Albert Street | |
---|---|
General information | |
Location | Albert Street, Brisbane |
Coordinates | 27°28′19″S153°01′39″E / 27.471861°S 153.027478°E [1] |
Owned by | Queensland Rail |
Operated by | Queensland Rail |
Line(s) | Cross River Rail |
Platforms | 2 |
Tracks | 2 |
Construction | |
Structure type | Underground |
Accessible | Yes |
Other information | |
Status | Under construction |
Fare zone | Go card zone 1 |
Website | www.crossriverrail.qld.gov.au |
History | |
Opened | 2026 (scheduled) |
Electrified | Yes |
Albert Street railway station is a railway station currently under construction as part of the Cross River Rail project in the Brisbane central business district, Queensland, Australia. It is the first Brisbane CBD train station built in more than 120 years. [2]
To be built as an underground station directly beneath Albert Street, it will consist of two platforms. [3] Construction commenced in October 2019, with it scheduled to open in 2026. [4] The platforms are built at a depth of 31 metres. [5] [6]
The station will provide access to the mixed-use residential, employment and retail precinct adjoining the City Botanic Gardens, the financial district, Queen’s Wharf, the government precinct and Queensland University of Technology at Gardens Point. [7] The precinct is expected to attract more than 67,000 commuters each weekday in 2036. [8]
The station has two entrances. The main entrance lies to the south on the corner of Mary Street, while the second entrance is located to the north. A 40-storey, mixed-use commercial building at 101 Albert Street is to be built partially above the station. [9]
Whilst the intended name of the new railway station is Albert Street, a number of names have been proposed to the public, including Brisbane City, City Botanic Gardens and Frog’s Hollow, in reference to the former neighbourhood where the station is to be located. [10]
Because of difficult ground conditions drill and blast techniques were used to excavate space for the station. [6] The design features two shafts between the surface and platform level. The elevator shaft for the platform reaches a depth of 50 metres, making it the deepest basement in Brisbane. [6] During construction, needles used for opium smoking, as well as boots, ceramics and coins were unearthed. [11] During construction, 47,305 cubic metres of spoil was removed. [5] Excavation of the station box was completed in April 2022. [5]
Components of the station were lowered into the cavern down a 31 metre deep access shaft. [12] By January 2024 the mezzanine level which consists of 183 pre-cast concrete beams, each up to 19 metres wide and weighing up to 70 tonnes, was completed. [12]
The City Loop is a piece of underground commuter rail infrastructure in the central business district (CBD) of Melbourne, Victoria, Australia.
Flagstaff railway station is a commuter railway station on the Burnley, Caulfield, Clifton Hill and Northern group lines, serving the Melbourne CBD in Victoria, Australia. Flagstaff is an underground premium station on the City Loop, featuring four platforms, two island platforms on two floors connected to street level via an underground concourses. It opened on 27 May 1985.
Roma Street railway station is located in the Brisbane central business district, Queensland, Australia. It is the junction station for the North Coast, Main, Gold Coast and NSW North Coast lines. The station is one of four inner city stations that form a core corridor through the centre of Brisbane.
Exhibition railway station is located on the Exhibition line in Queensland, Australia. It serves the Brisbane Exhibition Ground in Bowen Hills and is normally only opened during the Ekka show each August.
South Brisbane railway station is a heritage-listed railway station at 133 Grey Street, South Brisbane, City of Brisbane, Queensland, Australia. It is one of two stations serving the South Brisbane area, the other being South Bank. It was built from 1891 to 1918, making it the second oldest railway station in central Brisbane. It is also known as Cultural Centre Station, Melbourne Street Station, and South Brisbane (Interstate) Station. It was added to the Queensland Heritage Register on 21 October 1992.
Brisbane City is the central suburb and central business district of Brisbane, the state capital of Queensland, Australia. It is also colloquially referred to as the "Brisbane CBD", "the city", or simply "town". The CBD is located on a point on the northern bank of the Brisbane River, historically known as Meanjin, Mianjin or Meeanjin in the local Yuggera dialect. The triangular-shaped peninsula is bounded by the median of the Brisbane River to the east, south and west. The point, known at its tip as Gardens Point, slopes upward to the north-west where the city is bounded by parkland and the inner city suburb of Spring Hill to the north. The CBD is bounded to the north-east by the suburb of Fortitude Valley. To the west the CBD is bounded by Milton, Petrie Terrace, and Kelvin Grove.
