549th Engineer Light Pontoon Company

Last updated

549th Engineers Light Pontoon Company
United States Army Corps of Engineers logo.svg
Active1943–46
Country Flag of the United States.svg United States
Branch United States Department of the Army Seal.svg United States Army
TypeCombat Engineer
RoleCombat Service Support
SizeCompany
Engagements World War II (Ardennes-Alsace Campaign, Rhineland Campaign, Central Europe Campaign)
Commanders
Notable
commanders
Captain George B. Lotridge, Commanding Officer

The 549th Engineers Light Pontoon Company was a combat engineer company of the United States Army during World War II. Operationally attached to the 1150th Engineer Combat Group, it served under XXI Corps of the Seventh Army in action in France and Germany in 1944 and 1945.

Contents

The 549th was primarily a highly mobile pontoon bridge construction unit, which also provided both M2 assault boats and a selection of infantry support bridging, ferries, and rafts. It was created on 14 January 1943, but was not committed troops until training began five months later at Camp Hood, Texas. The company was composed of black American troops [1] and NCOs, with primarily white senior officers. [2]

The 549th's bridge building, assault troop ferrying, and other combat capabilities were drawn on for the assault of Saarbrücken on the Saar River at the Siegfried Line, the crossing of the Main River and capture of Würzburg, and the Danube at Dillingen, then continued on towards Austria as three separate platoons. [1]

In the European Theater of Operations it was often just ahead or behind the 289th Engineer Combat Battalion during the months of March, April, and May 1945. At various points it detached a platoon to the 289th and traded an officer back and forth in April. [2] On 1 April 1945, the detached 1st Platoon enjoyed Easter Dinner with the 289th at the Mudau Hotel in Mudau, Germany. [2]

By war's end its units were scattered throughout a fast-moving front that saw spearheads of U.S. troops spread throughout southern Germany and into borderlands of Austria and Italy.

The 1st platoon went south from Augsburg to Landsberg, where it bridged the Lech River [ citation needed ] before ending up on the Chiemsee in southeast Germany just miles from Salzburg, Austria. [2]

The Second platoon ended up in Kufstein at the Inn River in the Austrian Tyrol in support of the 12th Armored [3] and 36th Infantry Divisions. [4]

The 3rd Platoon bridged the Saalach River at Bad Reichenhall to clear the way for the U.S. 101st Airborne and the French First Army in their bids to be first to reach Nazi Germany's Bavarian retreat of Berchtesgarden and capture Adolf Hitler's Berhof and Eagle's Nest. [2]

History

World War II recruiting poster for the U.S. Army Corps of Engineers "WE CLEAR THE WAY - ENGINEERS", 1941 - 1945.jpg
World War II recruiting poster for the U.S. Army Corps of Engineers

By war's end the 549th's 2nd platoon had reached Kufstein, Austria, where it had bridged the Inn River in support of the 12th Armored Division in its race to be first to the Brenner Pass.[ citation needed ] The 1st platoon rested on the Chiemsee in southeast Germany, just miles from Salzburg, Austria.

The 3rd platoon was the last to finish its mission, which was in support of the 101st Airborne Division and the 2nd Armored Division (France) of the French First Army in their bids to capture the Nazi high command's retreat in the "National Redoubt" of Berchtesgarden. While attached to the 48th Engineer Combat Battalion it constructed three Bailey bridges totaling 400 feet to open the road-net ahead of the competing divisions. According to the unit's history, "The last bridge, which totaled 200 feet in length, was completed on May 8 and the boys really proceeded to celebrate V-E Day 'royally' in Hitler's 'Nest'". [2] [lower-alpha 1]

Unit headquarters was still at Degerndorf when the news arrived that Germany had surrendered. Rumors were rife about where they would go next, some suggesting Italy, but on 13 May the 549th departed for Oringen, Germany back toward the Rhine. [2]

There were no changes in assignment and attachments during the 549th's service in the ETO. It remained assigned to the Sixth Army Group, Seventh Army, attached to the XXI Corps and assigned to the 1150th Engineer Combat Group for operational duty. [2]

