New England Central Railroad mainline.

<span class="mw-page-title-main">Essex Junction station</span>

Essex Junction station, also known as Essex Junction–Burlington, is an Amtrak train station in the city of Essex Junction, Vermont, United States. The station was originally built by the Central Vermont Railway in 1959. It serves Amtrak's Vermonter train, which runs from St. Albans, near the Canada–U.S. border, south to Washington, D.C. Prior to bridge trouble at Alburg, north of St. Albans, train service continued to Montreal. Until the early 1960s, the Boston and Maine railroad operated Montreal to Boston service on The Ambassador through the station.

<span class="mw-page-title-main">St. Albans station (Vermont)</span> Amtrak station in St. Albans, Vermont

St. Albans station is an Amtrak train station in St. Albans, Vermont, United States. It is the northern terminus of the daily Vermonter service.

<span class="mw-page-title-main">Rouses Point station</span> Intercity rail station in New York, US

Rouses Point station is an Amtrak intercity train station in Rouses Point, New York, served by the single daily round trip of the Adirondack. The station building is a former Delaware and Hudson Railway constructed in 1889, with a one low-level side platform on the east side of the track. It was added to the National Register of Historic Places in 2005 as Rouses Point Railroad Station.

<span class="mw-page-title-main">Fair Haven station</span> Train station in Fair Haven, Vermont, US

Fair Haven station was an Amtrak intercity train station in Fair Haven, Vermont. It opened in November 1997, and was closed and replaced by nearby Castleton station in January 2010.

<span class="mw-page-title-main">Rutland station</span>

Rutland station is a train station in Rutland, Vermont served by Amtrak, the national railroad passenger system. It is served by the single daily round trip of the Amtrak Ethan Allen Express. The station has a single low-level side platform, with a short high-level section for accessible level boarding.

<span class="mw-page-title-main">Macomb station</span> Amtrak intercity train station in Macomb, Illinois

Macomb station is an Amtrak intercity train station in Macomb, Illinois, United States. There is one daily morning train to Chicago. In the evening, the return train continues on to Quincy, Illinois. The station is a brick structure constructed around 1913 by the Chicago, Burlington and Quincy Railroad as designed by the railroad's architect Walter Theodore Krausch. The city of Macomb leases the station from BNSF Railway to prevent demolition and has done so since 1971.

<span class="mw-page-title-main">Union Station (Chatham, New York)</span> Former railroad station in New York State (closed 1976)

Union Station served the residents of Chatham, New York, from 1887 to 1972 as a passenger station and until 1976 as a freight station. It was the final stop for Harlem Line trains. It had originally served trains of the Boston and Albany Railroad, then the New York Central Railroad and the Rutland Railway. It served as a junction for service that radiated to Rensselaer, New York, to the northwest; Hudson, New York, to the southwest; Vermont, to the northeast, and Pittsfield, Massachusetts to the east and New York City, to the south.

<span class="mw-page-title-main">Castleton station (Vermont)</span> Train station in Castleton, Vermont, US

Castleton station is an Amtrak intercity train station in Castleton, Vermont. Originally built by the Rutland and Whitehall Railroad in 1850, the depot is now privately owned, and is located across from the northern terminus of the Delaware and Hudson Rail Trail. Castleton replaced Fair Haven station on the Ethan Allen Express in January 2010. It serves nearby Castleton University and Lake Bomoseen.

The Green Mountain Flyer was an international day train between Montreal, Quebec, Canada, and the Northeast United States, with sections to New York City and Boston. It was operated in cooperation between the Rutland Railroad, the Canadian National Railway and the New York Central Railroad. The train carried the number 65 running north, and number 64 running south. The Mount Royal was the night train counterpart to the Green Mountain Flyer. Following years of cutbacks, both trains were discontinued in 1953 when the Rutland Railway ended all passenger service.

<span class="mw-page-title-main">Daniel Chipman Linsley</span> American engineer, railroad executive, and politician

Daniel Chipman Linsley was an engineer, businessman, author, and political figure from Vermont. He was most notable for his railroad work which included serving as chief engineer of the Central Vermont Railway and assistant chief engineer of the Northern Pacific Railroad. Linsley was also active in politics and government in his hometown of Burlington, Vermont, and briefly served as Burlington's mayor in 1870.