Stanley Street is a major street in Brisbane, Queensland. It carries the designation state route 41 for the entirety of its length and state route 10 between the Vulture Street and Annerley Road intersections. For the majority of its length the road is a one-way carriageway westbound. The route is a major connector between the Southern and Eastern suburbs and South Brisbane. The street passes directly to the south of The Gabba and runs directly through the Mater Hospital precinct.
Albert Street is a street in the Brisbane central business district, Queensland, Australia. It was named after Prince Albert, the Prince Consort of Queen Victoria of the United Kingdom. Albert Street railway station is being built directly beneath the street and is expected to open in 2026. The station precinct includes partial road closures as planned in the 2014 City Centre Master Plan, for the creation of a new public space.
The Metro Tunnel, formerly known as Melbourne Metro Rail (MMR), is an underground heavy rail project currently under construction in Melbourne, Victoria, Australia. It involves the construction of twin 9-kilometre (5.6 mi) rail tunnels between South Kensington and South Yarra with five new underground stations. The tunnel will connect the Pakenham and Cranbourne lines with the Sunbury line, creating a new high-frequency cross-city line that bypasses Flinders Street station and the City Loop. The line is also planned to serve Melbourne Airport via a new branch line west of Sunshine.
Cross River Rail (CRR) is an underground heavy rail project currently under construction in Brisbane, Queensland, Australia. The project will see the development of a new rail line underneath Brisbane River, alongside the redevelopment of a number of stations in the Brisbane central business district and along the Beenleigh railway line. The business case for the project was released in August 2017, with construction work officially beginning in September that year. The project replaced the planned 2013 BaT Tunnel, which in turn had replaced the original 2010 Cross River Rail proposal. It is the largest infrastructure megaproject ever undertaken in Queensland.
The City Rail Link (CRL) is a rail project currently under construction in Auckland, New Zealand. The project consists of a 3.5 km (2.2 mi) long double-track rail tunnel underneath Auckland's city centre, between Waitematā (Britomart) and Maungawhau railway stations. Two new underground stations will be constructed to serve the city centre: Te Waihorotiu near Aotea Square and Karanga-a-Hape near Karangahape Road. Waitematā will be converted from a terminus station into a through station, and Mount Eden station will be replaced by Maungawhau station, a new station with four platforms to serve as an interchange between the new CRL line and the existing Western Line.
Parkville railway station will be a rapid transit railway station on the Cranbourne, Pakenham and Sunbury lines, serving the inner-northern Melbourne suburb of Parkville in Victoria, Australia. When opened as part of the Metro Tunnel project, Parkville will be an underground premium station, featuring an island platform with two faces. Major construction commenced in April 2018, and was completed in May 2024, with minor finishing works to continue until its opening in 2025.
Laird is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It is located in the Leaside neighbourhood in East York at the intersection of Laird Drive and Eglinton Avenue. It is scheduled to open in 2024.
The BaT (Bus and Train) project was a proposed north–south tunnel that would provide bus and rail modes of transportation by combining a new underground rail line and busway in a single, double-decked, 15m-wide tunnel beneath the Brisbane River and Brisbane central business district. The tunnel was to have three underground stations at Woolloongabba, George Street and Roma Street with Dutton Park upgraded.
Woolloongabba railway station is a railway station currently under construction as part of the Cross River Rail project in the Brisbane suburb of Woolloongabba.
Barangaroo railway station is an underground Sydney Metro station in the Barangaroo precinct of Sydney, Australia. The station is served by the Metro North West & Bankstown Line.
Gadigal railway station is an underground Sydney Metro station in the central business district of Sydney, Australia. The station serves the Metro North West & Bankstown Line.
State Library railway station is a rapid transit railway station on the Cranbourne, Pakenham and Sunbury lines, serving the Melbourne CBD in Victoria, Australia. When opened as part of the Metro Tunnel project, State Library will be an underground premium station, featuring an island platform with two faces. The station will connect directly to Melbourne Central via an underground concourse. Major construction commenced in April 2018, with completion in early 2025.
Town Hall railway station is a rapid transit railway station on the Cranbourne, Pakenham and Sunbury lines, serving the Melbourne CBD in Victoria, Australia. When opened as part of the Metro Tunnel project, Town Hall will be an underground premium station, featuring an island platform with two faces. The station will connect directly to Flinders Street via an underground concourse. Major construction commenced in April 2018, with completion in early 2025.
Boggo Road railway station is a railway station currently under construction as part of the Cross River Rail project in the Brisbane suburb of Dutton Park in Queensland, Australia. It is planned for a health, science and knowledge cluster and mixed-use precinct to develop around the station. It is expected to provide facilities to 23,000 people each weekday, making it the second busiest station in the state.