Godavari Arch Bridge

Last updated

Godavari Arch Bridge
Archbridgegodavari.JPG
The Godavari Arch Bridge in Rajahmundry
Coordinates 17°00′28.2″N81°45′21″E / 17.007833°N 81.75583°E / 17.007833; 81.75583
CarriesSingle Railway lane
Crosses Godavari River
Locale Rajahmundry, Andhra Pradesh
Other name(s)Rajahmundry-Kovvur Bridge
Owner Indian Railways
Maintained by Indian Railways
Preceded by Godavari Bridge
Characteristics
Design Bowstring-Girder
Total length2,745 metres (9,006 ft)
Longest span97.552 metres (320 ft)
No. of spans28 twin arches
Piers in water28
History
Designer Hindustan Construction Company
Constructed by Hindustan Construction Company
Construction start1991
Construction end1997
OpenedMarch 12, 1997
Replaces Havelock Bridge
Location
Godavari Arch Bridge

The Godavari Arch Bridge is a bowstring-girder bridge that spans the Godavari River in Rajahmundry, India. It is the latest of the three bridges that span the Godavari river at Rajahmundry. The Havelock Bridge being the earliest, was built in 1897, and having served its full utility, was decommissioned in 1997. [1] [2] The second bridge known as the Godavari Bridge is a truss bridge and is India's third longest road-cum-rail bridge crossing a water body. [1] [3] [4] [5]

Contents

The bridge is one of the longest span prestressed concrete arch bridges in Asia. [5] The Indian Railways who built this bridge have stated that "It is perhaps for the first time anywhere in the world that a bowstring arch girder using concrete has been constructed for such a long span of 97.55 metres (320.0 ft), and that too for the Railway loading." [1] It has been widely used to represent Rajahmundry in arts, media, and culture. It is one of the recognised symbols of Rajahmundry.

Geography

The bridge is built across the Godavari River, the largest river in South India at over 1,000 metres (0.62 mi) length. It is built in the region as the river enters into the deltaic reach before discharging into the sea 60 kilometres (37 mi) downstream of the bridge. At the location of the bridge the Godavari River flows with a width of about 3 kilometres (1.9 mi), split in two channels with an island formation in between. The maximum discharge observed in the river is reported to be around 3 million m3/s and the maximum velocity of water flow as 5 metres (16 ft) per second. [1] The bridge is located in a cyclonic area where the wind speed touch 200 kilometres (120 mi) per hour.

The bridge is located in two channels, the Kovvur channel and the Rajahmundry channel, and hence the bridge is also known as the Kovvur-Rajahmundry Bridge. The Rajahmundry channel has a deep rocky bed, and even the water level is 18–20 metres (59–66 ft). Comparatively the Kovur channel is shallow with a water depth of about 8–10 metres (26–33 ft) and riverbed is made up of clay deposits.

History

Earlier Bridges

The bridge on the left is the Old Godavari Bridge or the Havelock Bridge (decommissioned). Godavari Bridge2.jpg
The bridge on the left is the Old Godavari Bridge or the Havelock Bridge (decommissioned).

This bridge is the third in the series of the bridges that spans the Godavari River at Rajahmundry. The earliest bridge is the Havelock bridge, which was built in 1897 by Frederick Thomas Granville Walton. It is 2,950 metres (9,680 ft) long and is made of masonry piers and steel girders. [1] It was decommissioned in 1997 as it had served its full utility. The Godavari Arch bridge was actually built to replace the Havelock bridge. Additionally, the Godavari Arch bridge is aligned parallel to the Old Godavari bridge, and is separated by a short distance of about 200 meters.

