Abraham Moss Community School

Last updated

Abraham Moss Community School
Fair use logo Abraham Moss Community School.png
Address
Abraham Moss Community School
Crescent Road

, ,
M8 5UF

England
Coordinates 53°30′42″N2°14′09″W / 53.51179°N 2.23579°W / 53.51179; -2.23579
Information
Type Academy
Established1973
FounderAbraham Moss
Local authority Manchester
TrustThe Dean Trust
Department for Education URN 150009 Tables
Ofsted Reports
PrincipalJosette Arnold [1]
Gender Coeducational
Age3to 16
Enrolment1,848 as of September 2023

Abraham Moss Community School is a coeducational all-through school located on a 19-hectare (47-acre) site situated on Crescent Road in the Crumpsall/Cheetham Hill district of North Manchester adjacent to the Abraham Moss Metrolink station. The complex also includes a leisure centre, the district library and a 230-person theatre complex. The centre also hosts other tenants mainly in the public, voluntary and community sectors. [2] It is named after Abraham Moss, Lord Mayor of Manchester (1953–54).

Contents

History

The Abraham Moss opened in 1973 as a multipurpose integrated centre with lower school, and upper school seamlessly joining to a FE college, a library and a leisure centre. The first principal was Ron Mitson, with Dave Shapcott being head of school. It aimed to teach through independent resource-based learning [3] - staff developed and pasted up their own materials which were then taken to the printroom, where the masters were allocated an accession number and the printroom staff would print the required number of copies on offset litho machines. It was referred to as a school without books. The building was featured in a DES best practice building report. [4]

It was one of six such centres [5] built around that time that were characterised by shared-use area, collaboration across phases with an inclusive approach to the pupils, their welfare and developing their potential. They all had innovative curriculums and purpose designed buildings. [6] It was built at a cost of £2.472 m. [4]

Manchester City Libraries moved the stock from Crumpsall Library in 1974. The stock transfer, and subsequent change in the reader profile was subject to a study in 1979 published in the Journal of Librarianship and Information Science. [7] In effect, the number of younger readers increased by 88% but the over 65s stopped coming.

Community education

Community education, as practised by Cambridgeshire village colleges of the 1930s, [8] was seen as a viable solution for the densely populated long-established communities in areas in need of urban regeneration. Manchester City Council recognised that factors in Cheetham Crumpsall made this area where the experiment could take place. Community Education envisages that the school is the centre of the community, and instead of being closed to all but its pupils, the community should be encouraged. This is done by integrating sports and cultural facilities. Shared use creates financial saving- and the shared identity binds and strengthens the community which eventually takes over the running and management of the facility.

In the case of the Moss, Cheetham Secondary Modern School was due to be rebuilt; following DES Circular 10/65 selection was to be abolished and schools reorganised on comprehensive lines. Rebuilding was included in the 1967–68 and 1968–69 major building programme. Provision for an 800 fte (full-time equivalent) student further education college to be located on Cheetham Hill Road had been approved in 1967, land at Crescent Road would be cheaper and offered further savings if the two were to be in one building. The adult education centre was to move from old buildings adjacent to Cheetham Secondary Modern School to the proposed FE college. It would move too. [9]

The former library on Cheetham Hill Road Crumpsall and Cheetham District Library.jpg
The former library on Cheetham Hill Road

Need had been identified in the area for a youth club, a residential unit for short stay accommodation for children and an elderly and handicapped persons' club with facilities for centralised catering. Providing these in one building was seen as attractive and cost effective.

The existing 19th century public baths on Cheetham Hill Road were due to be closed and replaced with a district sports and recreation centre that would have playing fields, outdoor public recreation space, sports halls and swimming pools. It too was at the early planning stage. Similarly, the Edwardian public library was no longer adequate. On a combined site it could provide the reference materials needed for college and school, and have a full lending library with children section and study space. It would have 60,000 volumes. [10]

Thus, the finance and will to integrate was present, and Manchester was prepared to take the risk. [11]

Arson

Tackling the blaze AMC arson-Firefighters.png
Tackling the blaze

Two of the three school blocks were gutted in an arson attack on Friday, 15 May 1997. This destroyed the buildings, the collected resources and all school records. In spite of this the school reopened in makeshift accommodation in other parts of the centre, the Monday after the weekend. [12] It was thought a group of teenagers, drunk or on drugs were responsible: No-one was charged for the attack. [13] [14] The BBC reported that the blaze, caused five million pounds worth of damage, destroying two-thirds of the school buildings, forty eight classrooms including the drama and music suites.

