Northern Busway, Auckland

Last updated

Northern Busway
Northern Busway Auckland.jpg
The Northern Busway (right) adjacent to Akoranga station
Overview
StatusOpen
Owner Auckland Transport
LocaleNorth Shore, Auckland
Termini
Stations6
Service
TypeBusway
System AT Metro
Services NX1, NX2, 83, 866
Operator(s)AT Metro
History
Opened2008
Technical
CharacterUrban rapid transit
Route map

Contents

BSicon lBHF.svg
BSicon KHSTa grey.svg
Hibiscus Coast
BSicon SKRZ-G4o.svg
State Highway 1 NZ.svg
SH 1
Northern
Motorway
BSicon lBHF.svg
BSicon STR grey.svg
Albany
BSicon SKRZ-G4o.svg
State Highway 1 NZ.svg
SH 1
Northern
Motorway
BSicon SKRZ-G1u.svg
McClymonts Road
BSicon SKRZ-G1o.svg
Greville Road
BSicon SKRZ-G1o.svg
Rosedale Road
BSicon SKRZ-G1o.svg
Constellation Drive
BSicon KBHFa.svg
BSicon STR grey.svg
Constellation
BSicon SKRZ-G1u.svg
Sunset Road
BSicon BHF.svg
BSicon STR grey.svg
Sunnynook
BSicon SKRZ-G1u.svg
Sunnynook Road
BSicon SKRZ-G1o.svg
Tristram Avenue
BSicon SKRZ-G1o.svg
Wairau Road
BSicon BHF.svg
Smales Farm
BSicon SKRZ-G1u.svg
Northcote Road
BSicon BHF.svg
Akoranga
BSicon SKRZ-G1u.svg
Esmonde Road
BSicon RP2CONT2.svg
BSicon RP2c3.svg
BSicon STRf.svg
State Highway 1 NZ.svg
SH 1
Northern
Motorway
BSicon RP2c1.svg
BSicon RP22+4.svg
BSicon STR2.svg
BSicon RP2c3.svg
BSicon lhSTRc3a.svg
Onewa Road interchange
BSicon RP2c1.svg
BSicon lhSTRc1a.svg
BSicon RP2CONT4.svg
BSicon uexhCONT4.svg
Key
BSicon STRq.svg
dedicated busway lanes
BSicon RP2q.svg
highways
BSicon RP1q.svg
local roads
Northern Busway, Auckland
Map

The Northern Busway is a segregated busway that runs along the eastern side of the Northern Motorway, part of State Highway 1, in the north of Auckland, New Zealand, linking the North Shore with the northern end of the Auckland Harbour Bridge. As of May 2022, the busway consists of two-way lanes running between Albany Station and Akoranga Station, and from Akoranga Station a southbound-only lane that joins the Harbour Bridge approaches just south of the Onewa Road on-ramp system. The busway previously ended at Constellation before an extension to Albany was constructed in 2022.

Six stations provide access points for passengers to board; some stations have park and ride parking spaces; others have drop off and pick up zones only.

City-bound Northern Express (NX1 and NX2) services commence from Hibiscus Coast Station or Albany Station; from Albany, the lanes reduced travel time to Britomart Transport Centre from around one hour by car during peak hours to about half an hour by bus. [1] In the reverse direction, NX1 and NX2 services leaving the city travel north to the Akoranga off-ramp, cross over the motorway, and enter Akoranga Station, from where they travel north on the busway lanes. The busway lanes are also an important transport link within the North Shore, where they are the spine of the bus-based public transport system.

History

Background

Prior to 2000, indicative scheme and station planning was undertaken by International Transport Planning Consultants (McCormick Rankin International) who were engaged by Serco on behalf of Transit.

