Auckland light rail | |
---|---|
Overview | |
Area served | Auckland, New Zealand |
Transit type | Light rail |
Number of lines | 1 |
Website | www |
Technical | |
System length | 24 km (14.9 mi) |
Between 2015 and 2023, Auckland, New Zealand's largest city, considered introducing light rail lines to replace some of its most heavily used bus routes. [1] Many of these new light rail lines would have reused the routes of Auckland's former tram system. [2] Light rail systems have been proposed in Auckland throughout the late-20th and early 21st centuries following the closure of the tram system in the 1950s. [2]
In 2015, the city's transport agency Auckland Transport proposed a new light rail network - with a focus on a line between the Auckland CBD and Auckland Airport. [1] In subsequent years, various technology types and modes were proposed by local and central government - including traditional street tramways and light metro. The most recent form of the project, proposed by the Sixth Labour Government, would have seen the construction of a hybrid underground/surface route. [3] The project was cancelled by the National-led coalition government in January 2024. [4]
Auckland was served by a network of traditional tramcar routes with horse-drawn trams (1884–1902) and electric trams (1902–1956). [5] [6] The original tram network was 72 kilometres (45 mi) in length at its fullest extent from the mid-1930s until closures began in 1949. [7]
In 2015, Steve Hawkins, Auckland Transport's Chief Engineer, said that the bus routes on Symonds Street and Fanshawe Street require as many as 150 buses each. [8] The light rail study is considering replacing the bus routes on Dominion Road, Manukau Road, Mt Eden Road, Symonds Street and Queen St with light rail routes. All of these bus routes replaced routes on Auckland's former tram network.
Stuff quoted Auckland Transport officials who described how the study was considering the option of building light rail routes with dedicated right of way versus routes where rail vehicles shared the road with other vehicles, as with a traditional streetcar system. [8] Officials projected that the maximum passenger capacity of a segregated light rail line would be 18,000 passengers per hour, while that of a street-running system would be 12,000 passengers per hour. This compares with a bus on a shared path shifting 2,500 people and a bus on a priority path's 6,000 people an hour. [6]
In 2015, then Auckland Mayor Len Brown pointed out that the city's ten-year plan did not include funding for building new light rail routes. [8]
A line from the airport east to Botany Downs has also been proposed with a new interchange at Puhinui railway station, planned to be built in two stages, the first of which is said to be an early deliverable component of the Airport to Botany rapid transit line, planned to be operational by the end of 2020/early 2021. This encompasses a new at-grade bus/rail interchange and enhanced station. Buses will still use the existing local road (Bridge Street) to cross the railway line to/from Manukau, along with local traffic. The second phase provides a rapid transit overbridge across the railway line to provide a more direct and bespoke rapid transit connection. The new rapid transit link will integrate with the new interchange station on the overbridge. The first stage is estimated to cost $59 million to construct. [9] The line will also go through Manukau railway station before ending in Botany. [10] [11]
On 26 April 2018, Mayor Phil Goff and Transport Minister Phil Twyford announced the Auckland Transport Alignment Project 2018 with $NZ28 billion of investment in Auckland transport infrastructure over ten years, including the fast-tracking of light rail to Auckland International Airport. [12] [13]
On 9 May 2018, in a pre-Budget announcement, Twyford and Finance Minister Grant Robertson made the surprise announcement that work on two routes would commence immediately, with an open-tender process for funding, construction, and operation of the lines: [14]
In May 2018, it was announced that the New Zealand Superannuation Fund had expressed an interest in financing, designing, building and operating Auckland's light rail network, in a consortium with CDPQ Infra, a Canadian infrastructure company. The consortium was named NZ Infra. [14]
By early 2019, the cost of the two lines had been estimated at $6 billion, with an underground alignment through Queen St under consideration. [15]
In August 2019, Mayor Phil Goff announced that work on the light rail network might begin the following year. [16] The same month, two delivery partners for the project were shortlisted; NZ Infra and NZ Transport Agency, but it was stated that a 2020 start date would be unlikely. [17] By late 2019, two different types of technology were being considered by the New Zealand Ministry of Transport. The original proposal from the New Zealand Transport Agency consisted of surface level light rail; the other from NZ Super Fund explored fully grade-separated, driverless light metro technology, with an underground alignment through Queen St and elevated sections elsewhere, with fewer stations between the city centre and airport. [18] [19]
In May 2020, it was reported that the light rail project had been placed on hold due to the impact of the COVID-19 pandemic in New Zealand. [20] In June, Twyford confirmed that the Ministry of Transport was still committed to the project, but as a fully grade-separated light metro line between the city and airport; [21] stating that "Our policy is that light metro is the form of rapid transit that Auckland needs. We've decided very clearly that we need a rapid transit system that's not competing with pedestrians and other cars in the road corridor. A light metro system just like you see in London, New York, Tokyo, Paris, is actually faster and more efficient. It would allow you to get from Queen St to the Airport in 30 minutes as opposed to the 47 minutes that was projected for the old streetcar model Auckland Transport developed."