A lot of hard work awaited the company when it reached Oringen on 13 May getting its vehicles and equipment ready to move closer to France and eventually the United States of America. [2]

Capabilities

The 549th was primarily a bridge construction unit. [5] As a combat engineers, though, they could be called upon to deliver a number of diverse services when needed. These included, but were not limited to: [6]

Primarily the units were devoted to the construction of various pontoon bridges and the deployment and operation of ferries, rafts, and assault boats [2]

Equipage

Treadway bridge supported by pneumatic pontons 3rd Armored Division vehicles cross the Seine River.jpg
Treadway bridge supported by pneumatic pontons

A Light Pontoon Bridge company was equipped with the M3 pneumatic bridge, which could handle all normal infantry division loads and could be reinforced to carry heavier loads. The pontoon bridge was supported by heavy inflatable pneumatic floats. It had two bridge platoons, each equipped with one unit of M3 pneumatic bridge, and a lightly equipped platoon which had one unit of footbridge and equipment for ferrying. [7]

Its equipment included:

Engineers were required to operate assault boats ferrying infantry troops and equipment in combat.

Awards

United States Bronze Star Medal Bronze Star medal.jpg
United States Bronze Star Medal
Sixth Army Group, Seventh Army, XXI Corps insignia composite.png

Twelve members of the 549th received awards for meritorious service in connection with the successful crossing of three rivers in Germany and the Alps: [1]

NORMANDY BASE SECTION, France – At its first and last formation, 12 members of the 549th Engineer Light Pontoon Company were awarded the Bronze Star Medal for meritorious service in connection with the successful crossing of three rivers in Germany and the Alps. One of two colored pontoon bridge units in the ETO, the 549th in April, after ferrying assault troops across the Saar River„ erected 1084 feet of Bailey Bridge and Infantry foot bridge over the river. The men, who; had helped capture Saarbrücken, moved on to Würzburg, which they helped subdue, and swinging southward, threw up 1400 feet of bridge over the Main and Danube Rivers.

Under Constant Fire

Then assigned the job of bridging the river at Würzburg, the pontoners worked three days and nights under constant fire erecting a 570-foot triple bridge, strong enough for the heaviest train load. Finally attached [lower-alpha 2] to the 12th Armored Division [8] [lower-alpha 3] of General Patton's [sic] Seventh Army [lower-alpha 4] they worked through to Bad Reichenthal, [lower-alpha 5] Germany, where on V-E day they finished a 190-foot bridge, that proved a gateway for French and American troops. During its three campaigns, the company lost only one man, T/Sgt. Elmer Barrett of 2208 Dickinson St., Philadelphia, who was posthumously awarded the Bronze Star Medal and Purple Heart. 

The three officers and nine enlisted men who received the Bronze Star from Col. E. J. Dowling of the 1150th Engineer Combat Group were:

1st Sgt. Leon Wilburn. Florence Villa, Fla.; Sgt. Evan T. Guess, 711 Elm St., Madison. Ind.: S/Sgt. Weldon D. Bryant, NYC.; S/Sgt. Wilson R. Forney, Cornelius, NC.: PFC Johnnie D. Townsend. Chattanooga. Tenn.; T/4 Milton Green. Panama City, Fla.: S/ Sgt. Stanley J. Short, Pittsburgh; Cpl. Lawrence C. Cooke, Palatka, Fla.; Sgt. Daniel I. Poe, 2231 Tort St., Detroit; 1st Lt. John R. Hopkins, Florence. Ma.; 1st Lt. Robert A. Flynn, NYC.. and 1st Lt. George

