Auckland Regional Council

Last updated

Auckland Regional Council coat of arms Auckland Regional Council Coat of Arms.jpg
Auckland Regional Council coat of arms
Auckland Regional Council logo Auckland Regional Council logo.svg
Auckland Regional Council logo

The Auckland Regional Council (ARC) was the regional council (one of the former local government authorities) of the Auckland Region. Its predecessor the Auckland Regional Authority (ARA) was formed in 1963 and became the ARC in 1989. The ARC was subsumed into the Auckland Council on 1 November 2010. [1]

Contents

Formation

There had been earlier attempts to rationalise Auckland's local government dating back to the early 1900s. Dove-Myer Robinson in standing for Mayor of Auckland City in 1959 campaigned on wanting to unify all of Auckland. Once elected he sought to build a consensus for reform, starting in 1960 with a meeting of 400 local body politicians from 32 local bodies. An Auckland Regional Authority Establishment Committee resulted. Robinson used the Municipality of Metropolitan Toronto and the Melbourne and Metropolitan Board of Works as models. He started with a draft comprehensive empowering bill but soon ran into opposition, with some Establishment Committee members deliberately avoiding meetings, and the Mayors of the many small boroughs fearing for the ability of their bodies to continue to govern themselves, lobbying against the proposal. Auckland City was the principal supporter of the initiative. A Bill to create the ARA was introduced to Parliament in 1961 but the Establishment Committee then thought better of it and it was withdrawn from the Parliamentary process by the Government. Robinson sought compromises about what was to be included (the Auckland Harbour Board, Electricity Supply Authorities and North Shore Drainage Board were excluded), on representation (appointment by the Local Authorities was used in the first term), on funding (direct rating was excluded) and restricting the role so only specifically empowered functions were allowed. Opposition continued with some parties implacably opposed, others wanting sub-regional councils and some promoting an alternative, much more limited Bill to Parliament. Through a good relationship with the Prime Minister Keith Holyoake, Robinson persuaded the Government to support his second compromise Bill in 1962, which was passed. Many of the compromises persisted though the duration of the ARA and its successor, the ARC. Robinson was rewarded with his election by the Authority members as its first chairman. [2]

Auckland Regional Authority, 1963–1989

The ARC was preceded by the Auckland Regional Authority (ARA), which was formed in 1963. [3] The ARA took over a number of existing operations from other bodies. One of its first areas of responsibility was bulk water supply, which it assumed from Auckland City Council. [4] Other functions taken over were regional planning, from the Auckland Regional Planning Authority, bulk sewage collection and treatment (south of the harbour only) from the Auckland Metropolitan Drainage Board, and bus passenger transport from the Auckland Transport Board. Water supply activities included constructing further bulk water storage dams, and treatment and water distribution works. Other achievements were completing and upgrading the Manukau wastewater treatment plant, creating the largest bus fleet in the country at the time, constructing Auckland Airport representing local government in a joint venture with central government and creating the regional parks network, [1] founded on the Centennial Memorial Park in the Waitākere Ranges which was transferred from Auckland City Council control and added to first with the purchase of what became Wenderholm Regional Park. [5]

Functions added at later dates included a regional role operating and regulating refuse disposal, regional roads, the regional water board under the Water and Soil Conservation Act 1967 and harbour master and marine regulation.

Despite the massive public support for Regional Parks even they were the subject of political division with the rural based district councils successfully resisting paying a contribution towards them. They were essentially built for the urban population and paid for by them.

Auckland Rapid Transit

The ARA turned its attention to commuter transport. It commissioned a comprehensive transportation plan completed in 1965 – the De Leuw Cather reports. [6] The rail aspect of this made little progress with minimal support from Authority politicians and staff, from Central Government and opposition from other Auckland councils.

The return in 1968 of Dove-Myer Robinson to the Auckland Mayoralty and as a member of the Authority marked a return to progress. A more detailed plan of a rapid transit system was worked on, and a planning committee known as Auckland Rapid Transit was formed. [7] The scheme design as finalised in 1972 had a tight inner city underground ring, operating in one direction only. The existing suburban rail line routes were to be used with track duplication to avoid freight conflicts, with extensions to Hobsonville and Howick and two new lines; under the harbour to Whangaparaoa and south to the Airport. [7]

The station spacings were larger than the existing system and travel speeds would be much higher. Local opposition and obstruction within the elected ARA members continued, as there was from the New Zealand Railways Department and railway unions.