There was no sprinkler system, and some of the fire barriers in the ceilings had been pierced during alterations to the building. The blaze, one of the biggest seen in Manchester since the Second World War was brought under control by 160 firemen using 30 appliances. [15]

Richard Jobson, Chief Education Officer for Manchester said:

It's a bit like an act of terrorism. There was twenty four hours security here and I haven't heard one single word of criticism from people saying that you didn't do enough. In fact on the contrary we're now fairly well experienced. I mean small fires and vandalism is part of our working life, so we've got used to the notion of making our buildings as secure as possible. [14]

A temporary school of 40 classrooms was constructed out of portacabins on the tennis courts to service the nine hundred staff and pupils. [15]

2012 Expansion

There was a large rise in the birth rate in 2008 in Manchester, manifesting in the need for many extra primary school places starting in 2012. Government legislation prevents Manchester City Council from fulfilling it statutory duty by building new schools to accommodate these children, they can only expand existing schools. Twenty seven primary schools were asked to increase their admission numbers by at least 15, and Abraham Moss was asked to change its designation from an 11–16 school to a 5–16 all-through school. [16] The response was favourable, but there are tensions on how some of the existing facilities should be managed, issues such as outdoor play, indoor play and use of the theatre being at dispute. The Moss became an all-through 5–16 school, with a two form primary intake. The first reception class children arrived in September 2012. [6]

The longstanding head teacher David Watchorn had taught at the school since it opened in 1973, and became head in 1984. The 2003 Ofsted report reports:

He has been a force for stability and continuity throughout the school's history, not least when the school "kept going" in the immediate aftermath of the devastating fire of 1997; but he has also grasped the need for change and development and in recent years has helped to fix the staff's attention on the need to raise standards of attainment. [17]

However, despite Watchorn's distinguished and distinctive service to the school and the young people of the area, he was suspended in July 2013 because he publicly disagreed with the City Council about some aspects of the primary school development. Manchester City Council's relationship with its heads has often been stormy and it has a history of suspending headteachers, [18]

Gillian Houghton, a former vice-principal at The Co-operative Academy of Manchester in Blackley was appointed principal. [19]

Coronavirus pandemic

Due to COVID-19 pandemic in the United Kingdom in March 2020, there has been staff shortages and prolonged self-isolation and the decision was made for a partial school closure to take place for a month. Year 3, Year 4, Year 5, Year 9 and Year 10 pupils have to remain at home for a month, whilst the Early Years, Year 1, Year 6, Year 7, Year 8 and Year 11 still have to attend the school normally. Two days later, the school was later opened to Year 6 and Year 11 only until further notice.

Academy

Previously a community school administered by Manchester City Council, [20] in September 2023 Abraham Moss Community School converted to academy status. [21] The school is now sponsored by The Dean Trust. [22]

Site

A block plan of the buildings in 1973 AMC.svg
A block plan of the buildings in 1973

The building is on three levels, on falling land, bridging a pedestrian spine, 'the right of way', between Crescent Road and Woodlands Road which is reached through an underpass beneath the Bury line railway. The 9.5 ha of the 13 ha site had been a chemical waste tip, and the remaining 3.5 ha were formerly municipal allotments, to the south of the site the land falls away towards the Irk valley at the time it was informal open space. [23] The southern boundary is defined by the former industrial branch line than led to Crumpsall Vale. The buildings were placed on the former allotment land. This has a high water table, and a subsoil of lenticulated glacial drift containing pockets of clay and running sand overlain in part by peat, so this is not very stable. Before landscaping the waste tip was covered with a 6m layer of clean top soil. [24]

The 1973 buildings

The 1973 building was constructed using the CLASP Mk 4b system. [25] CLASP was a building construction technique introduced post-war and popular in the 1960s for short-term, cheap and easily constructed buildings such as schools, [26] fire stations, libraries etc.

AMC-CLASP 4b Concrete panels-wet night.png

CLASP buildings of wood and concrete panel construction encompass a vast number of hidden voids for services. CLASP Mk 4b was the incarnation used between 1969 and 1972, measurements were imperial using 4" as the basic unit. Panels were multiples of this – that is 12 inches or 1 foot, 3-foot, 6-foot and 9-foot. The planning grid was 12x12 inches, and a structural grid of 36x36 inches. The preferred floor to ceiling heights were 8 ft and 10 ft. The structure was steel frame with a 6 ft bay. [27] It was hung with external 10 ft by 3 ft pre-fabricated concrete panels. The interior partitions were built using plastic-faced, plasterboard-backed steel Stelvelite panels. There was a hung exposed-T ceiling with 36x36 inch mineral tiles. The void above was used for service ducting, heating, electric power and lighting. The system was not heavy which was important due to the difficult sub-soil, and quick to erect which was important due to the tight time scale. [28] It was designed to have a 60-year life. Hindsight shows that the extensive voids were a design fault, and many CLASP buildings have been destroyed by fire and have posed an asbestos risk.

