Fawley branch line

Last updated

Fawley branch line
Marchwood railway station (site), Hampshire (geograph 5262456).jpg
The site of Marchwood railway station
Overview
Stations0 (2 planned)
Service
TypeHeavy rail
History
Opened1925
Technical
Line length8 mi (13 km)
Track gauge 4 ft 8+12 in (1,435 mm)
Route map
Fawley branch line.png
(Click to expand)
Fawley Branch Line
South West Main Line
to Bournemouth │ to Southampton
BSicon dCONTgq.svg
BSicon lHST~L.svg
BSicon ABZq+l.svg
BSicon lHST~R.svg
BSicon CONTf@Fq.svg
Totton
BSicon eHST.svg
Marchwood
BSicon ABZgl.svg
BSicon KDSTeq.svg
Marchwood Military Port
BSicon eHST.svg
Hythe
BSicon eHST.svg
Hardley Halt
BSicon eHST.svg
Fawley
BSicon eKDSTe.svg
Fawley Refinery

The Fawley branch line, also known as the Waterside line, is a standard-gauge railway line to Fawley, in the English county of Hampshire. It is on the opposite side of Southampton Water from the city of Southampton itself, in an area known as Waterside. For 40 years a passenger service operated, but this was withdrawn except for the occasional enthusiasts' railtour. The line serves the freight needs of Marchwood Military Port, having also served the same function for Fawley Refinery until 2016.

Contents

There is a proposal to reopen the line with two stations at Marchwood and Hythe, known as the Waterside Line. [1]

History

Authorised in 1903, after some years of trying, the line was built under the Light Railways Act 1896 as the Totton, Hythe and Fawley Light Railway and opened on 20 July 1925. It begins at South West Main Line at Totton, west of Southampton, where Bournemouth-bound trains run parallel with the branch for one mile (1.6 km) before curving away to the south.

The passenger service served Marchwood, [2] Hythe, [3] and Fawley. [4] Between Hythe and Fawley there was a Hardley Halt [5] which opened for workmen in 1958 and closed in 1965. [6] Operated by steam trains, then the 'Hampshire' diesel-electric multiple units, the service was withdrawn on 14 February 1966.

At first, traffic was light but they subsequently expanded when the then largest oil refinery in Britain opened at Fawley in the 1920s. The line became part of the British Railways (Southern Region) following nationalisation in 1948. The first station to be closed was Hardley Halt on 5 April 1965, followed by Marchwood, Hythe and Fawley on 14 February 1966. The line was then only used by freight from Marchwood Military Port and Fawley Refinery until 2016.

Reopening proposal

On 16 June 2009 the Association of Train Operating Companies announced it was looking into the reopening of the railway as far as Hythe, with a possibility of a further extension to Fawley if agreement could be reached with Esso, which owns the land where Fawley railway station once stood. The proposals were:

It was envisaged that the railway link could be built over a five to 10 year period at a cost of around £3 million. The service would be operated by the then franchisee South West Trains using diesel multiple units (DMUs). If the scheme delivered a sufficient financial return, there would be a future possibility of electrification. The service was planned to run half-hourly during peak times and hourly at other times. [7] [8] [9] [10]

On 8 November 2013 Councillor David Harrison of Totton South and Marchwood obtained a copy of the final GRIP 3 Study report and shared it via his website. [11] In the report it was stated that the service would be half-hourly, using DMUs calling at all stations between Hythe and Southampton, including a new station to be called Hounsdown (once planned to be called Totton West). A new passing loop would have to be installed at Hounsdown to allow passing of freight and passenger trains. Other upgrades would include AWS/TPWS and signalling. For reasons of security at the oil refinery, Fawley station would not be reopened as part of the scheme. It has been pointed out that there are some possible drawbacks to this scheme. For example, if the Waterside line gets the green light, the subsidy from Hampshire County Council for the Southampton & Hythe ferry service would be likely to cease, and the local bus companies which operate in the area might be at risk of losing some of their subsidy. [12] On 21 January 2014 Hampshire County Council decided to shelve the plans to reopen the line. The council's report came down against committing further funding for the scheme due to a perceived poor value for money business case, although it said the authority should review the position should local circumstances change. [13]

The last train serving the refinery ran on 1 September 2016, [14] after which trains would normally run only as far as Marchwood, although the occasional private hire train would travel the branch line as far as the gates at Fawley oil refinery. [15] [16]

Hampshire County Council announced in November 2017 that it would look again at running passenger service due to planned housing development alongside the Waterside and on the former Fawley power plant site. [17]

