This article needs additional citations for verification .(August 2023) |
This article may require cleanup to meet Wikipedia's quality standards. The specific problem is: The article is out of date and reads like a dump of paragraphs from an out of date consultant's report. The article needs a rewrite to clearly discuss the history of the proposal and include up to date information on progress with the proposal.(October 2022) |
The West Africa Regional Rail Integration is a proposal to connect up isolated railway networks in West Africa.
In 2009, USTDA approved funding of $750,000 for a feasibility study grant to assist the Union économique et monétaire ouest-africaine (UEMOA), in determining the technical and economic viability of developing a rail line from Bamako, Mali to Mali's southeastern border with Côte d’Ivoire, as well as its associated costs, design and construction criteria, and implementation plan. The study will also include a technical assessment on the existing rail line between Dakar, Senegal and Bamako, which would be linked to the proposed rail line. The total cost of the proposed line is expected to exceed $1.9 billion.
The 15-month railway study USTDA contract was authorised to begin in October 2010. ZETA-TECH Associates of Cherry Hill NJ (NOW Harsco Rail Intelligent Solutions) undertook the study with other companies assisting, including the Law Offices of Peter C. Hansen, LLC, [1] which analysed the existing legal framework and drafted a treaty to modernise the ownership structure and facilitate long-term financing of the revitalised railway. A final report was delivered in December 2012, and a French translated copy was accepted by UEMOA in March 2013.
No progress was reported on that announcement as of the summer of 2012.
In October 2012 UEMOA held a meeting to at its Burkina Faso headquarters to review and discuss a draft report on the USTDA funded rail project. The consulting team presented four different capital cost modernisation plans. One would be for just minimum safety changes. The most ambitious plan would support a possible 10 million ton modernised standard gauge conversion rail project, with the earliest train operations occurring sometime around 2017 between Dakar and Bamako. The requirements would include an integrated plan of execution with mine + rail + port + a new Railway 2-nation Authority[ clarification needed ], if the project consultant suggestions are followed. Building just the railway without integrating these other transport and customer commercial actions was recommended as a critical process for moving towards a final total plan.
The Bamako to the south railway corridor has a separate set of competitive issues and technical costs associated with it.
The consultant team also projected the possible Pro Forma Income Statement for three of the possible railway operating company levels of modernisation. Contact UEMOA or the consultants for further information as to the capital costs, possible operating scenarios, and economic outcomes.
A complete Critical Path for debating and then making project decisions (given the many technical choices) and then executing project funding and bidding and construction was also submitted to UEMOA by the consultant team. As of mid October 2012 that process was just starting at a technical review level under the guidance of UEMOA staff.
A PowerPoint presentation that summarised the technical results and possible financial or Pro Forma operating income of the upgraded Dakar to Bamako railway was presented to The Corporate Council of Africa in Washington in mid-February 2013. Among the items discussed was the calculated cost of 1) a modern meter gauge railway service as requested by a UEMOA rail task force "solution" and 2) the cost of a conversion to a standard gauge between Dakar and Bamako. The project capital costs together with the estimated cost of rail operation plus the cost of repaying the capital infrastructure debt were identified in a Pro Forma Income Statement for the improved railway enterprise (a designed railway company) at a given future year 2017 tonnage. The project design was built around an attempt to resolve for the lowest possible bulk cargo rates to reach a new proposed bulk cargo port south of Dakar. The target rate was <$32 a metric ton at standard gauge and somewhat higher at meter gauge. This pro forma analysis shows evidence that the railway can be independently financed by investors without the need of a Senegal or a Mali mine company actual railway "ownership" (a burden to the mine company Balance Sheet). A railway authority is recommended as a means of attracting private capital using the bonding and commercial structure of such a government of Senegal and Mali chartered body rather than a conventional concession approach. The railway feasibility was based on a variety of engineering and economic possible designs that used different rail mode market shares and different levels of railway operating efficiency (operating ratios) and different track structure safety standards. Naturally, the local African leaders will have to make the final design choices. From an economic point of view, subsidies and doners are not necessary if the traffic market share and the engineering and train operational designs are correctly matched. USTDA financed The next step is for the large shippers to meet collectively or individually with UEMOA and test the feasibility study against their specific (and often private) shipper requirements. Either the authors or UEMOA should be contacted. In the meantime, rail service is continuing in the corridor under the existing concession arrangement.
During February 2013 the report was translated into French. Contact UEMOA or Harsco Rail Zeta Tech or USTDA for further information.
Harsco Rail Zeta Tech; Jim Blaze Project Director
Mali's transportation infrastructure is regarded as poor, even by regional standards, and deficiencies have limited economic growth and development. Nevertheless, improvements have been noted in the early 2000s. Most of the transportation in Mali consists of cars, planes, and boats.