The ruling Labour government showed little enthusiasm for the scheme and proposed a cheaper alternative in 1973 which the ARA seized upon, to Robinson's dismay. The OPEC oil price shock and the 1975 election of the Robert Muldoon lead National government was the end of the scheme. It has been mythologised since then as "Robbies Rapid Rail". [2] ART was disbanded in 1976. [7]

From then on and despite the focus of successor organisations on public transport, ARA had a mixed record on the matter, in 1983 going so far as to propose abolishing the Auckland railway system altogether. As late as 1987, major ARA transport strategy reports were still paying little attention to public transport. [8] In 1975 a documentary was released which charts the short history of the Auckland Rapid Transit project, presented by project manager Ian Mead. [9]

Local government reforms, 1980s–90s

In the late 1980s the Fourth Labour Government, consistent with its policy of corporatising and privatising government-owned entities, looked to other quasi-commercial entities to apply the same process to. Power boards received early attention, but local government was not considered as potential owners of these and their corporatisations proceeded separately. Port authorities were considered part of local government and the Auckland Harbour Board was corporatised in 1988 as Ports of Auckland, with the majority shareholding held by the ARA and the minority by Waikato local government. Some non-commercial assets and maritime regulation came to the ARA. The ARA at one stage looked to sell its holding in the port company but the proposal was defeated politically.

The Government also wanted a more commercial arrangement for the Auckland International Airport and it was corporatised in 1988, with the shareholding split between the Government and Auckland local authorities. Substantial airport reserves were also dispersed to the same parties. The ARA had no ongoing role, despite being the representative of the region's councils in the former joint venture with Government.

ARC headquarters in Pitt St Auckland Regional Council.jpg
ARC headquarters in Pitt St

In 1989 local government minister Michael Bassett concluded a reform of all local government in New Zealand. This greatly reduced the number of territorial councils in Auckland but did not materially alter the ARA, which essentially retained its previous functions under the new name of Auckland Regional Council. Two functions transferred to the larger territorial councils were regional roads and a role in stormwater on the isthmus. Anticipating a greater role in the region's governance and needing better accommodation for its staff, the ARC commenced acquisition of a new headquarters in Pitt St, completed in 1990. [10] It was a controversial move, the building later criticised by an Audit Office review for being out-sized. The ARC had a guarantee from the developer of rental of the extra space but the failure of that guarantor, owned and asset stripped by Equiticorp, left it worthless. The controversy helped in creating a political justification for the subsequent separation of many of the ARC's functions.

The power to corporatise local government operations as local-authority trading enterprises (LATEs), modelled on state-owned enterprises, was created. However this was voluntary, with the exception of transport, where council road design and delivery operations were required to be corporatised. Council bus operations were likewise required to be corporatised, with the ARC bus operation emerging in 1991 as Transport Auckland Ltd, trading as the Yellow Bus Company. The ARC studied forming its commercial operations into LATEs held under a holding company, but was injuncted by Auckland City Council in respect of the water and wastewater function and had a failure of political will in execution.

Bassett's successor, National’s Warren Cooper, took the process further. He promoted legislation requiring that the remaining ARC corporatisations take place and transferred ownership of the resulting companies from the ARC to a new short-lived body, the Auckland Regional Services Trust (ARST). The businesses transferred included the shareholding in Ports of Auckland and the Yellow Bus Company. Watercare Services (formed 1992) was one resulting company, the largest local government corporatisation in New Zealand. The Auckland Regional Services Trust was later required to privatise the Yellow Bus Company, which was bought by Stagecoach. The ARC later recovered the Ports of Auckland shareholding when ARST was wound up, and later forcibly purchased the minority shares.

Watercare did not continue ownership of the catchment lands in the Waitakere and Hunua Ranges, taking a lease from the Council of the dam, pipeline and lake areas only. The result was the largest addition to the land in Regional Parks in the ARC's history.

Auckland Regional Council, 1989–2010

The ARC had an umbrella function covering all the cities and districts of the region, but its regulatory power and funding abilities were restricted to areas such as public transport, environmental protection and regional parks. The ARC was an elected body, and collected its own rates. In 2003 the ARC commenced direct rating and ceased to collect levies through the territorial councils.