<span class="mw-page-title-main">Ferrisburgh–Vergennes station</span> Train station in Ferrisburgh, Vermont, US

Ferrisburgh–Vergennes station is an intermodal Amtrak and bus station in Ferrisburgh, Vermont, adjacent to the city of Vergennes. The facility opened in 2007 as a free park and ride lot operated by the Vermont Agency of Transportation (VTrans). Bus service is provided by Tri-Valley Transit and Vermont Translines. The historic station building serves passengers at the Amtrak platform located along the southwest corner of the facility. It was listed on the National Register of Historic Places in 2021 as the Vergennes Station House. Rail service began on July 29, 2022, when the Ethan Allen Express was extended from Rutland to Burlington.

References

  1. "Amtrak Fact Sheet, Fiscal Year 2023: State of Vermont" (PDF). Amtrak. March 2024. Retrieved June 30, 2024.
  2. 1 2 3 4 Cramer, Adele; Dumville, John P.; Schoettle, B. Clark (1976), National Register of Historic Places - Nomination Form for the Battery Street Historic District (PDF), Montpelier, Vermont: United States Department of Interior, National Park Service, p. 11
  3. 1 2 3 4 "Burlington's New Passenger Station is Ready for Use – Open To-morrow". The Burlington Free Press . January 22, 1916. p. 11 via Newspapers.com.
  4. Sanborn Fire Insurance Map from Burlington, Chittenden County, Vermont. Sanborn Map Company. April 1926. p. 20.
  5. "Union Station: Tenants". Main Street Landing Company. Retrieved July 15, 2022.
  6. 1 2 Iyengar, Sonya (November 10, 1997). "Developer plans commuter hub". The Burlington Free Press. p. 9 via Newspapers.com.
  7. 1 2 "Amtrak to Burlington" (PDF). Vermont Agency of Transportation. 2022.
  8. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Lindsell, Robert M. (2000). The Rail Lines of Northern New England. Branch Line Press. ISBN   0942147065.
  9. "Burlington, VT (BTN)". Great American Stations. Amtrak.
  10. 1 2 Polston, Pamela (April 20, 2011). "Monkey See". Seven Days . Da Capo Publishing, Inc. Archived from the original on July 15, 2014.
  11. "Winged monkeys fly to Union Station". The Burlington Free Press. April 19, 1997. p. 17 via Newspapers.com.
  12. "Monkey Business". The Burlington Free Press. June 11, 1997. p. 11 via Newspapers.com.
  13. "Rutland and Burlington Railroad, Through to Bellows Falls". The Enterprise and Vermonter. January 2, 1850. p. 3 via Newspapers.com.
  14. 1 2 3 4 5 Sargent, David W. Jr. (1942). "The Rutland Railroad". The Railway and Locomotive Historical Society Bulletin (58A): 73–90. JSTOR   43504336.
  15. 1 2 "Map of Burlington, Vermont". Presdee & Edwards. 1853.
  16. "Vermont Central Railroad". The Burlington Free Press. December 28, 1849. p. 2 via Newspapers.com.
  17. 1 2 "An Historic House". Burlington Free Press. August 30, 1895. p. 5 via Newspapers.com.
  18. "Twenty-seven Years on the Docket". Burlington Weekly Free Press. May 17, 1878. p. 4 via Newspapers.com.
  19. Harlow, Alvin Fay (1946). Steelways of New England. Creative Age Press.
  20. "Through the Tunnel". Vermont Watchman and State Journal. May 24, 1861. p. 2 via Newspapers.com.
  21. "The New Vt. and Canada Passenger Depot". Burlington Weekly Free Press. February 16, 1866. p. 1 via Newspapers.com.
  22. Sanborn Fire Insurance Map from Burlington, Chittenden County, Vermont. Sanborn Map Company. November 1894. Plate 19.
  23. "The Storm". Burlington Daily Times. December 29, 1866. p. 3 via Newspapers.com.
  24. "Franklin County". Vermont Record. January 5, 1867. p. 8 via Newspapers.com.
  25. "[Untitled]". The Vermont Transcript. July 27, 1866. p. 2 via Newspapers.com.
  26. "[Untitled]". The Burlington Free Press. February 8, 1871. p. 3 via Newspapers.com.