The ministry did not release the updated cost of the new light metro proposal, or any time frame for its construction. However, industry commentators estimated that the decision to use the metro mode would increase cost of the two lines from $6 billion to more than $20 billion, with a new design and construction period of 8 to 10 years beginning from 2021 at the earliest. [22]
In January 2022, the New Zealand government confirmed it had endorsed a $14.6 billion "Tunnelled Light Rail" line from the city centre to the airport, featuring an underground line between the city centre and Mount Roskill, which would then emerge to the surface and continue to the airport via Māngere. In October 2022, Auckland Light Rail Limited was established to further work on the project. [23] Minister for Transport Michael Wood indicated construction could begin in 2023 and last six to seven years. [24]
Following the 2023 General Election, the incoming Prime Minister, Christopher Luxon, told media that his government would be cancelling the project "because it’s a white elephant”. [25]
However, Auckland mayor Wayne Brown contended that the project could be built at a fraction of the cost of previous options, citing overseas projects such as the light rail network in the French city of Angers which cost just $53 million per kilometre, against the $375 million which he described as being the current cheapest option for the route. [26]
On 29 November 2023, under their 100-day plan, the National-led government undertook to stop central government work on the Auckland Light Rail project. [27] However, Auckland Transport chief executive Dean Kimpton said light rail was still an option for the city - if above ground. [28] Nevertheless, on 14 January 2024, Simeon Brown, Minister of Transport in the new National-led coalition government, instructed Auckland Light Rail Limited to immediately cease work on the project and take the necessary steps to wind up the company. Brown described the projected $29.2 million cost of the Light Rail project as unsustainable. He also criticised the previous Labour government for spending NZ$228 million on the project over the past six years with little to show for it. Brown confirmed that the Government would continue work on the City Rail Link, which had been started the previous National Government. [4]
A Government Cabinet paper revealed that the disestablishment of the Ministry of Transport’s work on the project was estimated to cost millions of dollars spent over six months and would involve the disposal of property and land, and settling obligations, coming after an alleged $228m had already been spent on the project without a metre of track laid. [29]
The business case for the cancelled project was released in February 2024, showing that every dollar invested would have brought an economic benefit of $NZ2.40. [30]
The City Centre-Māngere line was planned to run from Wynyard Quarter to Auckland Airport; via the Auckland CBD, University of Auckland, Kingsland railway station, Wesley, Mount Roskill, Onehunga and Māngere. There would have been be a total of 18 stops with trains running every five minutes. While the line between Wynyard Quarter and Mount Roskill would have been tunnelled, the rest of the network would have been a surface line running alongside State Highway 20. [31] [32]
Transport in New Zealand, with its mountainous topography and a relatively small population mostly located near its long coastline, has always faced many challenges. Before Europeans arrived, Māori either walked or used watercraft on rivers or along the coasts. Later on, European shipping and railways revolutionised the way of transporting goods and people, before being themselves overtaken by road and air, which are nowadays the dominant forms of transport. However, bulk freight still continues to be transported by coastal shipping and by rail transport, and there are attempts to (re)introduce public transport as a major transport mode in the larger population centres.
Auckland International Airport is an international airport serving Auckland, the most populous city of New Zealand. It is the largest and busiest airport in the country, with over 16 million passengers served in the year ended August 2023. The airport is located near Māngere, a residential suburb, and Airport Oaks, a service-hub suburb 21 kilometres (13 mi) south of the Auckland city centre. It serves as the principal hub for Air New Zealand, and the New Zealand operating base for Jetstar.
Botany Town Centre is a large shopping mall and lifestyle centre located in Auckland, New Zealand. It has more than 200 stores spread across three complexes, including restaurants and entertainment buildings such as cinemas. It is situated at the corner of Ti Rakau Drive and Chapel Road in the suburb of East Tāmaki, and was opened in 2001.
The Onehunga Branch railway line is a section of the Onehunga Line in Auckland, New Zealand. It was constructed by the Auckland Provincial Government and opened from Penrose to Onehunga on 24 December 1873, and extended to Onehunga Wharf on 28 November 1878. It is 3.6 kilometres (2.2 mi) in length and is single-track only.