The creation of the Auckland Regional Transport Authority (ARTA) followed the return of assets to the Auckland Regional Council in 2004. They picked up on projects initiated by the ARC, territorial local authorities and government agencies such as Transit NZ. These included projects like the Northern Busway, as well as significant rail and public transport investment. Soon after, the Council purchased those shares in private hands Ports of Auckland to fund the improvements with the dividends. [1] In the final period before its subsumation into Auckland Council, the ARC was concentrating on the electrification of the Auckland railway network, building the case for a CBD rail tunnel, and an extension of rail to Auckland Airport. [1]

Auckland Regional Council sign and office ARC Sign Out On Pitt Street.jpg
Auckland Regional Council sign and office

In its final years, the ARC had been getting more involved in land use regulation, a move which was met with criticism from some politicians of the concerned Councils who normally regulate such matters. [11] This criticism surfaced especially during a short-lived 2006 debate on further integration of the Auckland area, where many of the proposals included a proposed abolishment of the ARC, or a changed, less independent role. [12]

One of the mainstays of the ARC's work was expanding the parks network, which as of 2010 included 26 regional parks with more than 40,000 hectares, including many restored natural habitats and sanctuaries developed in co-operation with the Department of Conservation and volunteers. [1]

Of the rates collected by the ARC, 50% would go to fund public transport via ARTA, [13] which is to amount to NZ$155 million in 2007/2008, up from $124 million in the preceding 2-year period 2006/2007. [14] The ARC also managed regional parks with 400 km² and 150 km of coastline, for which 15% of its total funding is spent. [15] A further 19% was spent on ecological concerns, such as water quality and protecting ecosystems. [16] Other minor percentages funded areas like "built environment" (4%), "safety" (1%), "economic development" (3%) and "regional leadership and community development" (8%). [17]

Subsidiaries

Personnel

Chairs

The following have served as chairpersons of ARA or ARC: [18]

NameTermConstituency
1 Dove-Myer Robinson 19631965Auckland City
2 Hugh Lambie [19] 19651968Manukau
3 Tom Pearce 19681976†Auckland City
4 Lee Murdoch 19771983Papatoetoe
5 Fred Thomas 19831986Takapuna
6 Colin Kay 19861992Auckland City
7 Phil Warren [20] 19922002†Auckland City
8 Gwen Bull 20022004Manukau
9 Mike Lee 20042010Auckland City

General managers / chief executives

Legacy

The legacy of the Regional Council is primarily in the acceptance by Aucklanders and central government that a single government organisation for Auckland was needed. This resulted in the Auckland Council. The most enduring material things are the former Regional Parks now the dominant part of what the Auckland Council identifies as its Premier and Regional Parks. [23]

Related Research Articles

Transport in New Zealand Overview of the transport in New Zealand

Transport in New Zealand, with its mountainous topography and a relatively small population mostly located near its long coastline, has always faced many challenges. Before Europeans arrived, Māori either walked or used watercraft on rivers or along the coasts. Later on, European shipping and railways revolutionised the way of transporting goods and people, before being themselves overtaken by road and air, which are nowadays the dominant forms of transport. However, bulk freight still continues to be transported by coastal shipping and by rail transport, and there are attempts to (re)introduce public transport as a major transport mode in the larger population centres.

Regions of New Zealand List of the top tier administrative divisions in New Zealand

New Zealand is divided into sixteen regions for local government purposes. Eleven are administered by regional councils, and five are administered by unitary authorities, which are territorial authorities that also perform the functions of regional councils. The Chatham Islands Council is not a region but is similar to a unitary authority, authorised under its own legislation.

Auckland Airport International airport serving Auckland, New Zealand

Auckland Airport is the largest and busiest airport in New Zealand, with over 21 million passengers in the year ended March 2019. The airport is located near Māngere, a residential suburb, and Airport Oaks, a service hub suburb 21 kilometres (13 mi) south of the Auckland city centre. It is both a domestic and international hub for Air New Zealand, and the New Zealand hub of Jetstar.

Council-controlled organisations (CCOs) and council-controlled trading organisations in New Zealand are what were formerly known as local-authority trading enterprises (LATEs). Introduced under Sections 6 and 7 of the Local Government Act 2002, they are essentially any company with a majority council shareholding, or a trust or similar organisation with a majority of council-controlled votes or council-appointed trustees, unless designated otherwise. More than one council may be represented in a council-controlled organisation.

Rail transport in New Zealand Conveyance of passengers and goods by way of wheeled vehicles running on rail tracks in New Zealand

Rail transport in New Zealand is an integral part of New Zealand's transport network, with a nationwide network of 4,375.5 km (2,718.8 mi) of track linking most major cities in the North and South Islands, connected by inter-island rail and road ferries. Rail transport in New Zealand has a particular focus on bulk freight exports and imports, with 19 million net tonnes moved by rail annually, with 99.5% of New Zealand's exports and imports being transported through the country's seaports.