  27. "Notice". The Burlington Free Press. February 10, 1871. p. 2 via Newspapers.com.
  28. "Fire". The Burlington Free Press. December 17, 1875. p. 3 via Newspapers.com.
  29. "Burlington and Lamoille Railroad". Burlington Weekly Free Press. June 29, 1877. p. 3 via Newspapers.com.
  30. "Burlington, VT". Democrat and Weekly Sentinel. July 21, 1877. p. 3 via Newspapers.com.
  31. "Burlington and Lamoille Railroad – Important Contract". Rutland Daily Herald. May 28, 1880. p. 4 via Newspapers.com.
  32. "About Home". The St. Albans Advertiser. May 28, 1880. p. 1 via Newspapers.com.
  33. "Vermont News". Express and Standard. July 20, 1880. p. 3 via Newspapers.com.
  34. "Railroad Matters". Rutland Weekly Herald. April 25, 1889. p. 2 via Newspapers.com.
  35. "City and Vicinity". The Burlington Free Press. August 24, 1894. p. 8 via Newspapers.com.
  36. "City News". The Burlington Free Press. August 16, 1897. p. 6 via Newspapers.com.
  37. "Wanted – A Union Depot". Burlington Clipper. July 25, 1889. p. 5 via Newspapers.com.
  38. "The Union Depot". The Burlington Free Press. November 12, 1889. p. 5 via Newspapers.com.
  39. "The Depot Question". The Burlington Free Press. January 9, 1890. p. 5 via Newspapers.com.
  40. "A New Depot". The Burlington Free Press. February 12, 1895. p. 1 via Newspapers.com.
  41. 1 2 "Ready for Use". Burlington Weekly Free Press. December 19, 1895. p. 5 via Newspapers.com.
  42. "Home Matters". Burlington Weekly Free Press. July 11, 1895. p. 3 via Newspapers.com.
  43. "Queen City News". Burlington Clipper. January 2, 1896. p. 4 via Newspapers.com.
  44. 1 2 "Rutland Road Sold". The Burlington Free Press. October 17, 1898. p. 1 via Newspapers.com.
  45. "New Railroad to Canada". Montpelier Evening Argus. October 25, 1898. p. 1 via Newspapers.com.
  46. "The Rutland–Canadian". The Burlington Free Press. January 2, 1901. p. 5 via Newspapers.com.
  47. Sanborn Fire Insurance Map from Burlington, Chittenden County, Vermont. Sanborn Map Company. January 1900. Plate 19.
  48. Sanborn Fire Insurance Map from Burlington, Chittenden County, Vermont. Sanborn Map Company. March 1906. Plate 20.
  49. "Ask Public Service Commission to Act on New Railroad Station". Burlington Daily News. April 20, 1911. p. 1 via Newspapers.com.
  50. "Union Station Discussed". The Burlington Free Press. September 4, 1909. p. 8 via Newspapers.com.
  51. "The Special Act Providing for a New Union Station". The Burlington Free Press. August 16, 1911. p. 4 via Newspapers.com.
  52. "Railroad Hearing Adjourns". Burlington. July 27, 1911. p. 7 via Newspapers.com.
  53. "The Two Railroads Can Easily Get Together". The Burlington Free Press. August 22, 1911. p. 4 via Newspapers.com.
  54. "Adjourn Hearing to September 6". Burlington Daily News. August 17, 1911. p. 5 via Newspapers.com.
  55. "Central Vermont Offers New Plan". Burlington Daily News. September 7, 1911. p. 5 via Newspapers.com.
  56. "Rutland Road's Estimate". The Burlington Free Press. October 3, 1911. p. 11 via Newspapers.com.
  57. "The Central's Alternate Plan". Burlington Daily News. December 7, 1911. p. 5 via Newspapers.com.
  58. "Two Months' Adjournment". The Burlington Free Press. February 14, 1912. p. 8 via Newspapers.com.
  59. "Burlington Wins Fight for New Union Station". The Burlington Free Press. August 8, 1912. p. 9 via Newspapers.com.
  60. "New Station Ordered". The Boston Globe. December 2, 1912. p. 5 via Newspapers.com.
  61. "Rutland Railroad and Union Station". Burlington Daily News. December 28, 1912. p. 8 via Newspapers.com.
  62. "Union Station in Supreme Court". Burlington Daily News. February 11, 1913. p. 6 via Newspapers.com.