The Dakar–Niger Railway connects Dakar, Senegal to Koulikoro, Mali. The name refers to the Niger River, not the Republic of Niger. It serves many cities in Senegal, including Thiès, and in Mali, including Kayes, Kita, Kati, Bamako. The line covers a course of 1,287 km of which 641 km lies in Mali.
The individual member states of the African Union (AU) coordinate foreign policy through this agency, in addition to conducting their own international relations on a state-by-state basis. The AU represents the interests of African peoples at large in intergovernmental organizations (IGO's); for instance, it is a permanent observer at the United Nations' General Assembly.
The Central Bank of West African States is a central bank serving the eight west African countries which share the common West African CFA franc currency and comprise the West African Economic and Monetary Union.
The Trans–West African Coastal Highway or TAH 7 is a transnational highway project to link 12 West African coastal nations, from Mauritania in the north-west of the region to Nigeria in the east, with feeder roads already existing to two landlocked countries, Mali and Burkina Faso.
AfricaRail is a project to link the railway systems of Ivory Coast, Burkina Faso, Niger, Benin and Togo. These are all 1,000 mm gauge.
The Trans-Sahelian Highway or TAH 5 is a transnational highway project to pave, improve and ease border formalities on a highway route through the southern fringes of the Sahel region in West Africa between Dakar, Senegal in the west and Ndjamena, Chad, in the east. Alternative names for the highway are the Dakar-Ndjamena Highway or Ndjamena-Dakar Highway and it is Trans-African Highway 5 in the Trans-African Highway network.
The West African Club Championship, also known as the General Eyadéma Cup, was a football tournament for West African clubs from 1977 to 1999. It was open to league runners-up in the West Africa region of the CAF. While the first matches were played of the 2000 tournament, the competition was cancelled before the final, largely for financial reasons. While the intention of the CAF was to revive a national squad tournament in its place, the planned annual CSSA Nations Cup has not been regularly scheduled since. The tournament was resurrected in 2009 to pit each member country's highest team not featuring in the CAF Champions League or the CAF Confederation Cup. The final four was played in December with Togo as the host.
Railway stations in Mali include:
This will be the third UEMOA Tournament contest. It is a competition for domestic-league football players from the eight UEMOA member countries: Mali, Côte d'Ivoire, Burkina Faso, Niger, Togo, Benin, Senegal and Guinea-Bissau.
There are 622 kilometres of 1,000 mmmetre gauge railway in Burkina Faso, which run from Kaya to the border with Côte d'Ivoire and is part of the Abidjan-Ouagadougou railway. As of June 2024, 'Sitarail' does not operate a passenger train to Abidjan.
Ivory Coast has 660 kilometres of railway. The track gauge is 1,000 mm.
Mali has one railroad, including 729 kilometers in Mali, which runs from the port of Koulikoro via Bamako to the border with Senegal and continues on to Dakar. The Bamako-Dakar line, which has been described as dilapidated, was owned by a joint company established by Mali and Senegal in 1995, with the eventual goal of privatization. In 2003, the two countries sold a 25-year concession to run the rail line to a Canadian company, which has pledged to upgrade equipment and infrastructure.
Atlantic Bank Group, commonly known by its French name Groupe Banque Atlantique, is a West African financial services conglomerate, headquartered in Lomé, Togo. The Group consisting of banks and other financial services companies in Côte d'Ivoire, Benin, Niger, Burkina Faso, Mali, Togo, Senegal and Cameroon.
Tourism is an important economic sector for many countries in Africa. There are many countries that benefit heavily from tourism like Kenya, Uganda, Algeria, Egypt, South Africa, Morocco, Tunisia, Ghana and Tanzania. The touristic particularity of Africa lies in the wide variety of points of interest, diversity and multitudes of landscapes as well as the rich cultural heritage. Also, an ecotourist industry is present in some African countries.
There is currently one railway in Niger, built between 2014 and 2016 between Niamey and Dosso by the French Bolloré conglomerate. The objective was to connect Niamey to the rail network in Benin and thus to the coast. But competing commercial interests by several parties resulted in endless litigation and the connection to Benin never materialized. So the 145 km Niamey-Dosso stretch now lies orphaned and unused, with the tracks ending in the middle of nowhere some 6 km south of Dosso. After several years of neglect the tracks are already damaged to such an extent in some places, that they have become unusable. At the Niamey Terminus Station, the rails are kinked to such an extent by the summer heat that the train would not be able to leave the station.
The African Judo Union (AJU) is the governing body of judo in Africa. It is one of the five continental confederations making up the International Judo Federation (IJF). AJU was formed on 28 November 1961 in Dakar (Senegal). AJU has headquarters in Madagascar and consists of 54 member federations.