The Glasgow Airport Rail Link (GARL) is a proposed link between Glasgow City Centre and Glasgow Airport. The original plans for an airport rail link were proposed during the 2000s to directly link Glasgow Central station with Glasgow Airport in Scotland. The link was intended for completion by 2013 and would have had a service of four trains per hour via Paisley Gilmour Street railway station.
The Northern Busway is a segregated busway that runs along the eastern side of the Northern Motorway, part of State Highway 1, in the north of Auckland, New Zealand, linking the North Shore with the northern end of the Auckland Harbour Bridge. As of May 2022, the busway consists of two-way lanes running between Albany Station and Akoranga Station, and from Akoranga Station a southbound-only lane that joins the Harbour Bridge approaches just south of the Onewa Road on-ramp system. The busway previously ended at Constellation before an extension to Albany was constructed in 2022.
Transport in Auckland, New Zealand's largest city, is defined by factors that include the shape of the Auckland isthmus, the suburban character of much of the urban area, a history of focusing investment on roading projects rather than public transport, and high car-ownership rates.
Urban bus transport is the main form of public transport in New Zealand. Two of the country's largest cities, Auckland and Wellington, also have suburban rail systems, while some cities also operate local ferry services. There are no rapid transit metros and no remaining tram systems active anywhere in New Zealand, though trams once had a major role in New Zealand's public transport.
Public transport in Auckland, the largest metropolitan area of New Zealand, consists of three modes: bus, train and ferry. Services are coordinated by Auckland Transport (AT) under the AT and AT Metro brands. Waitematā railway station is the main transport hub.
The Avondale–Southdown Line is a proposed railway line between Avondale and Southdown in Auckland, New Zealand. One of its main functions would be to remove north–south freight trains from parts of the Auckland rail system that have significant passenger traffic.
Dominion Road is an arterial road in Auckland, New Zealand, running north–south across most of the Auckland isthmus. It is a major public transport route that carries 50,000 bus passengers each week, making it one of the few roads in Auckland on which similar or greater numbers of people travel by public transport than by private car.
The Second Harbour Crossing is the name given to the proposed second transport link across the Waitematā Harbour in Auckland, New Zealand. Planners have also referred to new links across the harbour as the Additional Waitematā Harbour Crossing (AWHC) or the Waitematā Harbour Connections.
Urban rail transit in India plays an important role in intracity transportation in the major cities which are highly populated. It consists of rapid transit, suburban rail, monorail, and tram systems.
The City Rail Link (CRL) is a rail project currently under construction in Auckland, New Zealand. The project consists of a 3.5 km (2.2 mi) long double-track rail tunnel underneath Auckland's city centre, between Waitematā (Britomart) and Maungawhau railway stations. Two new underground stations will be constructed to serve the city centre: Te Waihorotiu near Aotea Square and Karanga-a-Hape near Karangahape Road. Waitematā will be converted from a terminus station into a through station, and Mount Eden station will be replaced by Maungawhau station, a new station with four platforms to serve as an interchange between the new CRL line and the existing Western Line.
The New Zealand AM class of electric multiple unit (EMU) was constructed for the electrification of Auckland's railway network. The class was introduced in 2014 with the first unit having arrived in September 2013. The units are classified AM, with the driving motor car with pantograph classified AMP, the middle trailer car AMT and the driving motor car without pantograph AMA. The trains are operated by Auckland One Rail for Auckland Transport under the AT Metro brand.
Transdev Australasia is an operator of bus, ferry, light rail and heavy rail services in Australia and New Zealand. It is a subsidiary of French-based, international Transdev. It was formed in 2013 by grouping the operations of Veolia Transport Australia and former Transdev together, as a result of the global rebranding from Veolia Transdev to Transdev.
The Auckland Airport Line was a proposed heavy rail line in Auckland, New Zealand, that would have linked Auckland Airport with the Auckland central business district via central isthmus suburbs.
Simeon Peter Brown is a New Zealand politician and Member of Parliament in the House of Representatives for the National Party.
Let's Get Wellington Moving was a proposal to improve Wellington's mass transit, public transport, infrastructure in walking and cycling, and state highways. It was run by the Wellington City Council, Greater Wellington Regional Council, and NZTA Waka Kotahi. First announced in May 2019, it was cancelled in December 2023.
The City Centre–Māngere Line was a planned Light Rail line in Auckland, New Zealand, intended to be the first line in the Auckland Light Rail network. The planned route for the line travelled from the City Centre to Auckland Airport in Māngere. Final plans were for part of the 24 km line to be underground, with a cost of $14.6 billion which would have made it the single biggest transport project in New Zealand history. The entire Auckland Light Rail project was cancelled by the National-led coalition government in January 2024.