  63. "Railroads Agree on Union Station". Burlington Daily News. April 16, 1913. p. 10 via Newspapers.com.
  64. "Railway Officials Agree". The Burlington Free Press. July 30, 1913. p. 6 via Newspapers.com.
  65. "Our Share of Cost Will Be $15,000". Burlington Daily News. February 10, 1914. p. 8 via Newspapers.com.
  66. "Union Station and Wharf". Burlington Weekly Free Press. March 5, 1914. p. 5 via Newspapers.com.
  67. "Legal Step Taken to Union Station". Burlington Daily News. April 13, 1914. p. 5 via Newspapers.com.
  68. "Union Station Bids Not Made Public". Burlington Daily News. June 13, 1914. p. 5 via Newspapers.com.
  69. "Track Clear for New Station". Burlington Weekly Free Press. July 16, 1914. p. 5 via Newspapers.com.
  70. "Confer Once More on Union Station". Burlington Daily News. September 12, 1914. p. 8 via Newspapers.com.
  71. "Streets Ordered Vacated". The Burlington Free Press. September 14, 1914. p. 9 via Newspapers.com.
  72. "Contract Awarded for Union Station". Burlington Daily News. October 24, 1914. p. 5 via Newspapers.com.
  73. "Biggest Surprise of Year". The Burlington Free Press. November 3, 1914. p. 8 via Newspapers.com.
  74. "No. 143". The Burlington Free Press. April 16, 1915. p. 28 via Newspapers.com.
  75. "Probe of State Newspapers is Killed by Veto". Burlington Weekly Free Press. February 11, 1915. p. 1 via Newspapers.com.
  76. "Work Resumed Soon on Union Station". Burlington Daily News. March 20, 1915. p. 5 via Newspapers.com.
  77. "City and Vicinity". The Burlington Free Press. June 1, 1915. p. 16 via Newspapers.com.
  78. "Fifty Feet of Tower Up". The Burlington Free Press. April 9, 1915. p. 7 via Newspapers.com.
  79. "New Union Station". Burlington Daily News. July 15, 1915. p. 6 via Newspapers.com.
  80. "Progress of Work on Union Station". Burlington Daily News. August 3, 1915. p. 8 via Newspapers.com.
  81. "Work on Station". Burlington Daily News. September 15, 1915. p. 1 via Newspapers.com.
  82. "Union Station Inspected". Burlington Daily News. September 28, 1915. p. 5 via Newspapers.com.
  83. "The Union Station". Burlington Daily News. October 8, 1915. p. 5 via Newspapers.com.
  84. "City and Vicinity". The Burlington Free Press. November 15, 1915. p. 12 via Newspapers.com.
  85. "New Union Station". Burlington Daily News. December 20, 1915. p. 5 via Newspapers.com.
  86. "Whole Yard to be Changed". The Burlington Free Press. January 26, 1917. p. 5 via Newspapers.com.
  87. "City News". Burlington Daily News. February 8, 1917. p. 6 via Newspapers.com.
  88. "J.E. Cashman Has Contract for the New Factory". Burlington Daily News. March 23, 1917. p. 1 via Newspapers.com.
  89. "Chocolate Factory to Open in Fall". Burlington Daily News. July 12, 1917. p. 8 via Newspapers.com.
  90. "Railroad Employees Begin Overhauling of Union Station". The Burlington Free Press. September 7, 1929. p. 14 via Newspapers.com.
  91. "Put Burlington on Central Vermont Main Line". The Burlington Free Press. April 11, 1927. p. 4 via Newspapers.com.
  92. "C.V. Railway Makes Contract With Burlington Rapid Transit Co. For Busses to Replace Passenger Trains, Burlington to Essex Jct". The Burlington Free Press. January 28, 1932. p. 12 via Newspapers.com.
  93. "Central Vermont R.R. and B.R.T. Launch Consolidated Service". The Burlington Free Press. February 2, 1932. p. 7 via Newspapers.com.
  94. "B. & L. Now Back To Daily Schedule". The Burlington Free Press. March 20, 1933. p. 8 via Newspapers.com.
  95. Time Tables. Central Vermont Railway. September 27, 1936 via Wikimedia Commons.
  96. "Twenty Ride on 'Last Train'". The Burlington Free Press. June 17, 1938. p. 2 via Newspapers.com.
