2019 Argentina, Paraguay and Uruguay blackout

Last updated

2019 Argentina, Paraguay and Uruguay blackout
Apagon en el Obelisco.png
Blackout at the Obelisco de Buenos Aires
Date16 June 2019 (2019-06-16)
Location Argentina (except Tierra del Fuego), Uruguay and parts of Paraguay
Type Blackout
CauseOperative error

On 16 June 2019, a large-scale power outage struck most of Argentina, all of Uruguay, and parts of Paraguay, leaving an estimated total of 48 million people without electrical supply. [1] [2]

Contents

By the following day it was confirmed that power had been restored to most of Argentina and Uruguay, and Argentine President Mauricio Macri promised a full investigation.

The blackout is believed to have been caused by an operational misbehavior from Transener, a transmission lines operator in Argentina. A 500 kV line running from Colonia Elía to Campana, crossing the Paraná Guazú river, was down on undergoing maintenance to repair the tower number 412, whose base had been suffering from erosion by the river. The company made a bypass for this tasks, using a nearby overhead line, but missed to reflect that network grid change in the Automatic Generation Shutdown system (in spanish: DAG), which is designed to alert energy generators of network changes that would require a lower of energy generation. This caused, after a short circuit which lowered demand, an excess of power generation in the grid, a lack of synchronization of power plants, loss of balance, and a low frequency in the network. [3] [4]

In about 30 seconds, a succession of automatic disconnections from the grid caused a blackout that came to affect 50 million users in the continent. [3]

Timeline

At 7:07 a.m. (UTC-3) on 16 June 2019, Argentina's power grid "collapsed", according to Gustavo Lopetegui, the country's Energy Secretary. [5] [2] The failure occurred in the Argentine Interconnection System. [6] In total, an estimated 48 million people lost power. [7] The blackout affected most of Argentina (Tierra del Fuego in the country's far south was not affected) and Uruguay, along with parts of Paraguay. [5] [6] Although some media reported blackouts in parts of Chile [2] and parts of southern Brazil, [2] this claim was denied by the Chilean [8] and Brazilian [9] national authorities. Macri called it "unprecedented". [10]

Argentine distributor of electricity Edesur announced on Twitter at 7:50 a.m. that all of Argentina and Uruguay had lost power as a result of the incident. [5] It caused disruptions in subways and trains, but did not affect electric and non-electric airborne transport. [5] [11] According to Edesur, power had already been restored to some parts of Buenos Aires by 10 a.m.; [11] Edesur reported that it might take many hours to restore power to all affected customers. [2] By 1:30 p.m. power had been restored across 75% of Uruguay. [12] By mid-afternoon 50,000 people had power restored in Argentina; north of Río Negro, coastal cities and the metropolitan areas of Uruguay also had power restored, as confirmed via Twitter by Uruguay's government-owned power company UTE. [13] [7] By the evening, it was announced that power had been restored to 98% of Argentina. [14]

By 17 June, power had been restored to most of Argentina and Uruguay. Macri undertook to ensure an investigation. Angentianian media reported that the loss of power arose due to a transmission failure from the Yacyretá hydroelectric dam. [11]

Impact

People voting in the local elections at the Formosa Province, during the blackout. Formosa votando sin luz.png
People voting in the local elections at the Formosa Province, during the blackout.

Distribution of drinking water was affected by the loss of power, with Agua y Saneamientos Argentinos, one of Argentina's largest water supply companies, urging people affected to reduce their water consumption. [11]

The blackout had an impact on local gubernatorial elections taking place in Argentina, where the lack of power forced voters to fill out ballots in the dark, using their mobile phones as flashlights. In some regions of the country, the elections were postponed by authorities. [11] [15]

Medical patients who were dependent upon home equipment were urged to attend local hospitals, where similar devices were still operational, as they were powered by backup generators. [15]

Investigation

Investigations into the cause of the outage are being undertaken by both Edesur and the Argentine government. [16]

An independent energy expert in Argentina attributed a role in the blackout to "systemic operational and design errors" in the country's energy infrastructure. [15]

Argentine Energy Secretary Gustavo Lopetegui said it was unlikely to have been caused by a cyberattack. [17]

Preliminary reports suggested that the blackout likely originated from a fault in a 500 kV circuit from the municipality of Colonia Elía to Belgrano, a suburb of Buenos Aires. A second 500 kV circuit from Colonia Elía to Mercedes subsequently tripped under automatic action; the cause of that trip is still under investigation.[ needs update ] A third 500 kV line from Colonia Elía to Nueva Campana was out of service at the time owing to construction work. [18]