The Afro-American, 25 August 1945, page 1-2

Campaign credit

See also

Notes

  1. Note this choice of words suggests the celebration was on May 8 at the Kehlsteinhaus (known to the Allies as Hitler's "Eagle's Nest") rather than his home below on the Obersalzberg, the Berghof. It was commonplace at that time for U.S. Troops and members of the press corps to conflate the two; the reference is more than likely to the Berghof, as few people at that time were able to get access to the mountaintop Kehlsteinhaus.
  2. The 549th repeatedly provided general support to the 12th Armored Division without being officially attached, including 2–3 April near Wurzburg (p.22), near Neunkischen mid-April, at Bad Tolz and Murnau in late April, and at Kufstein, Austria in early May (all p.23, 549th unit history)
  3. Only one of two U.S. Tank Divisions with African-American combat soldiers during World War II
  4. The 12th Armored Division was not under Patton's command at that point. Patton commanded the Seventh Army in the Italian campaign during 1943 but was put in command of the Third Army in Europe following the June 1944 D-Day landings at Normandy. The 12th Armored Division was temporarily assigned to the command of the Third Army during the crossing of the Rhine in March 1945, during which time Gen. Patton nicknamed the 12th AD "The Mystery Division", [9] after which the 12th reverted to the Seventh Army. At no time was the 549th Eng Lt Pontoon Company attached to the 12th Armored Division.
  5. Bridging the Saalach River

Related Research Articles

<span class="mw-page-title-main">36th Infantry Division (United States)</span> US Army National Guard formation

The 36th Infantry Division ("Arrowhead") also known as the "Panther Division", the "Lone Star Division", "The Texas Army", and the "T-patchers", is an infantry division of the U.S. Army and part of the Texas Army National Guard. The 36th Infantry Division was organized during World War I (1914–1918) from units of the Texas National Guard and of the Oklahoma National Guard. As an all-Texas unit, the Arrowhead Division was called to service for World War II (1937–1945) on 25 November 1940, was deployed to the European Theater of Operations in April 1943, and returned to the Texas Army National Guard in December 1945.

<span class="mw-page-title-main">1st Infantry Division (United States)</span> US Army combat formation

The 1st Infantry Division (1ID) is a combined arms division of the United States Army, and is the oldest continuously serving division in the Regular Army. It has seen continuous service since its organization in 1917 during World War I. It was officially nicknamed "The Big Red One" after its shoulder patch and is also nicknamed "The Fighting First." The division has also received troop monikers of "The Big Dead One" and "The Bloody First" as puns on the respective officially sanctioned nicknames. It is currently based at Fort Riley, Kansas.

<span class="mw-page-title-main">Pontoon bridge</span> Type of bridge

A pontoon bridge, also known as a floating bridge, uses floats or shallow-draft boats to support a continuous deck for pedestrian and vehicle travel. The buoyancy of the supports limits the maximum load that they can carry.

<span class="mw-page-title-main">10th Armored Division (United States)</span> Military unit

The 10th Armored Division was an armored division of the United States Army in World War II. In the European Theater of Operations the 10th Armored Division was part of both the Twelfth United States Army Group and Sixth United States Army Group. Originally assigned to the Third United States Army under General George S. Patton, it saw action with the Seventh United States Army under General Alexander Patch near the conclusion of the war.

<span class="mw-page-title-main">12th Armored Division (United States)</span> Formation of the United States Army (1942–1945)

The 12th Armored Division was an armored division of the United States Army in World War II. It fought in the European Theater of Operations in France, Germany and Austria, between November 1944 and May 1945.

<span class="mw-page-title-main">14th Armored Division (United States)</span> Military unit

The 14th Armored Division was an armored division of the United States Army assigned to the Seventh Army of the Sixth Army Group during World War II. It remains on the permanent roll of the Regular Army as an inactive division, and is eligible for reactivation. The division is officially nicknamed the "Liberators".

<span class="mw-page-title-main">20th Armored Division (United States)</span> Armored unit of the United States army in World War II

The 20th Armored Division was an armored division of the United States Army that fought in World War II. It was activated on 15 March 1943 at Camp Campbell in Kentucky.

<span class="mw-page-title-main">Siege of Bastogne</span> American/German engagement December 1944

The siege of Bastogne was an engagement in December 1944 between American and German forces at the Belgian town of Bastogne, as part of the larger Battle of the Bulge. The goal of the German offensive was the harbor at Antwerp. In order to reach it before the Allies could regroup and bring their superior air power to bear, German mechanized forces had to seize the roadways through eastern Belgium. Because all seven main roads in the densely wooded Ardennes highlands converged on Bastogne, just a few miles away from the border with neighboring Luxembourg, control of its crossroads was vital to the German attack.