  97. "Essex Junction-Burlington, VT (ESX)". Great American Stations. Amtrak.
  98. "Curtailment of R.R. Passenger Service Approved". The Barre Daily Times. September 19, 1951. p. 3 via Newspapers.com.
  99. The Green Mountain Lake Champlain Route. Rutland Railway. April 26, 1953 via Wikimedia Commons.
  100. "RR Strike Idles 650, Ties Up All Traffic on Line". Rutland Daily Herald. June 27, 1953. p. 1 via Newspapers.com.
  101. "Green Mountain Power Buys Union Station". The Burlington Free Press. March 14, 1955. p. 3 via Newspapers.com.
  102. "Green Mountain Power Has Open House Today". The Burlington Free Press. December 13, 1955. p. 8 via Newspapers.com.
  103. "Vermont Railway Planning Two Excursion Runs". The Burlington Free Press. May 5, 1964. p. 3 via Newspapers.com.
  104. "Vermont Railway Steam Train Excursion". The Burlington Free Press. June 26, 1965. p. 2 via Newspapers.com.
  105. Cooley, Kathleen H. (June 11, 1986). "Long-Awaited Bicycle Path Reaching Final Destination". The Burlington Free Press. p. 1B, 7B via Newspapers.com.
  106. "North End Bicycle Path To Get Further Clearing Work Tonight". The Burlington Free Press. July 27, 1971. p. 15 via Newspapers.com.
  107. "Comparies". The Burlington Free Press. April 22, 1991. p. 30 via Newspapers.com.
  108. 1 2 "Will Burlington enjoy a depot redux?". The Burlington Free Press. February 21, 1997. p. 13 via Newspapers.com.
  109. Corredera, Enrique (May 26, 1988). "Offices, stores planned for old Union Station". The Burlington Free Press. p. 22 via Newspapers.com.
  110. Scagliotti, Lisa (March 28, 1988). "Day Center provides of variety services for city's homeless". The Burlington Free Press. p. 9 via Newspapers.com.
  111. Teetor, Paul (May 29, 1992). "Owners unveil plans for waterfront property". The Burlington Free Press. p. 5 via Newspapers.com.
  112. "Ethan Allen Connection [Advertisement]". Rutland Daily Herald. September 3, 1999. p. 41 via Newspapers.com.
  113. Keays, Alan J. (October 13, 1999). "'Connection' Is Nearing End Of Line". Rutland Daily Herald. pp. 13, 15 via Newspapers.com.
  114. Sutkoski, Matt (December 3, 2000). "Champlain Flyer takes off". The Burlington Free Press. pp. 1A, 4A via Newspapers.com.
  115. Sutkoski, Matt (February 28, 2003). "Flyer takes last run today". The Burlington Free Press. pp. 1A, 4A via Newspapers.com.
  116. Daley, Fred (April 28, 1996). "New train will link local area with NYC". The Post-Star. pp. 1, 7 via Newspapers.com.
  117. Remsen, Nancy (August 21, 2011). "To Rutland by train: 68 miles and many millions of dollars". The Burlington Free Press . pp. 1B, 7B.
  118. "USDOT announces $474 million in TIGER V grants". Progressive Railroading. September 6, 2013. Retrieved July 12, 2022.
  119. "TIGER 2015 Awards" (PDF). United States Department of Transportation. p. 40.
  120. VHB (June 2019). "Burlington Amtrak Train Servicing and Storage Facility Assessment" (PDF). Chittenden County Regional Planning Commission.
  121. "Vermont Agency of Transportation announces Amtrak Burlington train parking location" (PDF) (Press release). Vermont Agency of Transportation. March 12, 2020.
  122. Bakuli, Ethan (January 27, 2021). "Progress on Burlington Amtrak service and bike path relocation moves along". The Burlington Free Press. Retrieved July 12, 2022.
  123. Delabruere, Dan (June 16, 2022). "Agency of Transportation Announces Start Date for Long-Awaited Amtrak Service in Burlington, Vergennes, and Middlebury" (PDF). Vermont Agency of Transportation.
  124. "Vermont Rail Plan: Passenger Rail Forecasting Scenarios" (PDF). Vermont Rail Plan. Vermont Agency of Transportation. May 2021.
  125. "Planning Resources". Vermont Rail System. Retrieved August 15, 2024.