The Moss was designed between 1968 and 1970 by the DES Development Group, the principal architects being David and Mary Medd, Michael Hacker and Ian Fraser. [29] A significant choice as David and Mary Medd have been leading school architects for 40 years. The curriculum was intended to align to the design of the centre. This was envisages as a network of multidisciplinary centres, an idea, that through their work at Maiden Erlegh, springs from a recommendation in the Newsom Report pages 46–48. The 24,000 m² complex was a low and compact 3-storey CLASP network, lit by small courtyards with 25 dispersed entrances linked by high level footbridges with an 'internal street'. Each component still had to satisfy multiple design regulations. The lower school was designed to provide a sheltered and identifiable environment for younger pupils (Year 7–Year 8). There were four centres or bases for smaller groups of 120 pupils and their five principal teachers who worked in a team to deliver resource based multidisciplinary project based work. The bays were 90% self-sufficient, and the lower school had its own hall and dining area with pullman style bays to further satisfy design requirements and shelter the pupils. [29]

Arson damage

Two of the three school blocks were gutted in an arson attack on Friday, 15 May 1997. This destroyed the buildings, the collected resources and all school records. [12] There was no sprinkler system, and some of the fire barriers in the ceilings had been pierced during alterations to the building. [15]

A temporary school of 40 classrooms was constructed out of portacabins on the tennis courts to service the nine hundred staff and pupils. [15] The BBC reported that the blaze caused five million pounds worth of damage, destroying two-thirds of the school buildings, forty eight classrooms including the drama and music suites. The Guardian reported the cost was eight million. [15]

2012 buildings

There are tensions on how some of the existing facilities should be managed, issues such as outdoor play, indoor play and use of the theatre being at dispute. It is hoped to move the library from within the main-centre to a site within the leisure centre allowing the remaining CLASP 4b cladding to be replaced. It will have a separate entrance. The library and the primary school both wish to claim some key areas. [16]

Current facilities

It comprises a school, an adult learning centre (City College), a library, a professional recording studio. The large leisure centre has extensive facilities including an IsoSpa gym, a sauna, two swimming pools, squash courts and a number of large halls for a variety of sports activities.

Admissions

There are formal procedures for entry at 3 years, and for entry at 11 years. The Abraham Moss follows the Manchester Education Committee admissions and appeals system. For Year seven, the applications are made the preceding October. The school has raised its admissions number from 240 to 270, but still predicts that it will be over subscribed. [30]

Curriculum

The secondary school operates a two-week 46 period timetable. [31]

Key Stage 3

All pupils in state funded community schools are required to follow the National Curriculum that was recently revised in 2014. To fulfil this requirement, pupils in Year 7 and Year 8 study:

SubjectHoursClass Size
English723
Maths723
Science623
ICT/Computing223
Art323
Music223
Drama223
PE223
Geography323
Language623
History323
Religious Studies223
Design Technology323

[31]

Key Stage 4

All pupils in state funded community schools are required to follow the National Curriculum that was recently revised in 2014. To fulfill this requirement, pupils in Year 10, and Year 11 study for GCSE and BTEC qualifications. All students study a common core of subjects that comprises English, English Literature, Mathematics, Science and Religious Studies. In addition to these subjects most will study 3 optional subjects, as well as Physical Education. In Year 11 PE is dropped and the students are banded, so the weaker students can spend more time on the essential core, and the more academic can study a further option. [32]

Academic performance

The 2011 Ofsted Inspection reported

"Students' attainment overall in GCSE examinations has improved year-on-year although it remains consistently below the national average. Low levels of attainment overall are affected by the intake of high numbers of students, often at different times of the year, with little or no knowledge of English" ...

 ... "From 2008 to 2010 progress in English and mathematics was significantly above the national average. Students of African heritage make outstanding progress overall and those who speak English as an additional language make outstanding progress in English."