<span class="mw-page-title-main">28th Infantry Division (United States)</span> US Army National Guard formation

The 28th Infantry Division ("Keystone") is a unit of the Army National Guard and is the oldest division-sized unit in the Department of Defense. Some of the units of the division can trace their lineage to Benjamin Franklin's battalion, The Pennsylvania Associators (1747–1777). The division was officially established in 1879 and was later redesignated as the 28th Division in 1917, after the entry of America into the First World War. It is today part of the Pennsylvania Army National Guard, Maryland Army National Guard, Ohio Army National Guard, and New Jersey Army National Guard.

<span class="mw-page-title-main">37th Armor Regiment</span> Military unit

The 37th Armor is an armor (tank) regiment of the United States Army. It is often remembered as the successor to the 37th Tank Battalion, 4th Armored Division, commanded by then Lieutenant Colonel Creighton Abrams during World War II.

<span class="mw-page-title-main">Western Allied invasion of Germany</span> 1945 offensive in the European theatre of World War II

The Western Allied invasion of Germany was coordinated by the Western Allies during the final months of hostilities in the European theatre of World War II. In preparation for the Allied invasion of Germany east of the Rhine, a series of offensive operations were designed to seize and capture its east and west banks: Operation Veritable and Operation Grenade in February 1945, and Operation Lumberjack and Operation Undertone in March 1945; these are considered separate from the main invasion operation. The Allied invasion of Germany east of the Rhine started with the Western Allies crossing the river on 22 March 1945 before fanning out and overrunning all of western Germany from the Baltic in the north to the Alpine passes in the south, where they linked up with troops of the U.S. Fifth Army in Italy. Combined with the capture of Berchtesgaden, any hope of Nazi leadership continuing to wage war from a so-called "national redoubt" or escape through the Alps was crushed, shortly followed by unconditional German surrender on 8 May 1945. This is known as the Central Europe Campaign in United States military histories.

<span class="mw-page-title-main">XXI Corps (United States)</span> Military unit

The XXI Corps was a corps of the U.S. Army during World War II. It was constituted on 2 December 1943, and activated on 6 December 1943 at Camp Polk, Louisiana. XXI Corps fought for 116 days in the European Theater of Operations, starting in the Alsace, crossing into southern Germany, and swarming into Austria, with individual elements reaching into northern Italy. The corps was commanded in combat by Major General Frank W. Milburn as a subordinate unit of the Seventh U.S. Army.

<span class="mw-page-title-main">Battle of Remagen</span> World War II US Army crossing the Rhine.

The Battle of Remagen was an 18-day battle during the Allied invasion of Germany in World War II. It lasted from 7 to 25 March 1945 when American forces unexpectedly captured the Ludendorff Bridge over the Rhine intact. They were able to hold it against German opposition and build additional temporary crossings. The presence of a bridgehead across the Rhine advanced by three weeks the Western Allies' planned crossing of the Rhine into the German interior.

<span class="mw-page-title-main">Battle of Heilbronn (1945)</span>

The Battle of Stuttgart was a nine-day battle in April 1945 during World War II between the United States Army and the German Army for the control of Heilbronn, a mid-sized city on the Neckar River located between Stuttgart and Heidelberg. Despite the impending end of World War II in Europe, the battle was characterized by very firm German resistance and the presence of various Nazi Party auxiliaries among the regular German troops. Following days of house-to-house combat, troops of the U.S. 100th Infantry Division captured Heilbronn and the U.S. VI Corps continued its march to the southeast.