Aftermath

The Ente Nacional Regulador de la Electricidad will apply fines to the wholesaler energy distributor Transener. According to regulations, the maximum fine can be either 10% of the annual earnings or 50% of the monthly ones; Transener earned $9,838.5 million in 2018. Distributors Edenor and Edesur turned off 38% of the service, which harmed the situation as it was required a 52% to compensate the outage. Cammesa, the institution that regulates those distributors, explained that this was an automatic process, and that this failure was a consequence of badly programmed systems. Cammesa would redirect the money of the fees to the users, who would get a tax credit as compensation. Those credits would be of a uniform amount, unrelated to the actual time each user was without energy. [19]

See also

Related Research Articles

<span class="mw-page-title-main">Power outage</span> Loss of electric power to an area

A power outage is the loss of the electrical power network supply to an end user.

The Argentine Interconnection System is a wide area synchronous grid that links the regional networks of all Argentinian provinces, with the exception of Tierra del Fuego. It is also connected to the power grids of several neighboring countries.

<span class="mw-page-title-main">Northeast blackout of 2003</span> Major power outage in August 2003 in North America

The Northeast blackout of 2003 was a widespread power outage throughout parts of the Northeastern and Midwestern United States, and most parts of the Canadian province of Ontario on Thursday, August 14, 2003, beginning just after 4:10 p.m. EDT.

<span class="mw-page-title-main">Comisión Federal de Electricidad</span> Mexican state-owned electric utility company

The Comisión Federal de Electricidad is the state-owned electric utility of Mexico, widely known as CFE. It is the country's dominant electric company, and the country's second most powerful state-owned company after Pemex. The Mexican constitution states that the government is responsible for the control and development of the national electric industry, and CFE carries out this mission. The company's slogan is "Una empresa de clase mundial".

<span class="mw-page-title-main">ANCAP (Uruguay)</span> Uruguayan state-owned fuel company

ANCAP is a state-owned company in Uruguay, it was created by Law No. 8.764, on October 15, 1931 during the administration of Gabriel Terra. Its Fundamental Law entrusts it with the power to exploit and administer the monopoly of national Alcohol and Fuel, portland cement, as well as import, refine and sell petroleum derivatives. It operates the only oil refinery in Uruguay in La Teja, inaugurated in 1937 next to its working-class neighborhood with homes with patios and gardens, President Gabriel Terra described the company as the "pride of Uruguay", it has a capacity of 50,000 barrels per day. ANCAP has a long-term corporate credit rating "BB−" with positive outlook by Standard & Poor's.

<span class="mw-page-title-main">2009 Brazil and Paraguay blackout</span>

The 2009 Brazil and Paraguay blackout was a power outage that occurred throughout much of Brazil and for a short time the entirety of Paraguay, on Tuesday, November 10, to Friday, 20 November, 2009, at approximately 22:15 BST. The blackout affected an estimated 60 million people in Brazil.

<span class="mw-page-title-main">Energy in Uruguay</span>

Energy in Uruguay describes energy and electricity production, consumption and import in Uruguay.

<span class="mw-page-title-main">2010 Chile blackout</span> Power outage in Chile

The 2010 Chile blackout was an electric power outage that affected most of Chile on March 14, 2010. It began at 8:44 pm on Sunday and continued into the next day. The power was restored in a few hours in some areas, and by midnight in most areas, except in the Biobío Region.

<span class="mw-page-title-main">2011 Southwest blackout</span> Power Outage In Southern California

The 2011 Southwest blackout, also known as the Great Blackout of 2011, was a widespread power outage that affected the San Diego–Tijuana area, southern Orange County, Imperial Valley, Mexicali Valley, Coachella Valley, and parts of Arizona. It occurred on Thursday, September 8, 2011, beginning at about 3:38pm PDT, and was the largest power failure in California history.

<span class="mw-page-title-main">2011 Chile blackout</span> Major power outage

The 2011 Chile blackout was a major power outage that occurred on 24 September 2011, approximately between 20:30 and 21:45 local time, although the time of reinstatement varied geographically. It mainly affected the regions from Coquimbo to Maule, where the blackout was total, but it also reportedly partially affected the Atacama and Bío Bío regions. The blackout affected approximately nine million Chileans.