[33]

Head teachers

Notable former pupils

See also

Notes

  1. "School Finder - Abraham Moss Community School | Manchester City Council". www.manchester.gov.uk. Retrieved 10 July 2023.
  2. Abraham Moss Centre Regeneration-Executive report (PDF), Manchester City Council, 30 May 2012
  3. Fletcher, Thompson & Mitson 1980, pp. 101–114.
  4. 1 2 Building Bulletin 49 1973, p. 55.
  5. N.B. Two others were Sidney Stringer Academy in Coventry where Estelle Morris taught, and the Stantonbury Campus in Milton Keynes.
  6. 1 2 Abraham Moss High School, Information to Assistant Principal, Head of Lower School Applicants letter, March 2012
  7. Jones, Arthur; King, M Barry (1979). "The effects of resiting a library". Journal of Librarianship and Information Science. Sage Publications. 11 (1979–11): 215. doi:10.1177/096100067901100304. S2CID   143122030.
  8. Franklin, Harwood & Taylor 2012, p. 51.
  9. Building Bulletin 49 1973, pp. 6, 7.
  10. Building Bulletin 49 1973, p. 7.
  11. Building Bulletin 49 1973, p. 1.
  12. 1 2 Education Guardian Archived 12 March 2016 at the Wayback Machine New classrooms rise from ashes of blaze that cost £8m, 13 April 2004
  13. TES Arson in schools Archived 4 October 2013 at the Wayback Machine Stopping the firestarters, created 6 November 1998,
  14. 1 2 "Archived copy". Archived from the original on 6 March 2016. Retrieved 15 February 2013.{{cite web}}: CS1 maint: archived copy as title (link) BBC Panorama
  15. 1 2 3 4 5 Education Guardian Archived March 12, 2016, at the Wayback Machine New classrooms rise from ashes of blaze that cost £8m, 13 April 2004
  16. 1 2 Manchester City Council, Executive committee, Jan 2013 Archived 4 March 2016 at the Wayback Machine
  17. Ofsted Report 2003, 105560 Abraham Moss High School
  18. Veteran headteacher in storm over reform plans is suspended Archived 4 March 2016 at the Wayback Machine July 2013
  19. Dobson, Charlotte (5 August 2017). "The inspiring message behind one school's educational miracle". Manchester Evening News. Retrieved 16 December 2017.
  20. "Abraham Moss Community School - GOV.UK".
  21. "Abraham Moss Community School - GOV.UK".
  22. https://thedeantrust.co.uk/
  23. Building Bulletin 49 1973, pp. 4, 5.
  24. Building Bulletin 49 1973, pp. 5.
  25. Building Bulletin 49 1973, pp. 8, 15.
  26. Franklin, Harwood & Taylor 2012.
  27. Scapebuild CLASP ID guide Archived 11 November 2013 at the Wayback Machine
  28. Building Bulletin 49 1973, p. 15.
  29. 1 2 Franklin, Harwood & Taylor 2012, p. 117.
  30. "Admissions_". abrahammoss.manchester.sch.uk. Retrieved 16 December 2017.
  31. 1 2 "Curriculum Model_". abrahammoss.manchester.sch.uk. Retrieved 16 December 2017.
  32. "Year 9 Options Boolet" (PDF). Abraham Moss. Retrieved 17 December 2017.
  33. Ofsted Report 2011, 105560 Abraham Moss High School

Related Research Articles

<span class="mw-page-title-main">Crumpsall</span> Electoral ward in England

Crumpsall is an outer suburb and electoral ward of Manchester, England, 3 miles (5 km) north of Manchester city centre, bordered by Cheetham Hill, Blackley, Harpurhey, Broughton, and Prestwich. The population at the 2011 census was 15,959. Historically part of Lancashire, Crumpsall was a township within the parish of Manchester, Salford Hundred. North Manchester General Hospital is in Crumpsall.

<span class="mw-page-title-main">Kearsley</span> Town in Bolton, Greater Manchester, England

Kearsley is a town in the Metropolitan Borough of Bolton, Greater Manchester, England. The population at the 2011 census was 14,212. Within the Historic County of Lancashire, it lies 8 miles (13 km) northwest of Manchester, 5 miles (8 km) southwest of Bury and 3+34 miles (6 km) south of Bolton.

Codsall Community High School is a coeducational upper school and sixth form located in Codsall, Staffordshire, England.

<span class="mw-page-title-main">Portsmouth Academy</span> Secondary, academy in Portsmouth, Hampshire, England

The Portsmouth Academy is a secondary school with academy status, located in Portsmouth, Hampshire, England on St Mary's Road in the central district of Fratton near St Mary's Church. Originally established as a girls' school, it became co-educational in the 2017/18 school year.