In August 2018, it was revealed that plans to reopen the line had been resurrected as part of the redevelopment known as Fawley Waters. It proposed a half-hourly service on a Monday to Saturday from Southampton Central to Fawley. At Marchwood the journey time would take 12 minutes and the line would be 60 miles per hour (100 km/h). The new Fawley station would be called ‘Hythe & Fawley Parkway’. [18] In November 2018 Hampshire County Council announced the removal of the Hythe Ferry subsidy, despite there being no progress on the proposed rail scheme. [19]

On 5 February 2019, the branch line was identified as a priority for reopening to passenger use by Campaign for Better Transport. Campaign for Better Transport went on to say that reopening the line would reduce air pollution and relieve pressure on congested roads adjacent to the New Forest National Park. [20]

On 23 May 2020, the DfT announced that the Waterside Line had been shortlisted for further funding to investigate restoration of passenger services. [21] This would see the reinstatement of Marchwood station and a new station at Hythe Town, a little further west of the previous station. The end of the 8-mile (13 km) line would be unused, but a southern terminus, called Hythe and fawley Parkway, would open on the site of the Hardley Halt station. [22] [23]

On 28 July 2020, South Western Railway ran a 'fact-finding train' down the branch line, stopping at Marchwood, to demonstrate the branch line's potential. This service carried the station's first passengers in 54 years. [24]

In February 2021, Hampshire County Council released an updated strategic outline business case. In the report, 3 new proposed service patterns were put forward;

In the business case, it would see Marchwood station reopen, possibly with an up and down platform, and electrification of the line, though both depend on the service pattern chosen above. Hythe station would be relocated north of the existing station between School Road and New Road, near Hythe Library and a new station called Hythe and Fawley Parkway, which would be located on the site of the former Hardley Halt. A local bus shuttle would operate from Hythe & Fawley Parkway station to Fawley and the housing development on the former Fawley Power Plant site. It also proposes that three level crossings would be replaced with overbridges to minimise traffic disruption in the local areas. [25]

On 7 May 2021, South Western Railway ran another fact-finding train down the branch line, stopping at Marchwood, to further demonstrate the branch line's potential. [26]

On 24 March 2022 Rail reported that Network Rail is taking forward the scheme to get the line reopened. However, the proposed Hythe & Fawley Parkway station, 2 miles (3 km) south of Hythe will not be included. The service that Network Rail is proposing is a 2 car Class 158/9, running every 30 minutes between Hythe and Southampton Central. [27] The business case is due to be submitted towards the end of 2022 to the Department of Transport, with a prospect of getting a decision in early 2024 and passenger services starting in 2025 at the earliest. [27]

A series of public consultations were held between Monday 8 August and Friday 9 September 2022 to hear views on reintroducing passenger services to the Waterside Line. [1] On 30 November, Network Rail reported that 84 per cent of people backed the proposal to reinstate the line for passenger service. [28]

Related Research Articles

<span class="mw-page-title-main">Hythe, Hampshire</span> Town in England

Hythe is a town in Hampshire, England. It is located by the shore of Southampton Water, and has a ferry service connecting it to Southampton. Hythe has a shopping area, a pier, and a marina for yachts.

<span class="mw-page-title-main">Southampton Water</span> Tidal estuary in England

Southampton Water is a tidal estuary north of the Solent and the Isle of Wight in England. The city of Southampton lies at its most northerly point, where the estuaries of the River Test and River Itchen meet. Along its salt marsh-fringed western shores lie the New Forest villages of Dibden, Hythe and Fawley, and the Fawley Refinery. On the slightly steeper eastern shore are the Southampton suburb of Weston, the villages of Netley and Hamble-le-Rice, and the Royal Victoria Country Park. To the south, Southampton Water enters the Solent between Calshot Spit and Hill Head.

<span class="mw-page-title-main">Marchwood</span> Human settlement in England

Marchwood is a village and civil parish located in Hampshire, England. It lies between Totton and Hythe on the western shore of Southampton Water and directly east of the New Forest. The population of the village in the 2011 census was 6,141.

<span class="mw-page-title-main">Holbury</span> Human settlement in England

Holbury is a village in Hampshire, England. It is part of the parish of Fawley.

<span class="mw-page-title-main">Romsey (UK Parliament constituency)</span>

Romsey was a seat of the House of Commons of the UK Parliament 1983–2010 which accordingly elected one Member of Parliament (MP) by the first past the post system of election. It is virtually tantamount to its replacement Romsey and Southampton North which takes in two typical-size local government wards of the United Kingdom named after and approximate to the Bassett and Swaythling parts of Southampton.