Dove-Myer Robinson New Zealand mayor

Sir Dove-Myer Robinson was Mayor of Auckland City from 1959 to 1965 and from 1968 to 1980, the longest tenure of any holder of the office. He was a colourful character and became affectionately known across New Zealand as "Robbie". He was one of several Jewish mayors of Auckland, although he rejected Judaism as a teenager and became a lifelong atheist. He has been described as a "slight, bespectacled man whose tiny stature was offset by a booming voice and massive ego".

Hunua Ranges

The Hunua Ranges is a mountain range and regional park to the southeast of Auckland city, in the Auckland and Waikato regions of New Zealand's North Island. The ranges cover some 250 square kilometres (97 sq mi) and rise to 688 metres (2255 ft) at Kohukohunui.

Statutory boards of the Singapore Government

The Statutory boards of the Government of Singapore are organisations that have been given autonomy to perform an operational function by legal statutes passed as Acts in parliament. The statutes define the purpose, rights and powers of the authority. They usually report to one specific ministry. This list includes both current and new statutory boards formed.

Auckland Regional Transport Authority

The Auckland Regional Transport Authority (ARTA) was the central co-ordinating agency for transport in the Auckland Region of New Zealand from 2004 to 2010. In this role, ARTA provided public transport services, assigned funding and subsidies, and organised and advised on many aspects of regionwide transport. ARTA was under the control of the Auckland Regional Council (ARC) and was replaced by Auckland Transport on 1 November 2010.

Onehunga Branch Branch line between Penrose and Onehunga in Auckland

The Onehunga Branch railway line is a section of the Onehunga Line in Auckland, New Zealand. It was constructed by the Auckland Provincial Government and opened from Penrose to Onehunga on 24 December 1873, and extended to Onehunga Wharf on 28 November 1878. It is 3.6 kilometres (2.2 mi) in length and is single-track only.

Northern Busway, Auckland

The Northern Busway is a segregated busway that runs along the eastern side of the Northern Motorway, part of State Highway 1, in the north of Auckland, New Zealand, linking the North Shore with the northern end of the Auckland Harbour Bridge. As of May 2022, the busway consists of two-way lanes running between Albany Station and Akoranga Station, and from Akoranga Station a southbound-only lane that joins the harbour bridge approaches just south of the Onewa Road on-ramp system. Between 2008 and 2022 the busway terminated at Constellation.

Transport in Auckland, New Zealand's largest city, is defined by factors that include the shape of the Auckland isthmus, the suburban character of much of the urban area, a history of focusing investment on roading projects rather than public transport, and high car-ownership rates.

Public transport in New Zealand

Public transport in New Zealand exists in many of the country's urban areas, and takes a number of forms. Bus transport is the main form of public transport. Two major cities, Auckland and Wellington, also have suburban rail systems that have been gaining more patronage and new investment in recent years. Some cities also operate local ferry services. There are no rapid transit metros and no remaining tram systems active anywhere in New Zealand, though trams once had a major role in New Zealand's public transport.

Public transport in Auckland Information about public transit in Auckland

Public transport in Auckland, the largest metropolitan area of New Zealand, consists of three modes: bus, train and ferry. Services are coordinated by Auckland Transport under the AT Metro brand. Britomart Transport Centre is the main transport hub.

Auckland railway electrification

Auckland railway electrification occurred in phases as part of investment in a new infrastructure for Auckland's urban railway network. Electrification of the network had been proposed for several decades. Installation started in the late 2000s after funds were approved from a combination of regional and central government budgets.

Auckland Metropolitan city in North Island, New Zealand

Auckland is a large metropolitan city in the North Island of New Zealand. The most populous urban area in the country and the fifth largest city in Oceania, Auckland has an urban population of about 1,463,000. It is located in the greater Auckland Region—the area governed by Auckland Council—which includes outlying rural areas and the islands of the Hauraki Gulf, and which has a total population of 1,715,600. While Europeans continue to make up the plurality of Auckland's population, the city became multicultural and cosmopolitan in the late-20th century, with Asians accounting for 31% of the city's population in 2018. With its large population of Pasifika New Zealanders, Auckland is also home to the biggest ethnic Polynesian population in the world. The Māori-language name for Auckland is Tāmaki Makaurau, meaning "Tāmaki desired by many", in reference to the desirability of its natural resources and geography.

