Aker Solutions

Last updated

Aker Solutions ASA
Company type Allmennaksjeselskap
OSE: AKSO
Industry Oilfield services Engineering
PredecessorAker Mechanical Workshop (1841)
Founded
  • Aker Solutions (2008)
  • Aker Kværner (2004)
  • Kværner Brug (1853)
  • Aker Mechanical Workshop (1841)
Headquarters Fornebu, Norway
Area served
Worldwide
Key people
Revenue NOK 22,461 million (2017) [1]
NOK 571 million (2017) [1]
1,179,000,000 Norwegian krone (2022)  OOjs UI icon edit-ltr-progressive.svg
Total assets NOK 19,736 million (2017) [1]
Number of employees
6,000
Parent Aker ASA
Website www.akersolutions.com OOjs UI icon edit-ltr-progressive.svg

Aker Solutions ASA engineers and builds energy infrastructure while providing a range of products and consultancy services to low-carbon and renewable energy projects. Based in Oslo, the company's offerings to the energy industry include the systems and services required to de-carbonize oil and gas production, build wind-to-grid infrastructure and engineer CO2 capture and sequestration.[ citation needed ]

Contents

Founded in 1841 as Akers Mekaniske Verksted, the company has been called Aker, Aker Kvaerner and Aker Solutions (2008). In 2020, the company announced a merger with Kværner ASA. In 2023, the company trades on the Oslo stock exchange under the symbol 'AKSO'.

Aker Kværner was founded in 2004 from the major restructuring of a complex "Aker Kværner" business unit formed in 2002 by the merger of Aker Maritime and Kværner Oil & Gas. On 3 April 2008, Aker Kværner was renamed Aker Solutions in part due to the difficulty non-Scandinavians found in pronouncing "Kværner".

The company was majority controlled by Aker ASA until 2007. Then, via major ownership restructuring on 22 June 2007, Aker ASA gave up its holding in Aker Solutions and transferred a 40% stake to Aker Holding, [2] which in turn was owned by Aker ASA (60%), the Norwegian Ministry of Trade and Industry (30%), SAAB (7.5%) and Investor AB (2.5%). [3]

History

Aker Solutions derives from a series of start-ups and mergers brought into being by Norwegian companies of the 19th, 20th and 21st centuries.

Evolution of Aker Kvaerner: 1841 to 2002

The timeline below summarizes the main events leading to the foundation of Aker Kvaerner —from its origins as Aker Mechanical Workshop (1841) — until the merger of Aker Maritime with Kværner Oil & Gas to form Aker Kvaerner in 2002 .

Aker Kværner, and transition to Aker Solutions: 2002 to 2008

Logo of Aker Kvaerner prior to company renaming. Aker Kvaerner.svg
Logo of Aker Kværner prior to company renaming.

Aker Kværner resulted from a merger of Aker Maritime and Kværner Oil & Gas in 2002, and a major restructuring of the Aker Kværner business unit in 2004.

Earlier in 2003, the group structure of Aker Kværner was split into six business areas; Field Development Europe, MMO Europe, Subsea & Oilfield Products, Oil, Gas & Process International, E&C Europe and E&C Americas. A need arose in 2004 to simplify a complex group structure which led to the formation of two focused industrial groups: Aker Kværner, specialists within oil, gas, energy and process engineering, and Aker Yards , specialist shipbuilders. In addition, Aker Kværner became a minor shareholder in the Finnish engineering company Aker Arctic in 2004. The new Aker Kvaerner started trading on Oslo Stock Exchange under ticker symbol 'AKVER' on 2 April 2004. [5] [6]

In 2006, the company's pulp-and-paper and power businesses were sold to Finnish-based Metso in a deal worth €335 million. [7] On 7 June 2007, an agreement was announced where a 40.1 percent stake of the company would be sold from Aker ASA to Aker Holding. [2] The new company would be owned by Aker ASA (60%), the Norwegian Ministry of Trade and Industry (30%), SAAB (7.5%) and Investor (2.5%). [3] [8]

In 2007, the company was identified by Amnesty International as an accessory to torture and other human rights abuses for its collaboration in constructing and maintaining the US detention camp at Guantanamo Bay. [4]

Aker Solutions: 2008 to 2020

During the AGM held on 3 April 2008, Aker Kværner announced that it would rebrand as Aker Solutions, a name that references Aker's businesses heritage while being easy to pronounce.