The second bridge is a railroad bridge, the Godavari bridge, built in the 1960s as a part of doubling of railway track between ChennaiHowrah. This is a truss bridge, with the superstructure made of steel. It is in active service and carries a single railway track in the lower level, and two-way road, pedestrian pathways on the upper level. Initial plans for the construction of the Godavari Arch bridge consisted of a steel superstructure like the Godavari bridge. But later the concept of prestressed concrete girders was considered, and subsequently the designing was continued with the concrete girders. [1] [6]

Planning

The second Godavari Bridge, a Truss Bridge, Asia's second longest road-cum-rail bridge Nwgbridge.JPG
The second Godavari Bridge, a Truss Bridge, Asia's second longest road-cum-rail bridge

Godavari Arch Bridge was to be built to replace and the Havelock Bridge, which had served its full utility. Initial plans made for the bridge considered a superstructure made of steel. But, as the usage of concrete as construction material had become popular since its introduction in the 1930s, the issue of type of superstructure was re–examined by the Indian Railways. It was decided to examine the possibility of evolving a prestressed concrete bridge with a 97.55 metres (320.0 ft) span. Firms were pre-qualified for the purpose with preferred options suggested for submission of offers, and for the preference of steel girder or concrete girder.

Among the three firms which were shortlisted to submit proposals, two firms opted for concrete bridge and one for steel bridge. On the basis of these proposals, the authorities at Indian Railways prepared the Terms of Reference prescribing the design criteria. Following this, the three qualified firms, the Research Design and Standards Organization and the Railway Board were taken into consideration to indicate their views and comments on the Terms of Reference. And, subsequently the design criteria for the bridge was finalised.

The proposals received from the three firms were examined by Proof Consultants who recommended that the design offered by Hindustan Construction Company be accepted. It proposed the bowstring-girder type concrete arch of span 92.552 metres (303.65 ft) with prestressed concrete box girder to act as the tie. Following this recommendation, the proposal of Hindustan Construction Company was accepted considering its technical feasibility and financial viability. Hindustan Construction Company won the order to plan, design and build the bridge. [1]

Construction

The bridge, built by the Hindustan Construction Company, for the Indian Railways, was designed by Bureau BBR, Switzerland, and checked by Leonardt Andrä and Partners, Germany. [3] [6] Construction on the bridge began in 1991 and lasted till 1997. It was commissioned for passenger traffic in March 1997 and became fully operational for running trains by the Indian Railways from 2003. [5]

Description

Specifications

The twin arches, box girders, struts are all made of prestressed concrete.

The twin arches have a constant width of 0.8 metres (2 ft 7 in) and depth varying from 1.7 metres (5 ft 7 in) at the springing to 1.1 metres (3 ft 7 in) at the crown. These are connected laterally with struts (known as Vierendeel truss) and box girder.

There are 28 identical spans of twin arches, of parabolic profile, spaced at 5.6 metres (18 ft), each of 97 metres (318 ft) width from centre to centre of the piers with a total length of 2.7 kilometres (1.7 mi). [3]

The effective span from centre to centre of the bearings is 94 metres (308 ft). [5]

Each girder is 95.552 metres (313.49 ft) long.

The final dimensions of the box girder are 95.462 metres (313.20 ft)×5,200 millimetres (200 in) (bottom) with thickness of the top slab of 296 millimetres (11.7 in), the web of 300 millimetres (12 in) thickness and with the bottom slab thickness kept at 240 millimetres (9.4 in).A diaphragm stiffens the box girder at each Dina Hanger location. [6]

The substructure of the bridge consists of 28 piers. [7]

Design aspects

The superstructure of the bridge is of the bow-string girder type. While designing, the projected speed for the trains was taken as 160 km per hour. Taking into consideration the cyclonic conditions, the wind speed considered without live load was 200 kilometres (120 mi) per hour, and with dead load the speed considered was 158 kilometres (98 mi) per hour. As the location of the bridge is in the Seismic Zone I, seismic load has not been accounted for in the design.

The bridge is designed to run trains at a speed of 160 miles (260 km) per hour and is designed to withstand wind speed of 200 miles (320 km) per hour during cyclonic storms that are anticipated in and around Rajahmundry. [5]

Arches

The arches are designed to share 80% of the dead load and live load transferred from the hangers and thus a plays a critical role of relieving the flexural and shear stresses on the girder. Twelve sinking supports are provided at each hanger location connecting with the girder. [6]

Hangers

Each span of the bridge has 24 hangers, which are further divided into six types depending on their length. Each Dina Hanger is made of 49 high tensile steel wires of 7 millimetres (0.28 in) diameter each. These wires run parallel to each other and are encased in a high tensile polythene pipe, which is cement grouted. [8]

Girders

The box girders are made of M42 grade concrete. Each girder was prestressed with 16 longitudinal cables, which in turn were prestressed to a force of 2950 kN each. [1]