Several major power outages have occurred in the country of Malaysia.

<span class="mw-page-title-main">2012 India blackouts</span> Widespread power outages in India

Two severe power outages affected most of northern and eastern India on 30 and 31 July 2012. The 30 July 2012 blackout affected over 400 million people and was briefly the largest power outage in history by number of people affected, beating the January 2001 blackout in Northern India. The blackout on 31 July is the largest power outage in history. The outage affected more than 620 million people, about 9% of the world population, or half of India's population, spread across 22 states in Northern, Eastern, and Northeast India. An estimated 32 gigawatts of generating capacity was taken offline. Of the affected population, 320 million initially had power, while the rest lacked direct access. Electric service was restored in the affected locations between 31 July and 1 August 2012.

<span class="mw-page-title-main">2013 Southern Vietnam and Cambodia blackout</span> Power outage in Vietnam and Cambodia

The 2013 Southern Vietnam and Cambodia blackout was a power outage in the southern region of Vietnam on 22 May 2013, affecting millions of people.

<span class="mw-page-title-main">2019 Venezuelan blackouts</span> Nationwide power outages

Nationwide recurring electrical blackouts in Venezuela began in March 2019. Experts and state-run Corpoelec sources attribute the electricity shortages to lack of maintenance and to a lack of technical expertise in the country resulting from a brain drain; Nicolás Maduro's administration attributes them to sabotage. Since March, various nationwide blackouts occurred in the country.

Venezuela has experienced a marked deficit in the generation of electrical energy. The immediate cause of the energy crisis was a prolonged drought that caused the water in the reservoir of the Simón Bolívar Hydroelectric Plant to reach very low levels. Although various measures were taken to overcome the crisis, one of the most controversial was the implementation of a program of electrical rationing throughout the country, except in the capital Caracas, which was ultimately officially suspended in June 2010, due to the recovery of reservoirs due to the rains, and not to interrupt the transmission of the 2010 FIFA World Cup. Power cuts have continued to occur in the interior of the country, although with less frequency and duration, this time driven by failures in other parts of the system. The situation of "electrical emergency" decreed by the government on 21 December 2009 was suspended on 30 November 2010; however, on 14 May 2011, after the country experienced two national blackouts, the government of Hugo Chávez announced a temporary rationing plan and acknowledged that the electricity system continued to face "generation weaknesses" that they did not expect to surpass until end the year.

An energy collapse in the state of Zulia, Venezuela occurred as a result of the country's ongoing general crisis, and it is the largest of its kind in the history of the state. With previous events in 2015 and 2016, the collapse intensified in 2017, when in September an alleged theft of cables left the city of Maracaibo and its surroundings without electricity. Since then long and short-term blackouts have been reported, which also cause the suspension of water supply, failures in cable television, telephone coverage and Internet access, among other services, as well as difficulty conducting business transactions, caused by the scarcity of banknotes and the dependence on the large-scale use of the point of sale terminals as well as electronic payments that are deficient in the absence of electricity and the Internet, resulting in closing of establishments, absence of work, damage of food and electrical appliances, the decrease in quality of life, among other factors, which added to the high temperatures suffered by citizens, affect the normal development of the population. Authorities such as the national government and the government of Zulia have attributed these failures to an alleged sabotage, but the opposition and experts denounce that it is due to lack of maintenance, also arguing that only less than half of what is consumed regularly is produced, reason for which there is "cargo administration" (rationing). The National Assembly of Venezuela, of opposition majority, declared the region in a state of electrical emergency. The service has also been interrupted but to a lesser extent in other states such as Bolívar, Carabobo, Falcón, Mérida, Miranda, Nueva Esparta, Táchira, Vargas and the country's capital Caracas.

<span class="mw-page-title-main">Manhattan blackout of July 2019</span> Power outage in New York City

The West Side of Manhattan in New York City experienced a power failure on July 13, 2019, at approximately 7 p.m. EDT. Con Edison is the energy utility serving the area, and they reported that approximately 73,000 customers were without power. Power was fully restored by midnight. The power failure occurred on the 42nd anniversary of the New York City blackout of 1977, which left nine million customers without power.