Between April 2010 and June 2010, the company was awarded three contracts by Noble Energy to supply steel tube umbilicals, a complete mono-ethylene glycol (MEG) reclamation unit, and subsea control equipment for the construction of offshore oil platforms in the Tamar gas field in Israel. Together, the contracts were worth NOK 1.1 billion. [9]

On 6 May 2011, the Kværner name re-emerged when Aker Solutions' EPC (engineering, procurement and construction) division was re-branded, and a new company was spun off and listed on the Oslo Stock Exchange in the third-quarter of 2011. Aker Solutions' holding company — Aker Holdings AS — was renamed Aker Kværner Holding AS and it held about 40% of Kværner ASA. Aker ASA took over the 10% stake owned by Saab and Investor AB, raising its stake in Aker Kværner Holding AS to 70%.

In 2014, Aker Solutions was further divided into two companies, Aker Solutions and Akastor, and in August Aker Solutions leased the entire first phase of the new Aberdeen International Business Park [10] as part of a consolidation and strengthening of its oilfield services in and around Aberdeen, Scotland.

However, on 18 February 2015, the company announced the loss of around 300 jobs in Norway as a response to falling oil prices and the decline in demand for drilling services. [11]

In November 2020, Aker Solutions merged with Kværner ASA. [12] [13]

Aker Solutions since 2021

Aker Solutions weathered the Covid-19 supply-chain and energy-price disruptions of 2020 and emerged a changed company. Restrictions related to the declared Covid-19 pandemic had primarily impacted the mobilization of personnel in and out of Norway.

The structural change embarked on by management late in 2020 saw the successful spinning off of Aker Carbon Capture and Aker Offshore Wind. The move won praise for unlocking significant shareholder value, and the newly merged company assumed a leading position as a consultancy and project-execution partner for existing and emerging energy industries.

Though serving renewable-energy and oil-and gas clients, the end of 2020 revealed the company was still a powerhouse of offshore energy engineering. A contract from Chevron to provide subsea umbilicals for the Jansz-Io subsea gas compression development, offshore Australia, affirmed the company's position as a cutting-edge subsea technology company. Jansz-lo's subsea gas compression system marked an international breakthrough for world-leading subsea gas compression technology that marked a major leap in improving recovery rates, reducing costs, enhancing safety and lowering emissions. The contract later moved into the OneSubsea venture after the Subsea spin-off

After securing the largest decommissioning contract seen in Europe in 2021 (the Heimdal and Veslefrikk infrastructure), tendering activity to start 2021 remained high, and Aker Solutions bid on contracts worth about NOK 78 billion, some 30 percent of which derived from offshore wind, carbon capture, hydrogen, and low-carbon solutions for oil and gas such as subsea gas compression.

In 2022, an EPCI contract from Shell to build the Jackdaw not-permanently attended installation, or NPAI, affirmed the continued importance of gas production for UK energy security as well as Aker Solutions' role as engineering consultancy and builder of vital offshore energy infrastructure.

Subsea Divestiture

In the summer of 2022, Aker Solutions, Schlumberger and Subsea 7 announced they would form a large new, pure-play subsea operations business. On 2 October 2023, the deal closed, and Aker Solutions became 20-percent co-owner of the OneSubsea joint venture (JV) for a total consideration of USD 700 million. This new version of OneSubsea, an existing company, comprises SLB's and all Aker Solutions' former subsea assets and 5.500 employees.

ESG & Sustainability

Aker Solutions appears committed to UN Sustainability Goals, and in early 2021 announced it would reduce its environmental footprint by targeting a 50 percent reduction of its own CO2 emissions by 2030 (over 2019 levels). By mid-2021, a commitment to be Net Zero (net zero-emissions of CO2) by 2050 had also been announced, and an initiative to be transparent about company emissions was well-underway, guided by the Aker Solutions Climate Action Plan.  

By 2022, a range of emissions-tracking tools as part of the Aker Solutions Climate Action Plan were in place to measure the carbon-dioxide and resource-use footprints of objects and logistics ahead of ESG reporting in earnest.[ citation needed ]

New Energies

Aker Solutions stated mission of "solving energy challenges for future generations" found an important partner in early 2021, when a Memorandum of Understanding with Doosan Babcock was signed for the joint delivery of low-carbon renewable energy projects in the UK. The partnership aims to design and build onshore plant for the production of hydrogen and for carbon capture, utilization and storage (CCUS).

A number of wind energy project awards followed by mid-2021. In May, ScottishPower Renewables' East Anglia THREE offshore wind project called for the delivery of engineering, procurement, construction, and installation (EPCI) of a large high-voltage, direct-current (HVDC) platform. In July, Aker Solutions and consortium partners signed another EPCI contract to provide an HVDC transmission system and converter platform for a large offshore wind project.