The box girder, which functions as the deck of the bridge and carries the live load, comprises end diaphragm (1,000 millimetres (39 in) thick), which has inspection windows. [9]

The design of the girder accounts for loading conditions of full span train load, half span train load, one third span train load and so forth with due accounting of temperature variation of ±10 °C (50 °F). At each stage of casting of the girders (seven stages of casting were involved for each girder from girder stressing to removal of form work) forces generated in the arch section were studied and accounted. The girder casting also ensured that no cracks appeared in the arches at any stage. [10]

Bearings

The bridge has been provided with pot bearings, of 1050 tonnes capacity. One each pier, the girder is supported on four pot bearings of three types: PNa, PNe, PN.

The PNa type bearing (which facilitates free sliding in both directions) on one pier and PNe type (slides only in one direction) in the succeeding pier and PN type which is fixed type.

The PNa and PNe type of bearings have been pre-set for 60 millimetres (2.4 in) movement in the longitudinal direction and 10 millimetres (0.39 in) in the lateral direction and the centre line of top plate has been fixed relatively by 60 millimetres (2.4 in)/10 millimetres (0.39 in) with respect to centre line of bottom plate of the bearing which will permit the movements due to creep, shrinkage and elastic deformation. [7] Their placement ensures that only longitudinal movement takes place without permitting any lateral moment. [11]

Three sets of bearings were imported from Switzerland, while the balance bearings were made by BBR (India) Pvt Ltd, India. [1]

Maintenance

Corrective action

After the bridge was constructed, the railway authorities carried out settlement studies of all 28 piers in view of the foundation conditions on which they were founded. These measurements indicated that pier settlement in only one pier, namely "pier 27" in the Kovvur Channel was of the order of 211 millimetres (8.3 in), which needed corrective action, while in all other piers the settlement was less than 75 millimetres (3.0 in) indicating that pier foundations had settled down. Since the rotation in the vertical plane exceeded the prescribed value for differential settlement, BBR, consultants to Hindustan Construction Company (HCC), anticipated that the top plate of the bearing is "likely touch the bottom plate thereby damaging the bearing." To remedy the situation, the consultant advised HCC, to maintain a uniform gradient of 200 millimetres (7.9 in) between the piers 26, 27 and 28. However, the lifting of bearings by 200 millimetres (7.9 in) was executed during the month of May 2003, even though the settlement of the pier in question was not significant after May 2002. This was achieved by using Conbextra HES (which has properties of free flow, achieving high early strength and quick setting), a cementation material manufactured by M/s. FOSROC, India. The gap of 200 millimetres (7.9 in) between the pedestal top and bottom of bearing was filled with this material. This was done by careful planning of stopping train operations (by taking two breaks of short intervals) over the bridge during the period of rectification supported by eight 400 tonnes capacity hydraulic jacks with lock nut and shim plates’ arrangement. [7]

See also

Related Research Articles

<span class="mw-page-title-main">Albert Bridge, Brisbane</span> Bridge in Queensland, Australia

Albert Bridge is a heritage-listed railway bridge of steel truss design crossing the Brisbane River between Indooroopilly and Chelmer in the City of Brisbane, Queensland, Australia. It was designed by Henry Charles Stanley and built from 1894 to 1895 by John McCormick & Son as a replacement for an earlier bridge lost to flooding in 1893. Both bridges were named in honour of the Prince of Wales, Prince Albert. It was added to the Queensland Heritage Register on 21 October 1992.

<span class="mw-page-title-main">Cantilever bridge</span> Bridge built using cantilevers

A cantilever bridge is a bridge built using structures that project horizontally into space, supported on only one end. For small footbridges, the cantilevers may be simple beams; however, large cantilever bridges designed to handle road or rail traffic use trusses built from structural steel, or box girders built from prestressed concrete.

<span class="mw-page-title-main">Beam bridge</span> Type of bridge

Beam bridges are the simplest structural forms for bridge spans supported by an abutment or pier at each end. No moments are transferred throughout the support, hence their structural type is known as simply supported.