<span class="mw-page-title-main">New Forest East (UK Parliament constituency)</span>

New Forest East is a constituency in Hampshire represented in the House of Commons of the UK Parliament since its creation in 1997 by Julian Lewis of the Conservative Party.

<span class="mw-page-title-main">Fareham railway station</span> Railway station in Hampshire, England

Fareham railway station is on the West Coastway Line situated about 0.62 miles (1 km) from the town of Fareham in Hampshire, England. It is 84 miles 21 chains (135.6 km) down the line from London Waterloo.

<span class="mw-page-title-main">Eastleigh railway station</span> Railway station in Hampshire, England

Eastleigh railway station serves the town of Eastleigh in the county of Hampshire in England. It is located on the South West Main Line and is the junction station for two other routes, the Eastleigh-Fareham Line and the Eastleigh-Romsey Line. It is 73 miles 35 chains (118.2 km) from London Waterloo. South of the station are Eastleigh Railway Works and Eastleigh Depot.

<span class="mw-page-title-main">Southampton Central railway station</span> Railway station in Hampshire, England

Southampton Central railway station is a main line station serving the city of Southampton in Hampshire, southern England. It is on the South West Main Line and also serves the Wessex Main Line and the West Coastway Line. The station is approached from the London direction by passing through Southampton Tunnel and is 79 miles 19 chains (127.5 km) measured from London Waterloo. It is the busiest station in Hampshire, and the fifth busiest in South East England.

<span class="mw-page-title-main">Fleet railway station</span> Railway station in Hampshire, England

Fleet railway station serves the town of Fleet in Hampshire, England. It is situated on the South West Main Line, which has four tracks through the station. There are two platforms on the outer pair of tracks, which are served by trains between London Waterloo and Basingstoke and Southampton. The centre pair of tracks have no platforms and are used by through-services.

<span class="mw-page-title-main">Southampton Airport Parkway railway station</span> Railway station in Eastleigh, Hampshire

Southampton Airport Parkway railway station is on the South West Main Line located in the south of Eastleigh in Hampshire, England, 74 miles 66 chains (120.4 km) down the line from London Waterloo. It is adjacent to Southampton Airport.

<span class="mw-page-title-main">Totton railway station</span> Railway station in Totton, England

Totton railway station serves the towns of Totton and Eling, Hampshire, England and is on the South West Main Line. It is 82 miles 43 chains (132.8 km) down the line from London Waterloo. It is managed by South Western Railway who also operate the only services to stop at the station.

<span class="mw-page-title-main">Fawley Power Station</span> Former oil-fired power station in Hampshire, England

Fawley Power Station was an oil-fired power station located on the western side of Southampton Water, between the villages of Fawley and Calshot in Hampshire, England. Its 198-metre (650 ft) chimney was a prominent landmark, but it was not, as is sometimes claimed, the highest point in Hampshire.

<span class="mw-page-title-main">Fawley Refinery</span> Oil refinery in Hampshire, England

Fawley Refinery is an oil refinery located at Fawley, Hampshire, England. The refinery is owned by Esso Petroleum Company Limited, a subsidiary of Exxon Mobil Corporation, which acquired the site in 1925. Situated on Southampton Water, it was rebuilt and extended in 1951 and is now the largest oil refinery in the United Kingdom, and one of the most complex refineries in Europe. With a capacity of 270,000 barrels (43,000 m3) per day, Fawley provides 20 per cent of the UK's refinery capacity. Over 2,500 people are employed at the site.

<span class="mw-page-title-main">Port of Southampton</span> Passenger and cargo port in Southampton, England

The Port of Southampton is a passenger and cargo port in the central part of the south coast of England. The modern era in the history of the Port of Southampton began when the first dock was inaugurated in 1843. After the Port of Felixstowe, Southampton is the second largest container terminal in UK, with a handled traffic of 1.5 million twenty-foot equivalent units (TEU). It also handles cruise ships, roll-on roll-off, dry bulk, and liquid bulk.

<span class="mw-page-title-main">Hythe railway station (Hampshire)</span> Railway station in Hythe, England

Hythe (Hants) railway station in Hampshire was an intermediate station on the Totton, Hythe and Fawley Light Railway, which was built along the coast of Southampton Water to connect Totton and Fawley and to provide a freight link from the South West Main Line to Fawley Refinery.