In Norway, as Aker Solutions’ yard at Stord completed the milestone first phase of construction for 11 concrete wind-turbine hulls for Equinor’s Hywind Tampen project, a contract was won to provide wind energy developers Ørsted and Eversource with an HVDC transmission system for the Sunrise Wind offshore wind project, New York's first.

In anticipation of a Norwegian offshore wind licensing round involving the Utsira Nord acreage offshore Stavanger, Aker Solutions, Mainstream Renewable Power, Ocean Winds and Statkraft formed a consortium in 2022 to develop floating wind power in a license first showcased by the government in March 2023.

A front-end engineering and design (FEED) contract to develop an e-Fuel facility for Nordic Electrofuel envisions the production of synthetic fuels based on hydrogen, CO2 and renewable power.

Electrification

Offering the electrification of offshore oil-and-gas infrastructure as part of a maintenance-and-modifications package has paid off for the Aker Solutions bottom line.

The strategy of electrifying oil platforms also takes aim at Norway's carbon-dioxide emissions, about 30-percent of which can be traced to oil and gas extraction on the Norwegian continental shelf. The business impetus comes from the Norwegian government's CO2 tax and the ESG objectives.

Aker Solutions offers technology and expertise to replace the gas-fired power used by offshore installations with hydro power from shore or wind-energy from nearby wind turbines.

Between 2021 and 2023, a switch to electrification by offshore energy company's was underway offshore Norway. Electrification studies and projects accrued and now include the following:

Northern Lights

In January 2019, Aker Solutions won a contract to build the world's first onshore CO2 receiving terminal and storage facility for shipments of the greenhouse gas from various industrial emitters.

The order kick-started the Northern Lights project, and two years later, energy company Equinor awarded Aker Solutions the NOK 1.3 billion task of designing and building onshore CCS plant and a subsea system to effect CO2 storage. Northern Lights is part of the Norwegian government’s Longship project for establishing full-scale CO2 capture, transport and storage facilities in-line with the country’s international climate agreements.

The aim is to transport by ship CO2 captured from a Norcem cement plant at Brevik, in southern Norway, to a new receiving terminal at Øygarden, near Bergen, in western Norway. Aker Solutions had also acted as subcontractor for CCS-technology company, Aker Carbon Capture, as they planned the cement factory's CO2 plant. The plan is for CO2 to be stored intermittently at Øygarden before being injected by pipeline and via subsea wells into geological structures.

See also

Related Research Articles

Kværner was a Norwegian engineering and construction services company that existed between 1853 and 2005. In 2004, it was amalgamated into the newly formed subsidiary of Aker ASA - Aker Kværner, which was renamed Aker Solutions on 3 April 2008. Kværner re-emerged on 6 May 2011, when the EPC part of Aker Solutions took the Kværner name. The new Kværner company was listed on the Oslo Stock Exchange on 8 July 2011.

<span class="mw-page-title-main">Snøhvit</span>

Snøhvit(English: Snow White) is the name of a natural gas field in the Norwegian Sea, situated 140 kilometres (87 mi) northwest of Hammerfest, Norway. The northern part of the Norwegian Sea is often described as the Barents Sea by offshore petroleum companies. Snøhvit is also the name of a development of Snøhvit and the two neighbouring natural gas fields Albatross and Askeladden. Estimated recoverable reserves are 193 billion cubic metres of natural gas, 113 million barrels of condensate, and 5.1 million tonnes of natural gas liquids (NGL). The development comprises 21 wells. The Snøhvit development is operated by Equinor on behalf of six gas companies owning licenses:

<span class="mw-page-title-main">Bellona Foundation</span> International environmental NGO

The Bellona Foundation is an international environmental NGO headquartered in Oslo, Norway, with branches in Europe and North America. Founded in 1986 by Frederic Hauge and Rune Haaland as a direct action protest group to curb Norway's oil and gas industry pollution, it grew to be multi-disciplinary and multinational in scope and in present day maintains offices in Oslo, Brussels, Berlin and Vilnius. In 2022, Bellona ended activities in Russia and relocated experts to the Vilnius, Lithuania office to assist Ukraine with environmental challenges resulting from the Russian invasion. In 2023, the Russian Prosecutor General's Office recognized Bellona as an "undesirable organization".