<span class="mw-page-title-main">17th Armored Engineer Battalion</span> Military unit

The 17th Armored Engineer Battalion was a part of the 2nd Armored Division "Hell on Wheels". During World War II, they were active in North African Campaign, and Western Europe Campaign. 17th Armored Engineer Battalion was founded on 1 October 1933 as part of the US Army. First called 17th Engineer Battalion, Motorized. It was renamed on 10 July 1940 to 17th Engineer Battalion (Armored) and assigned to the 2nd Armored Division. The unit became active and started training 15 July 1940 at Fort Benning, Georgia. Renamed again on 8 January 1942 as the 17th Armored Engineer Battalion. The Battalion is now based at Fort Cavazos, Texas. The battalion's motto was We pave the way. Tasks of the 17 included construction and demolition under combat conditions, constructing and breaching trenches, tank traps and other fortifications, bunker construction, bridge and road construction, and building destruction bridges and other physical work in the battlefield whenever needed. They also laid and cleared land mines. The 17th facilitated the movement and support of friendly forces while slowing down the enemy's forces.

<span class="mw-page-title-main">291st Engineer Combat Battalion (United States)</span> Military unit

The 291st Engineer Combat Battalion was one of the most decorated engineer combat battalions of the United States Army during World War II, playing notable roles both in the Battle of Bulge and the Rhine river crossing at Remagen.

<span class="mw-page-title-main">289th Engineer Combat Battalion (United States)</span> Military unit

The 289th Engineer Combat Battalion was a combat engineer battalion of the United States Army during World War II. It served under XXI Corps of the Seventh Army in action mainly in France and Germany in 1944 and 1945. It received campaign credit for participation in the Ardennes-Alsace campaign , Rhineland campaign, and the Invasion of Germany.

<span class="mw-page-title-main">Engineer Light Ponton Company</span>

An Engineer Light Ponton Company was a combat engineer company of the United States Army that served with U.S. Army ground forces during World War II. It was primarily a highly mobile pontoon bridge construction unit, though it also provided both M2 assault boats and a selection of infantry support bridging, ferries, and rafts.

General George Patton's Third Army's Seine River Crossing at Mantes-Gassicourt was the first allied bridgehead across the Seine River in the aftermath of Operation Overlord, which allowed the Allies to engage in the Liberation of Paris. During the two days of the bridge crossing, American anti-aircraft artillery shot down almost fifty German planes.

<span class="mw-page-title-main">1139th Engineer Combat Group</span> Military unit

The 1139th Engineer Combat Group was a technical United States Army Headquarters Unit providing administration and supervision support to Combat Engineers on bridge building and other construction activities during World War II. The 1139th Engineer Combat Group was part of the Third Army and was attached for operations to the XX Corps in direct support of the 7th Armored Division. The 1139th Engineer Combat Group fought from northern France to Austria in World War II, supporting General George Patton's Third Army's rapid movements during the war.

References

  1. 1 2 3 "The Afro American - Google News Archive Search". news.google.com. Retrieved 5 February 2022.
  2. 1 2 3 4 5 6 7 8 9 10 549th Engineer Light Pontoon Company History
  3. 549th Engineer Light Pontoon Company History, p. 23
  4. Hammersen, Fredrick P. A., LTC, The End of the War Archived 18 May 2015 at the Wayback Machine "Further east, Combat Command A of the 12th Armored Division and the 142nd Infantry Regiment of the 36th Infantry Division (XXI Corps) captured Murnau on April 29th."
  5. War Department Field Manual FM-5-5, Engineer Troops 11 October 1943 Engineer Light Pontoon Company
  6. What Did Combat Engineers Do?
  7. Engineer Field Manual FM 5-5
  8. 549th Engineer Light Pontoon Company History, p. 22,"The 1st and 2nd platoons were attached to the 286th Engineer Combat Battalion at this time, where they reinforced 140 feet of DS Bailey Bridge with four bays of DD in the center near Murnau and completed 80 feet of DS Bailey Bridge at Bad Telz (sic) [Bad Tölz]. Both of these projects were in general support of the 12th Armored Division, Combat Commands A and B."
  9. "Mystery Division at Rhine: Patton's Forces Chasing Germans on Road Back". Joseph Driscoll, New York Herald-Tribune, March 22, 1945, archived at the 12th Armored Memorial Museum website, accessed 4-25-2015. Archived from the original on 4 February 2015.
  10. 1 2 Department of the Army, Unit Citation and Campaign Participation Credit Register, p. 242