Railway stations in Togo

Last updated

Railway stations in Togo include:

Maps

Railways in Togo.svg

Towns served by rail

All lines 1,000 mm (3 ft 3+38 in) gauge. Overview

Contents

Existing

Although the following destinations are listed as 'existing', none of them has been served by trains for many years.





Proposed



2018

Proposals Lomé to Cinkassé [6]

Treaty

A treaty of the 1960s expected certain railway lines to be closed on completion of road improvements. [7]

See also

Related Research Articles

<span class="mw-page-title-main">Aflao</span> Town in Volta Region, Ghana

Aflao is a town in Ketu South District in the Volta Region on Ghana's border with Togo. Aflao is the twenty-eighth most populous settlement in Ghana, in terms of population, with a population of 96,550 people.

AfricaRail is a project to link the railway systems of Ivory Coast, Burkina Faso, Niger, Benin and Togo. These are all 1,000 mm gauge.

<span class="mw-page-title-main">Railway stations in Sudan</span>

Railway stations in Sudan include:

Railway stations in Sierra Leone include:

Railway stations in the Republic of the Congo (Congo) include:

<span class="mw-page-title-main">Railway stations in Ghana</span>

The railway stations in Ghana serve a rail network concentrated in the south of the country.

<span class="mw-page-title-main">Railway stations in Cameroon</span>

The list of railway stations in Cameroon includes:

Railway stations in Mozambique include:

<span class="mw-page-title-main">Railway stations in Angola</span>

Railway stations in Angola include:

Railway stations in Guinea include:

<span class="mw-page-title-main">Railway stations in Benin</span>

There has been continuous provision of rail transport in Benin since 1906. Railway stations in Benin include:

<span class="mw-page-title-main">Railway stations in Tanzania</span>

Railway stations in Tanzania include:

<span class="mw-page-title-main">Railway stations in Nigeria</span>

Railway stations in Nigeria include:

<span class="mw-page-title-main">Rail transport in Ghana</span>

The railway system in Ghana has historically been confined to the plains south of the barrier range of mountains north of the city of Kumasi. However, the 1,067 mm narrow gauge railway, totalling 1,300 kilometres, is undergoing major rehabilitation and inroads to the interior are now being made. In Ghana, most of the lines are single tracked, and in 1997 it was estimated that 32 kilometres were double tracked.

<span class="mw-page-title-main">Rail transport in Burkina Faso</span>

There are 622 kilometres of 1,000 mmmetre gauge railway in Burkina Faso, which run from Kaya to the border with Côte d'Ivoire and is part of the Abidjan-Ouagadougou railway. As of June 2014, 'Sitarail' operates a passenger train three times a week along the route from Ouagadougou to Abidjan. Journey time is 43 to 48 hours.

<span class="mw-page-title-main">Rail transport in Togo</span> Railway transport in the west African country of Togo

Rail transport in Togo consists of 568 km (353 mi) (2014) of 1,000 mmmetre gauge railway.

<span class="mw-page-title-main">West Africa Regional Rail Integration</span>

The West Africa Regional Rail Integration is a proposal to connect up isolated railway networks in West Africa.

Diamond Cement Ghana Limited is an Indian-owned Portland cement producing company located at Aflao in the Volta Region of Ghana near the border with Togo. The plant complements the Government Industrialization Program and economic up-lift. The company is using the latest technology of Programmable Logic Control (PLC) system in the cement production process to maintain consistency in the quality.

<span class="mw-page-title-main">Railway stations in Niger</span>

There is currently one railway in Niger, built between 2014 and 2016 between Niamey and Dosso by the French Bolloré conglomerate. The objective was to connect Niamey to the rail network in Benin and thus to the coast. But competing commercial interests by several parties resulted in endless litigation and the connection to Benin never materialized. So the 145 km Niamey-Dosso stretch now lies orphaned and unused, with the tracks ending in the middle of nowhere some 6 km south of Dosso. After 5 years of neglect the tracks are already damaged to such an extent in some places, that they have become unusable.

References

  1. Togo extension
  2. "Railpage".
  3. Cement siding opened.
  4. http://web.worldbank.org/external/projects/main?pagePK=64283627&piPK=73230&theSitePK=40941&menuPK=228424&Projectid=P002843
  5. UN
  6. Link
  7. http://untreaty.un.org/unts/1_60000/19/30/00037499.pdf [ bare URL PDF ]