<span class="mw-page-title-main">Ulstein Group</span>

Ulstein Group is a group of companies that focus on various marine-related industries, but is mainly known for its shipbuilding and ship design activities. The largest unit is Ulstein Verft AS. The company's head office and primary operations are located in the town of Ulsteinvik in the municipality of Ulstein in Møre og Romsdal county, Norway, an important area for the Norwegian maritime cluster, and with subsidiaries in several other countries. The group also includes companies working with power & control systems and solutions, engineering, site follow-up and aftermarket services. The company has also been engaged in shipping.

Aker may refer to:

<span class="mw-page-title-main">BW Group</span> Maritime company

BW Group is a maritime company involved in shipping, floating gas infrastructure and deep-water oil & gas production. The company has over 490 vessels managed by an international team of over 12,000 staff worldwide. The group was founded by Sir Yue-Kong Pao in Hong Kong in 1955 as World-Wide Shipping. In 2003, the company acquired Bergesen d.y. ASA, Norway's largest shipping company, which was founded in 1935 by Sigval Bergesen the Younger. In 2005, the business was re-branded as BW. With its LNG and LPG fleets combined, BW Group owns and operates the world's largest gas shipping fleet of more than 200 gas vessels, including five FSRUs. Hafnia, a member of the BW Group, operates the world's largest fleet of oil product tankers, and BW Offshore comprises the second largest number of floating oil and gas production units (FPSOs).  BW's controlled fleet of over 490 ships also includes crude oil supertankers and dry bulk carriers.

<span class="mw-page-title-main">Subsea 7</span> Luxembourgish-domiciled subsea engineering, construction, and services company

Subsea 7 S.A. is a Luxembourgish-domiciled subsea engineering, construction and services companyserving the offshore energy industry. The company is registered in Luxembourg with its headquarters in London. Subsea 7 delivers offshore projects and provides services for the energy industry.

<span class="mw-page-title-main">Aker ASA</span> Aruba company

Aker ASA is a Norwegian industrial investment company with ownership interests concentrated in oil and gas, renewable energy and green technologies, industrial software, seafood and marine biotechnology sectors. The company is listed on Oslo Stock Exchange. Aker's main shareholder is Kjell Inge Røkke, who owns 68.2% per cent of Aker through his company TRG Holding AS. The corporate headquarters are located in Fornebu, Norway. Aker was established in 1841 when Akers Mekaniske Verksted was founded in Oslo.

<span class="mw-page-title-main">Aker Verdal</span>

Aker Verdal AS formerly known as Aker Kværner Verdal is a construction yard for large steel constructions and substructures for offshore oil platforms. The yard is owned by Kvaerner and is located in Verdal in Nord-Trøndelag, Norway.

<span class="mw-page-title-main">Vetco</span> British oilfield service company

Vetco was a British oilfield service company that was established in July 2004 and operated through its subsidiaries Vetco Gray and Vetco Aibel AS. Vetco was the result of a consortium consisting of the private equity firms Candover, 3i and JP Morgan Partners, which took over ABB's oil and gas division, ABB Offshore Systems. These companies have served the upstream oil and gas industry since 1903 and are suppliers of products, systems, and services for onshore and offshore drilling. Vetco was headquartered in London UK, and employed over 10,000 people in more than 30 countries worldwide.

<span class="mw-page-title-main">Energy in Norway</span>

Norway is a large energy producer, and one of the world's largest exporters of oil. Most of the electricity in the country is produced by hydroelectricity. Norway is one of the leading countries in the electrification of its transport sector, with the largest fleet of electric vehicles per capita in the world.

<span class="mw-page-title-main">Equinor</span> Norwegian energy company

Equinor ASA is a Norwegian state-owned multinational energy company headquartered in Stavanger, Norway. It is primarily a petroleum company operating in 36 countries with additional investments in renewable energy. In the 2020 Forbes Global 2000, Equinor was ranked as the 169th-largest public company in the world. In 2023, the company was ranked 52nd in the same list. As of 2021, the company has 21,126 employees.

The Siemens Energy Sector was one of the four sectors of German industrial conglomerate Siemens. Founded on January 1, 2009, it generated and delivered power from numerous sources including the extraction, conversion and transport of oil and natural gas in addition to renewable and alternative energy sources. As of October 1, 2014, the sector level has been eliminated, including the Siemens Energy Sector.

GC Rieber Shipping is a Norwegian shipping company that operates offshore subsea support vessels, marine seismic vessels and polar logistics and research expeditions. Based in Bergen, Norway it is listed on the Oslo Stock Exchange. A major owner is GC Rieber.