In 2000, the North Shore Busway Office was established with a team to focus both on the overall scheme as well as the station components. This reflected the nature of the proposed funding. McCormick Rankin undertook refined schematic design and the Busway Team focused on the community consultation and funding programmes. Original plans included a Northcote Point station proposed for Stafford Road, which Northcote residents lobbied against, and was removed from the plan in December 2000. [2]

The ARC held a regional Station Theming Design Competition in 2001 to select a consultant to develop a Theming Manual for application across all major public transport stations to the Auckland Region. This provided a distinctive design signature to the region visually linking all public transport facilities. MARIO MADAYAG/Jasmax Architects were selected as winners for the competition with part of their benefit being their commission on this concept design exercise. The ARC separately engaged MARIO MADAYAG/Jasmax to develop the Theming Manuals within the set parameters of that project. The project ran in parallel with the busway station concept design exercise but was heavily integrated as the pedestrian overbridge, stair lift towers and waiting enclosure developed concepts for the Busway were integrated with the Theming Manual. [3] [4] [5]

Concept, design and construction

Passengers boarding a Maxx-branded Northern Express service operated by Ritchies Transport in 2008 Aklbusway14.jpg
Passengers boarding a Maxx-branded Northern Express service operated by Ritchies Transport in 2008
Smales Farm Station, shortly before the busway opening Smales Farm Busway Station Almost Done.jpg
Smales Farm Station, shortly before the busway opening

Concept design for the busway was developed by MRCagney (formerly McCormick Rankin Cagney), with detailed design and consultation completed by Mario Madayag Architecture, Jasmax, Beca Group, Opus and Connell Wagner. Fletcher Construction was responsible for construction. Akoranga, Smales Farm, and Sunnynook stations were built by NZ Strong Construction. [6] [7] [8]

Difficulties encountered included the nearby residential areas, the predominantly soft ground, and environmental efforts to protect New Zealand dotterel breeding grounds. Construction employed around 300 people at its peak, with around a million man-hours being invested, including shifts during 512 nights. [8] [9]

A proposed station at Onewa was cancelled after local residents petitioned and protested against the scheme – claiming that it would increase traffic on neighbourhood streets. [10] [11]

Operation

The busway was officially opened in February 2008 [12] after several years of construction, though the Albany and Constellation stations had been operating since December 2005 using the normal Northern Motorway lanes. [13] It was credited with reducing peak traffic on the Northern Motorway by around 500 cars each rush hour one month after opening, [14] and about 39% of passengers on the Northern Express bus service had never used public transport before. [8] The busway was initially used by 70 buses per hour during peak time. [9]

In 2008, the busway received the 'Shell Bitumen Excellence Award for a Major Roading Project' and the 'Roading New Zealand Supreme Award'. [15] In June 2009, it received the Ingenium 'Excellence Award' (in the category for projects above NZ$2 million construction cost). [16]

In June 2010, the busway carried its 5 millionth passenger and was estimated to remove the equivalent of about 5,100 cars in the morning peak, with 80 buses per hour during peak times. [17]

By mid-2011, frequency of the Northern Express had risen to every three minutes during the morning peak hour, five minutes during the 'shoulder peak'. [18]

In 2015, some Northern Express services were extended to Hibiscus Coast busway station (formerly named Silverdale Park and Ride). [19]

In 2017, Auckland Transport's projections indicated that the busway would reach maximum capacity in 2026, twenty years earlier than originally expected. AT's report said that increased patronage would "manifest in overcapacity conditions and poor operational performances" at Albany, Sunnynook and Akoranga stations. AT was investigating a range of improvements, including lengthening station platforms. A decision on a timeline for conversion of the busway to a rail link was expected to be announced before the end of 2017. [20] In the 12 months to December 2018, the busway carried nearly 6 million passengers. [21]

In May 2022 the extension of the busway between Constellation and Albany was opened. [22]

Funding

The busway became fully operational in 2009, with some final sections being completed with little publicity, for around NZ$290–294 million: $210 million for the busway and $84 million for the stations. [23] [24] The project was funded by Transit New Zealand, ARTA, Auckland City Council and North Shore City Council. [9]

Infrastructure

Entrance to Constellation busway station Aklbusway07.jpg
Entrance to Constellation busway station

Busway

The busway has two lanes for 6.2 km [25] running parallel with the eastern side of the Northern Motorway from Albany Station to Akoranga Station at the Esmonde Road interchange, [26] from where a one-way southbound bus lane extends a further 2.5 km to south of the Onewa Road interchange, where it merges with the motorway for the Harbour Bridge. [8] There are no dedicated bus lanes on the bridge itself.

