Heathrow Southern Railway | |||
---|---|---|---|
Overview | |||
Status | Proposed | ||
Owner | Heathrow Southern Railway Limited | ||
Locale | London, England, UK | ||
Termini | |||
Service | |||
Type | Urban rail / Airport rail link proposal | ||
System | National Rail | ||
History | |||
Planned opening | 2026 | ||
Technical | |||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
|
Heathrow Southern Railway is a proposed new railway in the United Kingdom which would link Heathrow Airport to railway lines south of London. The scheme, announced in August 2017, [1] is promoted by Heathrow Southern Railway Limited and would be financed privately. [2] [3] In a government paper published in November 2019, the project has been officially called SAtH - Southern Access to Heathrow. The reason given is that it is not only heavy rail access that is being considered but other transport options too. [4]
If built, the new rail infrastructure, up to 8 miles (13 km) in length, would link Heathrow Terminal 5 with Chertsey or Virginia Water and Staines, and would enable direct trains to run from Basingstoke, Woking, Guildford to Heathrow Airport stations. It would also create a new link to the airport from London Waterloo via Clapham Junction, Twickenham, Richmond, Hounslow and Staines. The proposals are similar to an earlier scheme, Heathrow Airtrack. [5]
Heathrow Southern Railway would open between 2025 and 2027. The estimated capital cost is between £1.3bn and £1.6bn. [6] [7] [8] The scheme has been put forward in response to the Department for Transport's invitation for proposals from private investors for a southern rail link to Heathrow. [9]
Heathrow Southern Railway Limited is a private limited company registered in London. [10] It was founded on 16 June 2016 with the aim of bidding for improved rail access to Heathrow Airport. The company states that its proposals would improve public transport capacity and help to reduce traffic congestion and pollution. [11]
The company's founding member was transport planner Steven Costello, [10] [12] and the company board is chaired by Baroness Jo Valentine. [13] [14]
This section needs additional citations for verification .(August 2018) |
The proposed route starts in a short section of tunnel from the west end of Terminal 5 station, then rises briefly to the surface to make a connection with the Windsor-Staines Line, with the main route continuing in tunnel following the M25 corridor to connect to existing railway near Chertsey or Virginia Water.[ citation needed ]
Services from Heathrow towards Woking would use the existing Byfleet Junction, enabling trains to join the South Western Main Line "slow lines" between there and Woking. The junction at Byfleet already has a dive-under, avoiding any delays to trains on the intensively used "fast lines".[ citation needed ]
Heathrow Southern Railway claims best journey times from Heathrow to Woking of 16 minutes; Guildford 26 minutes; and Basingstoke 40 minutes.[ citation needed ]
Overall, construction of the new infrastructure can be carried out with minimal impact on existing railway operations. The only impacts would be the new junctions on the Staines – Windsor and Egham – Weybridge routes, both of which are lightly used lines compared to the South Western Main Line.[ citation needed ]
Network Rail estimates that there needs to be an additional 60% capacity to serve the expanding Heathrow Airport by 2043 [15] and identified that there is a strong case for implementing a new southern route to meet these needs. [16]
The proposed Heathrow Southern Railway infrastructure also allows for trains from Basingstoke, Woking and Guildford to continue beyond Heathrow Airport to serve a proposed new station at Old Oak Common where there will from 2026 be an interchange with HS2, and also London Paddington which is now on the Elizabeth line. [17] This will also increase accessibility into London from the south and south-west, mainly increasing access to Waterloo and Clapham Junction, while also allowing for new routes such as the Basingstoke to Paddington route and a possible route into Southampton in the future. [18] Using Network Rail's modelling system it has been determined that this new line will be able to carry four trains per hour. Heathrow Southern Railway also recognises that if an extra platform were constructed at Staines station their proposed new infrastructure creates an opportunity for an extension of the Elizabeth Line from Heathrow to Staines, which would create another route from Staines into London. [19]
Heathrow Southern Railway intends that the planned route will be financed privately, with ownership remaining in the private sector during and after the development process. Heathrow Southern Railway claims that the scheme in operation does not need financial support from the tax payer. While being owned by Heathrow Southern Railway the infrastructure is subject to regulation by the Office of Rail and Road (ORR), and the operation and maintenance of the route could be contracted out to other corporations. [20]
Waterloo station, also known as London Waterloo, is a central London terminus on the National Rail network in the United Kingdom, in the Waterloo area of the London Borough of Lambeth. It is connected to a London Underground station of the same name and is adjacent to Waterloo East station on the South Eastern Main Line. The station is the terminus of the South West Main Line to Weymouth via Southampton, the West of England main line to Exeter via Salisbury, the Portsmouth Direct line to Portsmouth Harbour which connects with ferry services to the Isle of Wight, and several commuter services around west and south-west London, Surrey, Hampshire and Berkshire.
Stagecoach South Western Trains Limited, trading as South West Trains (SWT), was an English train operating company owned by Stagecoach, which operated the South Western franchise between February 1996 and August 2017.