<span class="mw-page-title-main">LUMA Energy</span> Power company in Puerto Rico

LUMA Energy is the power company responsible for power distribution and power transmission in the Commonwealth of Puerto Rico. They are also in charge of maintaining and modernizing the power infrastructure. Previously, these duties belonged exclusively to the Puerto Rico Electric Power Authority, but as of July 20, 2018, permission was granted for PREPA assets and service duties to be sold to private companies, and on June 22, 2020, a 15-year contract with LUMA was signed, making LUMA the new operator. The takeover took place on June 1, 2021.

<span class="mw-page-title-main">2022 Southern Cone heat wave</span>

In mid-January 2022, the Southern Cone had a severe heat wave, which made the region for a while the hottest place on earth, with temperatures exceeding those of the Middle East. This extreme weather event was associated with the Atlantic anticyclone, a particularly intense La Niña phenomenon in the Pacific Ocean, and the regional effects of climate change.

References

  1. "Crippling blackout hits tens of millions in South America". CBS News.
  2. 1 2 3 4 5 Livni, Ephrat (15 June 2019). "Massive Power Failure Sweeps Across Argentina and Uruguay". Quartz. Bloomberg News . Retrieved 16 June 2019.
  3. 1 2 Spaltro, Santiago (4 June 2020). "A un año del apagón, no hubo multas para Transener y otras eléctricas" [A year after the blackout, no fines for Transener and other electric companies]. El Cronista (in Spanish).
  4. "REUNIÓN DE LA COMISIÓN DE MINERÍA, ENERGÍA Y COMBUSTIBLES" [Hearing of the mining, energy and fuels commission](PDF). Argentine Senate (in Spanish). 3 July 2019. Archived from the original (PDF) on 11 September 2020. Retrieved 8 August 2020.
  5. 1 2 3 4 Politi, Daniel (16 June 2019). "Argentina and Uruguay Without Power After 'Massive' Failure". The New York Times . ISSN   0362-4331 . Retrieved 16 June 2019.
  6. 1 2 McLaughlin, Eliott C. "'Massive failure' leaves Argentina, Paraguay and Uruguay with no power, utility says". CNN. CNN . Retrieved 16 June 2019.
  7. 1 2 Shaw, Gabbi. "A massive power outage left over 48 million people in the dark across entire countries in South America". Business Insider . Retrieved 16 June 2019.
  8. Coordinador Eléctrico Nacional [@coord_electrico] (16 June 2019). "(INFORMACIÓN) Coordinador Eléctrico Nacional informa que el sistema eléctrico de Chile funciona con total normalidad, luego de la falla que afectó este domingo al sistema interconectado que une a Argentina con Uruguay" (Tweet) (in Spanish). Retrieved 16 June 2019 via Twitter.
  9. Reporter, Contributing (17 June 2019). "Massive Blackout Strikes South America, Brazil not Affected". The Rio Times .
  10. "Argentina Isn't Ruling Out a Cyberattack in Major Power Outage". Bloomberg.com. 16 June 2019. Retrieved 6 October 2020.
  11. 1 2 3 4 5 "Argentina and Uruguay reel after massive power outage". BBC News . Retrieved 16 June 2019.
  12. UTE (16 June 2019). "COMUNICADO DE UTE. A las 13:30 el 75% de los servicios es normal" (in Spanish). Twitter.
  13. UTE (16 June 2019). "Ya está restablecido el servicio al norte del Río Negro. También se restituyó en parte del litoral sur y zona metropolitana. Quedan pendientes daños por el temporal. Se sigue trabajando para reponer el resto del sistema" (in Spanish). Twitter.
  14. "Massive blackout hits tens of millions in South America". Associated Press. 16 June 2019.
  15. 1 2 3 Byrne, Paul & Henao, Luis (16 June 2019). "South America blackout leaves tens of millions without power". Associated Press.
  16. Phillips, Tom; Goñi, Uki (16 June 2019). "Millions across South America hit by massive power cut". The Guardian . ISSN   0261-3077 . Retrieved 16 June 2019.
  17. "'Unprecedented' blackout hits three South American countries". South China Morning Post . 17 June 2019.
  18. Nordrum, Amy (18 June 2019). "Transmission Failure Causes Nationwide Blackout in Argentina". IEEE Spectrum: Technology, Engineering, and Science News. Retrieved 20 June 2019.
  19. Sofia Diamante (4 July 2019). "Por el apagón, todos los usuarios del país recibirán una bonificación en sus facturas de luz" [Because of the blackout, users in all the country will receive a credit in the energy fees] (in Spanish). La Nación. Retrieved 15 July 2019.