Its use is limited to Auckland Transport approved buses, emergency and maintenance vehicles. [23] Since August 2021, SkyBus no longer operates in Auckland. [27] The busway has been designed for possible use by car pools. [28]

Bus stations

Smales Farm bus station from north in 2019 Smales Farm bus station.jpg
Smales Farm bus station from north in 2019

The busway includes six dedicated stations, some with extensive park-and-ride car parks. Feeder bus services serve the stations, allowing transfer.

The stations are (north to south): [6] [25] All stations provide shelters and cycle parking – with glass walls, low planting, night lighting and CCTV to enhance security. [29]

Hibiscus Coast

Located in Silverdale, this station was originally a park and ride before being converted into a busway. It was officially opened as a busway station in February 2021. [30] The station has services Waiwera, Orewa, Gulf Harbour, Manly and, Warkworth. [31]

Albany

Located in Albany. The Albany park and ride station was opened in November 2005. [32]

Constellation

Located near Constellation Drive. Construction for a park and ride began in 2003 and was finished in November, 2005. [33]

Sunnynook

Located in Sunnynook. Construction began in 2005 and finished in February 2008. [34]

Smales Farm

Located in Takapuna it has a customer service centre. [35]

Akoranga

Akoranga bus station is located in Northcote. [36]

Akoranga - the footbridge leads to the western side of the motorway and AUT campus Aklbusway25.jpg
Akoranga – the footbridge leads to the western side of the motorway and AUT campus

Other structures

Major related structures are the new Esmonde Interchange (including large-scale improvements for general traffic) and Tristram Avenue Viaduct, which crosses the often-congested Tristram Avenue via grade separation. The viaduct has 12 spans of 30 m each, with the foundation piles being 1.5 m thick. [26]

Electricity transmission cables

Cable ducts were placed beneath the busway during the construction in 2005, to provide for the future installation of electricity transmission cables. The cables installed in these ducts during 2012 and 2013 form part of a major upgrade to the security of supply to North Auckland and Northland. [37] [38]

Plans

Sunnynook, the smallest of the six stations. Aklbusway16.jpg
Sunnynook, the smallest of the six stations.

By 2015, plans were unveiled to extend the busway lanes northwards between Constellation Station to Albany Station. [39] This was completed in 2022.

An extension towards Orewa in the north is being debated for the long-term future. It was originally expected to cost around NZ$500 million, [24] although the success of the scheme has now sparked potentially more extensive schemes for between NZ$700 million and NZ$1.2 billion to at least Silverdale, with up to five tunnels and seven bridges, including a motorway flyover between Constellation and Albany stations. Plans in 2008 included additional stations at Rosedale and Redvale. [40]

In December 2017, plans were released for a $70 million station at Rosedale, situated between the Albany and Constellation stations. The station would be sited on Arrenway Drive with platforms extending across Rosedale Road for bus transfers to other routes. A construction start date of mid-2019 and opening in 2021 were proposed. [41] Resource consent was granted in 2020 and construction of the new station is expected to begin in late 2024. [42]

Conversion to rail-based transit

The Northern Busway's usage is tracking towards capacity being reached by 2030. Auckland Transport have studied the future mass transit needs for the North Shore, with light rail being determined the most flexible mode compared to other rail-based options. [43]

See also

Related Research Articles

<span class="mw-page-title-main">North Shore, New Zealand</span> Subregion of Auckland, New Zealand

The North Shore is one of the major geographical regions of Auckland, the largest city in New Zealand. The area is defined as the northern shores of the Waitematā Harbour as far north as the Ōkura River.

<span class="mw-page-title-main">Auckland Harbour Bridge</span> Road bridge in Auckland, New Zealand

The Auckland Harbour Bridge is an eight-lane motorway bridge over the Waitematā Harbour in Auckland, New Zealand. It joins St Marys Bay on the Auckland city side with Northcote on the North Shore side. It is part of State Highway 1 and the Auckland Northern Motorway. The bridge is operated by the NZ Transport Agency (NZTA). It is the second-longest road bridge in New Zealand, and the longest in the North Island.

<span class="mw-page-title-main">Eastern Transport Corridor</span>

The Eastern Transport Corridor in Auckland, New Zealand, is a transport reserve along a strip of land and water some of which is occupied by housing, commerce, industry and local roads. It runs adjacent to the North Island Main Trunk freight and passenger railway line.