<span class="mw-page-title-main">Fawley railway station</span> Railway station in Fawley, England

Fawley railway station was the terminus of the Totton, Hythe and Fawley Light Railway, which was built along the coast of Southampton Water to connect Totton and Fawley and to provide a freight link from the South West Main Line to Fawley Refinery.

<span class="mw-page-title-main">Marchwood railway station</span> Railway station in Marchwood, England

Marchwood railway station was an intermediate station on the Totton, Hythe and Fawley Light Railway, which was built along the coast of Southampton Water to connect Totton and Fawley and to provide a freight link from the South West Main Line to Fawley Refinery. It was 86 miles 10 chains measured from London Waterloo.

Hardley Halt was a railway station on the Fawley branch line.

References

  1. 1 2 Ross, Perri. "The Waterside Line". Network Rail. Retrieved 24 July 2022.
  2. "Marchwood Station". Subterranea Britannica. Retrieved 14 April 2021.
  3. "Hythe Station". Subterranea Britannica. Retrieved 14 April 2021.
  4. "Fawley Station". Subterranea Britannica. Retrieved 14 April 2021.
  5. "Disused Stations:Hardley Halt".
  6. Croughton, Godfrey (1982). Private and Untimetabled Railway Stations (first ed.). The Oakwood Press. ISBN   978-0853612810.
  7. "Waterside Passenger Rail Service". David Harrison; County, District & Town Councillor Contributors: David Harrison. 10 April 2011. Retrieved 24 May 2017.
  8. "Plans to explore Ringwood rail link". Southern Daily Echo Contributors:Chris Yandell, New Forest Chief Reporter. 16 June 2009. Retrieved 24 May 2017.
  9. "Campaign to extend rail along Waterside". Southern Daily Echo Contributors:Journal Reporter. 16 June 2009. Retrieved 18 February 2010.
  10. "Rail links to the past". BBC News. 15 June 2009.
  11. "Out in the Open!". David Harrison; County, District & Town Councillor Contributors: David Harrison. 8 November 2013.
  12. "Waterside Rail Study Final Report, Hampshire County Council" (PDF). Halcrow Group . 15 June 2013.
  13. "Waterside Totton and Hythe rail plan shelved" BBC News 21 January 2014
  14. "Hampshire railway history hits buffers after branch line between Totton and Fawley closes". Southern Daily Echo . 1 September 2016. Retrieved 1 September 2016.
  15. "More Autumn Freight-Line Tours". Rail.co.uk. 7 April 2012. Archived from the original on 13 August 2017. Retrieved 23 May 2017.
  16. "Events Listings: The Fawley Forester". New Forest National Park . Retrieved 23 May 2017.[ permanent dead link ]
  17. "Full steam ahead: Campaign to reopen historic railway back on track". Southern Daily Echo Contributors:Christopher Yandell. 12 November 2017. Retrieved 12 November 2017.
  18. RAIL Issue 859 p.24
  19. "Council cuts funding for embattled ferry". BBC News. 29 November 2018. Retrieved 26 December 2018.
  20. "Reopen these rail lines and put 500,000 people in reach of the railways". Campaign for Better Transport.
  21. "Restoring Your Railway Fund". GOV.UK. Retrieved 24 May 2020.
  22. Clifton, Paul (12 August 2020). "Special train offers a strong case for reopening the Fawley line". Rail Magazine. No. 911. Peterborough: Bauer Media. p. 24. ISSN   0953-4563.
  23. Sherratt, Philip, ed. (September 2020). "Fawley fact-finder trip as reopening mooted". Modern Railways. Vol. 77, no. 864. Stamford: Key Publishing. p. 9. ISSN   0026-8356.
  24. "Station welcomes first passengers for 54 years". BBC News. 28 July 2020. Retrieved 30 July 2020.
  25. "Waterside Rail Re-Opening Strategic Outline Business Case" (PDF). Hampshire County Council. 1 February 2021. Retrieved 30 November 2021.
  26. "Another DMU visits Fawley". Key Modern Railways. 20 May 2021. Retrieved 30 November 2021.
  27. 1 2 "Progress on Fawley reopening, but plans scaled back". Rail Magazine. 24 March 2022. Retrieved 24 March 2022.
  28. Yandell, Chris. "Residents back proposal to reopen Totton-Hythe branch line". Southern Daily Echo . Retrieved 1 December 2022.

Further reading

50°52′18″N1°24′44″W / 50.8718°N 1.4121°W / 50.8718; -1.4121