Auckland Council Governing body of New Zealands Auckland Region

Auckland Council is the local government council for the Auckland Region in New Zealand. It is a territorial authority that has the responsibilities, duties and powers of a regional council and so is a unitary authority, according to the Local Government Act 2009, which established the council. The governing body consists of a mayor and 20 councillors, elected from 13 wards. There are also 149 members of 21 local boards who make decisions on matters local to their communities. It is the largest council in Oceania, with a $3 billion annual budget, $29 billion of ratepayer equity, and 9,870 full-time staff as of 30 June 2016. The council began operating on 1 November 2010, combining the functions of the previous regional council and the region's seven city and district councils into one "super council" or "super city".

Auckland Transport Transport organisation in Auckland, New Zealand

Auckland Transport (AT) is the council-controlled organisation (CCO) of Auckland Council responsible for transport projects and services. It was established by section 38 of the Local Government Act 2009, and operates under that act and the Local Government Act 2010.

Local government in New Zealand

New Zealand has a unitary system of government in which the authority of the central government defines sub-national entities. Local government in New Zealand has only the powers conferred upon it by the New Zealand Parliament. In general, local authorities are responsible for enabling democratic local decision-making and promoting the social, economic, environmental, and cultural well-being of their communities, as well as more specific functions for which they have delegated authority.

References

  1. 1 2 3 4 5 Lee, Mike (July 2010). "From the Chairman". Region Wide. Auckland Regional Council. p. 1.
  2. 1 2 John Edgar 2012 Urban Legend Sir Dove-Meyer Robinson. Hodder Moa.
  3. Submission to the Auckland Governance Legislation Select Committee, Auckland Regional Council, 26 June 2009
  4. History of Auckland City – Chapter 4 Archived 13 May 2008 at the Wayback Machine (from the Auckland City Council website. Accessed 7 June 2008)
  5. "Parks for everyone, forever". Region Wide. Auckland Regional Council. July 2010. p. 4.
  6. "Archived copy" (PDF). Archived from the original (PDF) on 12 February 2013. Retrieved 28 October 2012.{{cite web}}: CS1 maint: archived copy as title (link)
  7. 1 2 3 "Auckland Underground". Archives New Zealand . Retrieved 1 April 2015.
  8. Mees, Paul; Dodson, Jago (1 February 2001). "The American Heresy: Half a century of transport planning in Auckland". Presentation to joint conference of New Zealand Geographical Society / Australian Institute of Geographers conference, University of Otago, Dunedin. Urban Planning Program, Faculty of Architecture, Building & Planning, University of Melbourne. Retrieved 9 February 2011.
  9. "START...STOP...A FILM ABOUT THE AUCKLAND RAPID TRANSIT PROJECT 1974-1975". ngataonga.org.nz. Retrieved 28 June 2018.
  10. Gibson, Anne (3 November 2010). "Auckland council washing its hands of former HQ". The New Zealand Herald . Retrieved 14 March 2011.
  11. "John Law: Our mayors should anchor the ARC". The New Zealand Herald. 6 November 2006.
  12. "Supersized rates bill for super city". The New Zealand Herald. 9 September 2006.
  13. "Public transport funding gap highlighted in ARC Draft LTCCP Archived 12 December 2006 at the Wayback Machine ". ARC press release. 27 February 2005.
  14. Transport – How we will do this (from the Summary Draft Annual Plan and amendments to the ten-year plan leaflet, April 2007, Page 4)
  15. Regional parks – How we will do this (from the Summary Draft Annual Plan and amendments to the ten-year plan leaflet, April 2007, Page 6)
  16. Natural environments and heritage – How we will do this (from the Summary Draft Annual Plan and amendments to the ten-year plan leaflet, April 2007, Page 8)
  17. Various sections (from the Summary Draft Annual Plan and amendments to the ten-year plan leaflet, April 2007, Page 7-11)
  18. "Timeline of Auckland Mayors: An Online Exhibition". Auckland Council Archives. Retrieved 17 July 2022.
  19. "The father of Manukau City". Archived from the original on 24 July 2011. Retrieved 14 March 2011.
  20. Orsman, Bernard (23 January 2002). "ARC chairman Phil Warren dies of a heart attack". The New Zealand Herald.
  21. "Obituary: Hugh Aimer". The New Zealand Herald. 23 March 2002.
  22. "Anew NZ". Archived from the original on 21 July 2011. Retrieved 14 March 2011.
  23. Premier and Regional Parks "Premier and regional parks". Archived from the original on 30 October 2012. Retrieved 22 October 2012.