<span class="mw-page-title-main">Northcote, Auckland</span> Suburb in Auckland, New Zealand

Northcote is a suburb of Auckland in northern New Zealand. It is situated on the North Shore, on the northern shores of Waitematā Harbour, 4 kilometres (2.5 mi) northwest of the Auckland City Centre. The suburb includes the peninsula of Northcote Point where the northern approaches to the Auckland Harbour Bridge are located, and Northcote Central, the commercial centre of Northcote. Northcote features two volcanic maars.

Whangaparāoa Peninsula Suburban area in Auckland Council, Auckland, New Zealand

The Whangaparāoa Peninsula is a suburban area about 30–50 km north of Auckland, New Zealand. It had 33,390 residents in 2018. It stretches from Red Beach, where it connects to Kingsway, Orewa and Silverdale, and extends to Army Bay in the Hauraki Gulf. It is part of the Hibiscus Coast. The area is populated by residents who work on the peninsula, or commute from the area to other parts of the Hibiscus Coast, the North Shore, Rodney district, Auckland CBD and beyond for work. They travel by vehicle, or via the Gulf Harbour ferry at Gulf Harbour Marina, or the Hibiscus Coast Bus Station at Silverdale. There is one main road along its entire length, which is accessible from State Highway 1 via Hibiscus Coast Highway at Silverdale, or from Hibiscus Coast Highway at Orewa via Red Beach. It is popular as a tourist destination for catching a ferry to Tiritiri Matangi Island, and for visiting Shakespear Regional Park. It has one open (Whangaparāoa Golf Club) and one closed golf club (Gulf Harbour Country Club), beaches, sporting and recreation facilities, a library, shops, businesses and public and private primary and secondary schools. The median age of the population is in the 30s-40s.

<span class="mw-page-title-main">Albany, New Zealand</span> Suburb in Auckland, New Zealand

Albany is one of the northernmost suburbs of the contiguous Auckland metropolitan area in New Zealand. It is located on the North Shore, 15 kilometres (9 mi) northwest of the Auckland city centre. Albany is found at the headlands of Lucas Creek, and was the location of a portage used by Tāmaki Māori, where waka could be taken between the Upper Waitematā Harbour and the Okura River/Hauraki Gulf. During the 1840s, early European settlers established the village of Lucas Creek, which became by the 1880s had become a major fruit growing centre in Auckland. The town voted to change the name from Lucas Creek to Albany in 1890.

<span class="mw-page-title-main">Māngere Bridge (bridges)</span> Bridge in New Zealand

Māngere Bridge, officially also called the Manukau Harbour Crossing, is a dual motorway bridge over the Manukau Harbour in south-western Auckland, New Zealand, crossing between the suburb also known as Māngere Bridge and the suburb of Onehunga.

<span class="mw-page-title-main">State Highway 1 (New Zealand)</span> Road in New Zealand

State Highway 1 is the longest and most significant road in the New Zealand road network, running the length of both main islands. It appears on road maps as SH 1 and on road signs as a white number 1 on a red shield, but it has the official designations SH 1N in the North Island, SH 1S in the South Island.

<span class="mw-page-title-main">Central Motorway Junction</span> Road junction in New Zealand

The Central Motorway Junction or CMJ, is the intersection of State Highways 1 and 16, just south of the central business district of Auckland. A multilevel structure, it has been described as a "fiendishly complicated, multi-layered puzzle of concrete, steel and asphalt". Carrying around 200,000 vehicles a day, it is one of the busiest stretches of road in New Zealand.

Transport in Auckland, New Zealand's largest city, is defined by factors that include the shape of the Auckland isthmus, the suburban character of much of the urban area, a history of focusing investment on roading projects rather than public transport, and high car-ownership rates.

<span class="mw-page-title-main">Auckland Northern Motorway</span> Motorway located in Auckland, New Zealand

The Auckland Northern Motorway in the Auckland Region of New Zealand links Central Auckland and Warkworth in the former Rodney District via the Hibiscus Coast and North Shore. It is part of State Highway 1.

<span class="mw-page-title-main">Auckland Southern Motorway</span> Road in New Zealand

The Auckland Southern Motorway is the major route south out of the Auckland Region of New Zealand. It is part of State Highway 1.