<span class="mw-page-title-main">Bangabandhu Bridge</span> Bridge in Tangail and Sirajganj

Bangabandhu Bridge, also known as the Jamuna Multi-purpose Bridge is a bridge opened in Bangladesh in June 1998. It connects Bhuapur on the Jamuna River's east bank to Sirajganj on its west bank. It was the 11th longest bridge in the world when constructed in 1998 and at present is the 6th longest bridge in South Asia. The Jamuna River, which it spans, is one of the three major rivers of Bangladesh, and is fifth largest in the world in discharge volume.

<span class="mw-page-title-main">Kovvur</span> Town in Andhra Pradesh, India

Kovvur is a town in the East Godavari district of the Indian state of Andhra Pradesh. It is a municipality and the mandal headquarters of Kovvur mandal in Kovvur revenue division.

<span class="mw-page-title-main">Extradosed bridge</span>

An extradosed bridge employs a structure that combines the main elements of both a prestressed box girder bridge and a cable-stayed bridge. The name comes from the word extrados, the exterior or upper curve of an arch, and refers to how the "stay cables" on an extradosed bridge are not considered as such in the design, but are instead treated as external prestressing tendons deviating upward from the deck. In this concept, they remain part of the main bridge superstructure.

<span class="mw-page-title-main">Tied-arch bridge</span> Type of bridge

A tied-arch bridge is an arch bridge in which the outward-directed horizontal forces of the arch(es) are borne as tension by a chord tying the arch ends rather than by the ground or the bridge foundations. This strengthened chord may be the deck structure itself or consist of separate, independent tie-rods.

<span class="mw-page-title-main">Girder bridge</span> Bridge built of girders placed on bridge abutments and foundation piers

A girder bridge is a bridge that uses girders as the means of supporting its deck. The two most common types of modern steel girder bridges are plate and box.

<span class="mw-page-title-main">Godavari Bridge</span> Bridge in Rajahmundry

The Godavari Bridge or Kovvur–Rajahmundry Bridge is a truss bridge spanning the Godavari River in Rajahmundry, India. It is India's fourth longest road-cum-rail bridge crossing a water body, the first one being the Bogibeel Bridge, also a rail-cum-road bridge over the Brahmaputra River in the Dibrugarh district of Assam state in north-east India, and second is Digha–Sonpur Bridge over Ganges in Bihar.

The Alexandra Bridge is a steel arch bridge across the Fraser River in the lower Fraser Canyon area of southwestern British Columbia, Canada. The two-lane crossing, carrying BC Highway 1, is by road about 44 kilometres (27 mi) north of Hope and 66 kilometres (41 mi) south of Lytton.

<span class="mw-page-title-main">Schierstein Bridge</span> Bridge in Hesse, Germany

The Schierstein Bridge is 1,282-meter (4,206 ft) long, four-lane highway bridge in Germany. It carries Bundesautobahn 643 over the Rhine River between Mainz-Mombach, Rhineland-Palatinate and Wiesbaden-Schierstein, Hesse. Crossing two arms of the Rhine and the intervening island of Rettbergsaue, the bridge is made of six individual structures, including 100 m (330 ft) from prestressed concrete. It was built between 1959 and 1962.

<span class="mw-page-title-main">Old Godavari Bridge</span> Bridge over the Godavari RIver in Andhra Pradesh, India

The Old Godavari Bridge is a decommissioned bridge that spans the Godavari River in Andhra Pradesh, India. Commissioned in 1900, the bridge served trains plying between Howrah and Madras. It is the earliest of three bridges that span the Godavari River at Rajahmundry. The Godavari Arch Bridge was later constructed as a replacement for the Havelock Bridge. The bridge along with the Godavari bridge and Godavari Arch Bridge is one of the most recognised symbols of Kovvur and Rajahmundry of the state of Andhra Pradesh.

<span class="mw-page-title-main">Vidyasagar Setu</span> Cable-stayed toll bridge in West Bengal, India

Vidyasagar Setu, also known as the Second Hooghly Bridge, is a toll bridge over the Hooghly River in West Bengal, India, linking the cities of Kolkata and Howrah.

<span class="mw-page-title-main">Incremental launch</span> Bridge building method

Incremental launch is a method in civil engineering of building a complete bridge deck from one abutment of the bridge only, manufacturing the superstructure of the bridge by sections to the other side. In current applications, the method is highly mechanised and uses pre-stressed concrete.