Crossrail is a railway construction project centred around London. Its aim is to provide a high-frequency hybrid commuter rail and rapid transit system crossing the capital from suburbs on the west to east, by connecting two major railway lines terminating in London: the Great Western Main Line and the Great Eastern Main Line. The project was approved in 2007, and construction began in 2009 on the central section and connections to existing lines that became part of the route, which has been branded the Elizabeth line in honour of Queen Elizabeth II who opened the line on 17 May 2022 during her Platinum Jubilee. The central section of the line between Paddington and Abbey Wood opened on 24 May 2022, with 12 trains per hour running in each direction through the core section in Central London.
Clapham Junction railway station is a major railway station and transport hub near St John's Hill in south-west Battersea in the London Borough of Wandsworth. It is 2 miles 57 chains from London Victoria and 3 miles 74 chains from London Waterloo; it is on both the South West Main Line and Brighton Main Line as well as numerous other routes and branch lines passing through or diverging from the main lines at this station. Despite its name, Clapham Junction is not located in Clapham, a district situated approximately 1 mile (1.6 km) to the south-east and is instead sited in Battersea.
Heathrow Terminal 5 is a shared railway and London Underground station serving Heathrow Terminal 5. It serves as a terminus for Heathrow Express services to Paddington, and for Elizabeth line and London Underground Piccadilly line services to central London. It is managed and staffed by Heathrow Express.
The South West Main Line (SWML) is a 143-mile major railway line between Waterloo station in central London and Weymouth on the south coast of England. A predominantly passenger line, it serves many commuter areas including south western suburbs of London and the conurbations based on Southampton and Bournemouth. It runs through the counties of Surrey, Hampshire and Dorset. It forms the core of the network built by the London and South Western Railway, today mostly operated by South Western Railway. Network Rail refers to it as the South West Main Line.
Reading railway station is a major transport hub in Reading, Berkshire, England. It is on the northern edge of the town centre, near the main retail and commercial areas and the River Thames, 36 miles (58 km) from London Paddington.
Feltham railway station serves Feltham in the London Borough of Hounslow, west London. It was opened on 22 August 1848 by the Windsor, Staines and South Western Railway.
Guildford railway station is at one of three main railway junctions on the Portsmouth Direct Line and serves the town of Guildford in Surrey, England. It is 30 miles 27 chains down the line from London Waterloo via Woking.
The Waterloo–Reading line is a National Rail electric railway line between London Waterloo and Reading. The line runs west through a series of South West London suburbs to Reading, in central Berkshire. Its passenger operation is by South Western Railway (SWR), which also manage its stations.
Woking railway station is a major stop in Woking, England, on the South West Main Line used by many commuters. It is 24 miles 27 chains (39.2 km) down the line from London Waterloo. The station is managed by South Western Railway, who operate all trains serving it.
Staines railway station is on the Waterloo to Reading line and is the junction station for the diverging Windsor line, in southern England to the west of London. It is 19 miles 2 chains (30.6 km) down the line from London Waterloo.
The Staines–Windsor line is a suburban railway line in England which branches from the Waterloo to Reading Line at Staines-upon-Thames in Surrey and runs to Windsor in Berkshire. Passenger services on the line are operated by South Western Railway.
Heathrow Airtrack was a proposed railway link in the United Kingdom which would link Heathrow Airport in west London to London Waterloo railway station in Central London.
In the 2010s Network Rail modernised the Great Western Main Line, the South Wales Main Line, and other associated lines. The modernisation plans were announced at separate times but their implementation overlapped in the 2010s.
The Windsor Link Railway was a proposed new railway in Windsor, Berkshire, connecting the Great Western and South Western franchise areas and potentially linking both to London Heathrow Airport.
The Western Rail Approach to Heathrow is a proposed bi-directional link westward from London's Heathrow Airport to the Great Western Main Line. It would thus run, in council areas, from Greater London under Iver, South Bucks, Buckinghamshire to Langley, Slough. Beginning at Heathrow Terminal 5 station, it would run via a tunnel to a junction east of Langley station, therefore allowing trains to run to and from destinations in the west: Slough, Reading and beyond. When completed, it would improve rail connections to Heathrow from the Thames Valley as well as from South West England, South Wales and The Midlands. It would also reduce congestion at London Paddington station by removing the need, which presently exists, for passengers from Heathrow who are bound for those regions, to travel to Hayes and Harlington and then change at Reading or to make their interchange at Paddington, central London. Paddington would remain an interchange for services to/from Euston, Saint Pancras and London generally and a little of the Great Western Main Line would gain rail capacity as many services would take the resultant side loop via Heathrow.
First MTR South Western Trains Limited, trading as South Western Railway (SWR), is a British train operating company owned by FirstGroup (70%) and MTR Corporation (30%) that operates the South Western franchise.
HS4Air is a proposal for a 140-kilometre (87 mi) high-speed railway line in the United Kingdom, put forward in 2018 by a British engineering consultancy, Expedition Engineering.
Over the years, a number of transport proposals have been made to improve public access to Heathrow Airport, near London in the United Kingdom.