<span class="mw-page-title-main">St Monica's High School</span> Academy in Prestwich, Greater Manchester, England

St Monica's R.C. High School is a coeducational secondary school on Bury Old Road in Prestwich, Greater Manchester, England, opposite Heaton Park.

<span class="mw-page-title-main">Sale Grammar School</span> Academy/grammar school in Sale, Greater Manchester, England

Sale Grammar School is a grammar school located in Sale to the south of Manchester, England. The school became an Academy Trust Grammar School in 2011. Admission to the school is through its own entrance examination. Trafford LA operates a fully selective secondary education system with grammar and high schools. The most recent Ofsted report rated the school as "outstanding".

Lister Community School is a co-educational secondary school located at St Mary's Road, Plaistow, Newham, London.

The Heys School is a coeducational secondary school located in Prestwich, Greater Manchester, England.

Chesterton Community College is a coeducational secondary school with academy status, located in Chesterton, Cambridge, in the county of Cambridgeshire, England. It was established in 1935 as two separate schools for boys and girls, which merged in 1974 to form a mixed comprehensive school and adult centre. Chesterton was granted Community College status in 1983, and became an academy in 2011.

<span class="mw-page-title-main">Brighton Hill Community School</span> Academy in Basingstoke, Hampshire, England

Brighton Hill Community School is a coeducational secondary school located in Brighton Hill, Basingstoke in the county of Hampshire in the south of England.

<span class="mw-page-title-main">Ralph Thoresby School</span> School in Leeds, West Yorkshire, England

Ralph Thoresby School is a foundation secondary school and sixth form located in Holt Park, Leeds, West Yorkshire, England. Named after the antiquarian Ralph Thoresby, the comprehensive school accommodates about 1000 pupils aged between 11 and 18. Ralph Thoresby School is part of the North West Leeds Education Partnership Trust with local Primary Schools. At 6th Form Level the school is part of a partnership arrangement with Lawnswood School. The school provides for pupils with severe physical and visual impairment.

<span class="mw-page-title-main">Workington Academy</span> Academy in Workington, Cumbria, England

Workington Academy is a mixed secondary school in Workington, Cumbria that was formed in September 2015 as a result of the merger of Southfield Technology College and Stainburn School and Science College.

<span class="mw-page-title-main">The Academy, Selsey</span> Academy in Selsey, West Sussex, England

The Academy Selsey, formerly the Manhood Community College and the Manhood Secondary Modern School, is an small co-educational non-selective academy for 11 to 16-year-old children, in the town of Selsey, on the Manhood Peninsula, just south of Chichester, West Sussex It is part of The Kemnal Academies Trust; the multi-academy trust that oversees a number of secondary and primary schools in Kent and the south-east of England.

<span class="mw-page-title-main">Cheetham Hill Road</span>

Cheetham Hill Road is a road in north Manchester, England, running from Corporation Street in Manchester city centre to Prestwich. In Crumpsall, its name changes to Bury Old Road.

<span class="mw-page-title-main">North Walsham High School</span> Academy in North Walsham, Norfolk, England

North Walsham High School is a co-educational secondary school located in North Walsham in the English county of Norfolk. On the same site there is the shared-use Atrium Arts Centre.

<span class="mw-page-title-main">Waterfront UTC</span> University technical college in Chatham, Kent, England

Waterfront UTC is a University Technical College in Chatham, Kent, England, which opened in September 2015 as Medway UTC on a site between Pier Road and South Side Three Road. After receiving an "inadequate" rating in every category in an Ofsted inspection in March 2018, the college joined The Howard Academy Trust in November 2018 and its name was changed.

<span class="mw-page-title-main">UTC South Durham</span> University technical college in Newton Aycliffe, County Durham, England

UTC South Durham is a University Technical College located in Newton Aycliffe, County Durham. It opened in 2016 and caters for 14–19 year olds with an interest in science, technology, engineering, and maths. It is located on the Aycliffe Business Park site, in a purpose-built new building.

Harris Invictus Academy Croydon is an 11–18 mixed, free secondary school and sixth form in Croydon, Greater London, England. It was established in September 2014 and is part of the Harris Federation.

<span class="mw-page-title-main">Scarcroft Primary School</span> Primary school in York, England

Scarcroft Primary School is a coeducational primary school housed in a grade II* listed building on Moss Street, just south-west of the city centre of York, in England.

References