<span class="mw-page-title-main">Sunnynook, New Zealand</span> Suburb in Auckland, New Zealand

Sunnynook is a suburb on the North Shore in the Auckland metropolitan area in New Zealand. It is currently under the governance of Auckland Council.

<span class="mw-page-title-main">Ritchies Transport</span>

Ritchies Transport is a New Zealand private bus operator, owned by KKR. It was established in 1972 and describes itself as "the largest privately owned bus and coach transport operator in New Zealand" with a fleet of over 1500 vehicles spread across depots nationwide. It owns a 46% stake in InterCity.

<span class="mw-page-title-main">Public transport in Auckland</span>

Public transport in Auckland, the largest metropolitan area of New Zealand, consists of three modes: bus, train and ferry. Services are coordinated by Auckland Transport (AT) under the AT and AT Metro brands. Waitematā railway station is the main transport hub.

<span class="mw-page-title-main">Bike Auckland</span>

Bike Auckland, formerly Cycle Action Auckland (CAA) is a pro-cycling advocacy group in Auckland, New Zealand. The predominantly volunteer group aims to improve infrastructure and conditions, as well as perceptions of cycling to encourage more "everyday people" to use bicycles, including for commuting and recreation.

<span class="mw-page-title-main">Second Harbour Crossing, Auckland</span>

The Second Harbour Crossing is the name given to the proposed second transport link across the Waitematā Harbour in Auckland, New Zealand. Planners have also referred to new links across the harbour as the Additional Waitematā Harbour Crossing (AWHC) or the Waitematā Harbour Connections.

<span class="mw-page-title-main">SkyBus (airport bus)</span> Australian airport bus service

SkyBus is an airport bus service operating in Australia in Melbourne and Hobart.

The North Auckland and Northland (NAaN) grid upgrade project reinforced transmission into the Auckland Region and across the harbour to North Auckland and the Northland Region. It added new 220 kV transmission capacity to the National Grid by providing 37 km of underground cable between the Pakuranga, Penrose, and Albany substations.

<span class="mw-page-title-main">Eastern Busway, Auckland</span> Busway project that is under construction

The Eastern Busway, also known as AMETI, is Auckland's first urban busway under construction in the southeastern suburbs of Panmure, Pakuranga and Botany, in Auckland. The first section of the busway, between Panmure and Pakuranga, opened in December 2021. The entire project is expected to be complete by 2027.