<span class="mw-page-title-main">DOF Subsea</span>

DOF Subsea is an international subsea operating company. The DOF Subsea Group is a specialist subsea service business that provides subsea construction, subsea engineering, inspection, repair and maintenance and survey services. DOF Subsea owns a large fleet of modern subsea construction, intervention and survey vessels that enable it to offer differentiated positions with its clients and work in long term relationships. The company’s core business is project management, engineering, vessel operations, survey, remote intervention and diving operations, primarily for the Offshore Energy, Marine Telecommunications, and Renewables markets. The Company's main operation centers and business units are located in Norway, the UK, the USA, Singapore, Brazil, Argentina, Canada, Angola, and Australia.

<span class="mw-page-title-main">Aker Maritime</span>

Aker Maritime is a defunct Norwegian petroleum industry supply company. Listed on the Oslo Stock Exchange it was controlled by Aker RGI, owned by Kjell Inge Røkke. The company was created in 1996 when Aker's oil and gas division was merged with Maritime Group. In 2001 Kværner was bought by the Aker Group, and Kværner and Aker Maritime were merged to Aker Kværner in 2004.

<span class="mw-page-title-main">Ezra Holdings</span>

Ezra Holdings Ltd, also known under their operating brand name of EMAS, is an integrated offshore support provider for the oil and gas industry. The business was founded in 1992 and is headquartered in Singapore. Ezra was listed on the Singapore Exchange Securities Trading Limited (SESDAQ) and promoted to Mainboard on 8 December 2005.

<span class="mw-page-title-main">EMAS (company)</span>

EMAS is an offshore contractor and integrated offshore solutions provider catering to the oil and gas (O&G) industry on a global scale. It operates as a subsidiary of Ezra Holdings and has gained recognition within the industry. Established in 1992, the company is headquartered in Singapore and initially focused its operations in the maritime sector of the Asia Pacific region, primarily managing a fleet of vessels. In 2003, the company successfully listed its shares on the Singapore Exchange SGX, enhancing its market presence. EMAS also established fabrication facilities in Vietnam.

The Johan Sverdrup oil field is an oil field in the North Sea, about 140 kilometres (87 mi) west of Stavanger, Norway. The field lies in two different production licenses and consists of two different discoveries called Avaldsnes and Aldous Major South. When it was revealed that these discoveries constituted one single field, it was renamed Johan Sverdrup after the father of Norwegian parliamentarism. The field has not yet been unitized between production licenses 501, 501B, and 265. Johan Sverdrup is expected to hold 1.9–3.0 billion barrels of oil. According to Statoil, the field is in 110 to 120 metres water depth, and the reservoir is at 1900 meters depth.

DeepOcean is an Oslo, Norway - based company which provides subsea services to the global offshore industries such as Inspection Maintenance and Repair (IMR), Subsea Construction, Cable Lay, and Subsea Trenching. Its 1,100 employees project manage and operate a fleet of Vessels, ROV's and subsea Trenchers.

References

  1. 1 2 3 "2017 Annual Report" (PDF). Akersolutions.com. Retrieved 4 January 2019.
  2. 1 2 "Ownership of Aker Solutions" . Retrieved 26 July 2012.
  3. 1 2 "Strategic ownership of Aker Kvaerner to be established" (Press release). Retrieved 26 July 2012.
  4. 1 2 "Aker Kværner har medvirket til tortur på Guantànamo" [Aker Kværner Contributed to Torture at Guantanamo] (in Norwegian). Amnesty International. 10 January 2007. Retrieved 24 October 2018.
  5. "Aker Kvaerner successfully listed" (Press release). Retrieved 26 July 2012.
  6. Dagens Næringsliv (27 December 2006). "20 minutter unna konkurs".
  7. Kati Renvall (2 August 2006). "Metso to acquire Aker Kvaerner's Pulping and Power business". Metso. Archived from the original on 27 September 2011.
  8. Norwegian Ministry of Trade and Industry (22 June 2007). "The Norwegian Government contributes to long-term strategic ownership of Aker Kværner" (Press release).
  9. "Tamar Natural Gas Field". Verdict Media. Retrieved 24 October 2018.
  10. "Oil firm signs major office lease". BBC. 12 August 2014. Retrieved 4 January 2019.
  11. "Aker Solutions cuts 300 Norway jobs". Petro Global News. Retrieved 19 February 2015.
  12. ·https://www.offshore-energy.biz/aker-solutions-kvaerner-fusion-gets-green-light/
  13. "Kværner ASA: Update on the contemplated merger with Aker Solutions ASA". 9 November 2020.

59°53′50.46″N10°37′39.98″E / 59.8973500°N 10.6277722°E / 59.8973500; 10.6277722