The Sharavati Bridge is a railway bridge, south of Honnavar, in the state of Karnataka, India, completed in 1994. It carries the Konkan Railway over the Sharavati river.

<span class="mw-page-title-main">Nepean River railway bridge, Menangle</span> Bridge in New South Wales, Australia

The Nepean River railway bridge is a heritage-listed railway bridge that carries the Main Southern railway line across Menangle Road and the Nepean River located at the outer south-western Sydney settlement of Menangle in the Wollondilly Shire local government area of New South Wales, Australia. It was designed by John Whitton as the Engineer-in-Chief, of the New South Wales Government Railways and NSW Department of Public Works. The railway bridge was built in 1863 by Messers Peto, Brassey and Betts. It is also known as Menangle rail bridge over Nepean River and Menangle Railway Bridge. The property was added to the New South Wales State Heritage Register on 2 April 1999.

<span class="mw-page-title-main">Rigid-frame bridge</span> Type of bridge

A Rigid-frame bridge is a bridge in which the superstructure and substructure are rigidly connected to act as a continuous unit. Typically, the structure is cast monolithically, making the structure continuous from deck to foundation. The connections between members are rigid connections which transfer bending moment, axial forces, and shear forces. A bridge design consisting of a rigid frame can provide significant structural benefits, but can also be difficult to design and/or construct.

<span class="mw-page-title-main">Launching gantry</span>

A launching gantry is a special-purpose mobile gantry crane used in bridge construction, specifically segmental bridges that use precast box girder bridge segments or precast girders in highway and high-speed rail bridge construction projects. The launching gantry is used to lift and support bridge segments or girders as they are placed while being supported by the bridge piers instead of the ground.

<span class="mw-page-title-main">Yowaka River bridge, Greigs Flat</span> Bridge in New South Wales, Australia

The Yowaka River bridge is a heritage-listed road bridge that carries the Princes Highway across the Yowaka River at Greigs Flat, New South Wales, Australia. It was built in 1936. The bridge is also known as the Yowaka Bridge near Eden. The bridge is owned by Transport for NSW. It was added to the New South Wales State Heritage Register on 20 June 2000.

<span class="mw-page-title-main">Macquarie River railway bridge, Dubbo</span> Bridge in New South Wales, Australia

The Dubbo rail bridge over Macquarie River – Wambuul is a heritage-listed railway bridge on the Main Western line across the Macquarie River, located west of the Dubbo central business district in New South Wales, Australia. It was designed by John Whitton as the Engineer-in-Chief for the New South Wales Government Railways. The bridge was built during 1884 by Benjamin Barnes, with ironwork by Cochrane & Co, Middlesborough, England. The railway bridge is also known as the Dubbo Lattice Railway Bridge. The property is owned by Transport Asset Holding Entity, an agency of the Government of New South Wales. The bridge was added to the New South Wales State Heritage Register on 2 April 1999 and was listed on the Register of the National Estate on 18 April 1989.

References

  1. 1 2 3 4 5 6 7 8 9 R.R.Bhandari. "Bridges: The Spectacular Feat of Indian Engineering" (PDF). Indian Railway Service of Mechanical Engineers. Archived from the original (PDF) on 5 March 2016. Retrieved 6 August 2012.
  2. Khan, Mukram. "The Havelock Bridge Memorial Stone". Flickr. Archived from the original on 23 March 2014. Retrieved 1 August 2012.
  3. 1 2 3 "Godavari Bridge". Structurae. Archived from the original on 5 August 2011. Retrieved 7 June 2011.
  4. "Third Godavari Railway Bridge, India". Structurae. Archived from the original on 9 June 2013. Retrieved 7 June 2011.
  5. 1 2 3 4 5 Dayaratnam, pp. 219–228
  6. 1 2 3 4 Dayaratnam, p. 219
  7. 1 2 3 "Project Report on correction of Level Pier 27 of Godavari Bridge" (PDF). iricen.indianrailways.gov.in. Archived from the original (PDF) on 18 August 2011. Retrieved 8 June 2011.
  8. Dayaratnam, p. 226
  9. Dayaratnam, p. 220
  10. Dayaratnam, pp. 224–226
  11. Dayaratnam, p. 227

Bibliography