References

  1. Rail electrificationRegion Wide, Auckland Regional Council newsletter, June 2007, Page 3
  2. Thompson, Wayne (5 December 2000). "Locals halt busway station". The New Zealand Herald . Retrieved 20 February 2024.
  3. "Transport Network Design Winners Announced". Scoop News.
  4. Council, Auckland. "The Northern Busway". Auckland Council. Archived from the original on 1 March 2020. Retrieved 1 March 2020.
  5. North Shore Busway Station Concept Design Brief Prepared by BRT Project Team 24 April 2002 File G72 Concept Design
  6. 1 2 Northern Busway Project (PDF) (Map). 1 : 4,000. NZ Transport Agency. Archived from the original (PDF) on 8 October 2007. Retrieved 12 August 2014.
  7. North Shore Busways Archived 14 October 2008 at the Wayback Machine (from the NZ Strong Construction company website. Accessed 3 March 2008.)
  8. 1 2 3 4 Dedicated busway a roaring successLG, New Zealand Local Government, March 2008, Volume 44 No 03
  9. 1 2 3 Busway bits 'n' piecesRegion Wide, newsletter of the Auckland Regional Council, March 2008, Page 4
  10. "Locals halt busway station – New Zealand News". NZ Herald. Archived from the original on 28 December 2022. Retrieved 28 December 2022.
  11. "U-TURN ON BUS STOP – Aucklander News". NZ Herald. Archived from the original on 28 December 2022. Retrieved 28 December 2022.
  12. "Multi-million dollar busway opens". Television New Zealand . 2 February 2008. Archived from the original on 16 May 2011. Retrieved 1 November 2011.
  13. Northern Busway The New Zealand Herald , Saturday 30 June 2007, Page C6
  14. Busway reduces cars by 500 each rush hourRegion Wide, newsletter of the Auckland Regional Council, March 2008, Page 4
  15. "Busway wins excellence award". The New Zealand Herald . 26 August 2008. Archived from the original on 22 May 2011. Retrieved 1 November 2011.
  16. "Northern Busway wins award". The New Zealand Herald . 8 June 2009. Archived from the original on 20 October 2012. Retrieved 1 November 2011.
  17. "Like a railway, but with buses". Region Wide. Auckland Regional Council. July 2010. p. 2.
  18. "Keeping our region moving". Our Auckland. Auckland Council. July 2011.
  19. "New Hibiscus Coast bus network revealed by Auckland Transport". Stuff.co.nz. 7 July 2015. Archived from the original on 28 September 2018. Retrieved 23 July 2017.
  20. "Plans for rail line through Auckland's North Shore to be determined this year". Stuff.co.nz. 14 March 2017. Archived from the original on 15 July 2017. Retrieved 16 July 2017.
  21. "Oct-18 Ridership". Greater Auckland. 29 November 2018. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  22. "Auckland's Northern Busway extension opens today". Archived from the original on 8 May 2022. Retrieved 8 May 2022.
  23. 1 2 Welcome to the Northern Busway Archived 8 October 2007 at the Wayback Machine (from the official project website)
  24. 1 2 Following the moneye.nz magazine, IPENZ January/February 2007
  25. 1 2 "SH1 Northern Busway". NZ Transport Agency. Archived from the original on 17 September 2016. Retrieved 22 March 2016.
  26. 1 2 Busway the way of the future for North ShoreLG, New Zealand Local Government, May 2007, Volume 43 No 05
  27. "Auckland Skybus - Shuttle Bus To Auckland Airport | Heart of the City". heartofthecity.co.nz. Retrieved 9 September 2024.
  28. "On the bus". Auckland Transport. Archived from the original on 25 March 2016. Retrieved 22 March 2016.
  29. Frequently Asked Question Archived 29 April 2008 at the Wayback Machine (from the North Shore City Council website. Accessed 21 March 2008.)
  30. "North Auckland gets public transport upgrade". Beehive. Retrieved 6 July 2024.
  31. "Warkworth Kowhai Coast Northern Bus Timetable" (PDF). 30 September 2018. Archived from the original (PDF) on 28 September 2018. Retrieved 27 September 2018.
  32. "Northern Busway". 7 December 2006. Archived from the original on 7 December 2006. Retrieved 11 September 2022.
  33. "New Zealand's first Park & Ride bus stations open Sunday 04/10/05". 29 April 2008. Archived from the original on 29 April 2008. Retrieved 3 October 2021.
  34. "Northern Busway". 14 May 2010. Archived from the original on 14 May 2010. Retrieved 29 December 2021.
  35. "Custom service centres". Auckland Transport. Retrieved 7 July 2024.
  36. "Man allegedly threatened to shoot and stab Auckland bus passengers". 1news. TVNZ. Retrieved 7 July 2024.
  37. "Transpower 220 kV Auckland CBD Cable Ducts Project". Transpower. 18 May 2006. Retrieved 5 April 2012.
  38. "$415m cable project to protect power supply". NZ Herald. 21 October 2011. Archived from the original on 12 March 2016. Retrieved 31 March 2012.
  39. "Northern Corridor Newsletter – August 2015 21 August 2015" (PDF). New Zealand Transport Agency. 21 August 2015. Archived (PDF) from the original on 14 February 2016. Retrieved 18 May 2016.
  40. Dearnaley, Mathew (13 November 2008). "Buzzing busway could get even bigger". The New Zealand Herald . Archived from the original on 23 May 2011. Retrieved 1 November 2011.
  41. "Businesses, students to benefit from new bus station on Auckland's Northern Busway". Stuff.co.nz. 8 December 2017. Archived from the original on 13 December 2017. Retrieved 13 December 2017.
  42. "BRosedale Busway Station". Auckland Transport . Retrieved 16 May 2024.
  43. "North Shore rapid transit network". Auckland Transport. Archived from the original on 16 February 2019. Retrieved 15 June 2019.
  44. "About Us | Tranzurban". Tranzurban. 2018. Archived from the original on 23 July 2018. Retrieved 2 October 2018. Tranzurban is the newest addition to Tranzit Group and will operate a part of the new North Shore bus network from September 2018 in collaboration with Auckland Transport.